ramps in 2006-07 sbnm in-service training stillwater, ok january 18-19, 2007

24
RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Upload: osborne-benson

Post on 19-Jan-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

RAMPs in 2006-07

SBNM In-Service TrainingStillwater, OKJanuary 18-19, 2007

Page 2: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

2006-07 Ramp Program

586 farmer’s fields have had Ramp Calibration Strips placed in them

Page 3: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Documenting Impact Each RCS has an

associated contact person who will collect sensor data. complete the data

sheet.

We know many of the fields have or will be receiving N soon.

Page 4: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

RCS Applicator Components

Page 5: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

We constructed a sprayer with sets of 4 StreamJet nozzles from TeeJet per location. Nozzles are spaced on 24 inch centers. The four nozzles are an 01, 02, 04, and 08. We are using a design pressure of 40 psi.

Page 6: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Nozzle Control

RCS Starts

RCS Ends

GPM flow rates are for 28% fertilizer solution.

Each step lasts approximately 10 feet.

SJ3-01 SJ3-02 SJ3-04 SJ3-08 GPM lbsN/acON ON ON ON 1.33 200

ON ON ON 1.24 187ON ON ON 1.15 173

ON ON 1.06 160ON ON ON 0.97 147

ON ON 0.88 133ON ON 0.80 120

ON 0.71 107ON ON ON 0.62 93

ON ON 0.53 80ON ON 0.44 67

ON 0.35 53ON ON 0.27 40

ON 0.18 27ON 0.09 13

0.00 0ON ON ON ON 1.33 200

Page 7: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Standard Industry ComponentsCan we build a ramp applicator with these?

Page 8: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Potential Road Blocks

Flow Limitations Orifice metering is pressure limited Quadruple the pressure to double the

flow

Potential Solutions VariTargetTM Nozzles Synchro PWM Variable Rate TurboDrop®

Page 9: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

VariTargetTM Nozzle

Variable

Orifice

Page 10: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

VariTargetTM Nozzle - Operation

Page 11: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

VeriTargetTM Flow Data

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

0 20 40 60 80 100 120

Pressure, psi

No

zzle

Flo

w,

GP

M

Mfg. DataStudent Data

They claim a 10x flow rate change with a 6.7x pressure change.

Data collected by OSU BAE students seem similar to mfg. data.

Page 12: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

VeriTargetTM Nozzle Flow

0.0

0.2

0.4

0.6

0.8

1.0

1.2

20 30 40 50 60 70 80

Pressure, psi

No

zzle

Flo

w,

GP

M

Flow data from three individual VeriTargetTM nozzles collected by OSU BAE students.

Page 13: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Should be released soon.

Double the pressure, double the flow rate.

Page 14: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Synchro Nozzles

Independent Flow Control (1-8X)

Independent Drop Size Control

Page 15: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Synchro Controller Components

Page 16: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

How it Works Uses high speed

solenoid valves to regulate flow

Varies application rate with duty cycle, independent of pressure

Page 17: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

What is Pulse Width? Type of control system Modulates a DC square wave signal

Page 18: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Spatial Information

Page 19: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

GreenSeeker Data Measuring NDVI

directly over the row with four sensors and between the rows with three sensors

Collected data from research plots and farmers’ fields on multiple dates

Page 20: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Estimating Canopy Closure

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

40 60 80 100 120

Days After Planting

ND

VI

0%

10%

20%

30%

40%

50%

60%

70%

80%

Over RowRow MiddleRatio

Page 21: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

40 60 80 100 120

Days After Planting

ND

VI

120 lbsN/ac [OR]

80 lbsN/ac [OR]

120 lbsN/ac [BR]

80 lbsN/ac [BR]

NDVI by Initial N Applied

Significant Difference

Page 22: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Ramp Task List

1. Read ramp strips/Save file2. Process data3. Record information on data sheet4. Mail copy of data sheet to me5. Download saved data files and email

to me

Page 23: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Ramps in 2007

Limited ramps in corn, cotton Some interest in bermuda, grazing Plans for wheat ??

Page 24: RAMPs in 2006-07 SBNM In-Service Training Stillwater, OK January 18-19, 2007

Wrap Up

We need to collect quality data from Ramp Calibration Strips

We need an ‘easier to build’ applicator

Randy Taylor111 Ag HallBiosystems and Agricultural EngineeringOklahoma State UniversityStillwater, OK 74078405-744-5277 voice405-744-6059 [email protected]