railway research and technology center (datem) · technology center (datem) atİla keskİn. datem...

22
RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) ATİLA KESKİN

Upload: others

Post on 09-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

RAILWAY RESEARCH AND

TECHNOLOGY CENTER (DATEM)

ATİLA KESKİN

Page 2: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

DATEM HISTORY

2

2009

TCDD Board Decision

2010Appointments and

Establishment of the Organization

2011Completing the Construction of

Administrative Buildings

2012 Completion of Geotechnical

Services Buildings and Laboratories

2018 Component Test Center,

Welding Center and EST Laboratory Completion

2016

Restructuring

2013 Completion of Material

Engineering Services Buildings and Laboratories

2019

Launch of Railway Welding Engineering

Services

Page 3: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

3

DATEM MANAGER

DATEM VICE MANAGER

Administrativeand Financial Department

Material andWelding

EngineeringServices

EST Engineering

Services

GeotechnicalEngineering

Services

TrackSuperstructure

EngineeringServices

Technical Project

Department

Standardisation, Certification

Engineering Services

QualityAssurance

Office

DATEMORGANIZATION CHART

Total of 78 employees

59 Engineers 12 Doctoral Candidate 1 Doctorate Degree 10 MSc Candidates 21 MSc Degree(some of graduated MSc from UK, German and Chinese Universities)

Page 4: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

4

DATEMORGANIZATION CHART

We support the graduate and doctoral students who study in the field of railway.

Page 5: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

• VisionIn order to create a better world and a happy society,

Conducting R&D studies for the railway technologies of the future,

Provide solutions for the railway sector,

Become an international organization that increases operational security, reducingcosts, developing of environment friendly technology

• MissionIn order to respond to needs and social challenges,

Investigating the development and research around the world in the field of railway,

Identifying needs and problems, providing new solutions or improving existing situations,

R&D and innovation studies.5

DATEM

Page 6: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

HORIZON 2020

6

H2020

EU FUNDED PROJECTS

SHIFT2RAIL

SHIFT2RAIL

INITIATIVE

EUROC UIC

TCDD

Supporters RICG

IRRB

Page 7: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

7

Germany

Germany Sweden

FranceSpain

Sweden

ItalyPortugal

England

Germany Germany

Spain

Turkey

OUR PROJECT PARTICIPANTS

England Holland

Page 8: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

8

SHIFT2RAILINNOVATION PROGRAMMES (IP)

TCDD participates in IP3 projects.

Page 9: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

From 2011 to present:

Completed projects 10

Ongoing projects 2

To be launched projects 2

9

EU FUNDED PROJECTS

Page 10: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

10

EU FUNDED PROJECTSCOMPLETED PROJECT

Page 11: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

11

EU FUNDED PROJECTSONGOING PROJECTS

Page 12: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

12

Project Topic: Research Into Enhanced Tracks, Switches and Structures

Starting Date: 01/09/2016

Project Duration :30 months

Ending Date: 28/02/2019

Total Budget: € 6.366.942 (TCDD Total Budget :100.000 €; H2020 Budget :63.486 €)

Coordinator : Trafikverket (Sweden)

PROJECT INFORMATION

IN2TRACK PROJECT

Page 13: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

13

TASKS

Improvement of track geometry quality

through under sleeper pads are analyzed

numerically and by experiments

Rail breakage detection and monitoring

techniques are reviewed and evaluated

Shot peening application on welded rail

zones for fatigue life improvement.

A numerical model development for the

modeling of rail corrugation for

prediction.

The grinding processes, methods and

procedures used by the worldwide

operators are examined.

IN2TRACK PROJECT

Page 14: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

14

Project Topic : Intelligent Innovative Smart Maintenance of Assets By Integrated Technologies

Starting Date : 01/09/2016

Project Duration :36 months

Ending Date : 31/08/2019

Total Budget : € 16.405.562,56 (TCDD Total Budget :30.000 €; H2020 Budget:13.355 €)

Coordinator : Ansaldo STS (Italy)

PROJECT INFORMATION

IN2SMART PROJECT

Page 15: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

15

IN2SMART PROJECT

Page 16: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

16

PROJECT INFORMATION

Project Topic : Indicator Monitoring for a new railway Paradigm in seamlessly

integrated Cross modal Transport chains – Phase 2

Starting Date : 01/09/2017

Project Duration :59 months

Ending Date : 30/08/2022

Total Budget : € 3,153,652 (TCDD Total Budget : € 53,000 ; H2020 Budget : € 23,996)

Coordinator : Jan Bergstrand / Trafikverket

IMPACT-2 PROJECT

Page 17: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

17

TASKS

Researching about Condition Based Monitoring/Maintenance Activies, State of Art technologies

Constitute common smart maintenance concept

Constitute common & efficient standards

Data Acqusition – Transmission

Storage –Analysing

IMPACT-2 PROJECT

Page 18: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

18

PROJECT INFORMATION

Project Topic: Research Into Enhanced Tracks, Switches and Structures - 2

Starting date: 01/11/2018

Duration: 30 months

Ending date: 30/04/2021

Total budget: € 30.162.671,14 (TCDD total budget :107.700 €; H2020 Funding :

47.861,86 €)

Coordinatır : Network Rail Infrastructure Limited (England)

IN2TRACK-2 PROJECT

Page 19: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

19

Numerical and experimental analysis for

track geometry quality improvement via

Under Sleeper Pads

Embedded track (concrete) system research

for transition zones

IN2TRACK-2 PROJECT

Page 20: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

20

PROJECTS TO BE LAUNCHED

IN2TRACK-3 (SHIFT2RAIL)

• Project Name: Research Into Enhanced Tracks, Switches and Structures - 3

DECAMERON(HORIZON 2020)

• Project Name : 5G for Connected & Automated Mobility

Page 21: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

FUTURE

21

HORIZON EUROPE

PROGRAMME

(Horizon Europe)

2021-2027

SHIFT2RAIL2

INITIATIVE

Demiryolu

Projeleri

• The issues that we want to take part in Horizon Europe;

Main topics of projects are;

smart – autonomous

implementable solutions,

environment friendly,

responding to needs,

production technologies for cost reduction

And also focusing on warning technologies and structural precautions to determine effect of

global warming and disasters (such as earthquakes, floods, heavy and sudden precipitation,

storms)

RAILWAY PROJECTS

Page 22: RAILWAY RESEARCH AND TECHNOLOGY CENTER (DATEM) · TECHNOLOGY CENTER (DATEM) ATİLA KESKİN. DATEM HISTORY 2 2009 TCDD Board Decision 2010 Appointments and Establishment of the Organization

22

CLOSURE

THANK YOU!

“Pek çok şafak vardırHenüz ışıldamamış olan.”

“ There are many dawnThat has not yet shined. ”

Friedrich Nietzsche