rail freight transport in paris

28
STORES Rail Freight Transport Rail Freight Transport in Paris in Paris

Upload: clarke

Post on 08-Jan-2016

57 views

Category:

Documents


5 download

DESCRIPTION

Rail Freight Transport in Paris. STORES. Monoprix at a glance. Monoprix 286 stores A broad range of products: an average of 30,000 Many services for urban customers. Monop’ 50 convenience stores More than 5,000 products Late opening hours. 2010 turnover : 4.000 M€ - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Rail Freight Transport in Paris

STORES

Rail Freight Transport Rail Freight Transport in Parisin Paris

Page 2: Rail Freight Transport in Paris

© N

P

2

Monoprixat a glance

Monoprix 286 stores A broad range of products: an average of 30,000 Many services for urban customers

Monop’ 50 convenience stores More than 5,000 products Late opening hours

beauty monop 5 stores A broad range of beauty and hygiene products

dailymonop’ 13 stores Urban sandwich bars

Naturalia 49 stores A large range of organic products

2010 turnover : 4.000 M€excl.VAT consolidated

(IFRS standards)

Shareholder’s equityheld 50/50 by the

groups Galeries Lafayetteand Casino

Online shop : monoprix.fr

20 000 staff members

Page 3: Rail Freight Transport in Paris

© N

P

3

PROJECT’S

PRESENTATION

PROJECT’S

PRESENTATION

PART 1

Page 4: Rail Freight Transport in Paris

© N

P

4

La Direction Régionale de l’Équipement d’Île-de-France (Regional Equipment & Facilities Board for Paris and surrounding areas)

Le Conseil Régional d’Île-de-France (Ile-de-France Regional council)

La Mairie de Paris (Paris City Hall)

Réseau Ferré de France (French Rail Network)

The experiment is supported by:

Page 5: Rail Freight Transport in Paris

© N

P

5

The project’s major stages

Invitationto tender

2005 2006 2007 2008

Feasibility

Operator Specs

May2006

SelectionSNCF Freight

Dec2006

June2007

Dec2007

Contract withSNCF Freight

Start-up

2004

Conception of an operation including alternative transport and the search for partners

DREIFSAMADA

Page 6: Rail Freight Transport in Paris

© N

P

6

Key issues for success

Deliver MONOPRIX sales outlets in Greater Paris by rail

Start up of an experimental service in 2007

Define criteria-meeting solutions Economic and financial appeal Social, economic & environmental factors Logistic feasibility

Page 7: Rail Freight Transport in Paris

© N

P

7

Targets

Retain current logistics over 2 warehouses

The Paris-Melun line: use the rail lines available at off-peak hours

Optimise store deliveries

No change to delivery lead times

Page 8: Rail Freight Transport in Paris

© N

P

8

Description of the project

Rail transport to deliver merchandise to 60 Monoprix stores inside Paris. General merchandise (GM) and soft drinks

(SD) From the warehouses in Combs-la-Ville (77)

and Lieusaint (77) To a junction platform in Paris Using line D of the RER (regional train, Paris

to Melun) and/or the Circular Line (Grande Ceinture)

Page 9: Rail Freight Transport in Paris

© N

P

9

Combs-La-VilleBuilding E

(GM)

Lieusaint

Building D

(SD)

N

ES

O

useable length: 243 m quayside length: 193 m

Junction for build. E (mid 2008)

Junction for Build. D (end 2006)

Rail sidings IJK

track K (405m)

track J (360m)

track I (380m)

length: 206 m

GM & SD Warehouses:Site Plan

Page 10: Rail Freight Transport in Paris

© N

P

N

S

EO

Rail approach :Short line regional train

Bercy

Page 11: Rail Freight Transport in Paris

© N

PThe SAMADA’s modal

shift system

loading 26 NGV trucks : 06h00 /

12h00

Bercy (75)

Crossdoking over 1 000 palett/day unloading 21h00 / 05h00

Short line Lieusaint – Bercy

5 trains a week VFLI until 1 200 t

Combs & Lieusaint (77)

loading up to 22 freight cars

08h00 / 18h00

Delivery of 90 parisians and suburbans stores

06h30 / 12h30

Page 12: Rail Freight Transport in Paris

© N

P

12

CHOOSING A

SITE IN PARIS

CHOOSING A

SITE IN PARIS

PART 2

Page 13: Rail Freight Transport in Paris

© N

P

13

Junction sites in Paris

Page 14: Rail Freight Transport in Paris

© N

P

14

Utilisation of infrastructures

Advantages Ground available in the heart of Paris Good connection with the rail network

Drawbacks Limited number of junction sites

In great demand from promoters and town-planners Complex split of land (SNCF/RFF)

The way sites are cut up Development and upgrading work now indispensable

Cost, time lines Integrating activity with the environment

Immediate neighbourhood (pollution, noise…) Rail work sites

Page 15: Rail Freight Transport in Paris

© N

PSite at Paris-Bercy :

Halle G. Lamé

SAMADA

Bercy

Gare de Lyon

Melun

Road quayside

Rail quayside

NGV Station

Page 16: Rail Freight Transport in Paris

© N

P

16

Halle G. Lamé after renovation

Integration of a logistics facility in the urban environmentBuilding of an anti-noise device to

accommodate freight trainsArchitectural style

But still a few fears on the part of neighbours

Page 17: Rail Freight Transport in Paris

© N

P

Platform at Bercy:rail quayside

Available length: 200 m Acoustic protection (boarding)

acoustic test to be conducted

Page 18: Rail Freight Transport in Paris

© N

P

18

OPERATING

THE

HALLE G. LAME

OPERATING

THE

HALLE G. LAME

PART 3

Page 19: Rail Freight Transport in Paris

© N

PPlatform at Bercy:

Building’s blueprint

Cellule MILLIET SAMADA unit 3700m²

EX

IT

Rail line

EN

TRy

movement of traffic

Car Park SAMADA

neighboring buildingshotel

Rail quayside

Page 20: Rail Freight Transport in Paris

© N

P

20

Bercy: operating la Halle

Positioning of pallets in bays (plan) Storage capacity: 1,100 pallets (80x120) Max. shuttle capacity: 1,000 pallets (80x120)

Unloading bay Freight cars available 9.30 pm/4 am (to check): 6

and a half hours Manoeuvring time: 90 minutes

3 quay load coupons (30’) + 3 car movements (10’)

Real work time: 5 hours

Page 21: Rail Freight Transport in Paris

© N

P

21

Upgrading of operations

CONSOLIDATION & OPTIMISATION of the EXPERIMENT

RAIL TRANSPORT Junction at COMBS la VILLE May 2008

All products delivered by train June 2008

ROAD TRANSPORT Gradual introduction of GNV trucks

10 vehicles may/june 2008

10 vehicles june/july 2008

6 vehicles september 2008

Optimisation of transport plan 1st SEM 2008

NGV station integrated with the Bercy site october 2008

Page 22: Rail Freight Transport in Paris

© N

PUpgrading of

operations November 2007

27 stores

February 2008 55 stores

June 2008 72 stores

September 2008 80 stores

June 2010 : 92 Monoprix stores

60 City 25 Monop’ 5 réserves 2 Beauty

51% IDF stores 68% Paris stores+ 1 Casino superstore

hypermarcket Masséna (Paris 13)

-> 755 pal/day = 15 500 pal/month =190 000 pal/year

Page 23: Rail Freight Transport in Paris

© N

PBercy:

Railway Approach 1 rail operator = VFLI

Fret SNCF subsidiary

5 shuttles / week 17 freight cars

average a day (22 max)

unloading : 21:30 / 04:30

Rolling stock Diesel particle filter

Engine

Page 24: Rail Freight Transport in Paris

© N

P

24

Natural Gas Vehicle, low-noise, 29 sq. m ground-space, the equivalent to 21 pallets

Environmental benefits: Low pollution emissions Low-noise vehicles

End deliveries: NGV trucks

Page 25: Rail Freight Transport in Paris

© N

P

25

Technical drawbacks: Limited range and power Higher purchase and operating costs

But city centre locations offset the drawbacks of GNVs.

End deliveries: NGV trucks

Page 26: Rail Freight Transport in Paris

© N

P

26

Platform at Bercy:NGV station

Page 27: Rail Freight Transport in Paris

© N

P

Environmental gains Greatly reduced emissions of pollutants:

410 t fewer CO2 emissions = - 47% Harmful particles = - 52% Volatile organic compounds = - 44% NOx = - 56%

700 000 km reduced per year

250 rail shuttles substitute 10 000 trucks per year

Page 28: Rail Freight Transport in Paris

© N

P

Thank you for your attention.