Page 1: RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

RADWG 2ND - 2012 6TH MARCH 2012

G. Spiezia (EN/STI/ECE)

Page 2: RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

AGENDAMatters arisingRadiation test plan PSI CNRAD H4IRRAD

Equipment in TT83 MWPCBE-RF equipment in PS

Page 3: RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

Matters arising-1 LHC restart – 14 March 2012 The shift for the failure analysis will

restart Each group should communicate the

failures which are related to radiations A dedicated mail address will be created

Review of critical projects Recommended by the R2E reviewers in

Nov 2011 External experts and PH-ESE group can be

contacted

Page 4: RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

Matters arising -2 Data base for tracking radiation tolerant

components Strong interest from TE/EPC Very useful for all the groups that have equipment

exposed to radiation Definition of the specifications to complete Collaboration with BE/CO for the implementation

NanoFip tested at PSI in December 2011 Test results will be presented by E. Gousiou at the

next meeting Should we proceed with a unique purchase for all

the CERN groups?

Page 5: RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

PSI test plan -1Date Equipment

OwnerTest group DUT

1 February EN/STI EN/STI PXI power supply

18-19FebruaryEN/STI EN/STI

Voltage regulator

Cypress

Toshiba

Diff Amp

TE/EPC TE/EPC AC/DC

17-18 March BI BI BPM electronics

24-25 March EN/STI EN/STI

Analog switches

current regulator

RadFet

21-22 April

TE/EPC EN/STI Mosfet-1

EN/STI EN/STI RadMon prototype

BI BI Beam Loss Monitor

Page 6: RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

PSI test plan -2

DateEquipment

Owner Test group DUT

May TE/EPC EN/STI

Mosfet-2 or other, to be defined

  

June-JulyTE/EPC

EN/STI-TE/EPC

PWM

EN/STI EN/STIProfibus for LVDT

ConditionerAugust TE/EPC TE/EPC FGC critical components

OctoberEN/STI EN/STI LVDT conditionerTE/EPC EN/STI Diode-1

December TE/EPC EN/STIDiode-2

ADC-8bitTBD

Page 7: RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

PSI test plan -3 Program could be changed if high

priorities arise To be planned in time – 2 months before

the slot Other requests could arrive from TE/EPC

for the FGC-Lite project.

Page 8: RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

CEA – 1 MeV facility We can reserve beam time Send requests if interested

Page 10: RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

Course conference workshop Course radiation effects R. Gaillard on

CERN training web site SEE symposium

April 2012 http://radhome.gsfc.nasa.gov/radhome/SEE/

NSREC July 2012 www.nsrec.net

RADECS September 2012 www.radecs.com

Page 11: RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

Back-up