    RTTT Project Management Team

    2010-09-

    22 14,990.28

    RTTT Project Management Team

    2010-09-

    24 4,996.76

    RTTT Project Management Team2010-10-08 4,996.76

    RTTT Project Management Team

    2010-10-

    22 4,996.76

    RTTT Project Management Team

    2010-11-

    05 4,996.76

    RTTT Project Management Team

    2010-11-

    19 4,996.76

    RTTT Project Management Team

    2010-12-

    03 4,996.76

    RTTT Project Management Team

    2010-12-

    17 4,996.76

    RTTT Project Management Team

    2010-12-

    30 4,996.76

    RTTT Project Management Team

    2011-01-

    14 9,058.05

    RTTT Project Management Team

    2011-01-

    28 9,058.05

    RTTT Project Management Team

    2011-02-

    11 9,058.05

    RTTT Project Management Team

    2011-02-

    25 9,058.05

    RTTT Project Management Team

    2011-03-

    11 9,058.05

    RTTT Project Management Team

    2011-03-

    25 9,058.05

    RTTT Project Management Team

    2011-04-

    08 9,058.05

    RTTT Project Management Team

    2011-04-

    21 9,058.05

    RTTT Project Management Team

    2011-05-

    06 9,058.05

    RTTT Project Management Team

    2011-05-

    20 9,058.05

    RTTT Project Management Team

    2011-06-

    03 9,058.05

    RTTT Project Management Team

    2011-06-

    17 9,058.05

    RTTT Project Management Team

    2011-07-

    01 9,058.05

    RTTT Project Management Team2011-07-15 6,559.67

    RTTT Project Management Team

    2011-07-

    29 4,061.29

    RTTT Project Management Team

    2011-08-

    12 4,061.29

    RTTT Project Management Team

    2011-08-

    26 4,061.29

    RTTT Project Management Team 2011-09- 4,061.29

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    2/158

    09

    RTTT Project Management Team

    2011-09-

    23 4,061.29

    RTTT Project Management Team

    2011-10-

    07 4,061.29

    RTTT Project Management Team

    2011-10-

    21 4,061.29

    RTTT Project Management Team

    2011-11-

    04 4,061.29

    RTTT Project Management Team

    2011-11-

    18 4,061.29

    RTTT Project Management Team

    2011-12-

    02 4,061.29

    RTTT Project Management Team

    2011-12-

    16 4,061.29

    RTTT Project Management Team

    2011-12-

    30 4,061.29

    RTTT Project Management Team

    2012-01-

    13 4,061.29

    RTTT Project Management Team

    2012-01-

    27 4,142.48

    RTTT Project Management Team

    2012-02-

    10 4,142.48

    RTTT Project Management Team

    2012-02-

    24 4,142.48

    RTTT Project Management Team

    2012-03-

    09 4,142.48

    RTTT Project Management Team

    2012-03-

    23 4,142.48

    RTTT Project Management Team

    2012-04-

    05 4,142.48

    RTTT Project Management Team

    2012-04-

    20 4,142.48

    RTTT Project Management Team2012-05-04 4,142.48

    RTTT Project Management Team

    2012-05-

    18 4,142.48

    RTTT Project Management Team

    2012-06-

    01 4,142.48

    RTTT Project Management Team

    2012-06-

    15 11,787.44

    RTTT Project Management Team

    2012-06-

    29 9,239.12

    RTTT Project Management Team

    2012-07-

    13 9,239.12

    RTTT Project Management Team

    2012-07-

    27 9,331.51

    RTTT Project Management Team

    2012-08-

    10 9,331.51

    RTTT Project Management Team

    2012-08-

    24 9,331.51

    RTTT Project Management Team

    2012-09-

    07 9,331.51

    RTTT Project Management Team

    2012-09-

    21 9,331.51

    RTTT Project Management Team 2012-10- 9,331.51

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    3/158

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    4/158

    01

    RTTT Project Management Team

    2013-11-

    15 5,651.90

    RTTT Project Management Team

    2013-11-

    27 5,651.90

    RTTT Project Management Team

    2013-12-

    13 5,651.90

    RTTT Project Management Team

    2013-12-

    27 5,651.90

    RTTT Project Management Team

    2014-01-

    10 5,651.90

    RTTT Project Management Team

    2014-01-

    24 6,203.25

    RTTT Project Management Team

    2014-02-

    07 6,341.09

    RTTT Project Management Team

    2014-02-

    21 6,341.09

    RTTT Project Management Team

    2014-03-

    07 6,341.09

    RTTT Project Management Team

    2014-03-

    21 6,341.09

    RTTT Project Management Team

    2014-04-

    04 6,341.09

    RTTT Project Management Team

    2014-04-

    17 6,341.09

    RTTT Project Management Team

    2014-05-

    02 6,341.09

    RTTT Project Management Team

    2014-05-

    16 6,341.09

    RTTT Project Management Team

    2014-05-

    30 6,341.09

    RTTT Project Management Team

    2014-06-

    13 6,341.09

    RTTT Project Management Team2014-06-27 11,488.67

    RTTT Project Management Team

    2014-07-

    11 11,488.67

    RTTT Project Management Team

    2014-07-

    17 3,250.78

    RTTT Project Management Team

    2014-07-

    25 12,856.78

    RTTT Project Management Team

    2014-08-

    08 12,856.78

    RTTT Project Management Team

    2014-08-

    22 12,856.78

    RTTT Project Management Team

    2014-09-

    05 12,856.78

    RTTT Project Management Team

    2014-09-

    19 12,856.78

    RTTT Project Management Team

    2011-07-

    15 6,290.97

    RTTT Project Management Team

    2013-07-

    12 4,672.26

    RTTT Project Management Team

    2010-09-

    22 2,578.32

    RTTT Project Management Team 2010-09- 859.44

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    5/158

    24

    RTTT Project Management Team

    2010-10-

    08 859.44

    RTTT Project Management Team

    2010-10-

    22 859.44

    RTTT Project Management Team

    2010-11-

    05 859.44

    RTTT Project Management Team

    2010-11-

    19 859.44

    RTTT Project Management Team

    2010-12-

    03 859.44

    RTTT Project Management Team

    2010-12-

    17 859.44

    RTTT Project Management Team

    2010-12-

    30 859.44

    RTTT Project Management Team

    2011-01-

    14 1,557.98

    RTTT Project Management Team

    2011-01-

    28 1,557.98

    RTTT Project Management Team

    2011-02-

    11 1,557.98

    RTTT Project Management Team

    2011-02-

    25 1,557.98

    RTTT Project Management Team

    2011-03-

    11 1,557.98

    RTTT Project Management Team

    2011-03-

    25 1,557.98

    RTTT Project Management Team

    2011-04-

    08 1,557.98

    RTTT Project Management Team

    2011-04-

    21 1,557.98

    RTTT Project Management Team

    2011-05-

    06 1,557.98

    RTTT Project Management Team2011-05-20 1,557.98

    RTTT Project Management Team

    2011-06-

    03 1,557.98

    RTTT Project Management Team

    2011-06-

    17 1,557.98

    RTTT Project Management Team

    2011-07-

    01 1,699.29

    RTTT Project Management Team

    2011-07-

    15 1,230.60

    RTTT Project Management Team

    2011-07-

    29 761.90

    RTTT Project Management Team

    2011-08-

    12 761.90

    RTTT Project Management Team

    2011-08-

    26 761.90

    RTTT Project Management Team

    2011-09-

    09 761.90

    RTTT Project Management Team

    2011-09-

    23 761.90

    RTTT Project Management Team

    2011-10-

    07 761.90

    RTTT Project Management Team 2011-10- 761.90

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    6/158

    21

    RTTT Project Management Team

    2011-11-

    04 761.90

    RTTT Project Management Team

    2011-11-

    18 761.90

    RTTT Project Management Team

    2011-12-

    02 761.90

    RTTT Project Management Team

    2011-12-

    16 761.90

    RTTT Project Management Team

    2011-12-

    30 761.90

    RTTT Project Management Team

    2012-01-

    13 761.90

    RTTT Project Management Team

    2012-01-

    27 777.13

    RTTT Project Management Team

    2012-02-

    10 777.13

    RTTT Project Management Team

    2012-02-

    24 777.13

    RTTT Project Management Team

    2012-03-

    09 777.13

    RTTT Project Management Team

    2012-03-

    23 777.13

    RTTT Project Management Team

    2012-04-

    05 777.13

    RTTT Project Management Team

    2012-04-

    20 777.13

    RTTT Project Management Team

    2012-05-

    04 777.13

    RTTT Project Management Team

    2012-05-

    18 777.13

    RTTT Project Management Team

    2012-06-

    01 777.13

    RTTT Project Management Team2012-06-15 2,211.32

    RTTT Project Management Team

    2012-06-

    29 1,733.26

    RTTT Project Management Team

    2012-07-

    13 1,873.69

    RTTT Project Management Team

    2012-07-

    27 1,892.43

    RTTT Project Management Team

    2012-08-

    10 1,892.43

    RTTT Project Management Team

    2012-08-

    24 1,892.43

    RTTT Project Management Team

    2012-09-

    07 1,892.43

    RTTT Project Management Team

    2012-09-

    21 1,892.43

    RTTT Project Management Team

    2012-10-

    05 1,892.43

    RTTT Project Management Team

    2012-10-

    19 1,892.43

    RTTT Project Management Team

    2012-11-

    02 1,892.43

    RTTT Project Management Team 2012-11- 1,892.43

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    7/158

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    8/158

    13

    RTTT Project Management Team

    2013-12-

    27 1,188.03

    RTTT Project Management Team

    2014-01-

    10 1,188.03

    RTTT Project Management Team

    2014-01-

    24 1,303.93

    RTTT Project Management Team

    2014-02-

    07 1,332.90

    RTTT Project Management Team

    2014-02-

    21 1,332.90

    RTTT Project Management Team

    2014-03-

    07 1,332.90

    RTTT Project Management Team

    2014-03-

    21 1,332.90

    RTTT Project Management Team

    2014-04-

    04 1,332.90

    RTTT Project Management Team

    2014-04-

    17 1,332.90

    RTTT Project Management Team

    2014-05-

    02 1,332.90

    RTTT Project Management Team

    2014-05-

    16 1,332.90

    RTTT Project Management Team

    2014-05-

    30 1,332.90

    RTTT Project Management Team

    2014-06-

    13 1,332.90

    RTTT Project Management Team

    2014-06-

    27 2,414.92

    RTTT Project Management Team

    2014-07-

    11 2,373.56

    RTTT Project Management Team

    2014-07-

    17 671.61

    RTTT Project Management Team2014-07-25 2,656.21

    RTTT Project Management Team

    2014-08-

    08 2,656.21

    RTTT Project Management Team

    2014-08-

    22 2,656.21

    RTTT Project Management Team

    2014-09-

    05 2,656.21

    RTTT Project Management Team

    2014-09-

    19 2,656.21

    RTTT Project Management Team

    2010-09-

    22 391.10

    RTTT Project Management Team

    2010-09-

    24 391.10

    RTTT Project Management Team

    2010-10-

    08 391.10

    RTTT Project Management Team

    2010-10-

    22 391.10

    RTTT Project Management Team

    2010-11-

    05 391.10

    RTTT Project Management Team

    2010-11-

    19 391.10

    RTTT Project Management Team 2010-12- 391.10

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    9/158

    03

    RTTT Project Management Team

    2010-12-

    17 391.10

    RTTT Project Management Team

    2011-01-

    14 1,000.62

    RTTT Project Management Team

    2011-01-

    28 1,000.62

    RTTT Project Management Team

    2011-02-

    11 1,000.62

    RTTT Project Management Team

    2011-02-

    25 1,000.62

    RTTT Project Management Team

    2011-03-

    11 1,000.62

    RTTT Project Management Team

    2011-03-

    25 1,000.62

    RTTT Project Management Team

    2011-04-

    08 1,000.62

    RTTT Project Management Team

    2011-04-

    21 1,000.62

    RTTT Project Management Team

    2011-05-

    06 1,000.62

    RTTT Project Management Team

    2011-05-

    20 1,000.62

    RTTT Project Management Team

    2011-06-

    03 1,000.62

    RTTT Project Management Team

    2011-06-

    17 1,000.62

    RTTT Project Management Team

    2011-07-

    01 1,000.62

    RTTT Project Management Team

    2011-07-

    15 609.52

    RTTT Project Management Team

    2011-08-

    12 609.52

    RTTT Project Management Team2011-08-26 609.52

    RTTT Project Management Team

    2011-09-

    09 609.52

    RTTT Project Management Team

    2011-09-

    23 609.52

    RTTT Project Management Team

    2011-10-

    07 609.52

    RTTT Project Management Team

    2011-10-

    21 609.52

    RTTT Project Management Team

    2011-11-

    04 609.52

    RTTT Project Management Team

    2011-11-

    18 609.52

    RTTT Project Management Team

    2011-12-

    02 609.52

    RTTT Project Management Team

    2011-12-

    16 609.52

    RTTT Project Management Team

    2012-01-

    13 609.52

    RTTT Project Management Team

    2012-01-

    27 609.52

    RTTT Project Management Team 2012-02- 609.52

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    10/158

    10

    RTTT Project Management Team

    2012-02-

    24 609.52

    RTTT Project Management Team

    2012-03-

    09 609.52

    RTTT Project Management Team

    2012-03-

    23 609.52

    RTTT Project Management Team

    2012-04-

    05 609.52

    RTTT Project Management Team

    2012-04-

    20 609.52

    RTTT Project Management Team

    2012-05-

    04 609.52

    RTTT Project Management Team

    2012-05-

    18 609.52

    RTTT Project Management Team

    2012-06-

    01 609.52

    RTTT Project Management Team

    2012-06-

    15 609.52

    RTTT Project Management Team

    2012-07-

    13 609.52

    RTTT Project Management Team

    2012-07-

    27 597.02

    RTTT Project Management Team

    2012-08-

    10 597.02

    RTTT Project Management Team

    2012-08-

    24 597.02

    RTTT Project Management Team

    2012-09-

    07 597.02

    RTTT Project Management Team

    2012-09-

    21 597.02

    RTTT Project Management Team

    2012-10-

    05 597.02

    RTTT Project Management Team2012-10-19 597.02

    RTTT Project Management Team

    2012-11-

    02 597.02

    RTTT Project Management Team

    2012-11-

    16 597.02

    RTTT Project Management Team

    2012-12-

    14 597.02

    RTTT Project Management Team

    2012-12-

    28 597.02

    RTTT Project Management Team

    2013-01-

    11 597.02

    RTTT Project Management Team

    2013-01-

    25 597.02

    RTTT Project Management Team

    2013-02-

    08 851.83

    RTTT Project Management Team

    2013-02-

    22 528.76

    RTTT Project Management Team

    2013-03-

    08 528.76

    RTTT Project Management Team

    2013-03-

    22 273.95

    RTTT Project Management Team 2013-04- 528.76

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    11/158

    05

    RTTT Project Management Team

    2013-04-

    19 528.76

    RTTT Project Management Team

    2013-05-

    03 528.76

    RTTT Project Management Team

    2013-05-

    17 528.76

    RTTT Project Management Team

    2013-06-

    14 661.03

    RTTT Project Management Team

    2013-06-

    28 857.39

    RTTT Project Management Team

    2013-07-

    12 857.39

    RTTT Project Management Team

    2013-07-

    26 912.07

    RTTT Project Management Team

    2013-08-

    09 912.07

    RTTT Project Management Team

    2013-08-

    23 912.07

    RTTT Project Management Team

    2013-09-

    06 912.07

    RTTT Project Management Team

    2013-09-

    20 912.07

    RTTT Project Management Team

    2013-10-

    04 912.07

    RTTT Project Management Team

    2013-10-

    18 912.07

    RTTT Project Management Team

    2013-11-

    01 912.07

    RTTT Project Management Team

    2013-11-

    15 912.07

    RTTT Project Management Team

    2013-12-

    13 912.07

    RTTT Project Management Team2013-12-27 912.07

    RTTT Project Management Team

    2014-01-

    10 912.07

    RTTT Project Management Team

    2014-01-

    24 912.07

    RTTT Project Management Team

    2014-02-

    07 912.07

    RTTT Project Management Team

    2014-02-

    21 912.07

    RTTT Project Management Team

    2014-03-

    07 912.07

    RTTT Project Management Team

    2014-03-

    21 912.07

    RTTT Project Management Team

    2014-04-

    04 912.07

    RTTT Project Management Team

    2014-04-

    17 912.07

    RTTT Project Management Team

    2014-05-

    02 912.07

    RTTT Project Management Team

    2014-05-

    16 912.07

    RTTT Project Management Team 2014-06- 912.07

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    12/158

    13

    RTTT Project Management Team

    2014-06-

    27 912.07

    RTTT Project Management Team

    2014-07-

    11 912.07

    RTTT Project Management Team

    2014-07-

    25 975.95

    RTTT Project Management Team

    2014-08-

    08 975.95

    RTTT Project Management Team

    2014-08-

    22 975.95

    RTTT Project Management Team

    2014-09-

    05 975.95

    RTTT Project Management Team

    2014-09-

    19 975.95

    RTTT Project Management Team

    2013-02-

    08 10.33

    RTTT Project Management Team

    2010-09-

    22 292.32

    RTTT Project Management Team

    2010-09-

    24 97.44

    RTTT Project Management Team

    2010-10-

    08 97.44

    RTTT Project Management Team

    2010-10-

    22 97.44

    RTTT Project Management Team

    2010-11-

    05 97.44

    RTTT Project Management Team

    2010-11-

    19 97.44

    RTTT Project Management Team

    2010-12-

    03 97.44

    RTTT Project Management Team

    2010-12-

    17 97.44

    RTTT Project Management Team2010-12-30 97.44

    RTTT Project Management Team

    2011-01-

    14 176.64

    RTTT Project Management Team

    2011-01-

    28 176.64

    RTTT Project Management Team

    2011-02-

    11 176.64

    RTTT Project Management Team

    2011-02-

    25 176.64

    RTTT Project Management Team

    2011-03-

    11 176.64

    RTTT Project Management Team

    2011-03-

    25 176.64

    RTTT Project Management Team

    2011-04-

    08 176.64

    RTTT Project Management Team

    2011-04-

    21 176.64

    RTTT Project Management Team

    2011-05-

    06 176.64

    RTTT Project Management Team

    2011-05-

    20 176.64

    RTTT Project Management Team 2011-06- 176.64

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    13/158

    03

    RTTT Project Management Team

    2011-06-

    17 176.64

    RTTT Project Management Team

    2011-07-

    01 176.64

    RTTT Project Management Team

    2011-07-

    15 250.59

    RTTT Project Management Team

    2011-07-

    29 79.20

    RTTT Project Management Team

    2011-08-

    12 79.20

    RTTT Project Management Team

    2011-08-

    26 79.20

    RTTT Project Management Team

    2011-09-

    09 79.20

    RTTT Project Management Team

    2011-09-

    23 79.20

    RTTT Project Management Team

    2011-10-

    07 79.20

    RTTT Project Management Team

    2011-10-

    21 79.20

    RTTT Project Management Team

    2011-11-

    04 79.20

    RTTT Project Management Team

    2011-11-

    18 79.20

    RTTT Project Management Team

    2011-12-

    02 79.20

    RTTT Project Management Team

    2011-12-

    16 79.20

    RTTT Project Management Team

    2011-12-

    30 79.20

    RTTT Project Management Team

    2012-01-

    13 79.20

    RTTT Project Management Team2012-01-27 80.78

    RTTT Project Management Team

    2012-02-

    10 80.78

    RTTT Project Management Team

    2012-02-

    24 80.78

    RTTT Project Management Team

    2012-03-

    09 80.78

    RTTT Project Management Team

    2012-03-

    23 80.78

    RTTT Project Management Team

    2012-04-

    05 80.78

    RTTT Project Management Team

    2012-04-

    20 80.78

    RTTT Project Management Team

    2012-05-

    04 80.78

    RTTT Project Management Team

    2012-05-

    18 80.78

    RTTT Project Management Team

    2012-06-

    01 80.78

    RTTT Project Management Team

    2012-06-

    15 229.85

    RTTT Project Management Team 2012-06- 180.16

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    14/158

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    15/158

    26

    RTTT Project Management Team

    2013-08-

    09 46.14

    RTTT Project Management Team

    2013-08-

    23 143.10

    RTTT Project Management Team

    2013-09-

    06 60.28

    RTTT Project Management Team

    2013-09-

    20 90.44

    RTTT Project Management Team

    2013-10-

    04 90.44

    RTTT Project Management Team

    2013-10-

    18 90.44

    RTTT Project Management Team

    2013-11-

    01 90.44

    RTTT Project Management Team

    2013-11-

    15 90.44

    RTTT Project Management Team

    2013-11-

    27 90.44

    RTTT Project Management Team

    2013-12-

    13 90.44

    RTTT Project Management Team

    2013-12-

    27 90.44

    RTTT Project Management Team

    2014-01-

    10 90.44

    RTTT Project Management Team

    2014-01-

    24 99.26

    RTTT Project Management Team

    2014-02-

    07 101.46

    RTTT Project Management Team

    2014-02-

    21 101.46

    RTTT Project Management Team

    2014-03-

    07 101.46

    RTTT Project Management Team2014-03-21 101.46

    RTTT Project Management Team

    2014-04-

    04 101.46

    RTTT Project Management Team

    2014-04-

    17 101.46

    RTTT Project Management Team

    2014-05-

    02 101.46

    RTTT Project Management Team

    2014-05-

    16 101.46

    RTTT Project Management Team

    2014-05-

    30 101.46

    RTTT Project Management Team

    2014-06-

    13 101.46

    RTTT Project Management Team

    2014-06-

    27 183.82

    RTTT Project Management Team

    2014-07-

    11 183.82

    RTTT Project Management Team

    2014-07-

    17 52.01

    RTTT Project Management Team

    2014-07-

    25 205.70

    RTTT Project Management Team 2014-08- 205.70

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    16/158

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    17/158

    12

    RTTT Project Management Team

    2011-08-

    26 251.80

    RTTT Project Management Team

    2011-09-

    09 251.80

    RTTT Project Management Team

    2011-09-

    23 251.80

    RTTT Project Management Team

    2011-10-

    07 251.80

    RTTT Project Management Team

    2011-10-

    21 251.80

    RTTT Project Management Team

    2011-11-

    04 251.80

    RTTT Project Management Team

    2011-11-

    18 251.80

    RTTT Project Management Team

    2011-12-

    02 251.80

    RTTT Project Management Team

    2011-12-

    16 251.80

    RTTT Project Management Team

    2011-12-

    30 251.80

    RTTT Project Management Team

    2012-01-

    13 251.80

    RTTT Project Management Team

    2012-01-

    27 256.83

    RTTT Project Management Team

    2012-02-

    10 256.84

    RTTT Project Management Team

    2012-02-

    24 256.83

    RTTT Project Management Team

    2012-03-

    09 256.84

    RTTT Project Management Team

    2012-03-

    23 256.83

    RTTT Project Management Team2012-04-05 256.83

    RTTT Project Management Team

    2012-04-

    20 256.84

    RTTT Project Management Team

    2012-05-

    04 256.83

    RTTT Project Management Team

    2012-05-

    18 256.83

    RTTT Project Management Team

    2012-06-

    01 256.84

    RTTT Project Management Team

    2012-06-

    15 730.82

    RTTT Project Management Team

    2012-06-

    29 572.83

    RTTT Project Management Team

    2012-07-

    13 572.82

    RTTT Project Management Team

    2012-07-

    27 577.78

    RTTT Project Management Team

    2012-08-

    10 577.77

    RTTT Project Management Team

    2012-08-

    24 577.78

    RTTT Project Management Team 2012-09- 577.79

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    18/158

    07

    RTTT Project Management Team

    2012-09-

    21 577.78

    RTTT Project Management Team

    2012-10-

    05 577.77

    RTTT Project Management Team

    2012-10-

    19 577.78

    RTTT Project Management Team

    2012-11-

    02 577.78

    RTTT Project Management Team

    2012-11-

    16 577.78

    RTTT Project Management Team

    2012-11-

    30 578.55

    RTTT Project Management Team

    2012-12-

    14 577.78

    RTTT Project Management Team

    2012-12-

    28 577.78

    RTTT Project Management Team

    2013-01-

    11 577.78

    RTTT Project Management Team

    2013-01-

    25 599.43

    RTTT Project Management Team

    2013-02-

    08 782.49

    RTTT Project Management Team

    2013-02-

    22 519.51

    RTTT Project Management Team

    2013-03-

    08 519.51

    RTTT Project Management Team

    2013-03-

    22 521.91

    RTTT Project Management Team

    2013-04-

    05 519.51

    RTTT Project Management Team

    2013-04-

    19 519.50

    RTTT Project Management Team2013-05-03 519.50

    RTTT Project Management Team

    2013-05-

    17 519.50

    RTTT Project Management Team

    2013-05-

    31 526.01

    RTTT Project Management Team

    2013-06-

    14 518.25

    RTTT Project Management Team

    2013-06-

    28 632.15

    RTTT Project Management Team

    2013-07-

    12 862.09

    RTTT Project Management Team

    2013-07-

    26 237.96

    RTTT Project Management Team

    2013-08-

    09 167.67

    RTTT Project Management Team

    2013-08-

    23 543.39

    RTTT Project Management Team

    2013-09-

    06 222.46

    RTTT Project Management Team

    2013-09-

    20 339.31

    RTTT Project Management Team 2013-10- 339.30

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    19/158

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    20/158

    24

    RTTT Project Management Team

    2010-10-

    08 8.49

    RTTT Project Management Team

    2010-10-

    22 8.50

    RTTT Project Management Team

    2010-11-

    05 8.49

    RTTT Project Management Team

    2010-11-

    19 8.50

    RTTT Project Management Team

    2010-12-

    03 8.49

    RTTT Project Management Team

    2010-12-

    17 8.50

    RTTT Project Management Team

    2010-12-

    30 8.49

    RTTT Project Management Team

    2011-01-

    14 15.39

    RTTT Project Management Team

    2011-01-

    28 15.41

    RTTT Project Management Team

    2011-02-

    11 15.39

    RTTT Project Management Team

    2011-02-

    25 15.41

    RTTT Project Management Team

    2011-03-

    11 15.39

    RTTT Project Management Team

    2011-03-

    25 15.41

    RTTT Project Management Team

    2011-04-

    08 15.39

    RTTT Project Management Team

    2011-04-

    21 15.40

    RTTT Project Management Team

    2011-05-

    06 15.40

    RTTT Project Management Team2011-05-20 15.39

    RTTT Project Management Team

    2011-06-

    03 15.41

    RTTT Project Management Team

    2011-06-

    17 15.39

    RTTT Project Management Team

    2011-07-

    01 15.40

    RTTT Project Management Team

    2011-07-

    15 21.85

    RTTT Project Management Team

    2011-07-

    29 6.90

    RTTT Project Management Team

    2011-08-

    12 6.91

    RTTT Project Management Team

    2011-08-

    26 6.90

    RTTT Project Management Team

    2011-09-

    09 6.91

    RTTT Project Management Team

    2011-09-

    23 6.90

    RTTT Project Management Team

    2011-10-

    07 6.90

    RTTT Project Management Team 2011-10- 6.91

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    21/158

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    22/158

    16

    RTTT Project Management Team

    2012-11-

    30 15.86

    RTTT Project Management Team

    2012-12-

    14 15.87

    RTTT Project Management Team

    2012-12-

    28 15.86

    RTTT Project Management Team

    2013-01-

    11 15.86

    RTTT Project Management Team

    2013-01-

    25 16.50

    RTTT Project Management Team

    2013-02-

    08 21.53

    RTTT Project Management Team

    2013-02-

    22 14.42

    RTTT Project Management Team

    2013-03-

    08 14.42

    RTTT Project Management Team

    2013-03-

    22 14.44

    RTTT Project Management Team

    2013-04-

    05 14.42

    RTTT Project Management Team

    2013-04-

    19 14.42

    RTTT Project Management Team

    2013-05-

    03 14.42

    RTTT Project Management Team

    2013-05-

    17 14.42

    RTTT Project Management Team

    2013-05-

    31 14.43

    RTTT Project Management Team

    2013-06-

    14 14.42

    RTTT Project Management Team

    2013-06-

    28 17.62

    RTTT Project Management Team2013-07-12 23.87

    RTTT Project Management Team

    2013-07-

    26 6.75

    RTTT Project Management Team

    2013-08-

    09 4.91

    RTTT Project Management Team

    2013-08-

    23 15.20

    RTTT Project Management Team

    2013-09-

    06 6.40

    RTTT Project Management Team

    2013-09-

    20 9.61

    RTTT Project Management Team

    2013-10-

    04 9.61

    RTTT Project Management Team

    2013-10-

    18 9.61

    RTTT Project Management Team

    2013-11-

    01 9.60

    RTTT Project Management Team

    2013-11-

    15 9.61

    RTTT Project Management Team

    2013-11-

    27 9.62

    RTTT Project Management Team 2013-12- 9.61

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    23/158

    13

    RTTT Project Management Team

    2013-12-

    27 9.60

    RTTT Project Management Team

    2014-01-

    10 9.61

    RTTT Project Management Team

    2014-01-

    24 10.54

    RTTT Project Management Team

    2014-02-

    07 10.78

    RTTT Project Management Team

    2014-02-

    21 10.78

    RTTT Project Management Team

    2014-03-

    07 10.79

    RTTT Project Management Team

    2014-03-

    21 10.78

    RTTT Project Management Team

    2014-04-

    04 10.78

    RTTT Project Management Team

    2014-04-

    17 10.78

    RTTT Project Management Team

    2014-05-

    02 10.78

    RTTT Project Management Team

    2014-05-

    16 10.78

    RTTT Project Management Team

    2014-05-

    30 10.78

    RTTT Project Management Team

    2014-06-

    13 10.78

    RTTT Project Management Team

    2014-06-

    27 19.53

    RTTT Project Management Team

    2014-07-

    11 19.52

    RTTT Project Management Team

    2014-07-

    17 5.53

    RTTT Project Management Team2014-07-25 21.85

    RTTT Project Management Team

    2014-08-

    08 21.86

    RTTT Project Management Team

    2014-08-

    22 21.86

    RTTT Project Management Team

    2014-09-

    05 21.86

    RTTT Project Management Team

    2014-09-

    19 21.86

    RTTT Project Management Team

    2013-02-

    08 26.36

    RTTT Project Management Team

    2013-02-

    08 29.41

    RTTT Project Management Team

    2013-02-

    08 5.42

    RTTT Project Management Team

    2010-09-

    22 216.71

    RTTT Project Management Team

    2010-09-

    24 71.80

    RTTT Project Management Team

    2010-10-

    08 71.81

    RTTT Project Management Team 2010-10- 71.80

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    24/158

    22

    RTTT Project Management Team

    2010-11-

    05 71.80

    RTTT Project Management Team

    2010-11-

    19 71.80

    RTTT Project Management Team

    2010-12-

    03 71.80

    RTTT Project Management Team

    2010-12-

    17 71.80

    RTTT Project Management Team

    2010-12-

    30 72.46

    RTTT Project Management Team

    2011-01-

    14 130.69

    RTTT Project Management Team

    2011-01-

    28 130.69

    RTTT Project Management Team

    2011-02-

    11 130.69

    RTTT Project Management Team

    2011-02-

    25 130.69

    RTTT Project Management Team

    2011-03-

    11 130.69

    RTTT Project Management Team

    2011-03-

    25 130.69

    RTTT Project Management Team

    2011-04-

    08 130.69

    RTTT Project Management Team

    2011-04-

    21 130.69

    RTTT Project Management Team

    2011-05-

    06 130.69

    RTTT Project Management Team

    2011-05-

    20 130.69

    RTTT Project Management Team

    2011-06-

    03 130.70

    RTTT Project Management Team2011-06-17 130.68

    RTTT Project Management Team

    2011-07-

    01 130.69

    RTTT Project Management Team

    2011-07-

    15 186.33

    RTTT Project Management Team

    2011-07-

    29 58.89

    RTTT Project Management Team

    2011-08-

    12 58.89

    RTTT Project Management Team

    2011-08-

    26 58.89

    RTTT Project Management Team

    2011-09-

    09 58.89

    RTTT Project Management Team

    2011-09-

    23 58.89

    RTTT Project Management Team

    2011-10-

    07 58.88

    RTTT Project Management Team

    2011-10-

    21 58.89

    RTTT Project Management Team

    2011-11-

    04 58.89

    RTTT Project Management Team 2011-11- 58.89

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    25/158

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    26/158

    14

    RTTT Project Management Team

    2012-12-

    28 135.12

    RTTT Project Management Team

    2013-01-

    11 135.13

    RTTT Project Management Team

    2013-01-

    25 140.19

    RTTT Project Management Team

    2013-02-

    08 183.00

    RTTT Project Management Team

    2013-02-

    22 121.49

    RTTT Project Management Team

    2013-03-

    08 121.50

    RTTT Project Management Team

    2013-03-

    22 122.06

    RTTT Project Management Team

    2013-04-

    05 121.50

    RTTT Project Management Team

    2013-04-

    19 121.49

    RTTT Project Management Team

    2013-05-

    03 121.50

    RTTT Project Management Team

    2013-05-

    17 121.50

    RTTT Project Management Team

    2013-05-

    31 123.01

    RTTT Project Management Team

    2013-06-

    14 121.21

    RTTT Project Management Team

    2013-06-

    28 147.84

    RTTT Project Management Team

    2013-07-

    12 201.63

    RTTT Project Management Team

    2013-07-

    26 55.66

    RTTT Project Management Team2013-08-09 39.21

    RTTT Project Management Team

    2013-08-

    23 127.09

    RTTT Project Management Team

    2013-09-

    06 52.03

    RTTT Project Management Team

    2013-09-

    20 79.35

    RTTT Project Management Team

    2013-10-

    04 79.36

    RTTT Project Management Team

    2013-10-

    18 79.36

    RTTT Project Management Team

    2013-11-

    01 79.35

    RTTT Project Management Team

    2013-11-

    15 79.36

    RTTT Project Management Team

    2013-11-

    27 81.95

    RTTT Project Management Team

    2013-12-

    13 79.36

    RTTT Project Management Team

    2013-12-

    27 79.36

    RTTT Project Management Team 2014-01- 79.36

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    27/158

    10

    RTTT Project Management Team

    2014-01-

    24 87.35

    RTTT Project Management Team

    2014-02-

    07 89.35

    RTTT Project Management Team

    2014-02-

    21 89.35

    RTTT Project Management Team

    2014-03-

    07 89.35

    RTTT Project Management Team

    2014-03-

    21 89.35

    RTTT Project Management Team

    2014-04-

    04 89.35

    RTTT Project Management Team

    2014-04-

    17 89.35

    RTTT Project Management Team

    2014-05-

    02 89.35

    RTTT Project Management Team

    2014-05-

    16 89.35

    RTTT Project Management Team

    2014-05-

    30 91.94

    RTTT Project Management Team

    2014-06-

    13 89.35

    RTTT Project Management Team

    2014-06-

    27 163.99

    RTTT Project Management Team

    2014-07-

    11 163.99

    RTTT Project Management Team

    2014-07-

    17 47.14

    RTTT Project Management Team

    2014-07-

    25 184.24

    RTTT Project Management Team

    2014-08-

    08 184.25

    RTTT Project Management Team2014-08-22 184.24

    RTTT Project Management Team

    2014-09-

    05 184.24

    RTTT Project Management Team

    2014-09-

    19 184.24

    RTTT Project Management Team

    2013-02-

    08 6.73

    RTTT Project Management Team

    2010-12-

    15 105.35 JAMES PALMER

    RTTT Project Management Team

    2010-12-

    17 369.75 JAMES PALMER

    RTTT Project Management Team

    2011-06-

    16 175.80 JAMES PALMER

    RTTT Project Management Team

    2011-06-

    16 305.70 ELLEN MINGIONE

    RTTT Project Management Team

    2012-04-

    30 620.15 ELLEN MINGIONE

    RTTT Project Management Team

    2012-05-

    31 65.25 ELLEN MINGIONE

    RTTT Project Management Team

    2013-01-

    31 114.59 SARA KERR

    RTTT Project Management Team 2013-11- 34.00 KATHERINE VILLARI

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    28/158

    25

    RTTT Project Management Team

    2014-01-

    15 67.68 KATHERINE VILLARI

    RTTT Project Management Team

    2014-04-

    15 169.60 KATHERINE VILLARI

    RTTT Project Management Team

    2014-06-

    04 494.48 ELIZABETH JETTER

    RTTT Project Management Team

    2011-06-

    16 8.50 ELLEN MINGIONE

    RTTT Project Management Team

    2012-04-

    30 13.50 ELLEN MINGIONE

    RTTT Project Management Team

    2013-11-

    25 15.50 KATHERINE VILLARI

    RTTT Project Management Team

    2014-01-

    15 11.00 KATHERINE VILLARI

    RTTT Project Management Team

    2014-04-

    15 6.00 KATHERINE VILLARI

    RTTT Project Management Team

    2014-07-

    22 8.50 KATHERINE VILLARI

    RTTT Project Management Team

    2013-02-

    06 52.90 ALAN C PHILLIPS

    RTTT Project Management Team

    2013-02-

    12 23.91 SARA KERR

    RTTT Project Management Team

    2013-06-

    14 38.79 TERESA L BENNETT

    RTTT Project Management Team

    2014-07-

    22 34.40 KATHERINE VILLARI

    RTTT Project Management Team

    2010-09-

    27 212.40 DIV OF ACCOUNTING

    RTTT Project Management Team

    2010-10-

    27 43.10 DIV OF ACCOUNTING

    RTTT Project Management Team

    2010-12-

    27 380.00 DIV OF ACCOUNTING

    RTTT Project Management Team2013-05-28 90.00 DIV OF ACCOUNTING

    RTTT Project Management Team

    2013-05-

    28 207.80 DIV OF ACCOUNTING

    RTTT Project Management Team

    2014-01-

    27 117.00 DIV OF ACCOUNTING

    RTTT Project Management Team

    2012-12-

    27 6.10 DIV OF ACCOUNTING

    RTTT Project Management Team

    2013-05-

    28 56.22 DIV OF ACCOUNTING

    RTTT Project Management Team

    2013-05-

    28 94.36 DIV OF ACCOUNTING

    RTTT Project Management Team

    2013-06-

    13 52.49 KATHERINE VILLARI

    RTTT Project Management Team

    2014-01-

    15 18.00 KATHERINE VILLARI

    RTTT Project Management Team

    2014-02-

    19 60.36 KATHERINE VILLARI

    RTTT Project Management Team

    2014-07-

    22 83.01 KATHERINE VILLARI

    RTTT Project Management Team

    2012-12-

    27 137.45 DIV OF ACCOUNTING

    RTTT Project Management Team 2012-12- 137.45 DIV OF ACCOUNTING

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    29/158

    27

    RTTT Project Management Team

    2013-05-

    28 206.75 DIV OF ACCOUNTING

    RTTT Project Management Team

    2014-02-

    19 236.17 KATHERINE VILLARI

    RTTT Project Management Team

    2014-07-

    22 410.19 KATHERINE VILLARI

    RTTT Project Management Team

    2010-10-

    27 44.00 DIV OF ACCOUNTING

    RTTT Project Management Team

    2012-12-

    27 28.00 DIV OF ACCOUNTING

    RTTT Project Management Team

    2012-12-

    27 52.95 DIV OF ACCOUNTING

    RTTT Project Management Team

    2013-05-

    28 28.00 DIV OF ACCOUNTING

    RTTT Project Management Team

    2013-05-

    28 32.00 DIV OF ACCOUNTING

    RTTT Project Management Team

    2014-02-

    19 32.00 KATHERINE VILLARI

    RTTT Project Management Team

    2014-07-

    22 54.95 KATHERINE VILLARI

    RTTT Project Management Team

    2010-09-

    23 12,900.00 REBECCA TABER

    RTTT Project Management Team

    2010-10-

    21 12,900.00 REBECCA TABER

    RTTT Project Management Team

    2010-11-

    18 12,900.00 REBECCA TABER

    RTTT Project Management Team

    2010-12-

    21 12,900.00 REBECCA TABER

    RTTT Project Management Team

    2011-01-

    18 12,900.00 REBECCA TABER

    RTTT Project Management Team

    2011-02-

    18 12,900.00 REBECCA TABER

    RTTT Project Management Team2011-03-21 12,900.00 REBECCA TABER

    RTTT Project Management Team

    2011-04-

    20 12,900.00 REBECCA TABER

    RTTT Project Management Team

    2011-05-

    19 12,900.00 REBECCA TABER

    RTTT Project Management Team

    2011-06-

    07 12,900.00 REBECCA TABER

    RTTT Project Management Team

    2011-07-

    27 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2011-08-

    02 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2011-09-

    29 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2011-11-

    14 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2011-11-

    14 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2011-12-

    06 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2011-12-

    16 6,070.00 NATIONAL STUDENT CLEARINGHOUSE

    RTTT Project Management Team 2012-01- 5,000.00 MARGARET AITKEN COMMUNICATION

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    30/158

    23

    RTTT Project Management Team

    2012-01-

    24 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2012-03-

    01 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team

    2012-03-

    06 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2012-03-

    06 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2012-03-

    14 918.00 LAURISA SCHUTT

    RTTT Project Management Team

    2012-03-

    23 22,500.00 Us Education Delivery Inst

    RTTT Project Management Team

    2012-03-

    26 1,026.49 ASSOCIATES INTERNATIONAL INC

    RTTT Project Management Team

    2012-03-

    31 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team

    2012-04-

    05 1,406.00 LAURISA SCHUTT

    RTTT Project Management Team

    2012-04-

    11 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2012-05-

    01 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team

    2012-05-

    07 620.00 LAURISA SCHUTT

    RTTT Project Management Team

    2012-06-

    04 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team

    2012-06-

    05 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2012-06-

    05 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2012-06-

    13 610.00 LAURISA SCHUTT

    RTTT Project Management Team2012-06-25 3,750.00 COUNCIL OF CHIEF STATE SCHOOL OFFICERS

    RTTT Project Management Team

    2012-07-

    11 22,500.00 Us Education Delivery Inst

    RTTT Project Management Team

    2012-07-

    11 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team

    2012-07-

    12 910.00 LAURISA SCHUTT

    RTTT Project Management Team

    2012-07-

    20 11,226.38 REBECCA TABER

    RTTT Project Management Team

    2012-08-

    06 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team

    2012-08-

    29 380.00 LAURISA SCHUTT

    RTTT Project Management Team

    2012-08-

    30 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team

    2012-10-

    04 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team

    2012-11-

    05 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team

    2012-12-

    04 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team 2013-01- 2,500.00 MARGARET AITKEN COMMUNICATION

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    31/158

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    32/158

    20

    RTTT Project Management Team

    2013-04-

    22 12,499.00 NICOLE CAMPBELL

    RTTT Project Management Team

    2013-05-

    23 12,499.00 NICOLE CAMPBELL

    RTTT Project Management Team

    2013-08-

    07 5,241.52 NICOLE CAMPBELL

    RTTT Project Management Team

    2013-08-

    07 -5,241.52 NICOLE CAMPBELL

    RTTT Project Management Team

    2013-08-

    13 20,664.00 Us Education Delivery Inst

    RTTT Project Management Team

    2013-10-

    23 5,386.41 NICOLE CAMPBELL

    RTTT Project Management Team

    2013-10-

    23 -5,386.41 NICOLE CAMPBELL

    RTTT Project Management Team

    2011-01-

    07 114.17 MILFORD SCHOOL DISTRICT OFFICE

    RTTT Project Management Team

    2011-02-

    10 205.29 APPOQUINIMINK SCHOOL DISTRICT

    RTTT Project Management Team

    2011-03-

    11 36.23 MILFORD SCHOOL DISTRICT OFFICE

    RTTT Project Management Team

    2011-05-

    09 182.24 APPOQUINIMINK SCHOOL DISTRICT

    RTTT Project Management Team

    2011-05-

    19 181.14 DEPARTMENT OF EDUCATION

    RTTT Project Management Team

    2011-05-

    19 72.45 DEPARTMENT OF EDUCATION

    RTTT Project Management Team

    2014-02-

    27 3.99 DIV OF ACCOUNTING

    RTTT Project Management Team

    2014-07-

    28 8.94 DIV OF ACCOUNTING

    RTTT Project Management Team

    2010-12-

    27 18.31 DIV OF ACCOUNTING

    RTTT Project Management Team2011-01-27 3.54 DIV OF ACCOUNTING

    RTTT Project Management Team

    2011-06-

    27 8.26 DIV OF ACCOUNTING

    RTTT Project Management Team

    2011-07-

    27 8.26 DIV OF ACCOUNTING

    RTTT Project Management Team

    2013-11-

    27 2.49 DIV OF ACCOUNTING

    RTTT Project Management Team

    2010-11-

    30 171.72 OMB FLEET MANAGEMENT

    RTTT Project Management Team

    2010-11-

    18 637.10 TERRY CAMPUS

    RTTT Project Management Team

    2010-12-

    16 591.10 TERRY CAMPUS

    RTTT Project Management Team

    2011-02-

    08 39.00 COLONIAL PARKING INC

    RTTT Project Management Team

    2011-03-

    09 -39.00 COLONIAL PARKING INC

    RTTT Project Management Team

    2012-05-

    24 969.29 ASSOCIATES INTERNATIONAL INC

    RTTT Project Management Team

    2012-10-

    26 25.00 DIV OF ACCOUNTING

    RTTT Project Management Team 2014-05- 2,084.00 DIV OF ACCOUNTING

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    33/158

    27

    RTTT Project Management Team

    2010-10-

    20 15,300.00 HARVARD UNIV

    RTTT Project Management Team

    2012-09-

    27 95.00 DIV OF ACCOUNTING

    RTTT Project Management Team

    2012-10-

    26 1,595.00 DIV OF ACCOUNTING

    RTTT Project Management Team

    2010-12-

    27 185.40 DIV OF ACCOUNTING

    RTTT Project Management Team

    2012-10-

    26 130.97 DIV OF ACCOUNTING

    RTTT Project Management Team

    2012-12-

    27 478.53 DIV OF ACCOUNTING

    RTTT Project Management Team

    2013-03-

    27 120.33 DIV OF ACCOUNTING

    RTTT Project Management Team

    2014-05-

    27 72.45 DIV OF ACCOUNTING

    RTTT Project Management Team

    2013-09-

    01 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team

    2013-10-

    01 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team

    2013-12-

    01 2,500.00 MARGARET AITKEN COMMUNICATION

    RTTT Project Management Team

    2014-02-

    27 35.64 DIV OF ACCOUNTING

    RTTT Project Management Team

    2014-07-

    28 79.86 DIV OF ACCOUNTING

    RTTT Project Management Team

    2013-11-

    27 26.62 DIV OF ACCOUNTING

    RTTT Project Management Team

    2012-11-

    05 32,657.04 INSIGHT PUBLIC SECTOR

    RTTT Project Management Team

    2013-06-

    27 16,336.44 INSIGHT PUBLIC SECTOR

    RTTT LDS Project (Data)2011-10-21 9,300.00

    RTTT LDS Project (Data)

    2011-11-

    04 542.50

    RTTT LDS Project (Data)

    2011-11-

    18 77.50

    RTTT LDS Project (Data)

    2012-03-

    23 29.22

    RTTT LDS Project (Data)

    2012-04-

    05 -48.28

    RTTT LDS Project (Data)

    2012-04-

    20 -48.28

    RTTT LDS Project (Data)

    2012-05-

    04 -48.28

    RTTT LDS Project (Data)

    2012-05-

    18 -48.28

    RTTT LDS Project (Data)

    2012-06-

    01 -48.28

    RTTT LDS Project (Data)

    2012-06-

    15 -48.28

    RTTT LDS Project (Data)

    2012-06-

    29 -48.28

    RTTT LDS Project (Data) 2012-07- -48.28

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    34/158

    13

    RTTT LDS Project (Data)

    2012-07-

    27 -48.28

    RTTT LDS Project (Data)

    2011-10-

    21 1,744.74

    RTTT LDS Project (Data)

    2011-11-

    04 101.77

    RTTT LDS Project (Data)

    2011-11-

    18 14.54

    RTTT LDS Project (Data)

    2012-03-

    23 5.48

    RTTT LDS Project (Data)

    2012-04-

    05 -9.06

    RTTT LDS Project (Data)

    2012-04-

    20 -9.06

    RTTT LDS Project (Data)

    2012-05-

    04 -9.06

    RTTT LDS Project (Data)

    2012-05-

    18 -9.06

    RTTT LDS Project (Data)

    2012-06-

    01 -9.06

    RTTT LDS Project (Data)

    2012-06-

    15 -9.06

    RTTT LDS Project (Data)

    2012-06-

    29 -9.06

    RTTT LDS Project (Data)

    2012-07-

    13 -9.79

    RTTT LDS Project (Data)

    2012-07-

    27 -9.79

    RTTT LDS Project (Data)

    2011-10-

    21 181.28

    RTTT LDS Project (Data)

    2011-11-

    04 10.56

    RTTT LDS Project (Data)2011-11-18 1.51

    RTTT LDS Project (Data)

    2012-03-

    23 0.57

    RTTT LDS Project (Data)

    2012-04-

    05 -0.94

    RTTT LDS Project (Data)

    2012-04-

    20 -0.94

    RTTT LDS Project (Data)

    2012-05-

    04 -0.94

    RTTT LDS Project (Data)

    2012-05-

    18 -0.94

    RTTT LDS Project (Data)

    2012-06-

    01 -0.94

    RTTT LDS Project (Data)

    2012-06-

    15 -0.94

    RTTT LDS Project (Data)

    2012-06-

    29 -0.94

    RTTT LDS Project (Data)

    2012-07-

    13 -0.84

    RTTT LDS Project (Data)

    2012-07-

    27 -0.84

    RTTT LDS Project (Data) 2011-10- 553.90

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    35/158

    21

    RTTT LDS Project (Data)

    2011-11-

    04 31.54

    RTTT LDS Project (Data)

    2011-11-

    18 4.52

    RTTT LDS Project (Data)

    2012-03-

    23 1.72

    RTTT LDS Project (Data)

    2012-04-

    05 -2.83

    RTTT LDS Project (Data)

    2012-04-

    20 -2.83

    RTTT LDS Project (Data)

    2012-05-

    04 -2.83

    RTTT LDS Project (Data)

    2012-05-

    18 -2.83

    RTTT LDS Project (Data)

    2012-06-

    01 -2.83

    RTTT LDS Project (Data)

    2012-06-

    15 -2.83

    RTTT LDS Project (Data)

    2012-06-

    29 -2.96

    RTTT LDS Project (Data)

    2012-07-

    13 -2.83

    RTTT LDS Project (Data)

    2012-07-

    27 -2.82

    RTTT LDS Project (Data)

    2011-10-

    21 15.77

    RTTT LDS Project (Data)

    2011-11-

    04 0.90

    RTTT LDS Project (Data)

    2011-11-

    18 0.13

    RTTT LDS Project (Data)

    2012-03-

    23 0.05

    RTTT LDS Project (Data)2012-04-05 -0.08

    RTTT LDS Project (Data)

    2012-04-

    20 -0.08

    RTTT LDS Project (Data)

    2012-05-

    04 -0.08

    RTTT LDS Project (Data)

    2012-05-

    18 -0.08

    RTTT LDS Project (Data)

    2012-06-

    01 -0.08

    RTTT LDS Project (Data)

    2012-06-

    15 -0.08

    RTTT LDS Project (Data)

    2012-06-

    29 -0.08

    RTTT LDS Project (Data)

    2012-07-

    13 -0.08

    RTTT LDS Project (Data)

    2012-07-

    27 -0.08

    RTTT LDS Project (Data)

    2011-10-

    21 129.58

    RTTT LDS Project (Data)

    2011-11-

    04 7.39

    RTTT LDS Project (Data) 2011-11- 1.06

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    36/158

    18

    RTTT LDS Project (Data)

    2012-03-

    23 0.40

    RTTT LDS Project (Data)

    2012-04-

    05 -0.66

    RTTT LDS Project (Data)

    2012-04-

    20 -0.66

    RTTT LDS Project (Data)

    2012-05-

    04 -0.66

    RTTT LDS Project (Data)

    2012-05-

    18 -0.66

    RTTT LDS Project (Data)

    2012-06-

    01 -0.66

    RTTT LDS Project (Data)

    2012-06-

    15 -0.66

    RTTT LDS Project (Data)

    2012-06-

    29 -0.69

    RTTT LDS Project (Data)

    2012-07-

    13 -0.66

    RTTT LDS Project (Data)

    2012-07-

    27 -0.66

    RTTT LDS Project (Data)

    2012-07-

    27 282.20 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2012-07-

    27 282.20 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2012-09-

    27 30.00 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2012-09-

    27 26.00 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2012-07-

    27 40.42 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2012-09-

    27 19.05 DIV OF ACCOUNTING

    RTTT LDS Project (Data)2012-09-27 13.54 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2012-09-

    27 284.42 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2012-09-

    27 284.42 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2012-07-

    27 17.00 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2012-09-

    27 36.00 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2012-04-

    30 3,680.00 Positive Training Llc

    RTTT LDS Project (Data)

    2012-05-

    31 2,940.00 Positive Training Llc

    RTTT LDS Project (Data)

    2012-06-

    28 2,540.00 Positive Training Llc

    RTTT LDS Project (Data)

    2012-07-

    30 2,280.00 Positive Training Llc

    RTTT LDS Project (Data)

    2012-08-

    31 4,480.00 Positive Training Llc

    RTTT LDS Project (Data)

    2012-09-

    30 3,000.00 Positive Training Llc

    RTTT LDS Project (Data) 2012-10- 2,660.00 Positive Training Llc

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    37/158

    31

    RTTT LDS Project (Data)

    2012-11-

    30 3,760.00 Positive Training Llc

    RTTT LDS Project (Data)

    2012-12-

    21 1,500.00 Positive Training Llc

    RTTT LDS Project (Data)

    2013-01-

    31 5,160.00 Positive Training Llc

    RTTT LDS Project (Data)

    2013-02-

    28 4,380.00 Positive Training Llc

    RTTT LDS Project (Data)

    2010-09-

    01 15,697.50 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2010-10-

    01 179,240.00 MICROSOFT CORPORATION

    RTTT LDS Project (Data)

    2010-10-

    04 14,950.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2010-10-

    18 9,984.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2010-11-

    01 19,032.50 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2010-11-

    30 78,688.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2010-11-

    30 612.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2010-12-

    01 15,812.50 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2010-12-

    31 56,000.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2010-12-

    31 1,944.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2011-01-

    03 14,720.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2011-01-

    19 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)2011-01-19 274.48 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2011-01-

    25 5,120.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2011-01-

    25 892.42 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2011-01-

    31 1,908.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2011-02-

    01 17,480.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2011-02-

    10 347,221.42 MICROSOFT CORPORATION

    RTTT LDS Project (Data)

    2011-02-

    28 1,026.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2011-03-

    02 16,330.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2011-03-

    31 1,386.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2011-04-

    04 19,435.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2011-04-

    30 1,364.66 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data) 2011-04- 864.00 PROGRESSIVE SOFTWARE COMP INC

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    38/158

    30

    RTTT LDS Project (Data)

    2011-05-

    01 17,422.50 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2011-05-

    03 59,622.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2011-05-

    31 1,008.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2011-06-

    01 48,820.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2011-06-

    01 19,090.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2011-06-

    01 329,157.50 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2011-06-

    15 5,760.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2011-06-

    22 927.89 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2011-06-

    28 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2011-06-

    28 3,491.26 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2011-06-

    28 89.25 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2011-06-

    30 62,401.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2011-06-

    30 1,278.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2011-07-

    02 18,515.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2011-07-

    11 140,062.80 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2011-07-

    29 164,700.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)2011-08-02 93,461.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2011-08-

    31 70,303.00 MICROSOFT CORPORATION

    RTTT LDS Project (Data)

    2011-09-

    02 65,075.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2011-09-

    09 44,864.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2011-09-

    29 94,149.00 MICROSOFT CORPORATION

    RTTT LDS Project (Data)

    2011-10-

    03 62,577.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2011-10-

    04 32,386.20 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2011-11-

    04 141,204.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2011-11-

    28 108,725.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2011-12-

    06 74,424.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-01-

    01 49,803.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data) 2012-01- 28,479.00 ESP SOLUTIONS GROUP INC

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    39/158

    04

    RTTT LDS Project (Data)

    2012-02-

    02 195,729.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-02-

    10 53,543.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2012-03-

    06 187,329.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-04-

    03 77,919.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-04-

    11 139,093.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2012-04-

    30 4,798.77 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-05-

    08 6,864.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-05-

    21 23,733.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2012-06-

    05 80,754.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-07-

    02 59,355.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-07-

    18 84,251.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2012-07-

    23 98,800.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2012-08-

    03 1,980.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-08-

    28 4,950.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-09-

    05 125,937.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-10-

    01 37,989.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)2012-10-04 74,160.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2012-10-

    17 2,560.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-10-

    17 535.27 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-10-

    31 6,400.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-10-

    31 953.03 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-11-

    01 990.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-11-

    01 14,904.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-11-

    07 2,560.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-11-

    07 357.68 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-11-

    07 15,120.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-11-

    07 5,445.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data) 2012-11- 2,560.00 SUNGARD PUBLIC SECTOR

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    40/158

    12

    RTTT LDS Project (Data)

    2012-11-

    15 2,560.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-11-

    15 521.54 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-11-

    30 118,860.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-11-

    30 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-11-

    30 52.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-12-

    03 14,904.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2012-12-

    07 346.88 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-12-

    12 773.83 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-12-

    19 3,840.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-12-

    21 14,904.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2013-01-

    14 74,160.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2013-01-

    28 608.64 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-01-

    28 3,840.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-01-

    30 2,560.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-01-

    30 463.85 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-01-

    30 14,904.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)2013-01-31 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-02-

    02 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-02-

    02 415.07 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-02-

    21 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-02-

    21 103.40 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-02-

    27 53,980.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2013-02-

    28 14,904.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2013-03-

    08 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-03-

    08 110.18 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-03-

    14 2,560.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-03-

    14 352.26 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data) 2013-03- 1,280.00 SUNGARD PUBLIC SECTOR

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    41/158

    21

    RTTT LDS Project (Data)

    2013-03-

    26 2,560.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-03-

    26 568.93 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-03-

    26 405.68 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-03-

    27 14,904.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2013-03-

    29 2,560.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-03-

    29 465.08 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-04-

    11 54,810.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2013-04-

    18 2,560.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-04-

    18 810.27 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-04-

    22 39,610.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2013-04-

    24 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-04-

    24 659.30 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-04-

    30 144,144.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2013-04-

    30 14,904.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2013-05-

    08 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-05-

    08 583.05 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)2013-05-22 2,560.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-05-

    22 391.55 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-05-

    28 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-05-

    28 3,341.35 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-05-

    30 36,036.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2013-06-

    04 14,904.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2013-06-

    06 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-06-

    06 5,120.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-06-

    06 416.51 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-07-

    03 14,904.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2013-07-

    08 14,904.00 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data) 2013-07- 16,560.00 ESP SOLUTIONS GROUP INC

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    42/158

    08

    RTTT LDS Project (Data)

    2013-07-

    10 33,000.00 AMPLIFY EDUCATION INC

    RTTT LDS Project (Data)

    2013-09-

    10 16,027.50 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2013-10-

    22 640.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2014-07-

    08 13,727.50 ESP SOLUTIONS GROUP INC

    RTTT LDS Project (Data)

    2014-07-

    31 12,298.00 DOUBLE LINE INC

    RTTT LDS Project (Data)

    2010-10-

    18 15,660.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2010-10-

    18 11,362.00 924 INC DBA BRANDYWINE TECHNOLOGY

    RTTT LDS Project (Data)

    2010-10-

    18 -11,362.00 924 INC DBA BRANDYWINE TECHNOLOGY

    RTTT LDS Project (Data)

    2010-10-

    26 1,480.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2010-10-

    31 11,340.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2010-10-

    31 -11,340.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2010-11-

    09 640.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2010-11-

    09 2,960.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2010-11-

    30 1,480.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2010-11-

    30 285.84 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2010-11-

    30 12,800.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)2010-11-30 11,340.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2010-11-

    30 -12,800.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2010-11-

    30 -11,340.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2010-12-

    15 3,840.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2010-12-

    20 12,882.00 924 INC DBA BRANDYWINE TECHNOLOGY

    RTTT LDS Project (Data)

    2010-12-

    20 13,110.00 924 INC DBA BRANDYWINE TECHNOLOGY

    RTTT LDS Project (Data)

    2010-12-

    20 -12,882.00 924 INC DBA BRANDYWINE TECHNOLOGY

    RTTT LDS Project (Data)

    2010-12-

    20 -13,110.00 924 INC DBA BRANDYWINE TECHNOLOGY

    RTTT LDS Project (Data)

    2010-12-

    23 5,120.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2011-02-

    01 2,480.23 VERSALIGN INC

    RTTT LDS Project (Data)

    2011-03-

    10 493.95 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data) 2011-04- 640.00 SUNGARD PUBLIC SECTOR

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    43/158

    20

    RTTT LDS Project (Data)

    2011-04-

    20 89.50 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2011-08-

    01 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2011-09-

    02 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2011-09-

    19 692.18 COMPUTER AID INC

    RTTT LDS Project (Data)

    2011-09-

    22 797.05 COMPUTER AID INC

    RTTT LDS Project (Data)

    2011-10-

    01 89,687.00 MICROSOFT CORPORATION

    RTTT LDS Project (Data)

    2011-10-

    03 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2011-10-

    18 513.89 COMPUTER AID INC

    RTTT LDS Project (Data)

    2011-11-

    01 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2011-11-

    16 122.88 COMPUTER AID INC

    RTTT LDS Project (Data)

    2011-12-

    02 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2011-12-

    13 5,636.58 COMPUTER AID INC

    RTTT LDS Project (Data)

    2011-12-

    13 324.00 COMPUTER AID INC

    RTTT LDS Project (Data)

    2011-12-

    19 3,739.96 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-01-

    04 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2012-01-

    10 11,054.96 COMPUTER AID INC

    RTTT LDS Project (Data)2012-01-10 180.00 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-01-

    10 12,938.24 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-02-

    01 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2012-02-

    14 11,418.61 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-02-

    14 180.00 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-02-

    14 12,533.92 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-03-

    03 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2012-03-

    14 12,218.64 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-03-

    14 333.00 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-03-

    14 11,826.36 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-03-

    28 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data) 2012-04- 17,250.00 APPLIED TECHNOLOGIES INC

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    44/158

    02

    RTTT LDS Project (Data)

    2012-04-

    11 288.00 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-04-

    11 12,436.83 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-04-

    11 17,082.52 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-04-

    30 6,814.51 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-05-

    04 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2012-05-

    11 11,636.80 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-05-

    11 90.00 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-05-

    11 16,172.80 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-05-

    31 2,560.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-06-

    01 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2012-06-

    11 13,091.40 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-06-

    11 17,790.08 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-07-

    04 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2012-07-

    13 12,073.18 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-07-

    13 14,555.52 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-08-

    01 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)2012-08-22 11,636.80 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-08-

    24 1,538.08 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-08-

    27 15,364.16 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-09-

    01 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2012-09-

    19 13,382.32 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-09-

    19 17,687.92 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-09-

    19 17,790.08 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-10-

    01 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2012-10-

    16 10,909.50 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-10-

    16 13,842.72 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-10-

    16 14,555.52 COMPUTER AID INC

    RTTT LDS Project (Data) 2012-11- 17,250.00 APPLIED TECHNOLOGIES INC

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    45/158

    01

    RTTT LDS Project (Data)

    2012-11-

    13 11,320.96 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-11-

    13 17,687.92 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-11-

    13 11,054.96 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-11-

    13 597.11 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-11-

    30 3,840.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-11-

    30 663.95 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2012-12-

    03 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2012-12-

    14 16,149.84 COMPUTER AID INC

    RTTT LDS Project (Data)

    2012-12-

    14 14,555.52 COMPUTER AID INC

    RTTT LDS Project (Data)

    2013-01-

    02 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2013-01-

    15 15,380.80 COMPUTER AID INC

    RTTT LDS Project (Data)

    2013-01-

    15 12,938.24 COMPUTER AID INC

    RTTT LDS Project (Data)

    2013-01-

    17 2,560.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-01-

    17 350.10 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-02-

    01 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2013-02-

    13 16,918.88 COMPUTER AID INC

    RTTT LDS Project (Data)2013-02-13 5,024.69 COMPUTER AID INC

    RTTT LDS Project (Data)

    2013-03-

    01 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2013-03-

    13 15,380.80 COMPUTER AID INC

    RTTT LDS Project (Data)

    2013-04-

    01 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2013-04-

    19 16,149.84 COMPUTER AID INC

    RTTT LDS Project (Data)

    2013-05-

    04 17,250.00 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2013-05-

    08 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-05-

    15 1,280.00 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-05-

    15 342.38 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2013-05-

    16 14,611.76 COMPUTER AID INC

    RTTT LDS Project (Data)

    2013-06-

    02 16,783.78 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data) 2013-06- 16,918.88 COMPUTER AID INC

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    46/158

    07

    RTTT LDS Project (Data)

    2013-07-

    01 16,783.78 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2013-07-

    16 15,380.80 COMPUTER AID INC

    RTTT LDS Project (Data)

    2013-08-

    02 932.44 APPLIED TECHNOLOGIES INC

    RTTT LDS Project (Data)

    2013-08-

    15 16,149.84 COMPUTER AID INC

    RTTT LDS Project (Data)

    2013-09-

    12 16,918.88 COMPUTER AID INC

    RTTT LDS Project (Data)

    2013-10-

    11 13,842.72 COMPUTER AID INC

    RTTT LDS Project (Data)

    2013-11-

    12 8,459.44 COMPUTER AID INC

    RTTT LDS Project (Data)

    2013-11-

    12 2,087.56 COMPUTER AID INC

    RTTT LDS Project (Data)

    2014-02-

    26 427.20 SUNGARD PUBLIC SECTOR

    RTTT LDS Project (Data)

    2010-11-

    30 6,246.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2010-11-

    30 -6,246.00 PROGRESSIVE SOFTWARE COMP INC

    RTTT LDS Project (Data)

    2011-05-

    27 15.85 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2012-02-

    27 5.89 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2012-03-

    27 5.89 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2011-08-

    11 943.75 POLYTECH SCHOOL DISTRICT

    RTTT LDS Project (Data)

    2011-06-

    27 907.50 DIV OF ACCOUNTING

    RTTT LDS Project (Data)2011-06-27 518.95 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2013-05-

    28 179.98 DIV OF ACCOUNTING

    RTTT LDS Project (Data)

    2011-04-

    27 3,999.00 DIV OF ACCOUNTING

    RTTT Turnaround Office

    2010-09-

    24 4,996.76

    RTTT Turnaround Office

    2010-10-

    08 4,996.76

    RTTT Turnaround Office

    2010-10-

    22 4,996.76

    RTTT Turnaround Office

    2010-11-

    05 4,996.76

    RTTT Turnaround Office

    2010-11-

    19 4,996.76

    RTTT Turnaround Office

    2010-12-

    03 4,996.76

    RTTT Turnaround Office

    2010-12-

    17 4,996.76

    RTTT Turnaround Office

    2010-12-

    30 4,996.76

    RTTT Turnaround Office 2011-01- 4,996.76

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    47/158

    14

    RTTT Turnaround Office

    2011-01-

    28 8,339.17

    RTTT Turnaround Office

    2011-02-

    11 12,159.83

    RTTT Turnaround Office

    2011-02-

    25 12,159.83

    RTTT Turnaround Office

    2011-03-

    11 12,159.83

    RTTT Turnaround Office

    2011-03-

    25 12,159.83

    RTTT Turnaround Office

    2011-04-

    08 12,159.83

    RTTT Turnaround Office

    2011-04-

    21 12,159.83

    RTTT Turnaround Office

    2011-05-

    06 12,159.83

    RTTT Turnaround Office

    2011-05-

    20 12,159.83

    RTTT Turnaround Office

    2011-06-

    03 12,159.83

    RTTT Turnaround Office

    2011-06-

    17 12,159.83

    RTTT Turnaround Office

    2011-07-

    01 12,159.83

    RTTT Turnaround Office

    2011-07-

    15 9,020.01

    RTTT Turnaround Office

    2011-07-

    29 8,837.92

    RTTT Turnaround Office

    2011-08-

    12 12,234.55

    RTTT Turnaround Office

    2011-08-

    26 12,234.55

    RTTT Turnaround Office2011-09-09 12,234.55

    RTTT Turnaround Office

    2011-09-

    23 12,234.55

    RTTT Turnaround Office

    2011-10-

    07 12,234.55

    RTTT Turnaround Office

    2011-10-

    21 12,234.55

    RTTT Turnaround Office

    2011-11-

    04 12,234.55

    RTTT Turnaround Office

    2011-11-

    18 12,234.55

    RTTT Turnaround Office

    2011-12-

    02 12,234.55

    RTTT Turnaround Office

    2011-12-

    16 12,234.55

    RTTT Turnaround Office

    2011-12-

    30 12,234.55

    RTTT Turnaround Office

    2012-01-

    13 12,234.55

    RTTT Turnaround Office

    2012-01-

    27 12,475.13

    RTTT Turnaround Office 2012-02- 12,475.13

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    48/158

    10

    RTTT Turnaround Office

    2012-02-

    24 12,475.13

    RTTT Turnaround Office

    2012-03-

    09 12,475.13

    RTTT Turnaround Office

    2012-03-

    23 12,475.13

    RTTT Turnaround Office

    2012-04-

    05 12,475.13

    RTTT Turnaround Office

    2012-04-

    20 12,475.13

    RTTT Turnaround Office

    2012-05-

    04 12,475.13

    RTTT Turnaround Office

    2012-05-

    18 12,475.13

    RTTT Turnaround Office

    2012-06-

    01 12,475.13

    RTTT Turnaround Office

    2012-06-

    15 12,475.13

    RTTT Turnaround Office

    2012-06-

    29 12,475.13

    RTTT Turnaround Office

    2012-07-

    13 12,475.13

    RTTT Turnaround Office

    2012-07-

    27 12,599.86

    RTTT Turnaround Office

    2012-08-

    10 8,642.72

    RTTT Turnaround Office

    2012-08-

    24 5,147.60

    RTTT Turnaround Office

    2012-11-

    02 5,147.60

    RTTT Turnaround Office

    2012-11-

    16 5,147.60

    RTTT Turnaround Office2012-11-30 5,147.60

    RTTT Turnaround Office

    2012-12-

    14 5,147.60

    RTTT Turnaround Office

    2012-12-

    28 5,147.60

    RTTT Turnaround Office

    2013-01-

    11 5,147.60

    RTTT Turnaround Office

    2013-01-

    25 5,147.60

    RTTT Turnaround Office

    2013-02-

    08 6,840.69

    RTTT Turnaround Office

    2013-02-

    22 9,380.33

    RTTT Turnaround Office

    2013-03-

    08 9,380.33

    RTTT Turnaround Office

    2013-03-

    22 9,380.33

    RTTT Turnaround Office

    2013-04-

    05 9,380.33

    RTTT Turnaround Office

    2013-04-

    19 9,380.33

    RTTT Turnaround Office 2013-05- 9,380.33

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    49/158

    03

    RTTT Turnaround Office

    2013-05-

    17 9,380.33

    RTTT Turnaround Office

    2013-05-

    31 9,380.33

    RTTT Turnaround Office

    2013-06-

    14 9,380.33

    RTTT Turnaround Office

    2013-06-

    28 9,380.33

    RTTT Turnaround Office

    2013-07-

    12 9,380.33

    RTTT Turnaround Office

    2013-07-

    26 9,380.33

    RTTT Turnaround Office

    2013-08-

    09 9,380.33

    RTTT Turnaround Office

    2013-08-

    23 9,380.33

    RTTT Turnaround Office

    2013-09-

    06 9,380.33

    RTTT Turnaround Office

    2013-09-

    20 9,380.33

    RTTT Turnaround Office

    2013-10-

    04 9,380.33

    RTTT Turnaround Office

    2013-10-

    18 9,380.33

    RTTT Turnaround Office

    2013-11-

    01 9,380.33

    RTTT Turnaround Office

    2013-11-

    15 9,380.33

    RTTT Turnaround Office

    2013-11-

    27 9,380.33

    RTTT Turnaround Office

    2013-12-

    13 9,380.33

    RTTT Turnaround Office2013-12-27 9,380.33

    RTTT Turnaround Office

    2014-01-

    10 9,380.33

    RTTT Turnaround Office

    2014-01-

    24 9,380.33

    RTTT Turnaround Office

    2014-02-

    07 9,380.33

    RTTT Turnaround Office

    2014-02-

    21 9,380.33

    RTTT Turnaround Office

    2014-03-

    07 9,380.33

    RTTT Turnaround Office

    2014-03-

    21 9,380.33

    RTTT Turnaround Office

    2014-04-

    04 9,380.33

    RTTT Turnaround Office

    2014-04-

    17 9,380.33

    RTTT Turnaround Office

    2014-05-

    02 9,380.33

    RTTT Turnaround Office

    2014-05-

    16 9,380.33

    RTTT Turnaround Office 2014-05- 9,380.33

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    50/158

    30

    RTTT Turnaround Office

    2014-06-

    13 9,380.33

    RTTT Turnaround Office

    2014-06-

    27 9,380.33

    RTTT Turnaround Office

    2014-07-

    11 9,380.33

    RTTT Turnaround Office

    2014-07-

    25 9,380.33

    RTTT Turnaround Office

    2014-08-

    08 5,262.25

    RTTT Turnaround Office

    2014-08-

    22 4,232.73

    RTTT Turnaround Office

    2014-09-

    05 4,232.73

    RTTT Turnaround Office

    2014-09-

    19 4,232.73

    RTTT Turnaround Office

    2012-08-

    10 12,346.65

    RTTT Turnaround Office

    2012-08-

    24 8,138.78

    RTTT Turnaround Office

    2014-08-

    08 9,344.52

    RTTT Turnaround Office

    2010-09-

    24 859.44

    RTTT Turnaround Office

    2010-10-

    08 859.44

    RTTT Turnaround Office

    2010-10-

    22 859.44

    RTTT Turnaround Office

    2010-11-

    05 859.44

    RTTT Turnaround Office

    2010-11-

    19 859.44

    RTTT Turnaround Office2010-12-03 859.44

    RTTT Turnaround Office

    2010-12-

    17 859.44

    RTTT Turnaround Office

    2010-12-

    30 859.44

    RTTT Turnaround Office

    2011-01-

    14 859.44

    RTTT Turnaround Office

    2011-01-

    28 1,434.33

    RTTT Turnaround Office

    2011-02-

    11 2,091.48

    RTTT Turnaround Office

    2011-02-

    25 2,091.48

    RTTT Turnaround Office

    2011-03-

    11 2,091.48

    RTTT Turnaround Office

    2011-03-

    25 2,091.48

    RTTT Turnaround Office

    2011-04-

    08 2,091.48

    RTTT Turnaround Office

    2011-04-

    21 2,091.48

    RTTT Turnaround Office 2011-05- 2,091.48

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    51/158

    06

    RTTT Turnaround Office

    2011-05-

    20 2,091.48

    RTTT Turnaround Office

    2011-06-

    03 2,091.48

    RTTT Turnaround Office

    2011-06-

    17 2,091.48

    RTTT Turnaround Office

    2011-07-

    01 2,281.19

    RTTT Turnaround Office

    2011-07-

    15 1,692.15

    RTTT Turnaround Office

    2011-07-

    29 1,657.99

    RTTT Turnaround Office

    2011-08-

    12 2,295.20

    RTTT Turnaround Office

    2011-08-

    26 2,295.20

    RTTT Turnaround Office

    2011-09-

    09 2,295.20

    RTTT Turnaround Office

    2011-09-

    23 2,295.20

    RTTT Turnaround Office

    2011-10-

    07 2,295.20

    RTTT Turnaround Office

    2011-10-

    21 2,295.20

    RTTT Turnaround Office

    2011-11-

    04 2,295.20

    RTTT Turnaround Office

    2011-11-

    18 2,295.20

    RTTT Turnaround Office

    2011-12-

    02 2,295.20

    RTTT Turnaround Office

    2011-12-

    16 2,295.20

    RTTT Turnaround Office2011-12-30 2,295.20

    RTTT Turnaround Office

    2012-01-

    13 2,295.20

    RTTT Turnaround Office

    2012-01-

    27 2,340.34

    RTTT Turnaround Office

    2012-02-

    10 2,340.34

    RTTT Turnaround Office

    2012-02-

    24 2,340.34

    RTTT Turnaround Office

    2012-03-

    09 2,340.34

    RTTT Turnaround Office

    2012-03-

    23 2,340.34

    RTTT Turnaround Office

    2012-04-

    05 2,340.34

    RTTT Turnaround Office

    2012-04-

    20 2,340.34

    RTTT Turnaround Office

    2012-05-

    04 2,340.34

    RTTT Turnaround Office

    2012-05-

    18 2,340.34

    RTTT Turnaround Office 2012-06- 2,340.34

  • 7/26/2019 r Ttt Expenses for Doe as of 9222014

    52/158

    01

    RTTT Turnaround Office

    2012-06-

    15 2,340.34

    RTTT Turnaround Office

    2012-06-

    29 2,340.34

    RTTT Turnaround Office

    2012-07-