québec–new hampshire interconnection · 2015e1101-a. printed on paper made in québec from 100%...
TRANSCRIPT
Québec–New Hampshire Interconnection
INFORMATION ON THE SOLUTION SELEC TED • Summer 2015
The goal of this Hydro-Québec TransÉnergie project is to increase the energy interchange capacity between Québec and New England by building an interconnection to link Québec’s power grid with New Hampshire’s. Commissioning is scheduled for 2019.
Connecting the gridsThe project involves the construction of a 320-kV direct-current transmission line, about 80 km long, in Québec. This line will be extended into the U.S.A. and will connect Des Cantons substation in Val-Joli to Franklin sub-station in southern New Hampshire. To supply the planned transmission line, equipment that converts alter-nating current to direct current will be added to Des Cantons substation. No expansion of the existing Des Cantons substation is required.
2
##
##
##
##
####
##
##
##
##
!!
Bury, M
Stoke, M
Newport, M
Sherbrooke, V
Coaticook, V
Compton, M
Cookshire-Eaton, V
Saint-Malo, M
Val-Joli, M
Dixville, M Saint-Herménégilde, M
Saint-Isidore-de-Clifton, M
Barnston-Ouest, M
Ascot Corner, M
Saint-Claude, M
La Patrie, M
East Hereford, M
Martinville, MWaterville, V
Sainte-Edwidge-de-Clifton, CT
Saint-Venant-de-Paquette, M
Chartierville, M
Windsor, V
Cleveland, CT
Stanstead-Est, M
SawyervilleJohnville
Birchton
COATICOOK(MRC)
LE HAUT-SAINT-FRANÇOIS(MRC)
LE VAL-SAINT-FRANÇOIS(MRC)
SHERBROOKE(TÉ)
Windsorsubstation
Coaticooksubstation
Des Cantons substation (735 kV)
Poste de Weedon
Rivière
Rivière C
oaticook
Rivière
Rivière
LacMassawippi
aux
Saumons
Massa
wippi
Moe
Rivière
LacMagog
LacWallace
Saumon
Lac Lindsay
Saint-Franço
is
NEW HAMPSHIRE
VERMONTU.S.A
SherbrookeAirport
QUÉBEC
!(A
Monts Stoke450-kV line
450-kV line
Selected route
147
206
206
251
251
251
216
253
253
212
108
214
112
10
10
108
253
143
141
Mont Hereford
71°40'
71°40'
72°0'
72°0'
45°2
0'
45°2
0'
45°0
'
45°0
'
Information for publics concerned by the project. For any other use, contact Géomatique, Hydro-Québec Équipement et services partagés.
!
!
!Boston
Québec
Montréal
U.S.A.
Ontario
NewBrunswick
NovaScotia
Québec
P.E.I.
0 200 km
0 5 10 km
MTM, zone 7, NAD837178_bu_hq_038_solution_150812a.mxd
120 kV
450 kV or 735 kV
Transmission substations and lines
Regional county municipality (MRC) orequivalent territory (TÉ)
Municipality
Boundaries
Project components
Study area
Selected route
Route and variant studied
#
#
##
##
##
##
####
##
##
##
##
!!
Bury, M
Stoke, M
Newport, M
Sherbrooke, V
Coaticook, V
Compton, M
Cookshire-Eaton, V
Saint-Malo, M
Val-Joli, M
Dixville, M Saint-Herménégilde, M
Saint-Isidore-de-Clifton, M
Barnston-Ouest, M
Ascot Corner, M
Saint-Claude, M
La Patrie, M
East Hereford, M
Martinville, MWaterville, V
Sainte-Edwidge-de-Clifton, CT
Saint-Venant-de-Paquette, M
Chartierville, M
Windsor, V
Cleveland, CT
Stanstead-Est, M
SawyervilleJohnville
Birchton
COATICOOK(MRC)
LE HAUT-SAINT-FRANÇOIS(MRC)
LE VAL-SAINT-FRANÇOIS(MRC)
SHERBROOKE(TÉ)
Windsorsubstation
Coaticooksubstation
Des Cantons substation (735 kV)
Poste de Weedon
Rivière
Rivière C
oaticook
Rivière
Rivière
LacMassawippi
aux
Saumons
Massa
wippi
Moe
Rivière
LacMagog
LacWallace
Saumon
Lac Lindsay
Saint-Franço
is
NEW HAMPSHIRE
VERMONTU.S.A
SherbrookeAirport
QUÉBEC
!(A
Monts Stoke450-kV line
450-kV line
Selected route
147
206
206
251
251
251
216
253
253
212
108
214
112
10
10
108
253
143
141
Mont Hereford
71°40'
71°40'
72°0'
72°0'
45°2
0'
45°2
0'
45°0
'
45°0
'
Information for publics concerned by the project. For any other use, contact Géomatique, Hydro-Québec Équipement et services partagés.
!
!
!Boston
Québec
Montréal
U.S.A.
Ontario
NewBrunswick
NovaScotia
Québec
P.E.I.
0 200 km
0 5 10 km
MTM, zone 7, NAD837178_bu_hq_038_solution_150812a.mxd
120 kV
450 kV or 735 kV
Transmission substations and lines
Regional county municipality (MRC) orequivalent territory (TÉ)
Municipality
Boundaries
Project components
Study area
Selected route
Route and variant studied
#
#
Environmental studies From the start of the draft-design study, Hydro-Québec delineated a vast study area to expand its knowledge of the territory. Hydro-Québec confirmed that the route with the least impact consists in running the new 320-kV line near the existing 450-kV line over the longest possible distance.
The study area (571 km2) covers parts of three regional county municipalities (MRCs): Val-Saint-François, Haut-Saint-François and Coaticook. Within these MRCs, it crosses through the following municipalities: Val-Joli, Stoke, Ascot Corner, Cookshire-Eaton, Saint-Isidore-de-Clifton, Martinville, Sainte-Edwidge- de-Clifton, Saint-Malo, Saint-Venant-de-Paquette, East Hereford and Saint-Herménégilde.
Work completed in recent monthsEnvironmental field surveys were carried out in spring and summer 2015.
Field crews recorded numerous com-ponents of the biophysical environment (rare plants, snakes, etc.) in the section of the new line route that runs parallel to the existing 450-kV line and along the path of the variants studied.
Each variant was evaluated based on its impacts on the region’s landscape, as well as on the human and natural environments (noise, archeology, etc.).
Key role of host community’s commentsIn recent months, Hydro-Québec has been working with local authorities to obtain information on the host community and gather their opinion on the route under study (i.e., the section that runs parallel to the 450-kV line and the four variants in the other section). In addition, last June, we held meetings with the host community to present the project and gather comments. The community’s input had a decisive influence on the solution selected.
Location criteria for the lineIn developing the line route, the following main criteria were taken into account: • Run the line along the existing 450-kV line wherever
possible.
• Avoid siting near homes as much as possible.
• As much as possible, avoid sensitive elements such as farmland, sugar bush operations, exceptional forest ecosystems, habitats of special-status plant and animal species, wetlands and recreational or tourist sites.
• Avoid the highlands of the Mont Hereford massif.
• Avoid open spaces and sites offering panoramic views.
• Optimize line design with a view to harmonious integration into the environment.
3
"
"
"
Coaticook, V
Compton, M
Saint-Malo, M
Dixville, M
Saint-Herménégilde, M
Saint-Isidore-de-Clifton, M
East Hereford, M
Sainte-Edwidge-de-Clifton, CT
Saint-Venant-de-Paquette, M
NEW HAMPSHIRE
VERMONT
253251
251
206
206
253
147
147
141
141
Rivière
Rivière
Saumons
Moe
Rivière
aux
Lac Lindsay
Lac Wallace
Coaticook
Riviè
re
Hall
COATICOOK(MRC)
COATICOOK(MRC)
QUÉBEC
U.S.A.
Ch. de Coaticook
9e Rang
Ch. des Côtes
Ch. du 9e-Rang
West Stewartstown
Stewartstown
Pittsburg
Happy CornerMont Hereford
450-kV line
¬\
Selected route
71°30'
71°30'
71°45'
71°45'
45°0
'
45°0
'
Information for publics concerned by the project. For any other use, contact Géomatique, Hydro-Québec Équipement et services partagés.
!(A
0 2 4 km
MTM, zone 7, NAD837178_bu_hq_039_solution_sect_sud_150812a.mxd
Project components
Study area
Selected route
Proposed crossing point¬\
International border
Regional county municipality (MRC) orequivalent territory (TÉ) boundary
Municipal boundary
450-kV transmission line
"
"
"
Coaticook, V
Compton, M
Saint-Malo, M
Dixville, M
Saint-Herménégilde, M
Saint-Isidore-de-Clifton, M
East Hereford, M
Sainte-Edwidge-de-Clifton, CT
Saint-Venant-de-Paquette, M
NEW HAMPSHIRE
VERMONT
253251
251
206
206
253
147
147
141
141
Rivière
Rivière
Saumons
Moe
Rivière
aux
Lac Lindsay
Lac Wallace
Coaticook
Riviè
re
Hall
COATICOOK(MRC)
COATICOOK(MRC)
QUÉBEC
U.S.A.
Ch. de Coaticook
9e Rang
Ch. des Côtes
Ch. du 9e-Rang
West Stewartstown
Stewartstown
Pittsburg
Happy CornerMont Hereford
450-kV line
¬\
Selected route
71°30'
71°30'
71°45'
71°45'
45°0
'
45°0
'
Information for publics concerned by the project. For any other use, contact Géomatique, Hydro-Québec Équipement et services partagés.
!(A
0 2 4 km
MTM, zone 7, NAD837178_bu_hq_039_solution_sect_sud_150812a.mxd
Project components
Study area
Selected route
Proposed crossing point¬\
International border
Regional county municipality (MRC) orequivalent territory (TÉ) boundary
Municipal boundary
450-kV transmission line
Selected line routeBased on the results of its studies and the comments from community representatives and the public, Hydro-Québec has opted for the route described below.
For 80% of its length, from Des Cantons substation to the municipality of Saint-Malo, the planned line will run along the east side of the 450-kV line.
In the southern section, Hydro-Québec studied four variants that took into account technical and environmental criteria and the community’s suggestions and concerns. To reach the crossing point, the line will run west of the mountain, mainly because this side allows for a better integration into the landscape. By selecting this route, Hydro-Québec aims to bypass Mont Hereford and not interfere with outdoor activities, which are practiced more widely east of the mountain.
In addition, Hydro-Québec is currently working on optimizing the selected route by taking into account comments from residents and local authorities.
Tangible support for community developmentHydro-Québec sees its projects as an opportunity to participate in the development of host communities. With this in mind, it grants eligible organizations funding equivalent to 1% of the initially authorized value of the facilities covered by the Integrated Enhancement Program, to be used for local enhancement initiatives that improve the community.
Improved mitigation measuresStarting at the project design phase, Hydro-Québec implements a number of mitigation measures, including selecting the most suitable types of towers and careful tower siting. In this project, towers will be erected side by side when possible when the two lines are parallel, especially in open areas.
2015E1101-APrinted on paper made in Québec from 100% postconsumer recycled fibre.
Ce document est également publié en français. This is a translation of the original French text.
26.5 m 10 m60 m
53 m
30 m
26.5 m 10 m60 m
53 m
30 m
Pylône et emprise types lorsque la ligne projetée est juxtaposée à la ligne existante
7178
_bu_
hq_0
41_p
yl_1
5080
4a.F
H10
Guyed towers
Self-supporting towers
Aver
age
heig
ht: 3
5 m
Des Cantons–New England 450 kV DC
Planned line
Québec–New Hampshire320 kV DC
Aver
age
heig
ht: 4
0 m
Existing right-of-way
Existing right-of-wayPlanned right-of-way
average
Aver
age
heig
ht: 3
5 m
Des Cantons–New England 450 kV DC
Planned line
Québec–New Hampshire320 kV DC
Aver
age
heig
ht: 4
0 m
Existing right-of-way
Existing right-of-wayPlanned right-of-way
average
Information for publics concerned by the project. For any other use, contact Géomatique, Hydro-Québec Équipement et services partagés.
East
East West
West
26.5 m 10 m60 m
53 m
30 m
26.5 m 10 m60 m
53 m
30 m
Pylône et emprise types lorsque la ligne projetée est juxtaposée à la ligne existante
7178
_bu_
hq_0
41_p
yl_1
5080
4a.F
H10
Guyed towers
Self-supporting towers
Aver
age
heig
ht: 3
5 m
Des Cantons–New England 450 kV DC
Planned line
Québec–New Hampshire320 kV DC
Aver
age
heig
ht: 4
0 m
Existing right-of-way
Existing right-of-wayPlanned right-of-way
average
Aver
age
heig
ht: 3
5 m
Des Cantons–New England 450 kV DC
Planned line
Québec–New Hampshire320 kV DC
Aver
age
heig
ht: 4
0 m
Existing right-of-way
Existing right-of-wayPlanned right-of-way
average
Information for publics concerned by the project. For any other use, contact Géomatique, Hydro-Québec Équipement et services partagés.
East
East West
West
Typical towers and right-of-way when planned line is parallel to existing line
26.5 m10 m
60 m53 m
30 m
26.5 m10 m
60 m53 m
30 m
Pylô
ne et em
prise typ
es lorsq
ue la lig
ne
pro
jetée est juxtap
osée à la lig
ne existan
te
7178_bu_hq_041_pyl_150804a.FH10
Gu
yed to
wers
Self-su
pp
ortin
g to
wers
Average height: 35 m
Des C
antons–New
England 450 kV D
C
Planned line
Québec–N
ew H
ampshire
320 kV DC
Average height: 40 m
Existing right-of-way
Existing right-of-way
Planned right-of-way
average
Average height: 35 m
Des C
antons–New
England 450 kV D
C
Planned line
Québec–N
ew H
ampshire
320 kV DC
Average height: 40 m
Existing right-of-way
Existing right-of-way
Planned right-of-way
average
Information for publics concerned by the project. F
or any other use, contact Géom
atique, Hydro-Q
uébec Équipem
ent et services partagés.
East
EastW
est
West
Tower types and right-of-wayThis will be the first 320-kV DC line built by Hydro-Québec, so a new type of steel tower will be used.
These towers will be similar to the ones for the existing 450-kV line, but will be smaller. They will be installed near existing towers wherever possible.
ScheduleDRAFT DESIGN
General information Winter 2014-2015
Public consultation on line routes Spring 2015
Information on the route selected Summer 2015
PROJECT
Permitting Fall 2015 to spring 2017
Construction 2017–2019
Commissioning 2019
For more information
Info-project line 1 8 7 7 6 5 3-1 1 3 9
Ginette CantinAdvisor – Community Relations – Richelieu Direction – Affaires régionales et collectivités 705, boul. Clairevue Ouest, 1er étage Saint-Bruno-de-Montarville (Québec) J3V 6B6E-mail: [email protected]
www.hydroquebec.com/quebec-new-hampshire www.hydroforthefuture.com