quantity estimate sludge drying bed

Upload: ujjwal

Post on 06-Jul-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    1/30

    QUANTITY ESTIMATE FOR SLUDGE DRYING BED

    SN Description of Work No Unit L(! B(! "(! Q#$ntit% Re$rks

    A SLUDGE DRYING BED

    & E$rt' ork 

    &)&)&E*W Fi++in, in BMS soi+ 1 m3 28 25 0.6 420.00

    Tot$+ -./)//

    &). E$rt'ork For E0c$1$tion

    &).)&E$rt' ork For SDB $++ 0.00

    short wall 5 m3 19.3 0.7 0.5 33.78

    long wall 2 m3 26.4 0.7 0.5 18.48

    &).).E$rt' ork for pipe 0.00

    perforated pipe 5 m3 21.25 0.9 0.5 47.81

    Carrier pipe 1 m3 25.5 0.6 0.5 7.65

    &).)2E$rt' Work For co+#n 3$se 22 m3 1.5 1.5 1.5 74.25

    &).)-E$rt' Work For Tie 3e$

    short wall 2 m3 23.4 0.6 1.5 42.12

    long wall 2 m3 27.6 0.6 1.5 49.68

    &).)4E$rt' Work For s+#5,e In+et 6it 0.00

    short wall 2 m3 2.45 0.7 1.5 5.15

    long wall 2 m3 3.7 0.7 1.5 7.77

    &).)7 1 m3 1 0.7 1.5 1.05

    Tot$+ .89)92

    . Stone So+in, ork 

    .)& $++

    short wall 5 m3 19.3 0.7 0.2 67.55

    long wall 2 m3 26.4 0.7 0.2 36.96

    .). Stone So+in, ork for pipe 0 0 0 0 0.2 0

    perforated pipe 5 m3 21.25 1.9 0.2 201.875

    Carrier pipe 1 m3 25.5 0.6 0.2 15.3

    .)2 Stone So+in, ork For co+#n 3$se 22 m3 1.5 1.5 0.2 49.5

    .)- Stone So+in, ork For Tie 3e$ B$se 0 0 0 0 0.2 0

    short wall 2 m3 23.4 0.6 0.2 28.08

    long wall 2 m3 27.6 0.6 0.2 33.12

    .)4 Stone So+in, ork For s+#5,e In+et 6it 0 0 0 0 0.2 0

    short wall 2 m3 2.45 0.7 0.2 3.43

    long wall 2 m3 3.7 0.7 0.2 5.18

    .)7 1 m3 1 0.7 0.2 0.7

    .)9 Stone So+in, ork For Sp+$s' 6+$te 15 m3 0.5 0.5 0.15 3.75

    Tot$+ 441.70

    E$rt' Work For :onnectin, :'$nne+Bet;n In+et 6it $n5 SDB

    Stone So+in, ork For :onnectin,:'$nne+ Bet;n In+et 6it $n5 SDB

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    2/30

    SN Description of Work No Unit L(! B(! "(! Q#$ntit% Re$rks

    2 &

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    3/30

    SN Description of Work No Unit L(! B(! "(! Q#$ntit% Re$rks

    short wall 5 m3 19.5 0.475 0.125 5.79

    long wall 2 m3 25.5 0.475 0.125 3.03

    -)&)2 Above 2nd footing

    short wall 5 m3 20 0.25 2.15 53.75

    long wall 2 m3 25.25 0.25 2.15 27.14

    For c'$nne+ 3$se

    short wall 5 m3 15 0.25 0.125 2.34

    long wall 1 m3 25.25 0.45 0.125 1.42

    -). Brick $sson$r% ork For Tie 3e$ 0.00

    -).)& 1st Footing

    short wall 2 m3 23.5 0.5 0.125 2.94

    long wall 2 m3 27.5 0.5 0.125 3.44

    -).). 2nd footing

    short wall 2 m3 23.3 0.6 0.125 3.50

    long wall 2 m3 27.7 0.6 0.125 4.16

    -).)2 Above 2nd footing

    short wall 2 m3 23.3 0.6 1.3 36.35

    long wall 2 m3 27.5 0.6 1.3 42.90

    -)2 Brick ork For s+#5,e In+et 6it 0.00

    -)2)& 1st Footing

    short wall 2 m3 2.35 0.6 0.125 0.35

    long wall 2 m3 3.6 0.6 0.125 0.54

    -)2). 2nd footing

    short wall 2 m3 2.35 0.475 0.125 0.28

    long wall 2 m3 3.6 0.475 0.125 0.43

    -)2)2 Above 2nd footing

    short wall 2 m3 2 0.35 2.94 4.12

    long wall 2 m3 3.25 0.35 2.94 6.69

    -)-

    1st Footing 1 m3 0.4 0.6 0.125 0.03

    2nd footing 1 m3 0.525 0.475 0.125 0.03

     Above 2nd footing 1 m3 1 0.35 0.94 0.33

    For channel ase 1 m3 1 0.5 0.15 0.08

    Brick M$sson$r% ork For Sp+$s' 6+$te 15 m3 0.5 0.5 0.9 3.38

    Tot$+ 214.11

    4 Calculation for Reinforcement bars

    Column

    440 !g 1.5 586.67

     R.C.C. In Column 16 mm Dia Bar  88 !g 4.9 681.40

    Brick Work For :onnectin, :'$nne+Bet;n In+et 6it $n5 SDB

     R.C.C. In Column Base (Foooting Net)12 mmdia Bar 

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    4/30

    SN Description of Work No Unit L(! B(! "(! Q#$ntit% Re$rks

    tirru!s "mm dia m#s bar  473 !g 1.15 214.89

    SDB Tie beam !g

     $ong %all 12 mm dia m#s bar  8 !g 27.75 197.33

     &ort %all 12 mm dia m#s bar  8 !g 24.5 174.22

    Stirrups !g

     $ong %all "mm dia m#s bar  278 !g 1.15 126.07

    &ort %all "mm dia m#s bar  245 !g 1.15 111.31

    Intake it Tie beam at lint! level !g

     $ong %all 12 mm dia m#s bar  4 !g 3.85 13.69

     &ort %all 12 mm dia m#s bar  8 !g 2.6 18.49

    Stirrups !g

     $ong %all "mm dia m#s bar  39 !g 1.15 17.49

    &ort %all "mm dia m#s bar  26 !g 1.15 11.81

    Intake it Tie beam at Top

     $ong %all 12 mm dia m#s bar  4 !g 3.85 13.69

     &ort %all 12 mm dia m#s bar  8 !g 2.6 18.49

    Stirrups !g

     $ong %all "mm dia m#s bar  39 !g 1.15 17.49

    &ort %all "mm dia m#s bar  26 !g 1.15 11.81

    Slab !g

     'ain bar 1 mm dia m#s bar (o!) 43 !g 3.45 92.28

     Distribution Bar 1 mm dia m#s bar (Bottom) 27 !g 2.2 36.21

    Tot$+ .2-2)27

    7 6+$ster Work 

    6+$ster ork For SDB $++

    short wall 10 m3 20 1.515 303.00

    long wall 4 m3 26.25 1.515 159.08

    6+$ster Work For s+#5,e In+et 6it 0.00

    short wall 4 m3 2 2.2 17.60

    long wall 4 m3 3.25 2.2 28.60

    2 m3 1 1.9 3.80

    6+$ster ork For Sp+$s' 6+$te (Si5e F$ce! 0.00

    "ide Face 45 0.5 0.9 20.25

     #op Face 15 0.5 0.5 3.75

    Tot$+ 536.0750

    9 Be55in, M$teri$+s

    Fine "and $3%75 mm& 5 m3 20 6 0.15 90.00

    Co'rse "and $1%3 mm& 5 20 6 0.075 45.00

    Fine (ra)el $4%10 mm& 5 20 6 0.075 45.00

    *edi'm (ra)el $10%20 mm& 5 20 6 0.075 45.00

    6+$ster ork For :onnectin, :'$nne+Bet;n In+et 6it $n5 SDB

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    5/30

    SN Description of Work No Unit L(! B(! "(! Q#$ntit% Re$rks

    Co'rse (ra)el $20%40 mm& 5 20 6 0.075 45.00

    8 Tr#ss (.- M Sp$n!

    10 !g 45.86 1655.55

    10 !g 70.468 5581.07

    18 27.85 2556.63

    Tot$+ 9793.24

    > Roof :o1erin,

    C.(.+. "heet 26 (a'ge Commercial 2 m2 28.25 13.135 742.13

    ,idge -or! $(.+. lane "heet/28 (a'ge& 1 m 28 28.00

    &/ 6I6E AND FITTING WOR=S

    4 m 25 100

    300 ** + + 10 !gcm2 1 m 35 35

    2 m 28 56

    1 m 50 50.00

    && .4/@&// :ontro+ G$te on :'$nne+ 8 no 8.00

    -eight of 2 $48.3 mm& t dia.&medi'm

     #''lar ar-eight of 3 ea) $65 mm t.ia.''larar

    -eight of 2 $48.3 mm& t dia.&medi'm #''lar ar

    150 ** + ,F,# + 10!gcm2

    C.(.+ lane "heet 28 (a'ge g'tter for rainwater disposal

    110 ** + + 4 !gcm2 forraining ('tter o'tlet

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    6/30

    ABSTRA:T OF :OST

    A S+#5,e Dr%in, Be5

    SN Description of Work Unit Q#$ntit%

     R$te

    per #nit

    & m3 287.733 866.34

    . m2 420.000 136.22

    2 m2 214.107 9747.98

    - m2 536.075 272.78

    4 m3 441.695 1952.70

    7 m3 111.68 7686.03

    7 !g 2343.36 107.07

    8 Be55in, M$teri$+s

    m3 90.00 1477.75

    arthwor! in eca)ation for fo'ndation/pipe lie etc. for o'lder mied soilincl'ding disposal 'pto 10m ha'lagelead and 1.5 m lift Filling with earth stac!ed at site with150 mm thic! laers with wellcompaction witho't watering/ etc. allcomplete.ro)iding laing First class chimnemade ric! masonr wor! in fo'ndation

    and (ro'nd Floor with 1:6 cement sandmortar $1 cement : 6 sand& incl'dinglead 'pto 30 m c'ring/ cleaning rac!ing o't mortar ;oint and ma!ingd'cts/ recesses where reed in position indingwith 14 ga'ge *.". wire incl'ding thecost of c'tting/ ending/ inding/carring/ lifting/ etc. all complete as perdrawing speci>cation.

    Fine "and $.3%.75 mm& collection/placingand le)elling

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    7/30

    m3 45.00 1370.23

    m3 45.00 1591.60

    m3 45.00 1541.00

    m3 45.00 1541.00

    > Tr#ss (.- M Sp$n!

    !g 9793.24 109.25

    &/ Roof :o1erin,

    m2 742.13 1140.66

    m 84.00 3369.50

    && m 100.00 1590.08

    m 35.00 5634.76

    m 50.00 502.45

    Co'rse "and $1%3 mm&collection/placing and le)elling

    Fine (ra)el $4%10 mm&collection/placing and le)elling

    *edi'm (ra)el $10%20mm&collection/placing and le)elling

    Co'rse (ra)el $20%40 mm&collection/placing and le)elling

    "'ppling and placing #''lar "teel

     #r'ss >ed in position incl'ding thecost of positioning/c'tting/-eldingcarring/ lifting/ etc. all complete as perdrawing speci>cation.

    "'ppling and placing C.(.+. "heet 26(a'ge Commercial >ed in positionincl'ding the cost of positioning/c'tting/carring/ lifting/ etc. all complete as perdrawing speci>cation.

    "'ppling and placing lane C.(.+."heet 28 (a'ge >ed in positionincl'ding the cost ofpositioning/c'tting/carring/ lifting/ etc.all complete as per drawing speci>cation.'pp ng an p ac ng

    erforated pipe >ed in positionincl'ding the cost ofpositioning/c'tting/carring/ lifting/ etc.all complete as per drawing speci>cation.

    "'ppling and placing 300 ** + pipe >ed in position incl'dingthe cost of positioning/c'tting/carring/lifting/ etc. all complete as per drawing speci>cation.

    "'ppling and placing 110 ** 4!gcm2+ pipe >ed in positionincl'ding the cost ofpositioning/c'tting/carring/ lifting/ etc.

    all complete as per drawing speci>cation.

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    8/30

    no 8.00 6579.44

     #otal

    Constr'ction 150 ** + erforated pipe >ed in position incl'dingthe cost of positioning/c'tting/carring/lifting/ etc. all complete as per drawing speci>cation.

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    9/30

     

    Ao#nt

    N)RS)

    249275.12

    57211.35

    2087107.09

    146230.54

    862497.83

    858382.00

    250905.54

    132997.50

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    10/30

    61660.13

    71622.00

    69345.00

    69345.00

    1069911.64

    846518.16

    283038.00

    159008.20

    197216.55

    25122.33

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    11/30

    52635.50

    ???

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    12/30

    QUANTITY ESTIMATE FOR :OM6OSTING BED

    SN Description of Work No Unit B(! "(! Q#$ntit%Re$rk  

    B :opostin, Be5

    & E$rt' ork  

    &)& E*W For Fi++in, in BMS soi+ 1 m3 24 17 0.2 82.45

    Tot$+ 8.)-4

    &). E$rt' Work For co+#n 3$se 18 m3 1.5 1.5 1.5 60.75

    &)2 E$rt' Work For Tie 3e$

    short wall 2 m3 16.4 0.6 1.5 29.52

    long wall 2 m3 25 0.6 1.5 44.73

    Tot$+ &24)//

    . Stone So+in, ork 

    .)& 18 m3 1.5 1.5 0.15 6.08

    .).

    short wall 2 m3 16.4 0.6 0.15 2.95

    long wall 2 m3 25 0.6 0.15 4.47

    Tot$+ 13.50

    2 &

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    13/30

    1st Footing

    short wall 2 m3 16.5 0.5 0.125 2.06

    long wall 2 m3 25 0.5 0.125 3.09

    2nd footing

    short wall 2 m3 16.6 0.375 0.125 1.56

    long wall 2 m3 25 0.375 0.125 2.31

    Above 2nd footingshort wall 2 m3 16.5 0.25 1.3 10.73

    long wall 2 m3 24 0.25 1.3 15.76

    Tot$+ 35.51

    " Calculation for Reinforcement bars

    Column

    360 !g 1.5 480.00

     R.C.C. In Column 16 mm Dia Bar  72 !g 6.35 722.49

    tirru!s "mm dia m#s bar  633 !g 1.15 287.36

    Tie beam !g $ong %all 12 mm dia m#s bar  8 !g 25 176.00

     &ort %all 12 mm dia m#s bar  8 !g 17.5 124.44

    Stirrups !g

     $ong %all "mm dia m#s bar  248 !g 1.15 112.44

    &ort %all "mm dia m#s bar  175 !g 1.15 79.51

     'ain bar 1 mm dia m#s bar 166 !g 3.8 388.60

     Distribution Bar 1 mm dia m#s ba 23 !g 25 356.48

    Tot$+ 2#2#$%2

    7 Tr#ss (&9 M Sp$n!

    9 !g 27 881.45

    9 !g 36 2571.07

    14 !g 25 1774.29

    Tot$+ 5226.81

    9 Roof :o1erin,

    2 m2 25 9.5 479.75

    1 m 25 25.25

    8 R$in $ter Dr$inin, Works

     R.C.C. In Column Base (FoootingNet)12 mm dia Bar 

    R):): (M./! ork on 3e5s#rf$ce for e'ic#+$r Access

    -eight of 2 $48.3 mm& tdia.&medi'm #''lar ar

    -eight of 3 ea) $65 mmt.ia.''lar ar

    -eight of 2 $48.3 mm& tdia.&medi'm #''lar ar

    . . .Commercial

    ,idge -or! $(.+. lane "heet/28(a'ge&

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    14/30

    8)& 2 m 25 50.5

    8). 1 m 50 50.00

    C.(.+ lane "heet 28 (a'geg'tter for rain water disposal

     !gcm2 for raining ('ttero'tlet

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    15/30

    ABSTRA:T OF :OST

    B :opostin, Be5

    SN Description of Work Unit #$ntit

     R$te Ao#nt

    per #ni N)RS)

    & m3 ??? 866.34 116956.35

    . m2 82.450 136.22 11231.13

    2 m2 35.511 ??? 346159.73

    - m3 13.500 ??? 26361.45

    4 m3 122.03 ??? 1096634.10

    7 !g ??? 107.07 292016.66

    9 Tr#ss (&9 M Sp$n!

    !g ??? 95.00 496547.26

    8 Roof :o1erin, 0.00

    arthwor! in eca)ation for fo'ndation/pipe lie etc. for o'lder mied soilincl'ding disposal 'pto 10m ha'lage leadand 1.5 m lift

     Filling with earth stac!ed at site with 150mm thic! laers with well compactionwitho't watering/ etc. all complete.

    ro)iding laing First class chimnemade ric! masonr wor! in fo'ndation

    and (ro'nd Floor with 1:6 cement sandmortar $1 cement : 6 sand& incl'ding lead'pto 30 m c'ring/ cleaning rac!ing o'tmortar ;oint and ma!ing d'cts/ recesseswhere reed in position incl'ding the cost ofpositioning/c'tting/-elding carring/lifting/ etc. all complete as per drawing

    speci>cation.

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    16/30

    m2 ??? ??? 2932726.65

    >

    m 75.75 160.00 12120.00

    &/

    m 50.00 ??? 91750.00

     #otal 5/422/503.33

    "'ppling and placing C.(.+. "heet 26(a'ge Commercial >ed in positionincl'ding the cost of positioning/c'tting/carring/ lifting/ etc. all complete as perdrawing speci>cation.

    "'ppling and placing lane C.(.+. "heet28 (a'ge >ed in position incl'ding thecost of positioning/c'tting/carring/lifting/ etc. all complete as per drawing speci>cation.

    "'ppling and placing 110 ** 4!gcm2+ pipe >ed in position incl'dingthe cost of positioning/c'tting/carring/lifting/ etc. all complete as per drawing speci>cation.

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    17/30

    QUANTITY ESTIMATE FOR EA6ORATION TAN= 

    SN Description of Work No Unit L(! B(! "(! Q#$ntit% Re$rks

    : E1$por$tion T$nk 

    & E$rt' ork  

    &)& 1 m3 41.75 18.5 1.75 1351.66&). E$rt Wor For co #n $se 30 m3 1.5 1.5 1.5 101.25

    &)2 E$rt' Work For $++ 3$ses ort wa 2 m3 17 0.7 2.25 53.55long wall 2 m3 21.25 0.7 2.25 66.94

    Tot$ 1573.39

    . Stone So+in, ork .)& Stone So n, or n 6on 1 m3 41.75 18.5 0.15 115.86

    .). 30 m3 1.5 1.5 0.15 10.13

    E$rt Wor For $ $seshort wall 2 m3 17 0.7 0.15 3.57

    ong wa 2 m3 21.25 0.7 0.15 4.46

    Tot$ 134.012 &

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    18/30

    14 !g 43.05 3073.77

    Tot$+ 9566.06

    8 Roof :o1erin,

    2 m2 43.25 10.605 917.33

    1 m 43.25 43.25

    && R$in $ter Dr$inin, Works

    &&)2 2 m 43.25 86.5

    &&)- 1 m 50 50.00

    -eight of 2 $48.3 mm& tdia.&medi'm #''lar ar

    . . .Commercial

    ,idge -or! $(.+. lane "heet/28(a'ge&

    C.(.+ lane "heet 28 (a'geg'tter for rain water disposal

    110 ** + + 4!gcm2 for raining ('tter o'tlet

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    19/30

    ABSTRA:T OF :OST

    c E1$por$tion T$nk 

    SN Description of Work Unit Q#$ntit%

     R$te Ao#nt

    per #nit N)RS)

    1 m3 1573.394 866.34 1363099.13

    2 m3 103.716 9747.98 1011018.84

    3 m2 216.900 272.78 59165.98

    4 m3 134.014 0.00

    5 m3 178.51 7686.03 1372041.93

    6 !g 3163.60 107.07 338729.55

    9 Tr#ss (.- M Sp$n!

    !g 9566.06 95.00 908775.51

    8 Roof :o1erin, 0.00

    arthwor! in eca)ation for fo'ndation/pipe lie etc. for o'lder mied soilincl'ding disposal 'pto 10m ha'lage leadand 1.5 m lift

    ro)iding laing First class chimnemade ric! masonr wor! in fo'ndationand (ro'nd Floor with 1:6 cement sandmortar $1 cement : 6 sand& incl'ding lead'pto 30 m c'ring/ cleaning rac!ing o'tmortar ;oint and ma!ing d'cts/ recesses

    where reed in position inding with 14ga'ge *.". wire incl'ding the cost ofc'tting/ ending/ inding/ carring/ lifting/etc. all complete as per drawing speci>cation.

    "'ppling and placing #''lar "teel #r'ss>ed in position incl'ding the cost ofpositioning/c'tting/-elding carring/lifting/ etc. all complete as per drawing

    speci>cation.

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    20/30

    m2 917.33 1140.66 1046368.20

    >

    m 129.75 160.00 20760.00

    &/

    m 50.00 5634.76 281737.93

     #otal 6/401/697.08

    "'ppling and placing #ransparent "heet26 (a'ge Commercial >ed in positionincl'ding the cost of positioning/c'tting/carring/ lifting/ etc. all complete as perdrawing speci>cation.

    "'ppling and placing lane C.(.+. "heet28 (a'ge >ed in position incl'ding thecost of positioning/c'tting/carring/lifting/ etc. all complete as per drawing speci>cation.

    "'ppling and placing 300 ** 6!gcm2+ pipe >ed in position incl'dingthe cost of positioning/c'tting/carring/lifting/ etc. all complete as per drawing speci>cation.

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    21/30

    Q#$ntit% Esti$te For Ri1er Tr$inin, Works $n5 Access Ro$5

    SN Description of Work No Unit B(! "(! #$ntit Re$rks

    D

    & E$rt' Work  

    &)& For ccess ,oad in l'ms'm 1 m3 250 7.5 0.2 375.00

    &). - eca)ation in @*" soil 1 m3 27 1.8 1.8 87.48

    &).)& - eca)ation in @*" soil 1 m3 110 3 0.5 165.00

    Tot$+ 627.48

    . 1 m3 27 1.8 0.2 9.72

    2 1 m3 27 1.8 0.1 4.86

    - 1 m3 27 1 3.45 93.15

    4 G$3ion Works

    4)& 220 no 110 3 1 220.00

    4). 73 m3 110 1 1 73

    Tot$+ 293

    4)2 110 m3 110 2 1 110.00

    Tot$+ 110.00

    7 1 m3 250 7.5 0.15 281.25

    9 1 m3 250 7.5 0.35 656.25

    !

     Ri1er Tr$inin, Works $n5Access Ro$5

    "tone "oling wor! For eadrotection wot!

    .C.C. wor! for @ase of eadrotection -or!

    "tone massonar wor! in 1:4*ortar in ead rotection wor!

    @o siAe: 1.5m 1m 1m/in>rst laer

    @o siAe: 1.5m 1m 1m/intop laer

    @o siAe: 2m 1m 1m/in*iddle Baer

    Filling with soil at site with 150mm thic! laers with wellcompaction/ water sprin!ling/etc. all complete.

    (ra)eling -or! with di=erentsiAe of stone

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    22/30

    ABSTRA:T OF :OST

    D Ri1er Tr$inin, Works $n5 Access Ro$5

    SN Description of Work Unit Q#$ntit%

     R$te Ao#nt

    per #nit N)RS)

    1 m3 627.480 866.34 543613.09

    4 m3 9.720 1952.70 18980.24

    5 m3 4.86 8986.96 43676.64

    5 m3 93.15 7686.03 715953.23

    No 2,++.-" 2+

    743241.93

    ??? 110.00

    336154.78

    m3 407.618 281.25

    114642.42

    m3 ??? 656.25 1011281.25

    Tot$+ ???

    arthwor! in eca)ation for fo'ndation/ pipelie etc. for o'lder mied soil incl'dingdisposal 'pto 10m ha'lage lead and 1.5 mlift

    "tone "oling -or! in eca)ation forfo'ndation/ pipe lie etc. incl'ding collectionand ha'lage 'pto 10m lead and 1.5 m lift

    "'ppling miing/ placing/ compacting thedi=erent mies of plain cement concrete onoors lead 'pto 30m as per drawing/speci>cation instr'ction all complete.

    & .C.C.1:2:4 $1 Cement : 2 "and : cr'shedaggregate 40mm20 mm10mm well graded&

    "tone *assonar -or! "'ppling miing/placing/ compacting the di=erent mies ofplain cement concrete for fo'ndation ases lead 'pto 30m ecl'ding the cost offormwor! reinforcement ars/ as perdrawing/ speci>cation instr'ction all

    complete.

    Bo/ si0e 1.,m /1m / 1m abion Bo/s3Assemblingof gabion 4rates and !la4ing t&em in !ositionin4luding stret4&ing3 binding t&em toget&er andt5ing don lids Fabri4ation of gabion bo/esin4luding rolling3 4utting3 eaving 7 dia!&ragm is tobe !rovided to ever5 one meter lengt&(8e/agonal'es& i0e 1mm912mm3 selvedge ire:-sg3mes& ire:1 sg 7 binding ire:12 sg3 all &eav54oated)

    Bo/ si0e 2m /1m / 1m abion Bo/s3Assemblingof gabion 4rates and !la4ing t&em in !ositionin4luding stret4&ing3 binding t&em toget&er andt5ing don lids Fabri4ation of gabion bo/esin4luding rolling3 4utting3 eaving 7 dia!&ragm is tobe !rovided to ever5 one meter lengt&(8e/agonal'es& i0e 1mm912mm3 selved e ire:-s 3

    Filling with soil at site with 150 mm thic!laers with well compaction/ watersprin!ling/ etc. all complete.

    Collection and placing of di=erent siAe ofstone % gra)el with screening

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    23/30

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    24/30

     ANALYSIS OF RATE

    &

    For 1 cubic metre

    Dns!illed Bao'r 1.59 manda E ,s. 460 731.40

     #ools plants E 3 21.94

     #otal 753.34

    ContractorGs ro>t and )erhead E 15 of #otal 113.00

    (rand #otal 866.34H# E 13

    Net Tot$+ 877)2-

    &B

    For 1 square metre

    Dns!illed Bao'r 0.25 manda E ,s. 460 115.00

     #ools plants E 3 3.45

    ContractorGs ro>t and )erhead E 15 of #otal 17.77

    Gr$n5 Tot$+ &27)..

    H# E 13

    Iet #otal 136.22

    .)/ Stone M$son$r% Work 

    For 1 cubic metre Volume

    "!illed 1.00 manda E ,s. 575 575.00

    Dns!illed Bao'r 4.00 manda E ,s. 460 1840.00

    cement 0.220 *etric ton E ,s. 13600 2992.00

    "and 0.47 c'm. m. E ,s. 750 352.50

    @loc! stone 1.10 c'm. m. E ,s. 840 924.00

     #otal 6683.50

    ContractorGs ro>t and )erhead E 15 of #otal 1002.53

    (rand #otal 7686.03H# E 13

    Net Tot$+ 9787)/2

    2)/ 6+$in :eent :oncrete Work 

    For 1 cubic metre Volume

    "!illed 1.00 manda E ,s. 575 575.00

    Dns!illed Bao'r 4.00 manda E ,s. 460 1840.00

    cement 0.320 *etric ton E ,s. 13600 4352.00

    "tone Cr'shed ggregate 0.850 c'm. m. E ,s. 840 714.00

    Coarse "and 0.445 c'm. m. E ,s. 750 333.75

     #otal 7814.75

    ContractorGs ro>t and )erhead E 15 of #otal 1172.21

    (rand #otal 8986.96

    H# E 13

    Net Tot$+ 8>87)>7

    -)/ Reinforceent B$r

    Earthwork in excavation of boulder mixed soil in foundation trenches of pits, raft, pipe line, etc.depth upto 1.5m and lead 10m including dressing of sides, ramming of bottom, trenches as perdrawing and specication all complete.

    Filling with earth stacked at site with 150 mm thick laers with well compaction without watering,etc. all complete.

    !uppling, placing, and construction of the stone massonar work for walls " lead upto #0mexcluding the cost of formwork " reinforcement bars, as per drawing, specication " instruction allcomplete. 1$% mortar 

    !uppling mixing, placing, compacting the di&erent mixes of plain cement concrete on 'oors leadupto #0m as per drawing, specication " instruction all complete.

    b().*.*. 1$+$ -1 *ement $ + !and $ crushed aggregate 0mm+0 mm10mm well graded(

    !uppling and placing /or steel reinforced bar xed in position binding with 1 gauge .!. wireincluding the cost of cutting, bending, binding, carring, lifting, etc. all complete as per drawing "specication.

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    25/30

    For 1 Metric tonne

    "!illed $@lac!smith& 12.00 manda E ,s. 575 6900.00

    Dns!illed Bao'r 12.00 manda E ,s. 460 5520.00

    *.". @ar 1.050 *etric ton E ,s. 76000 79800.00

    @inding -ire 10 Jg. E ,s. 88.5 885.00

     #otal 93105.00

    ContractorGs ro>t and )erhead E 15 of #otal 13965.75

    (rand #otal 107070.75

    H# E 13

    Iet #otal 107070.75

    T'erefor r$te per k, &/9)/9

    4)// 6+$ster Work 

    For 100 Square Meter 

    "!illed 12.000 manda E ,s. 575 6900.00

    Dns!illed Bao'r 16.000 manda E ,s. 460 7360.00

    Cement 0.625 *etric ton E ,s. 13600 8500.00

    "and 1.280 C'. m. E ,s. 750 960.00

     #otal 23720.00

    ContractorGs ro>t and )erhead E 15 of #otal 3558.00(rand #otal 27278.00

    H# E 13

    Iet total 27278.00

    t'erefore r$te per sC#$re eter .9.)98

    7)//

    For 1 cubic meter 

    ,ed soil 1.100 C'.m E ,s. 110 121.00

    Dns!illed Bao'r 0.500 *anda E ,s. 460 230.00

    water and its carriage

     $B'mps'mE1.5 of lao'r cost& 3.45

     #otal 354.45ContractorGs ro>t and )erhead E 15 of #otal 53.17

    (rand #otal 407.62

    H# E 13

    Iet total 407.62

    9)// :o++ection $n5 p+$cin, of 5ierent sie of sie of s$n5 it' screenin,

    )roviding and laing ne sand -.# .25( mm screening sand

    For 1cubic meter

    Dns!illed Bao'r 1.000 *anda E ,s. 460 460.00

    Fine sand $.3 % .75& mm 1.100 C'm E ,s. 750 825.00

     #otal 1285.00

    ContractorGs ro>t and )erhead E 15 of #otal 192.75(rand #otal 1477.75

    H# E 13

    Iet total 1477.75

    )roviding and laing *ourse sand -1 #( mm screening sand

    For 1cubic meter

    Dns!illed Bao'r 1.000 *anda E ,s. 460 460.00

    Co'rse sand $1% 3& mm 1.100 C'm E ,s. 665 731.50

     #otal 1191.50

    ContractorGs ro>t and )erhead E 15 of #otal 178.73

    (rand #otal 1370.23

    )roviding and laing 1+.5 mm thick cement plaster over concrete surface with 1$# cement sandmortar in perfect line " level including sca&olding, curing, etc. all complete as per drawing,specication " instruction.

    Filling with earth stacked at site with 150 mm thick laers with well compaction, water sprinkling,etc. all complete.

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    26/30

    H# E 13

    Iet total 1370.23

    8)// :o++ection $n5 p+$cin, of 5ierent sie of stone ,r$1e+ it' screenin,

    )roviding and laing -10( mm screening gravel

    For 1cubic meter

    Dns!illed Bao'r 1.000 *anda E ,s. 460 460.00

    $4%10& mm ro'nd gra)el 1.100 C'm E ,s. 840 924.00

     #otal 1384.00

    ContractorGs ro>t and )erhead E 15 of #otal 207.60

    (rand #otal 1591.60H# E 13

    Iet total 1591.60

    >)// )roviding and laing 15 %0 mm gravel

    For 1cubic meter

    Dns!illed Bao'r 1.000 *anda E ,s. 460 460.00

    15 % 60 mm ro'nd gra)el 1.100 C'm E ,s. 800 880.00

     #otal 1340.00

    ContractorGs ro>t and )erhead E 15 of #otal 201.00

    (rand #otal 1541.00

    H# E 13

    Iet total 1541.00

    &/)/ Brick M$son$r% Work 

    For 1 cubic metre Volume

    "!illed 1.50 manda E ,s. 575 862.50

    Dns!illed Bao'r 4.20 manda E ,s. 460 1932.00

    cement 0.070 *etric ton E ,s. 13600 952.00

    "and 0.30 c'm. m. E ,s. 750 225.00

    @ric! 530.00 nos E ,s. 8.5 4505.00 #otal 8476.50

    ContractorGs ro>t and )erhead E 15 of #otal 1271.48

    (rand #otal 9747.98

    H# E 13

    Net Tot$+ >9-9)>811$& CC 'ork ()1&*1+%+,- including Form.ork

    Description /nit InputAmount 0Rs$

    A$ abors

    ;illed no. ., E ,s.   ,-,. 2"-.,

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    27/30

    (rand #otal   7/273.52

    H# E 13

    Net Tot$+   9.92)4.&. Roof :o1erin, Work  0.625

    nalAed for 10 m2 2.625

    Description /nit Input Amount 0Rs$

    A$ abors

    ;illed no. 2. E ,s.   ,-,. 131,.

    &oo; no 2. E ,s.   -. 1*.

    Bitumin %aser no ". E ,s.   2. 16.

    Subtotal B$ "3&$&&

    Total A5B 2*6%&$&&

    ContractorGs ro>t and )erhead E 15 of #otal   439.50

    (rand #otal   3/369.50

    H# E 13

    Net Tot$+   227>)4/

    &- T#3#+$r Iron Tr#ss Work nalAed for 1!g 6.6914498141

    Description /nit Input Amount 0Rs$

    )aterials

    ubular iron truss ;g 1. E ,s.   ,. ,.

    Subtotal 6"$&&

    Total 6"$&&

    ContractorGs ro>t and )erhead E 15 of #otal   14.25

    (rand #otal   109.25

    H# E 13

    Net Tot$+   &/>).4

    &4 6erfor$te5 6ipe Work 

    nalAed for 30 m 6.6914498141

    Description /nit Input Amount 0Rs$

    A$ abors

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    28/30

    ;illed no. 2., E ,s.   ,-,. 13*+-.,

    emi s;illed no. 1., E ,s.   *6. 6.

    t and )erhead E 15 of #otal   36/748.43

    (rand #otal   281/737.93

    H# E 13

    T'erefore r$te per   472-)97&9 &&/ "D6E 6ipeL$%in, $n5 ttin, Work 

    nalAed for 50 m 6.6914498141

    Description /nit Input Amount 0Rs$

    A$ abors

    ;illed no. 1. E ,s.   ,-,. ,-,.

    emi s;illed no. 1. E ,s.   *6. *6.

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    29/30

    T'erefore r$te per   749>)--

    &>)/ Stone So+in, Work 

    For 1 cubic metre Volume

    "!illed 0.00 manda E ,s. 575 0.00

    Dns!illed Bao'r 1.50 manda E ,s. 460 690.00

    @loc! "tone 1.20 c'm. m. E ,s. 840 1008.00 #otal 1698.00

    ContractorGs ro>t and )erhead E 15 of #otal 254.70

    (rand #otal 1952.70

    H# E 13

    Net Tot$+ &>4.)9/

    %or; Bo7 si8e+ 2m 7 1m 7 1m

     Anal50ed for 1bo/

    Description /nit Input Rate 0Rs$ Tools9:;uipment

    A$ abors

    ;illed no. .+ ,-,. 22*.2,

    t and )erhead E 15 of #ot   %63$,&

    H# E 13 0.00Net Tot$+ 2/44)>4

    %or; Bo7 si8e+ 1$"m 71m 7 1m

     Anal50ed for 1bo/ (Derieved from 29191)

    Description /nit InputRate 0Rs$

    Tools9:;uipment

    A$ abors

    ;illed no. .+2 ,-,. 1"+.*"

  • 8/17/2019 Quantity Estimate Sludge Drying Bed

    30/30

    Se5ient$tion T$nk

    Sn 6$rtic#+$rs +en,t'(! i5t'(! 'ei,'t(! nos) Q#$ntit% Unit

    & E$rt'ork (E0c$1$tion! 5.8 1.7 2.25 1 ..)&84

    & $++( Brickork!

    short wall 1.4 0.15 2.25 2 0.945

    long wall 4.5 0.15 2.25 2 3.038

    @ric! soling $@ase& 4.5 1.7 0.15 1 1.148

    InH#ent $n5 E#ent

    short wall 0.5 0.15 1.8 4 0.540

    long wall 1.7 0.15 1.8 2 0.918

    @ric! soling $@ase& 1.7 0.5 0.15 2 0.255

    Tot$+ 7)8-2

    . 6+$ster (&.! E0pose5

    short wall 1.4 2.25 4 3.15

    long wall 4.5 2.25 4 10.125

    ase 4.5 1.7 1 7.65

    InH#ent $n5 E#ent

    short wall 0.5 1.8 8 7.2

    long wall 1.7 1.8 4 12.24

    ase 1.7 0.5 2 1.7

    Tot$+ -.)/74

    3

    m3

    m3

    m3

    m3

    m3

    m3

    2

    m2

    m2

    m2

    m2

    m2

    m2

    .