quality of employee environment
DESCRIPTION
Quality of Employee Environment. EtO Self Managed Team J. Takusagawa D. Kenney D. Reilly T. Quazi D. Shiozaki. Project Proposal. Reduce EtO exposures < AL in 12 mo. Proposing to implement engineering and process controls designed to reduce or eliminate exposures to EtO. - PowerPoint PPT PresentationTRANSCRIPT
Quality of Employee Environment
EtO Self Managed TeamJ. Takusagawa
D. KenneyD. ReillyT. Quazi
D. Shiozaki
2
Project Proposal
• Reduce EtO exposures < AL in 12 mo.– Proposing to implement engineering and
process controls designed to reduce or eliminate exposures to EtO.
3
Project Development
• Describe the process used to identify the issue(s)– Summarize the results of the EHS Risk
Assessment
4
Objectives
5
EHS Strategy MapKey EHS
Opportunities
StakeholderInvolvement
Learning &Growth
EffectiveProcesses
Eto Employee Exposure reduction (Less than Action Level within 12 months)
Eng/Design EHSAffected Workforce
PHA – end Q1
Determine Eng. Cntrls – end Q2
PHA Training- End Q1
Dev. SOP – end Q3
PHAIH Monitoring –end Q1Chemical Rev./Substitition – end Q2Control Review – end Q3
Review/Approval SOP, Cntrl install., -end Q3
Dev. EtO trng.monitoring, program (Q1/Q4)
PHA – end Q1
EtO trng. (Q1/Q4), SOP Review (Q3), IH Sampling Comm. (Q2)
6
Project Benefits
• Tangible • Intangible
7
Estimated Project Costs
Cost ItemsYear 1 Year 2 Year 3
Item 1
Total 0 0 0
Costs
8
Estimated Savings
ItemsYear 1 Year 2 Year 3
Item 1
Total 0 0 0
Savings
9
Financial Analysis
Present Value of Savings: PV(Savings)
Net Present Value of Savings: NPV(Savings)
Payback Period:
ROI (x Years):
Internal Rate of Return(x Years):
10
Conclusions and Recommendations
• Ask for the money!!!