Induction program for new joinees
1) ISO 9001: 2008System which we are following
Interaction between department including gurgaon and Sweden Control of documents Control of records Quality policy Quality objectives Jog description MR Departmental communication Purchasing Incoming Production Special process
WeldingPaintingGalvanizing
Identification and traceability for cut parts, welding, lifting lug, painting Product preservation up to despatch
Inward material storageFinished product storage Material handingProtectionPacking
Calibration Measurement, Analysis and Improvement
2) Drawing First angle projection: Other companies following third angle projection Welding symbol as per ISO 2553 Referring cut section which is typical in camfil drawings Referring special notes given in mechanical assembly drawings which is typical in
camfil drawings Verifying BOM for completeness
3) Standards:ASME II A & C, ASME V, ASME VIII, ASME IXMaterial: IS 2062, 808, 1852 & EN 10025 part 1, 2ASME B 16.5, 16.9, 16.11 SA 500, 106, 312 IS 1239, SA 240, 312, 480, 500, 105, 234, 182, 479, 700, 999, 370Fasteners:
A4-70, A2-70 ASTM F 193, 194, 593, 594HDG: ISO 1461 & ASTM A 123Gasket: ASTM 1056 RE 41, 42, 43Pre cut parts: ISO 2768 class CFabrication: ISO 13920 General class BH, Flanges class FWeld defects: ISO 5817 general class C, lifting points class BPainting:ISO 19840Pickling:ASTM A 967
4) Inward Technical specification MIR MTC register
5) Pre fit up Change over process Identification and Traceability Best practices SS sensitivity Tools identification
Trial piece bending6) Fit up & Welding
Change over process Route card Best fabrication practices SS sensitivity Tools identification WPS, PQR & WPQR Weld sequence Temporary restraints Dead weight purpose WIND barrier purpose Report preparation and documentation