QAD Master Scheduling Workbench (QAD MSW)
Carianne Nieuwstraten – Sr. Product Manager – MFG/SCBrent Shooltz – Sr. Business Systems Analyst – MFG/SC
MMUG - 03/22/2010
QAD Proprietary
Agenda
MFG/SC - Key Strategic InitiativeMaster Scheduling Objective & ChallengesWorkbench Framework IntroductionRoadmapMaster Scheduling FuturesDemo Early Adopter ProgramWrap Up
QAD Proprietary
Key Strategic Initiative
Provide a workbench for each key role in the
Manufacturing and Supply Chain areas
QAD Proprietary
Master Scheduler’s ObjectiveEstablish an item’s most optimum build
schedule that meets customer demand– Measurements :
• Improved Customer Service– On time deliveries– Reduced back orders
• Reduced Inventories– Inventory turns– Reduced inventory investment
• Stable Manufacturing Schedule– Increased production efficiency– Reduced set up costs/time– Reduced overtime costs
QAD Proprietary
Master Scheduler’s Challenge
Finance
Engineering
Executives
Manufacturing
Sales
There’s too much cash tied up in
inventory!
There’s a new product introduction scheduled
for the fall! But we need more time for
design!Service levels are down. I need more
inventory! Whatever it takes
to keep the customer happy!
ROI must improve; the stockholders are not
happy!
There are too many changes! Provide fixed
schedules and the correct parts and delivery will
improve.
QAD Proprietary
Master Scheduling Challenge
QAD Proprietary
Common Planning Situation
MSW & PSW Framework Introduction
QAD Proprietary
Planning & Scheduling – Future Flow
Period - > Month - > Week - > Day - > Shift - > Interval - > hour
Production Planned
Production Scheduled
Production Dispatched
Production ReportedDemand received
MSW MSW PSW Base Base
CAC
MSW/PSW/CAC Together- Consolidation of 50 maintenance, report and inquiry programs- New capabilities (production scheduling, integrated component checking)
QAD Proprietary
Framework Introduction
Master Scheduling (MSW)Scheduling view designed for the purpose of master scheduling
QAD Proprietary
Framework Introduction
Production Scheduling (PSW)Scheduling view designed for the purpose of production scheduling
QAD Proprietary
Framework Introduction
Search Panel extracts content for both workbench views
Search Panel extracts content for both workbench views
Navigator Panel drives content focus of both
workbench views
Navigator Panel drives content focus of both
workbench views
Supporting Frames apply seamlessly to both workbench views
Supporting Frames apply seamlessly to both workbench views
MSW:Primary Grid-Set
Introduction
QAD Proprietary
Schedule Primary context of the workbench. All workbench activity and navigational behavior is driven from this panel
Capacity Displays information per selected resource/item in the Schedule Grid
Supply/DemandProvides demand & supply context for selected item in the Schedule Grid.Primary information used for scheduling decision making and adjustments
QAD Proprietary
User selects the item row in Schedule Grid.
Supporting PanelsEnables master scheduling action and decision making.
Represents over 30 maintenance programs and reports!
MSW:Views
Create customized workbench layouts
QAD Proprietary
ViewsProvides ability to create different user defined workbench layouts and save them for quick access
Saves Panel Size
Saves Filter/Sort/Group Settings of each Panel
QAD Proprietary
Example: Created View with Master Scheduling (MSW) and Production Scheduling (PSW) side-by-side
QAD Proprietary
2010 2012 2014 20152011 2013
Standard Edition
June 2010 : QAD 2010 SE release
Core Functionality : - Master Scheduling Workbench (MSW)- MSW integrated Component Check Capabilities
MSW Roadmap
QAD Proprietary
2010 2012 2014 20152011 2013
Enterprise Edition
September 2010 : QAD 2010.1 EE release
Core Functionality : - Master Scheduling Workbench (MSW)
- MSW integrated Component Check Capabilities
MSW Roadmap
QAD Proprietary
Futures: MPS Leveling Calculation
….is a planning tool to aid in the creation of a leveled Master Production Schedule
QAD Proprietary
Leveling the Master Schedule
Time
Vo
lum
e
Demand
Level Production
QAD Proprietary
QAD MPS Leveling Calculation SolutionA customizable batch program that
automatically calculates a level MPS for a specified date range by site
Batch program output can be viewed, modified and re-leveled in MSW
Demo
QAD Proprietary
Master Scheduling Workbench Value
Reduces master scheduling time and complexity
Provides exception alerts to demand, supply and capacity changes
Compresses manufacturing responseAbility to simulate changes Enables to be proactive
QAD Proprietary
Interested In Being An Early Adopter? Early Adopter Criteria:
– .Net use with QAD Enterprise Applications– eB2.1, SP4 or higher– Using QAD Enterprise Applications Discrete Work Orders
or Advanced Repetitive• No or verified customizations
– High data integrity/accuracy • BOM’s, inventory records, clean MRP data etc.
– Verified business need for MSW, PSW and integrated component check capabilities
– Resource availability from May 10th through around July 12th
• Project Manager, Master Scheduler, Production Scheduler, Material Planner availability
– Go live within the May 10th – July 12th time period
QAD Proprietary
QAD Demo Center
MSW and PSWTuesday, March 23rd: 8:30 – 11:30amStep through specific business scenarios
• You ask, we showCome talk to us!