purbrook way hulbert road junction –phasing · pdf filepurbrook way hulbert road...

7
Purbrook Way Hulbert Road Junction – Phasing Drawings Revision 3 Current at 21-04-2016

Upload: trinhdieu

Post on 16-Mar-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Purbrook Way Hulbert Road Junction –Phasing · PDF filePurbrook Way Hulbert Road Junction –Phasing Drawings Revision 3 Current at 21-04-2016. ... • SWGE01-0001-TMA01. From: Thursday

Purbrook Way Hulbert Road Junction – Phasing Drawings

Revision 3

Current at 21-04-2016

Page 2: Purbrook Way Hulbert Road Junction –Phasing · PDF filePurbrook Way Hulbert Road Junction –Phasing Drawings Revision 3 Current at 21-04-2016. ... • SWGE01-0001-TMA01. From: Thursday

From: Monday 18th April

To: Thursday 21st April

4 Nights

Surface Course

• HRN and Roundabout

Asda exit lane reduced in width

� Single file, one direction traffic control in place

Over night closures with 4-Way Traffic Light System in place

Roundabout returned to normal operation during the day

Extent of TM

Extent of Surfacing

LEGEND

TM Plan:

• W2549TMA26 Rev B

Diversion Plan:

• W2936TMA05

Page 3: Purbrook Way Hulbert Road Junction –Phasing · PDF filePurbrook Way Hulbert Road Junction –Phasing Drawings Revision 3 Current at 21-04-2016. ... • SWGE01-0001-TMA01. From: Thursday

Plane Out, Install Reinforcement Grid,

lay Binder & Surface Course

• Purbrook Way (East)

Asda exit lane reduced in width

� Two lines of traffic cannot safely join a roundabout with only 1 lane.

From: Monday 25th April

To: Wednesday 27th April

3 Nights

Extent of TM

Extent of Surfacing

LEGEND

TM Plan:

• W2549TMA27 Rev B

Diversion Plan:

• SWGE01-0001-TMA01

Page 4: Purbrook Way Hulbert Road Junction –Phasing · PDF filePurbrook Way Hulbert Road Junction –Phasing Drawings Revision 3 Current at 21-04-2016. ... • SWGE01-0001-TMA01. From: Thursday

From: Thursday 28th April

To: Thursday 5th May

5 Nights

Note: Bank Holiday Monday 2nd May

Plane Out, Install Reinforcement Grid,

lay Binder & Surface Course

• Purbrook Way (West)

Over night closures with 4-Way Traffic Light System in place

Roundabout returned to normal operation during the day

Asda exit lane reduced in width

� Single file, one direction traffic control in place

� During this phase there will be the need to stop all traffic for 15-20mins

to allow surfacing vehicles to lay entrance area. This will be controlled

and co-ordinated with Asda and the public.

Extent of TM

Extent of Surfacing

LEGEND

TM Plan:

• W2549TMA25 Rev B

Diversion Plan:

• EC/CJ007741/TRO/04

Page 5: Purbrook Way Hulbert Road Junction –Phasing · PDF filePurbrook Way Hulbert Road Junction –Phasing Drawings Revision 3 Current at 21-04-2016. ... • SWGE01-0001-TMA01. From: Thursday

From: Friday 6th May

To: Wednesday 11th May

4 Nights

Surface Course

• Hulbert Road (South)

Over night closures with 4-Way Traffic Light System in place

Roundabout returned to normal operation during the day

Asda exit lane reduced in width

� Single file, one direction traffic control in place

� During this phase there will be the need to stop all traffic for 15-20mins

to allow surfacing vehicles to lay entrance area. This will be controlled

and co-ordinated with Asda and the public.

Extent of TM

Extent of Surfacing

LEGEND

TM Plan:

• W2549tma24 Rev B

Diversion Plan:

• 0100-CI-DRG-005

Page 6: Purbrook Way Hulbert Road Junction –Phasing · PDF filePurbrook Way Hulbert Road Junction –Phasing Drawings Revision 3 Current at 21-04-2016. ... • SWGE01-0001-TMA01. From: Thursday

Asda exit lane reduced in width

� Works adjacent to Asda entrance/exit required, resulting in reduced width.

From: Monday 16th May

To: Wednesday 18th May• 2 days Break out and kerbing

• 1 day (Wednesday 18th May) surfacing

Break out and build Asda Splitter island

(including footway crossing and original

kerbing)

• Asda entrance/exit

Surface Course

• Around Asda splitter island

Signage, Guardrail, Traffic Signals, Street

Lighting, CCTV, Landscaping works

• Multiple areas

Page 7: Purbrook Way Hulbert Road Junction –Phasing · PDF filePurbrook Way Hulbert Road Junction –Phasing Drawings Revision 3 Current at 21-04-2016. ... • SWGE01-0001-TMA01. From: Thursday

Notes

• The dates and durations detailed are the current best forecast based on

current design and programme. They are subject to change should

unforeseen circumstances arise, design changes, weather etc.

• This phasing is different to that originally planned and has been produced

to minimise the disruption to local stakeholders and travelling public.

• Traffic Management layouts will be assessed when installed and may

require alteration on site to reflect Health, Safety and operational

requirements.