puntland water development agency wakaaladda … · 2020. 4. 30. · maraya 23 ceelmadoobe 24...

29
1 | Page PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA HORUMARINTA BIYAHA PUNTLAND Assessment Report for the Flood affected Coastal regions in Puntland Somalia.

Upload: others

Post on 26-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

1 | P a g e

PUNTLAND WATER DEVELOPMENT AGENCY

WAKAALADDA HORUMARINTA BIYAHA PUNTLAND

Assessment Report for the Flood affected Coastal regions in Puntland Somalia.

Page 2: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

2 | P a g e

Page 3: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

3 | P a g e

Introduction

This report summarizes the results of the effect of flood to the water source and the supply system in

the affected areas in Bari, Sanaag, Karkaar And Nugaal regions of PUNTLAND STATE, SOMALIA.

Background

The recent rains have impact in the northern parts of Somalia. most parts of Puntland particularly Bari,

Nugaal, Sanaag and Gardafuu regions. Puntland Government has appealed to the international agencies

to support them. HADMA and PDWA have submitted the flood affected areas but that report was

needed a technical report for the extend at the flood effects. Government requested an urged respond so

that were held Several meetings to discuss the extend of the damage and how can be supported and

means of support. Most of the agencies are planning to do in response to the affected communities.

In order to get technical information, PWDA has sent four teams to the intended areas. The four were

conducted technical assessment for the affected communities related water source and related

infrastructure.

The objective of this assessment is to identify and evaluate the affected of water supply systems in

Puntland State, Somalia by the floods and recommend the appropriate interventions. to achieve the

assigned work the teams were used the best approach to reach the planned objective.

The fieldwork was carried out between on 13- 22 December 2019. The first team was planned to

assess the Dangorayo, Eyl and Beyl districts. The second team was sent to assess Calula, Bargal

and Xafun districts. Team three was sent to carry-out the assessment at Kalndala district. Team

four was sent to assess Sanaag affected villages.

The they finished their plan at planned time although to meet different constrains such very rough

roads and even one of the team has travelled to sea. All pictures are available and raw data are

available at PWDA main office.

Team Composition

The assessment team was composed both engineers and technicians:

Page 4: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

4 | P a g e

S. N Teams Name Organization Title

1

Team 1

Maxamud Cisman Qarey PWDA Water Engineer

2 Cisman Ceynab PWDA Technician

3

Team 2

Maxamed Cabdi Sicid PWDA Water Engineer

4 Cabdirishid Cabdulahi PWDA Technician

5

Team 3

Cabdirisaq Cisman Cali PWDA Water Engineer

6 Cisman Sicid Bidar PWDA Technician

7 Team4 Cabdinasir Cali Ibraahim PWDA Technician

8 Photographer Cabdiqani Yasin Cartan PWDA ICT

9 Coordinator Mohamed Abdirahman PWDA Water Engineer

Objectives of the Assignment

The main purpose of this assessment is to identify and evaluate the flood of water supply systems in

Puntland State, Somalia by the floods and recommend the appropriate interventions

Approach to the Assignment

To achieve the above assigned work the teams were used the following approach:

i. Conduct in depth interviews with key informants including the mayor of the town, elders of the

communities, borehole and shallow wells responsible and technicians etc.

ii. Visits to the sites and collect all affected water resource, water supply systems and water

reservoirs.

iii. Evaluate both quantity and quality of the existing infrastructure.

iv. Evaluating the management systems, how they manage the system, their fiancé system, their

profile, taxations, filing systems and HH agreement with the company.

v. Prepare all technical required the assessment both bill of quantities and drawings.

Page 5: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

5 | P a g e

Field work

The fieldwork was carried out between on 13- 22 December 2019. The first team was planned to

assess the Dangorayo, Eyl and Beyl districts and they started their survey at Dhuudo at Beylo

district and ended at Eyl district. The second team was sent to assess Calula, Bargal and Xafun

districts. Team three was sent to carry out the assessment at Kalndala district. Finally, team four

was sent to assess Sanaag affected villages.

The first they team met the mayor, elders and technicians. The Second day was started to visit the

existing water supply to evaluate the intend of the damages to the water supply system. During

this time, they evaluated generators, Pumps and pipeline damages and measured all destroyed

pipelines.

The assessed villages

S.N Region District Borehole/Village

1

Bari

Iskushuban

Taageer

2 Baargaal

3 Foocaar

4

Kandala

Ceel-gaal

5 Toox (13,700 km NW of the town)

6 Karkaar Hafun Hafuun

7

Gardafuu

Caluula

Geesaley

8 Caluula

9 Wareegsame

10 Murcayo

11 Xaabo

12 KARKAAR

Beyla

Dhuudo spring

13 Beyla1 spring

14 Beyla2 spring

15 Dhalinbaar spring 1

16 Biyogaduud (dam)

Page 6: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

6 | P a g e

17 Nugaal

Dangorayo

Suuj

18 Garmaal

19 BaqBaq

20 Falaxfalax

21 Qundheed

22

Eyl

Maraya

23 Ceelmadoobe

24

Sanaag

laasqoray

Laasqoray

25 Durduri

26 Celaayo

27 Xidid

28 Xamur

29 Af-urur

30 Ceeldhafaruur

31 Ceeldibir

32 Gebidheer

33 Harwanaag

34 Maado

35 Milxoh

36 Godcaanood

37 Warbad

38 Qorax jiif

39 Ceel xasan

40 Laas macaan

41 Dhidaya

42 Qoton

43 Koxmo

Page 7: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

7 | P a g e

Key finding for Existing Water Supply System

• The flood mostly affected at Bari, Karkaar, Nugaal, Gardafuu and Sanaag regions, the

teams observed that most of water sources were affected especially shallow wells,

springs, pipelines systems, water storages, kiosks and other support facilities.

• All water source at visited communities are not functioning

• Almost all Shallow wells and springs were filled sand and gravels and also all debris

and cabbages collected the flood from the villages.

• Most of the pipes were washed-out by the floods

• Most of the infrastructures such as water storages, kiosks, generator rooms and solar

supported. were damaged or destroyed.

• Pumps were washed-out by the floods especially coastal villages

• Most of the communities visited were stressed with lack of water since their water source

was damaged.

Team 1: was assessed 11 sites, one town (Beyla) and 10 villages within Dangorayo, Eyl and Beyl

districts

A. Beyla district was assessed 5 sites

1) Dhuudo

1. 50 pcs pipes washed out floods others also damaged

2. Pump washed out by the floods.

3. All kiosks were damage by the flood.

4. Solar system washed out by the floods.

2) Biyo-gaduud Dam

Page 8: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

8 | P a g e

1. The dam was filled sand.

2. Champers was collapsed.

3. Inlet and outlet also collapsed.

3) Beyla District

1) Beyla district spring 1.

1. 100 pcs of pipes washed out by the floods and the other was damaged by the floods.

2. 15 Kw Pump washed out by the floods.

3. Water elevated are needs rehabilitation and generator rooms

4) Beyla Spring 2

1. 20 pcs of pipes washed out floods and the other was damaged by the floods

2. Pump washed out floods

3. Control panel wire cable washed out floods.

4. Water tank was affected winds of the floods.

5. Store room was effected the winds.

5) Dhalinbar Spring

6. 100 pcs pipes washed out floods and other are damaged by the floods

7. 11 kw of Pump washed out by the floods

8. Control panel wire cable washed out by the floods.

9. Water tank was affected winds of the floods.

10. Store room was affected by winds.

B. Dangorayo District

1) Suuj

1. Pump washed out by the floods and the other was damaged by the floods

2. 400m of GI pipes washed out floods and some of them damaged floods so that they need to

repair pipes.

Page 9: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

9 | P a g e

3. Water tank was affected winds of the floods.

4. Store room was affected winds of the flood.

5. 500m Cable washed out by the floods.

6. Generator was damaged.

2) Garmaal

1. Pump washed out by the floods.

2. Spring was filled sand and damaged by flood.

3. 70 pcs of GI pipes washed out and the other was damaged by the floods

4. Animal through and camel through was damaged.

100m of Wire Cable washed out floods.

3) Falaxfalax

1. 15 Kw of Pump washed out by the floods.

2. 150 pcs of GI pipes washed out and the other was damaged by the floods

3. 500m Cable washed out by the floods.

4. Store room was damaged by the floods.

4) Qundheed

1. 7.5 Kw Pump washed out by the floods.

2. 150m of pcs of GI pipes washed out and the other was damaged by the floods

3. 300m of Cable washed out by the floods.

4. Store room was damaged.

5) Baqbaq

1. 15 Kw of Pump washed out by the floods.

2. Shallow well was filled sand and damaged by the flood.

3. 600m pipes washed out and other were damaged.

Page 10: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

10 | P a g e

4. Solar washed out by the floods.

5. Store room collapsed.

6. 500m of Cable washed out by the floods.

C. Eyl District

1) Maraye

1. Generator of 45 Kva is not working

2. Submersible pump 11 Kw was damaged

3. 500m of Cable washed out by the floods

2) Ceelmadoobe

1. 15 Kw of Pump washed out by the floods.

2. Spring was filled sand and debris and damaged by the flood.

3. 110m of pipes washed out and other were damaged.

4. Fencing was damaged.

5. 500m of Cable washed out by the floods.

Dhuudo Baqbaq

Biyo-Gaduud Dhalinbar

Page 11: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

11 | P a g e

Baqbaq pipeline between the borehole and the tank Dharinbar

Baqbaq Eyl water tank

Beyla

Page 12: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

12 | P a g e

Dharinbaar

Suuj Ceel-madoobe

Page 13: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

13 | P a g e

Ceel-madoobe

Team 2: was assessed 9 sites, three towns and 6 villages within Baargaal, Alula and Hafun

districts

A: Baargaal

1) Taageer

1. 500m Pipes were washed-out by floods

2. 45 Kva Generator damaged

3. 100m Wire cable 3X16 was washed out

2) Baargaal

1. Borehole was collapsed

2. Generator room was damaged

3. Washman room also damaged

4. Tank damage is about to collapse, two columns are tilted

Page 14: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

14 | P a g e

3) Foocaar

1. 150 pcs of GI 2inch pipes washed-out by the floods

C: Hafun

1) Hafun

1. Three shallow wells were filled sand and ---- also the removed their cover sheets

2. 30 kva Generator was burned

3. Generator room has cracks

4. 3 submersible pumps with 2.5 Kw were not working

5. 15 Kw Booster pump was burned and rusted

6. 334 pcs pipes washed-out by the floods

D: Aluula

1) Alula

1. Shallow well collapsed and filled sand

2. Tank has cracks

2) Geesaley and Murcanyo theses two villages get water at one water source

1. Gen and pump and burned

2. 200 pipe pvc were washed-out

3. Elevated water tank is leaking

3) Xaabo

1. 534 pcs of 4-inch pipes washed-out

4) Wareegsame

1. Shallow well filled sand

2. 200 pcs of pipes washed -out by the floods

3. Pump 1.5 kva was burned

Page 15: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

15 | P a g e

Hafun Tank is about to collapse Hafun Shallow wells

Page 16: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

16 | P a g e

Haafun Bargaal

Page 17: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

17 | P a g e

Hafuun Pipeline

Page 18: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

18 | P a g e

Aluula

Generator of Murcanyo Meeting with Murcanyo community

Team 3: was assessed 2 sites one town (Kandala) and 1 village ceelgaal within Kandala district

A: Kandala

1) Ceelgaal

1. 1,000m of pipes were washed-out by the floods

2. Generator is not working

3. Submersible pump also is not working

2) Kandala: the spring is far from the town almost 14 km.

1. Pipe GI 3 inch 70 pcs and 2 inch 65 pcs and 1.5 inch 60 pcs were washed-out by the

floods

2. Water reservoirs were damaged.

3. Were also washed-out supporting anchors and pillars and 12 chamber blocks

4. 30 pcs air 9 valves, 3 wash-out,

5. 2 elevated 2 m tank 60 cum was damaged

Page 19: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

19 | P a g e

6. 3 Waas (small reservoir) was washed their roof sheets.

7. 5 kiosks were damaged

8. RH new 3 kiosks.

Kandala Kandala

Kandala pipeline

Team 4: was assessed 18 sites included Lasqoray town, all sites are under Lasqorey district

Laasqoray

1) Laasqoray

1. 7.5 Kw water pump damaged by the flood

2. Solar system was damaged

3. Animal trough and camel troughs cracked

2) Durduri

1. Shallow wells were filled sand and debris and cabbages.

Page 20: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

20 | P a g e

2. Solar 6 pcs(300w) were broken

3. 1.5 Kw Submersible Pump is functioning,

4. 1600m of pipes washed out by the floods.

3) Celaayo

1. solar (45 pcs) was damaged

2. 7.5kwt water pump is not functioning

3. pipes 3000m was washed out by the floods

4. Wire cable 3x16M (300m) were washed out by the floods.

5. Tank leaking and kiosks are not functioning.

4) Xidid

1. Shallow wells were filled by sand and debris also the slab was collapsed

2. Solar 4pcs (300w) were damaged

3. The pump 1 kw is not working

4. Tank is leaking,

5. 2,200 pcs PVC of pipes were damaged

5) Xamur

1. Shallow wells were filled by sand and cabbages

2. The tank is very old and needs rehabilitation.

6) Ceeldhafaruur

1. Shallow wells were filled by sand and debris also the slab was collapsed

2. Solar 6pcs (300w),

3. pump 1500w,

4. tank rehabilitation and kiosks rehabilitation,

5. Pipes of 2000m of pvc damaged

7) Ceeldibir

1. Shallow wells were filled by sand and cabbages

8) Gebidheer

1. Shallow wells were filled by sand and cabbages

9) Harwanaag

1. Shallow wells were filled by sand and cabbages

10) Maado

Page 21: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

21 | P a g e

1. Shallow wells were filled by sand and cabbages

11) Milxo

1. Shallow wells were filled by sand and cabbages

12) Godcandhood

1. Shallow wells were filled by sand and cabbages

13) Warbad

1. Shallow wells were filled by sand and cabbages

14) Qorax-jiif: is shallow that is nomads is using and very important for them

1. Shallow wells were filled by sand and cabbages

15) Ceel Xasan: is shallow that is nomads is using and very important for them

1. Shallow wells were filled by sand and cabbages

16) Laas Macaan: is shallow that is nomads is using and very important for them

1. Shallow wells were filled by sand and cabbages

17) DhidayaQoton: is shallow that is nomads is using and very important for them

1. Shallow wells were filled by sand and cabbages

18) Koxmo: is shallow that is nomads is using and very important for them

1. Shallow wells were filled by sand and cabbages

Durduri Village

Page 22: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

22 | P a g e

Ceel-Dhafaruuryo

Ceel Dhafaruur Durduri

Recommendations:

1. The assessment teams would hereby propose an immediate intervention for the

rehabilitation of water sources to ensure full operational of the water systems.

2. Emergency water assistance or water provision to the areas assessed that water is the most

emergency need should be considered to save lives.

3. Rehabilitation of non-functional boreholes/water sources at the affected areas.

4. Provision of supplementary backup fuel for operational boreholes and standby spare parts

for the strategic boreholes surrounding the affected areas. To use for the water trucking.

5. Sanitation and hygiene promotion activities are also a priority need for all as they have

limited sanitation facilities and unhygienic water sources.

Page 23: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

23 | P a g e

6. And lastly but not least, all project interventions should respect and be in line with

government agencies and the local communities.

Attachment I: The plan for the intervention required the assessed villages

Emergency Rehabilitation Boreholes, Shallow wells and Spring Affected by the Floods

S. N Region District Borehole/Village Status Intervention Require

1

Bari

Iskushuban Taageer Not Functioning 45 KVA Generator, control

panel wire cable 3x16M

(100m) and GI 3inch

2 Baargaal Not Functioning Old borehole collapsed at

the bottom, rehabilitation

water tank 20cum,

rehabilitation generator

room, washman room and

fencing 40mx40m.

3 Foocaar Not Functioning 150 pcs Gi pipe class B 2

inch

4 Kandala Ceel-gaal Not Functioning 40 kva generator, 15 Kw

submersible pump, control

panel wire cable 3x16M

(800m) and 1,500 m

pipeline

5 Toox (13,700 km NW

of the town)

Not Functioning Pipe GI 3 inch 70 pcs 2

inch 65 pcs 1.5 inch 60 pcs

8 water reservoir RH.

Supporting anchors and

pillars 30 pcs air 9 valves,

3 washout 12 chamber

blocks, 2 elevated 2 m tank

60 cum RH new. 3 waas

need sheets of Aluminum.

5 kiosks RH new 3 kiosks.

tool for plumping. Fittings

sockets 11/2 50 pcs, 2 inch

and 3 inch 50 and 50 pcs.

Fittings Union 11/2 50 pcs,

2 inch and 3 inch 50 and 50

pcs. Fittings Elbow 11/2 50

pcs, 2 inch and 3 inch 50

Page 24: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

24 | P a g e

and 50 pcs. Fittings

Reducer11/2 25 pcs, 2 inch

and 3 inch 25 and 25 pcs,

Fittings TEE 11/2 25 pcs, 2

inch and 3 inch 25 and 25

pcs. Fittings Gate valves

11/2 10 pcs, 2 inch and 3

inch 5 and 6 pcs. Cable

5mm 100m clips 200pcs.

6 Karkaar Hafun Hafuun Not Functioning Rehabilitation three

shallow, 30 KVA genset,

booster pump 15KW, 3

submersible pump 2.5KW,

PVC pipes 2inch 334

7

Gardafuu

Caluula Geesaley Not Functioning Old water tank is leaking,

Water tank 30m3, 3kiosk,

two rooms, solar

8 Caluula Not Functioning New borehole,

rehabilitation water tank,

solar

9 Wareegsame Not Functioning Pump and generator

1.5KW, water tank 20m3,

3kiosk and 3 inch 200 PVC

pipes or Glass B 2inch

pipes

10

Gardafuu

Murcayo Not Functioning New water tank 30m3 and

generator

11 Xaabo Not Functioning 534 PCS PVC pipe 4 inch

and new water tank

12

Beyla Dhuudo spring Not Functioning 7.5kW Submersible pump,

and 50pc pipes of class c,

45 KVA Generator,

rehabilitation of kiosks.

13 Beyla1 spring Not Functioning 45 KVA Generator, 15 kW

Submersible Pump, control

panel wire cable 3x16M,

GI Pipes Class C (100pcs),

Page 25: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

25 | P a g e

KARKAAR

rehabilitation of water

tank, rehabilitation of store.

14 Beyla2 spring Not Functioning 15kw submersible pump,

main raiser pipes 20 Pcs,

15 Dhalinbaar spring 1 Not Functioning 11kw submersible pump

and GI class C pipes

100pc, control panel wire

cable 3x16M (1000m),

Rehabilitation of water

tank, rehabilitation of store.

16 Biyogaduud (dam) Not Functioning Removing of soil from the

shallow well, rehabilitation

of concrete banks,

rehabilitation of inlet and

outlet water catchment.

construction of gabions to

prevent soil erosion

17

Nugaal

Dangorayo Suuj Not Functioning 11 KW Submersible pump,

rehabilitation of tank,

control panel wire cable

3x16M 500m,45 KVA

Generator, GI Pipes Class

B 400m

18 Garmaal Not Functioning 7.5 KW Submersible

pump, control panel wire

cable 3x16M (100m),

rehabilitation of animal

trough, rehabilitation of

camel trough, construction

of new tank, construction

of pump safety hall, GI

Pipes Class C (70pcs).

19 BaqBaq Not Functioning Rehabilitation of Shallow

well, GI Pipes Class B

(600m), control panel wire

cable 3x16M (500m), solar

system, construction of

store, 15kw submersible

pump, construction of

Page 26: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

26 | P a g e

animal and camel trough,

construction of new tank.

20 Falaxfalax Not Functioning 15kw submersible pump,

GI pipes class c (150 pcs),

control panel wire cable

3x16M (500m),

rehabilitation of generator

rooms.

21 Qundheed Not Functioning 29 kva Generator 7.5kw

submersible pump, GI

pipes class c (150 pcs),

control panel wire cable

3x16M (300m),

rehabilitation of store.

22 Eyl Maraya Functioning New generator of 45 Kva,

Submersible pump 11 Kw

and control panel wire

cable 3x16M (500m),

23 Ceelmadoobe Not Functioning Control panel wire cable

3x16M (500m), GI pipes

class c (110 pcs),

construction of animal and

camel trough, 15kw

submersible pump,

24

Sanaag

laasqoray Laasqoray High priority 7.5kWt water pump, solar,

rehabilitation of animal

trough and camel troughs,

rehabilitation of tank.

25 Durduri Not Functioning rehabilitation of shallow

wells, solar 6pcs(300w),

1500W Submersible Pump,

new tank construction,

kiosks construction pipes

1600m.

26 Celaayo Not Functioning solar (45 pcs), 7.5kwt

water pump, pipes 3000m,

control panel wire cable

3x16M (1000m),

Page 27: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

27 | P a g e

Rehabilitation of water

tank, rehabilitation of

kiosks, water catchment

rehabilitation.

27 Xidid Not Functioning rehabilitation of shallow

wells and construction of

slab, water point

construction, solar 4pcs

(300w), pump 1000w, tank

rehabilitation, kiosks

rehabilitation, pipes 2200m

(1.5 in pvc)

28 Xamur Not Functioning rehabilitation of shallow

wells, water point

construction, solar,

rehabilitation of tank.

29 Af-urur Not Functioning new tank construction,

construction of animal and

camel trough, water supply

of (4000m)

30 Ceeldhafaruur Not Functioning rehabilitation of shallow

wells and construction of

slab, water point

construction, solar 6pcs

(300w), pump 1500w, tank

rehabilitation, kiosks

rehabilitation, pipes 2000m

(1.5 in pVc.)

31 Ceeldibir Not Functioning solar, pipes 600m (1.5-inch

pvc), construction of new

tank 30m^3.

32 Gebidheer Not Functioning solar, pipes 800m (1.5-inch

pvc), construction of new

tank 30m^3

33 Harwanaag Not Functioning solar, pipes 500m (1.5-inch

pvc), construction of new

tank 30m^3

34 Maado Not Functioning solar, pipes 600m (1.5-inch

pvc), construction of new

tank 30m^3

Page 28: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

28 | P a g e

35 Milxoh Not Functioning solar, pipes 1000m (1.5-

inch pvc), construction of

new tank 40m3

36 Godcaanood Not Functioning solar, pipes 600m (1.5-inch

pvc), construction of new

tank 40m3

37 Warbad Not Functioning solar, pipes 600m (1.5-inch

pvc), construction of new

tank 30m3

38 Qorax jiif Not Functioning solar, pipes 600m (1.5-inch

pvc), construction of new

tank 30m3

39 Ceel xasan Not Functioning shallow wells

rehabilitation, new tank

construction, solar, pipes

400, water points

construction, animal

troughs construction camel

trough construction.

40 Laas macaan Not Functioning shallow wells

rehabilitation, new tank

construction, solar, pipes

400, water points

construction, animal

troughs construction camel

trough construction.

41 Dhidaya Not Functioning shallow wells

rehabilitation, new tank

construction, solar, pipes

400, water points

construction, animal

troughs construction camel

trough construction.

42 Qoton Not Functioning shallow wells

rehabilitation, new tank

construction, solar, pipes

400, water points

construction, animal

troughs construction camel

trough construction.

Page 29: PUNTLAND WATER DEVELOPMENT AGENCY WAKAALADDA … · 2020. 4. 30. · Maraya 23 Ceelmadoobe 24 Sanaag laasqoray Laasqoray 25 Durduri 26 Celaayo 27 Xidid 28 Xamur 29 Af-urur 30 Ceeldhafaruur

29 | P a g e

43 Koxmo Not Functioning shallow wells

rehabilitation, new tank

construction, solar, pipes

400, water points

construction, animal

troughs construction camel

trough construction.