Introduction
This report summarizes the results of the effect of flood to the water source and the supply system in
the affected areas in Bari, Sanaag, Karkaar And Nugaal regions of PUNTLAND STATE, SOMALIA.
Background
The recent rains have impact in the northern parts of Somalia. most parts of Puntland particularly Bari,
Nugaal, Sanaag and Gardafuu regions. Puntland Government has appealed to the international agencies
to support them. HADMA and PDWA have submitted the flood affected areas but that report was
needed a technical report for the extend at the flood effects. Government requested an urged respond so
that were held Several meetings to discuss the extend of the damage and how can be supported and
means of support. Most of the agencies are planning to do in response to the affected communities.
In order to get technical information, PWDA has sent four teams to the intended areas. The four were
conducted technical assessment for the affected communities related water source and related
infrastructure.
The objective of this assessment is to identify and evaluate the affected of water supply systems in
Puntland State, Somalia by the floods and recommend the appropriate interventions. to achieve the
assigned work the teams were used the best approach to reach the planned objective.
The fieldwork was carried out between on 13- 22 December 2019. The first team was planned to
assess the Dangorayo, Eyl and Beyl districts. The second team was sent to assess Calula, Bargal
and Xafun districts. Team three was sent to carry-out the assessment at Kalndala district. Team
four was sent to assess Sanaag affected villages.
The they finished their plan at planned time although to meet different constrains such very rough
roads and even one of the team has travelled to sea. All pictures are available and raw data are
available at PWDA main office.
Team Composition
The assessment team was composed both engineers and technicians:
4 | P a g e
S. N Teams Name Organization Title
1
Team 1
Maxamud Cisman Qarey PWDA Water Engineer
2 Cisman Ceynab PWDA Technician
3
Team 2
Maxamed Cabdi Sicid PWDA Water Engineer
4 Cabdirishid Cabdulahi PWDA Technician
5
Team 3
Cabdirisaq Cisman Cali PWDA Water Engineer
6 Cisman Sicid Bidar PWDA Technician
7 Team4 Cabdinasir Cali Ibraahim PWDA Technician
8 Photographer Cabdiqani Yasin Cartan PWDA ICT
9 Coordinator Mohamed Abdirahman PWDA Water Engineer
Objectives of the Assignment
The main purpose of this assessment is to identify and evaluate the flood of water supply systems in
Puntland State, Somalia by the floods and recommend the appropriate interventions
Approach to the Assignment
To achieve the above assigned work the teams were used the following approach:
i. Conduct in depth interviews with key informants including the mayor of the town, elders of the
communities, borehole and shallow wells responsible and technicians etc.
ii. Visits to the sites and collect all affected water resource, water supply systems and water
reservoirs.
iii. Evaluate both quantity and quality of the existing infrastructure.
iv. Evaluating the management systems, how they manage the system, their fiancé system, their
profile, taxations, filing systems and HH agreement with the company.
v. Prepare all technical required the assessment both bill of quantities and drawings.
5 | P a g e
Field work
The fieldwork was carried out between on 13- 22 December 2019. The first team was planned to
assess the Dangorayo, Eyl and Beyl districts and they started their survey at Dhuudo at Beylo
district and ended at Eyl district. The second team was sent to assess Calula, Bargal and Xafun
districts. Team three was sent to carry out the assessment at Kalndala district. Finally, team four
was sent to assess Sanaag affected villages.
The first they team met the mayor, elders and technicians. The Second day was started to visit the
existing water supply to evaluate the intend of the damages to the water supply system. During
this time, they evaluated generators, Pumps and pipeline damages and measured all destroyed
pipelines.
The assessed villages
S.N Region District Borehole/Village
1
Bari
Iskushuban
Taageer
2 Baargaal
3 Foocaar
4
Kandala
Ceel-gaal
5 Toox (13,700 km NW of the town)
6 Karkaar Hafun Hafuun
7
Gardafuu
Caluula
Geesaley
8 Caluula
9 Wareegsame
10 Murcayo
11 Xaabo
12 KARKAAR
Beyla
Dhuudo spring
13 Beyla1 spring
14 Beyla2 spring
15 Dhalinbaar spring 1
16 Biyogaduud (dam)
6 | P a g e
17 Nugaal
Dangorayo
Suuj
18 Garmaal
19 BaqBaq
20 Falaxfalax
21 Qundheed
22
Eyl
Maraya
23 Ceelmadoobe
24
Sanaag
laasqoray
Laasqoray
25 Durduri
26 Celaayo
27 Xidid
28 Xamur
29 Af-urur
30 Ceeldhafaruur
31 Ceeldibir
32 Gebidheer
33 Harwanaag
34 Maado
35 Milxoh
36 Godcaanood
37 Warbad
38 Qorax jiif
39 Ceel xasan
40 Laas macaan
41 Dhidaya
42 Qoton
43 Koxmo
7 | P a g e
Key finding for Existing Water Supply System
• The flood mostly affected at Bari, Karkaar, Nugaal, Gardafuu and Sanaag regions, the
teams observed that most of water sources were affected especially shallow wells,
springs, pipelines systems, water storages, kiosks and other support facilities.
• All water source at visited communities are not functioning
• Almost all Shallow wells and springs were filled sand and gravels and also all debris
and cabbages collected the flood from the villages.
• Most of the pipes were washed-out by the floods
• Most of the infrastructures such as water storages, kiosks, generator rooms and solar
supported. were damaged or destroyed.
• Pumps were washed-out by the floods especially coastal villages
• Most of the communities visited were stressed with lack of water since their water source
was damaged.
Team 1: was assessed 11 sites, one town (Beyla) and 10 villages within Dangorayo, Eyl and Beyl
districts
A. Beyla district was assessed 5 sites
1) Dhuudo
1. 50 pcs pipes washed out floods others also damaged
2. Pump washed out by the floods.
3. All kiosks were damage by the flood.
4. Solar system washed out by the floods.
2) Biyo-gaduud Dam
8 | P a g e
1. The dam was filled sand.
2. Champers was collapsed.
3. Inlet and outlet also collapsed.
3) Beyla District
1) Beyla district spring 1.
1. 100 pcs of pipes washed out by the floods and the other was damaged by the floods.
2. 15 Kw Pump washed out by the floods.
3. Water elevated are needs rehabilitation and generator rooms
4) Beyla Spring 2
1. 20 pcs of pipes washed out floods and the other was damaged by the floods
2. Pump washed out floods
3. Control panel wire cable washed out floods.
4. Water tank was affected winds of the floods.
5. Store room was effected the winds.
5) Dhalinbar Spring
6. 100 pcs pipes washed out floods and other are damaged by the floods
7. 11 kw of Pump washed out by the floods
8. Control panel wire cable washed out by the floods.
9. Water tank was affected winds of the floods.
10. Store room was affected by winds.
B. Dangorayo District
1) Suuj
1. Pump washed out by the floods and the other was damaged by the floods
2. 400m of GI pipes washed out floods and some of them damaged floods so that they need to
repair pipes.
9 | P a g e
3. Water tank was affected winds of the floods.
4. Store room was affected winds of the flood.
5. 500m Cable washed out by the floods.
6. Generator was damaged.
2) Garmaal
1. Pump washed out by the floods.
2. Spring was filled sand and damaged by flood.
3. 70 pcs of GI pipes washed out and the other was damaged by the floods
4. Animal through and camel through was damaged.
100m of Wire Cable washed out floods.
3) Falaxfalax
1. 15 Kw of Pump washed out by the floods.
2. 150 pcs of GI pipes washed out and the other was damaged by the floods
3. 500m Cable washed out by the floods.
4. Store room was damaged by the floods.
4) Qundheed
1. 7.5 Kw Pump washed out by the floods.
2. 150m of pcs of GI pipes washed out and the other was damaged by the floods
3. 300m of Cable washed out by the floods.
4. Store room was damaged.
5) Baqbaq
1. 15 Kw of Pump washed out by the floods.
2. Shallow well was filled sand and damaged by the flood.
3. 600m pipes washed out and other were damaged.
10 | P a g e
4. Solar washed out by the floods.
5. Store room collapsed.
6. 500m of Cable washed out by the floods.
C. Eyl District
1) Maraye
1. Generator of 45 Kva is not working
2. Submersible pump 11 Kw was damaged
3. 500m of Cable washed out by the floods
2) Ceelmadoobe
1. 15 Kw of Pump washed out by the floods.
2. Spring was filled sand and debris and damaged by the flood.
3. 110m of pipes washed out and other were damaged.
4. Fencing was damaged.
5. 500m of Cable washed out by the floods.
Dhuudo Baqbaq
Biyo-Gaduud Dhalinbar
11 | P a g e
Baqbaq pipeline between the borehole and the tank Dharinbar
Baqbaq Eyl water tank
Beyla
12 | P a g e
Dharinbaar
Suuj Ceel-madoobe
13 | P a g e
Ceel-madoobe
Team 2: was assessed 9 sites, three towns and 6 villages within Baargaal, Alula and Hafun
districts
A: Baargaal
1) Taageer
1. 500m Pipes were washed-out by floods
2. 45 Kva Generator damaged
3. 100m Wire cable 3X16 was washed out
2) Baargaal
1. Borehole was collapsed
2. Generator room was damaged
3. Washman room also damaged
4. Tank damage is about to collapse, two columns are tilted
14 | P a g e
3) Foocaar
1. 150 pcs of GI 2inch pipes washed-out by the floods
C: Hafun
1) Hafun
1. Three shallow wells were filled sand and ---- also the removed their cover sheets
2. 30 kva Generator was burned
3. Generator room has cracks
4. 3 submersible pumps with 2.5 Kw were not working
5. 15 Kw Booster pump was burned and rusted
6. 334 pcs pipes washed-out by the floods
D: Aluula
1) Alula
1. Shallow well collapsed and filled sand
2. Tank has cracks
2) Geesaley and Murcanyo theses two villages get water at one water source
1. Gen and pump and burned
2. 200 pipe pvc were washed-out
3. Elevated water tank is leaking
3) Xaabo
1. 534 pcs of 4-inch pipes washed-out
4) Wareegsame
1. Shallow well filled sand
2. 200 pcs of pipes washed -out by the floods
3. Pump 1.5 kva was burned
15 | P a g e
Hafun Tank is about to collapse Hafun Shallow wells
16 | P a g e
Haafun Bargaal
17 | P a g e
Hafuun Pipeline
18 | P a g e
Aluula
Generator of Murcanyo Meeting with Murcanyo community
Team 3: was assessed 2 sites one town (Kandala) and 1 village ceelgaal within Kandala district
A: Kandala
1) Ceelgaal
1. 1,000m of pipes were washed-out by the floods
2. Generator is not working
3. Submersible pump also is not working
2) Kandala: the spring is far from the town almost 14 km.
1. Pipe GI 3 inch 70 pcs and 2 inch 65 pcs and 1.5 inch 60 pcs were washed-out by the
floods
2. Water reservoirs were damaged.
3. Were also washed-out supporting anchors and pillars and 12 chamber blocks
4. 30 pcs air 9 valves, 3 wash-out,
5. 2 elevated 2 m tank 60 cum was damaged
19 | P a g e
6. 3 Waas (small reservoir) was washed their roof sheets.
7. 5 kiosks were damaged
8. RH new 3 kiosks.
Kandala Kandala
Kandala pipeline
Team 4: was assessed 18 sites included Lasqoray town, all sites are under Lasqorey district
Laasqoray
1) Laasqoray
1. 7.5 Kw water pump damaged by the flood
2. Solar system was damaged
3. Animal trough and camel troughs cracked
2) Durduri
1. Shallow wells were filled sand and debris and cabbages.
20 | P a g e
2. Solar 6 pcs(300w) were broken
3. 1.5 Kw Submersible Pump is functioning,
4. 1600m of pipes washed out by the floods.
3) Celaayo
1. solar (45 pcs) was damaged
2. 7.5kwt water pump is not functioning
3. pipes 3000m was washed out by the floods
4. Wire cable 3x16M (300m) were washed out by the floods.
5. Tank leaking and kiosks are not functioning.
4) Xidid
1. Shallow wells were filled by sand and debris also the slab was collapsed
2. Solar 4pcs (300w) were damaged
3. The pump 1 kw is not working
4. Tank is leaking,
5. 2,200 pcs PVC of pipes were damaged
5) Xamur
1. Shallow wells were filled by sand and cabbages
2. The tank is very old and needs rehabilitation.
6) Ceeldhafaruur
1. Shallow wells were filled by sand and debris also the slab was collapsed
2. Solar 6pcs (300w),
3. pump 1500w,
4. tank rehabilitation and kiosks rehabilitation,
5. Pipes of 2000m of pvc damaged
7) Ceeldibir
1. Shallow wells were filled by sand and cabbages
8) Gebidheer
1. Shallow wells were filled by sand and cabbages
9) Harwanaag
1. Shallow wells were filled by sand and cabbages
10) Maado
21 | P a g e
1. Shallow wells were filled by sand and cabbages
11) Milxo
1. Shallow wells were filled by sand and cabbages
12) Godcandhood
1. Shallow wells were filled by sand and cabbages
13) Warbad
1. Shallow wells were filled by sand and cabbages
14) Qorax-jiif: is shallow that is nomads is using and very important for them
1. Shallow wells were filled by sand and cabbages
15) Ceel Xasan: is shallow that is nomads is using and very important for them
1. Shallow wells were filled by sand and cabbages
16) Laas Macaan: is shallow that is nomads is using and very important for them
1. Shallow wells were filled by sand and cabbages
17) DhidayaQoton: is shallow that is nomads is using and very important for them
1. Shallow wells were filled by sand and cabbages
18) Koxmo: is shallow that is nomads is using and very important for them
1. Shallow wells were filled by sand and cabbages
Durduri Village
22 | P a g e
Ceel-Dhafaruuryo
Ceel Dhafaruur Durduri
Recommendations:
1. The assessment teams would hereby propose an immediate intervention for the
rehabilitation of water sources to ensure full operational of the water systems.
2. Emergency water assistance or water provision to the areas assessed that water is the most
emergency need should be considered to save lives.
3. Rehabilitation of non-functional boreholes/water sources at the affected areas.
4. Provision of supplementary backup fuel for operational boreholes and standby spare parts
for the strategic boreholes surrounding the affected areas. To use for the water trucking.
5. Sanitation and hygiene promotion activities are also a priority need for all as they have
limited sanitation facilities and unhygienic water sources.
23 | P a g e
6. And lastly but not least, all project interventions should respect and be in line with
government agencies and the local communities.
Attachment I: The plan for the intervention required the assessed villages
Emergency Rehabilitation Boreholes, Shallow wells and Spring Affected by the Floods
S. N Region District Borehole/Village Status Intervention Require
1
Bari
Iskushuban Taageer Not Functioning 45 KVA Generator, control
panel wire cable 3x16M
(100m) and GI 3inch
2 Baargaal Not Functioning Old borehole collapsed at
the bottom, rehabilitation
water tank 20cum,
rehabilitation generator
room, washman room and
fencing 40mx40m.
3 Foocaar Not Functioning 150 pcs Gi pipe class B 2
inch
4 Kandala Ceel-gaal Not Functioning 40 kva generator, 15 Kw
submersible pump, control
panel wire cable 3x16M
(800m) and 1,500 m
pipeline
5 Toox (13,700 km NW
of the town)
Not Functioning Pipe GI 3 inch 70 pcs 2
inch 65 pcs 1.5 inch 60 pcs
8 water reservoir RH.
Supporting anchors and
pillars 30 pcs air 9 valves,
3 washout 12 chamber
blocks, 2 elevated 2 m tank
60 cum RH new. 3 waas
need sheets of Aluminum.
5 kiosks RH new 3 kiosks.
tool for plumping. Fittings
sockets 11/2 50 pcs, 2 inch
and 3 inch 50 and 50 pcs.
Fittings Union 11/2 50 pcs,
2 inch and 3 inch 50 and 50
pcs. Fittings Elbow 11/2 50
pcs, 2 inch and 3 inch 50
24 | P a g e
and 50 pcs. Fittings
Reducer11/2 25 pcs, 2 inch
and 3 inch 25 and 25 pcs,
Fittings TEE 11/2 25 pcs, 2
inch and 3 inch 25 and 25
pcs. Fittings Gate valves
11/2 10 pcs, 2 inch and 3
inch 5 and 6 pcs. Cable
5mm 100m clips 200pcs.
6 Karkaar Hafun Hafuun Not Functioning Rehabilitation three
shallow, 30 KVA genset,
booster pump 15KW, 3
submersible pump 2.5KW,
PVC pipes 2inch 334
7
Gardafuu
Caluula Geesaley Not Functioning Old water tank is leaking,
Water tank 30m3, 3kiosk,
two rooms, solar
8 Caluula Not Functioning New borehole,
rehabilitation water tank,
solar
9 Wareegsame Not Functioning Pump and generator
1.5KW, water tank 20m3,
3kiosk and 3 inch 200 PVC
pipes or Glass B 2inch
pipes
10
Gardafuu
Murcayo Not Functioning New water tank 30m3 and
generator
11 Xaabo Not Functioning 534 PCS PVC pipe 4 inch
and new water tank
12
Beyla Dhuudo spring Not Functioning 7.5kW Submersible pump,
and 50pc pipes of class c,
45 KVA Generator,
rehabilitation of kiosks.
13 Beyla1 spring Not Functioning 45 KVA Generator, 15 kW
Submersible Pump, control
panel wire cable 3x16M,
GI Pipes Class C (100pcs),
25 | P a g e
KARKAAR
rehabilitation of water
tank, rehabilitation of store.
14 Beyla2 spring Not Functioning 15kw submersible pump,
main raiser pipes 20 Pcs,
15 Dhalinbaar spring 1 Not Functioning 11kw submersible pump
and GI class C pipes
100pc, control panel wire
cable 3x16M (1000m),
Rehabilitation of water
tank, rehabilitation of store.
16 Biyogaduud (dam) Not Functioning Removing of soil from the
shallow well, rehabilitation
of concrete banks,
rehabilitation of inlet and
outlet water catchment.
construction of gabions to
prevent soil erosion
17
Nugaal
Dangorayo Suuj Not Functioning 11 KW Submersible pump,
rehabilitation of tank,
control panel wire cable
3x16M 500m,45 KVA
Generator, GI Pipes Class
B 400m
18 Garmaal Not Functioning 7.5 KW Submersible
pump, control panel wire
cable 3x16M (100m),
rehabilitation of animal
trough, rehabilitation of
camel trough, construction
of new tank, construction
of pump safety hall, GI
Pipes Class C (70pcs).
19 BaqBaq Not Functioning Rehabilitation of Shallow
well, GI Pipes Class B
(600m), control panel wire
cable 3x16M (500m), solar
system, construction of
store, 15kw submersible
pump, construction of
26 | P a g e
animal and camel trough,
construction of new tank.
20 Falaxfalax Not Functioning 15kw submersible pump,
GI pipes class c (150 pcs),
control panel wire cable
3x16M (500m),
rehabilitation of generator
rooms.
21 Qundheed Not Functioning 29 kva Generator 7.5kw
submersible pump, GI
pipes class c (150 pcs),
control panel wire cable
3x16M (300m),
rehabilitation of store.
22 Eyl Maraya Functioning New generator of 45 Kva,
Submersible pump 11 Kw
and control panel wire
cable 3x16M (500m),
23 Ceelmadoobe Not Functioning Control panel wire cable
3x16M (500m), GI pipes
class c (110 pcs),
construction of animal and
camel trough, 15kw
submersible pump,
24
Sanaag
laasqoray Laasqoray High priority 7.5kWt water pump, solar,
rehabilitation of animal
trough and camel troughs,
rehabilitation of tank.
25 Durduri Not Functioning rehabilitation of shallow
wells, solar 6pcs(300w),
1500W Submersible Pump,
new tank construction,
kiosks construction pipes
1600m.
26 Celaayo Not Functioning solar (45 pcs), 7.5kwt
water pump, pipes 3000m,
control panel wire cable
3x16M (1000m),
27 | P a g e
Rehabilitation of water
tank, rehabilitation of
kiosks, water catchment
rehabilitation.
27 Xidid Not Functioning rehabilitation of shallow
wells and construction of
slab, water point
construction, solar 4pcs
(300w), pump 1000w, tank
rehabilitation, kiosks
rehabilitation, pipes 2200m
(1.5 in pvc)
28 Xamur Not Functioning rehabilitation of shallow
wells, water point
construction, solar,
rehabilitation of tank.
29 Af-urur Not Functioning new tank construction,
construction of animal and
camel trough, water supply
of (4000m)
30 Ceeldhafaruur Not Functioning rehabilitation of shallow
wells and construction of
slab, water point
construction, solar 6pcs
(300w), pump 1500w, tank
rehabilitation, kiosks
rehabilitation, pipes 2000m
(1.5 in pVc.)
31 Ceeldibir Not Functioning solar, pipes 600m (1.5-inch
pvc), construction of new
tank 30m^3.
32 Gebidheer Not Functioning solar, pipes 800m (1.5-inch
pvc), construction of new
tank 30m^3
33 Harwanaag Not Functioning solar, pipes 500m (1.5-inch
pvc), construction of new
tank 30m^3
34 Maado Not Functioning solar, pipes 600m (1.5-inch
pvc), construction of new
tank 30m^3
28 | P a g e
35 Milxoh Not Functioning solar, pipes 1000m (1.5-
inch pvc), construction of
new tank 40m3
36 Godcaanood Not Functioning solar, pipes 600m (1.5-inch
pvc), construction of new
tank 40m3
37 Warbad Not Functioning solar, pipes 600m (1.5-inch
pvc), construction of new
tank 30m3
38 Qorax jiif Not Functioning solar, pipes 600m (1.5-inch
pvc), construction of new
tank 30m3
39 Ceel xasan Not Functioning shallow wells
rehabilitation, new tank
construction, solar, pipes
400, water points
construction, animal
troughs construction camel
trough construction.
40 Laas macaan Not Functioning shallow wells
rehabilitation, new tank
construction, solar, pipes
400, water points
construction, animal
troughs construction camel
trough construction.
41 Dhidaya Not Functioning shallow wells
rehabilitation, new tank
construction, solar, pipes
400, water points
construction, animal
troughs construction camel
trough construction.
42 Qoton Not Functioning shallow wells
rehabilitation, new tank
construction, solar, pipes
400, water points
construction, animal
troughs construction camel
trough construction.
29 | P a g e
43 Koxmo Not Functioning shallow wells
rehabilitation, new tank
construction, solar, pipes
400, water points
construction, animal
troughs construction camel
trough construction.