pudding mill - queen elizabeth olympic park/media/lldc...pudding mill introductory flip-book summer...

39
PUDDING MILL Summer 2016 INTRODUCTORY FLIP-BOOK Pudding Mill Square

Upload: others

Post on 19-Feb-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

  • PUDDING MILL

    Summer 2016

    INTRODUCTORY FLIP-BOOK

    Pudding Mill Square

  • Pudding Mill Introductory Flip-Book | Summer 2016

    2

  • Pudding Mill Introductory Flip-Book | Summer 2016

    3

  • Pudding Mill Introductory Flip-Book | Summer 2016

    4

    The Legacy Corporation is revisiting the Pudding Mill masterplan in response to the changing context of adjoining developments, including the Cultural and Education District.

    The Legacy Corporation wants to create a vibrant Local Centre at the heart of Pudding Mill, as supported by the Local Plan, which maximises residential capacity and employment opportunities, as well as meeting key priorities around local economic benefit, equality and inclusion, sustainability and community engagement.

    INTRODUCTION

    London StadiumLondon Aquatics Centre

    Pudding Mill

  • Pudding Mill Introductory Flip-Book | Summer 2016

    5

    BACKGROUND - LEGACY COMMUNITIES SCHEME

    Illustrative Masterplan Produced for LCS (2012)

    The Legacy Communities Scheme (LCS) planning application, which was approved in September 2012, proposed a range of employment and residential uses at Pudding Mill, as well as other supporting social infrastructure and open space.

    In total the scheme allowed for around 1,300 homes, plus a range of employment floorspace, retail units and community facilities.

  • Pudding Mill Introductory Flip-Book | Summer 2016

    6

    The Pudding Mill masterplan aims to create a new residential neighbourhood with a vibrant Local Centre, providing a range of housing typologies to meet local need, as well as flexible employment floorspace, retail units and community facilities; all tied together through a high quality public realm.

    BRIEF AND VISION FOR PUDDING MILL

    The neighbourhood will include:

    • New homes, including sheltered accommodation

    • Flexible employment space

    • Retail units

    • Social infrastructure

    • Play space

    • Leisure space

    The new development will seek to improve pedestrian and cycle connections through the site and maximise on the opportunities presented by its proximity to the Pudding Mill Lane DLR station and Stratford High Street, as well as Queen Elizabeth Olympic Park.

  • Pudding Mill Introductory Flip-Book | Summer 2016

    7

    Illustrative Visualisation: City Mill River

  • Pudding Mill Introductory Flip-Book | Summer 2016

    8

    WHO’S INVOLVED

    LONDON LEGACY DEVELOPMENTCORPORATION (LLDC)Landowner & Developer

    ALLIES & MORRISONMasterplanners

    BRADLEY-HOLE SCHOENAICH LANDSCAPE ARCHITECTS (BHSLA)Landscape Architect

    AECOMPlanning Agent & Environmental Consultant

    FLUIDCommunity Consultation

  • Pudding Mill Introductory Flip-Book | Summer 2016

    9

  • Pudding Mill Introductory Flip-Book | Summer 2016

    10

    A masterplan usually consists of a series of two dimensional plans and three dimensional images and text describing how an area will be developed.

    The outline planning application will set out the vision for the site as well as details of access, scale, character, use and urban design; it provides a foundation from which future Reserved Matters Applications can be prepared.

    WHAT IS A MASTERPLAN

    The outline planning application will seek to deliver the following for Pudding Mill:

    EMPLOYMENTApproximately 36,000 sqm of flexible employment space that can either be used by a single tenant or by tenants, either taking entire floors or subdivided sections.

    RESIDENTIALApproximately 1,500 residential homes of which 40 will be assisted living homes.

    RETAIL AND LEISURE FACILITIESApproximately 2,500 sqm of retail space and leisure facilities

    COMMUNITY FACILITIESUp to 13,142 sqm of community facilities

    OPEN SPACEApproximately 16,000 sqm of open space to compliment the wider provision within Queen Elizabeth Olympic Park. The masterplan will also include play space and cater for all ages.

  • Pudding Mill Introductory Flip-Book | Summer 2016

    11

  • Pudding Mill Introductory Flip-Book | Summer 2016

    12

    SITE CONTEXT

    Pudding Mill sits between Queen Elizabeth Olympic Park to the North and Stratford High Street to the South. Both of which are undergoing a rapid period of change.

    Pudding Mill is bounded on two sides by the Waterworks River to the northeast and Bow Back River to the southeast. To the southwest it is contained by Cooks Road, and adjoins existing allotments and the Great Eastern Railway corridor to the northeast.

    The City Mill River also runs through Pudding Mill, crossing beneath the Great Eastern Railway corridor at its junction with the Greenway.

    In Links folder do again to change name

  • Pudding Mill Introductory Flip-Book | Summer 2016

    13

    SURROUNDING CONTEXTThe surrounding context of Pudding Mill, which is subject to rapid change, is defined largely by the Park to the north, Warton Road and the Carpenters Estate to the east, and Stratford High Street plus the associated development at Strand East to the south.

    CONNECTIONSThe ‘Greenway’, a strategic pedestrian and cycle route, bisects Pudding Mill and provides an important link between Stratford and Hackney, as well as routes into the Park.

    A network of waterways known as the ‘Bow Back Rivers’ intersects with theGreat Eastern Railway viaduct, Greenway (Northern Outfall Sewer) and High Street Stratford.

    There is the potential to expand and improve these links, particularly the Greenway, as the near-by UCL East site and Stratford Waterfront are developed.

    CHARACTER The site itself was formerly industrial land and is characterised by various site compounds, as well as the Bow Electricity Substation and associated utilities infrastructure that criss-cross the site.

    Pudding Mill DLR station is located at the junction of Marshgate Lane and Barbers Road and acts as a new gateway to the site. An allotment roughly 1 hectare in size, is located south of the railway viaduct.

    A cluster of residential buildings occupy a triangular piece of land between the City Mill River and Greenway, whilst a number of high rise residential towers are located to the south of the Bow Back River along Stratford High Street.

    Bow Back River

    Waterworks River

  • Pudding Mill Introductory Flip-Book | Summer 2016

    14

    BOW EAST

    WICK

    BOW EAST

    WICK

    BROMLEY-BY-BOW

    910

    11

    14

    14

    16

    17

    13

    12

    1

    3

    18

    6

    615

    4

    8

    N

    STRATFORDNEW TOWN

    2

    5

    Plan showing some of the major developments in the area. (Dots do not indicate locations of facilities)

    7

    7

    THE INTERNATIONAL QUARTERSummary: 4 million sq ft of new workplace - TFL and the FCA confirmed as tenants. A 4 star hotel, shops, restaurants, childcare and community facilities. Up to 25,000 jobs created.

    Status: Construction started in 2014, first office occupation in 2017

    Developer: Lend Lease and LCR

    14

    GLASSHOUSE GARDENSSummary: The residential development that forms part of The International Quarter - 330 new homes looking out over the iconic buildings of the south of the Park as part of The International Quarter.

    Status: Final completion estimated for 2017

    Developer: Lend Lease and LCR

    15

    CHERRY PARKSummary: Approx 1,200 new homes alongside community facilities, restaurants, cafes and a servicing facility for Marks and Spencer.

    Status: Hybrid planning application submitted

    Developer: Stratford City Developments Ltd

    16

    ANGEL LANESummary: Unite student accommodation for 750 students, new hotel, a major apartment tower and offices.

    Status: Opened September 2015

    Developer: Unite Group Plc

    17

    STRAND EASTSummary: 1,200 homes, office spaces for a range of businesses including digital and creatives, a riverside park and a range of retail and community uses.

    Status: Planning permission granted

    Developer: Vastint UK

    18

    CHOBHAM FARMSummary: A new family neighbourhood delivering around 1000 homes (of which over 40% are family homes), home zone streets, new public space, commercial space and community facilities.

    Status: Under construction

    Developer: LCR and East Thames Group

    13

    CHOBHAM ACADEMYSummary: A new school for 3-18 year olds that opened in September 2014. In addition to 100 children in the nursery, when the Academy is at full capacity it will have 600 students in the primary school, a further 900 students in the secondary school and a Sixth Form for 420.

    Status: Now open

    Developer: A Lend Lease Harris Partnership

    12EAST WICKSummary: Up to 870 new homes, new primary school and two new nurseries

    Status: Zonal masterplan approved December 2015, Phase 1 detailed design in planning process

    Developer: London Legacy Development Corporation, East Wick and Sweetwater Projects Ltd

    1

    SWEETWATERSummary: Up to 650 new homes including apartments and family homes. A new primary school, two new nurseries, community space, a library and health centre

    Status: Zonal masterplan to be submitted for planning approval in summer 2016

    Developer: London Legacy Development Corporation, East Wick and Sweetwater Projects Ltd

    2

    STRATFORD WATERFRONTSummary: A new campus for UAL’s London College of Fashion, along with major new spaces for the Victoria and Albert Museum and Sadler’s Wells.

    Status: Cultural and Education District outline planning applications due to be submitted late 2016

    Developer: London Legacy Development Corporation with site partners

    4

    HACKNEY WICK CENTRALSummary: Creation of a new neighbourhood centre focused around Hackney Wick Station. The new station which includes an underpass through the existing embankment will create a new north – south pedestrian link. The neighbourhood centre development will consist of workspace clusters with a diverse range of spaces, retail, local amenities, and the introduction of between 800-850 new homes.

    Status: Planning permission granted for the new station. Outline application for the Hackney Wick Neighbourhood Centre to be submitted April 2016

    Developer: London Legacy Development Corporation

    3

    HERE EASTSummary: Transforming the former Olympic Press and Broadcast Centre – an innovation centre set to provide over 1.2 million square feet of space for creative entrepreneurs and creating up to 7,500 jobs on site and in the local community. Key tenants include BT Sport, Hackney Community College, Loughborough University and Infinity SDC.

    Status: BT Sport already broadcast on site, fully operational by 2018

    Developer: iCITY, a joint venture between Delancey and Infinity SDC

    9

    CHOBHAM MANORSummary: The first of the five new neighbourhoods from 2015. Including 828 new homes, 75% designed for families and 1/3 affordable homes. Shops, cafes, bars and other facilities will support a vibrant community.

    Status: Sales underway, first residents occupied their homes in late 2015

    Developer: Chobham Manor LLP

    10

    EAST VILLAGESummary: 2,818 new homes, a new school (Chobham Academy - see point 12), a new health centre, cafés, bars, restaurants, shops and 27 acres of public space. Further developments for an additional 2,000 homes are currently in the planning process.

    Status: Now open

    Developer: Get Living London and Triathlon Homes

    11

    PUDDING MILLSummary: A residential neighbourhood that will deliver up to 1,300 homes, employment floorspace, retail units, community facilities, and a wide range of public open spaces.

    Status: Outline planning permission granted with amendments currently being considered by LLDC

    Developer: London Legacy Development Corporation

    7

    RICK ROBERTS WAYSummary: Provision of approx. 500 new homes as part of a mixed-use masterplan.

    Status: Outline planning permission granted, with secondary school relocated within PDZ3 (see no. 6) and further amendments under consideration

    Developer: London Legacy Development Corporation and Newham

    8

    THE STADIUMSummary: From 2016 the Stadium will become the home of West Ham United, before then it will host a number of international events including the Rugby World Cup in 2015. A new community track will be open alongside the Stadium and will be home to the Newham and Essex Beagles Athletic Club. The Stadium will also become the new national centre for athletics from 2016.

    Status: Fully open from summer 2016

    Developer: E20 Stadium LLP

    5

    LLDC BoundaryPudding Mill Site Boundary

    Education / TrainingWorkspace

    Health Centre

    Community Facilities

    Business

    Retail / LeisureSportSurrounding Area

    Hotel / Student Housing

    Cultural / Exhibition

    LB Hackney Boundary

    LB Tower Hamlets BoundaryLB Newham Boundary

    WIDER MAJOR DEVELOPMENTS

    19

    20

    BOBBY MOORE ACADEMY

    Summary: A sports specialist secondary school and primary school with a 6th form across two sites.

    Status: Planning applications granted

    Proposed operator: David Ross Education Trust

    6

  • Pudding Mill Introductory Flip-Book | Summer 2016

    15

    COOKS ROAD

    Summary: Up to 543 residential units, approx. 58,000 sq ft of commercial floorspace and open spaces and landscaping

    Status: The application for the southern block has been approved.

    Developer: BellwayPartnership

    MARSHGATE

    Summary: 8 new buildings containing approx. 45,000 sq ft of business floorspace, 254 new homes and open space

    Status: Planning permission granted

    Developer: Workspace

    19

    20

  • Pudding Mill Introductory Flip-Book | Summer 2016

    16

    OPPORTUNITIES

    CHARACTER AREASThe natural division of the site allows for the creation of two distinct, yet interconnected neighbourhoods: a vibrant urban neighbourhood at Pudding Mill defined by the Local Centre and a more domestic and relaxed neighbourhood at Bridgewater..

    TRANSPORT CONNECTIONSThe Pudding Mill DLR Station, re- opened in 2014, provides direct access to Stratford Station injust 2 minutes, which acts as an interchange for various onward connections across London.

    BridgwaterPudding Mill

  • Pudding Mill Introductory Flip-Book | Summer 2016

    17

    CONNECTIVITYAt present Pudding Mill is somewhat isolated, being bounded by various barriers to pedestrian or vehicular movement. The masterplan will explore opportunities to promote new or improved connections to the Park and Stratford High Street, as well as Warton Road. The masterplan will consider the hierarchy of these connections and how they should be linked to new internal routes across Pudding Mill.

    WATERWAYSPudding Mill benefits from a variety of waterside with rivers surrounding it on three sides. The masterplan will provide appropriate responses to this special setting by taking into account strategic views and pedestrian movement patterns, as well as townscape considerations.

  • Pudding Mill Introductory Flip-Book | Summer 2016

    18

    CONSTRAINTS

    RAILWAY VIADUCTThe Great Eastern Railway/Crossrail/DLR viaduct bounds Pudding Mill to the north. Whilst the station itself will offer a degree of active frontage, the viaduct west of the station is comprised of a blank concrete wall.

    To the east of the station, the Marshgate Lane underpass separates vehicular and pedestrian routes by way of a significant drop in level.

    UNDERGROUND UTILITIESA number of underground constraints such as Power Lines Underground (PLUG), HV cables and their easements as well as utilities within existing roads impact the development of the site.

  • Pudding Mill Introductory Flip-Book | Summer 2016

    19

    BOW ELECTRICITY SUBSTATION, Bow Electricity Substation and the new headhouses for the underground power lines are situated in the centre of Pudding Mill, on either side of Pudding MillLane.

    These enclosures form part of London’s strategic infrastructure network and have specific operational constraints that need to be respected. They therefore require careful integration into the layout of the neighbourhood to avoid stretches of uninhabited frontage alongside poor quality public space.

  • Pudding Mill Introductory Flip-Book | Summer 2016

    20

    PUDDING MILL KEY ASPIRATIONS

    The masterplan seeks to deliver the following:

    • A new residential neighbourhood that provides a range of housing to meet local need

    • A new Local Centre providing flexible employment floorspace, retail units and community facilities

    • A high-quality environment comprising a variety of building uses and typologies

    • A place that will engage with its immediate context in terms of form and character

    • Taller buildings that are located to signify key locations or relationships within the masterplan, such as the arrival at Pudding Mill DLR or proximity with Stratford High Street

    • A wide range of public open spaces, including play provision for all ages

    • Improved pedestrian and cycle connectivity within the site, as well as new links to the Park and Stratford High Street

  • Pudding Mill Introductory Flip-Book | Summer 2016

    21

    Illustrative Visualisation: City Mill Passage

  • Pudding Mill Introductory Flip-Book | Summer 2016

    22

    EMERGING ILLUSTRATIVE MASTERPLAN

    Overview of Key ComponentsA VIBRANT LOCAL CENTRE

    • Create a vibrant Local Centre at the heart of Pudding Mill

    • Provide flexible employment floorspace, retail units and various community facilities

    • Create a new pedestrian East-West Street that will improve connections across the site to adjoining developments

    A DIVERSE RESIDENTIAL NEIGHBOURHOOD

    • A network of close, intimate streets and shared spaces connecting a series of distinct public spaces with larger more formal blocks dissected by mews streets and passages.

    • A diversity of typologies, from mews houses, to stacked maisonette, to mansion blocks to residential towers.

    • At Bridgewater, a series of stacked maisonettes front the Greenway and the waters edge, whilst apartment blocks create an informal relationship to the allotments.

    • Locate taller buildings to signify key locations or relationships within the masterplan, such as the arrival at Pudding Mill DLR or proximity with Stratford High Street

    PUBLIC OPEN SPACES AND PLAY AREAS

    • Provide a series of public squares and play spaces within the masterplan that will create an enjoyable place to live and work

  • Pudding Mill Introductory Flip-Book | Summer 2016

    23

    2

    413

    7

    8

    9

    10

    11

    9

    9

    5

    3

    1

    12

    1 Allotments

    New

    Existing

    2 Bridgewater Square and connection to Greenway

    3 Stratford High Street

    4 Station Square

    5 Pudding Mill Square

    6 East - West Street

    10 Bow Back Square

    7 Residential blocks

    11 Railway

    8 Mews

    12 UCL East

    9 Towpath

    13 City Mill Yard

    6

    Local Centre

    Improved Connectivity

    Pudding Mill Lane Station

    The Greenway

    WARTON ROAD

    WATERW

    OR

    KS R

    IVER

    STRA

    TFORD

    HIG

    H S

    TREE

    T

    CITY MILL RIVER

    PUD

    DIN

    G MILL LA

    NE

    EAST

    - W

    EST

    STRE

    ET

    BOW

    BACK

    RIVE

    R

  • Pudding Mill Introductory Flip-Book | Summer 2016

    24

    A VIBRANT LOCAL CENTRE

    KEY FEATURES

    • Creation of a new square adjacent to Pudding Mill DLR comprising soft and hard landscaping elements will be a significant point of arrival linking the heart of the new development to the DLR station and the wider area

    • Creation of new employment spaces around Pudding Mill Lane DLR Station will add vibrancy and vitality within the Local Centre and support Marshgate Lane as a new local high street

    • Retail and leisure uses will be located principally around the station

    • Some community facilities will also be located in the Local Centre around neighbourhood open spaces and the East-West Street

    • Frontages will have active ground floor uses to help encourage movement towards Marshgate Lane

  • Pudding Mill Introductory Flip-Book | Summer 2016

    25

    Ground Floor Use Plan

    WARTON ROAD

    WATERW

    OR

    KS R

    IVER

    STRA

    TFORD

    HIG

    H S

    TREE

    T

    CITY MILL RIVER

    PUD

    DIN

    G MILL LA

    NE

    BOW BACK SQUARE

    BRIDGEWATER GREEN

    MARSHGATE LANE SQUARE

    PUDDING MILL SQUARE

    BOW

    BACK

    RIVE

    R

  • Pudding Mill Introductory Flip-Book | Summer 2016

    26

    Pudding Mill Square Marshgate Lane Yard

    ILLUSTRATIVE VISUALISATIONS

  • Pudding Mill Introductory Flip-Book | Summer 2016

    27

    1. Workspace 2. Local Retail

    3. High Density Residential 4. Community Facilities

    PRECEDENT IMAGES

  • Pudding Mill Introductory Flip-Book | Summer 2016

    28

    KEY FEATURES

    • To support a diverse residential neighbourhood the masterplan is comprised of a network of close, intimate streets and shared spaces connecting a series of distinct public spaces with larger more formal blocks dissected by mews streets and passages.

    • One of the key aspects of the landscape strategy is to ensure integration between the new neighbourhood and its adjacent key routes and sites through shared public open spaces or ‘neighbourhood places’

    A DIVERSE RESIDENTIAL NEIGHBOURHOOD

    STRA

    TFORD

    HIG

    H S

    TREE

    T

    WARTON ROAD

    ALLOTMENTS

    GREENWAY

    UCL EAST

    BOW

    BACK

    RIVE

    R

    CITY MILL RIVER

    WA

    TERW

    OR

    KS R

    IVER

    Residential Typologies Plan

    4

    4

    2

    3

    Bridgewater

    Pudding Mill

    1

    Dual Aspect Residential Block

    Single Aspect Residential Block

    Stacked Maisonettes

    Mews

    Sheltered Housing

    Townhouses

    Pudding Mill Lane Station

    Taller Buildings

  • Pudding Mill Introductory Flip-Book | Summer 2016

    29

    • A diversity of typologies, from mews houses, to stacked maisonette, to mansion blocks to residential towers.

    Mews House1 Terraced House2

    Perimeter Block3 Hybrid Block4

  • Pudding Mill Introductory Flip-Book | Summer 2016

    30

    • In order to create a successful urban neighbourhood with a sense of intimacy and intensity, a 6-storey datum has been established across the site.

    • Key moments have then been reinforced by taller context sensitive elements, which provide landmarks to improve legibility within the site.

    Building Heights

  • Pudding Mill Introductory Flip-Book | Summer 2016

    31

    Scale and Massing

    Pudding Mill Site

    Stratford High Street

    UCL East

    Warton Road

    43

    27 20

    2027

    23

    Heights (in storeys)

  • Pudding Mill Introductory Flip-Book | Summer 2016

    32

    1. Mews 2. Terraces

    3. Perimeter Block 4. Hybrid Block

    PRECEDENT IMAGES

  • Pudding Mill Introductory Flip-Book | Summer 2016

    33

  • Pudding Mill Introductory Flip-Book | Summer 2016

    34

    PUBLIC OPEN SPACE AND PLAY AREAS

    KEY FEATURES

    • Each public space within the masterplan responds directly to its immediate context and is connected through a variety of streets and shared spaces

    • Pudding Mill Square has an urban character in response to its location within the Local Centre.

    • Marshgate Yard is informal, working and robust due to its enclosure by employment and housing.

    • Bow Back Green is more relaxed, green and playful, articulating a widening in the river and benefiting from its southerly orientation.

    • Bridgwater Green is more domestic in scale, providing a moment of rest along the Greenway.

    • Play space provision will offer a range of leisure and recreation opportunities for users of all ages.

    STRA

    TFORD

    HIG

    H S

    TREE

    T

    BARB

    ER R

    OAD

    BOW

    BACK

    RIVE

    R

    CITY MILL RIVER

    WA

    TERW

    OR

    KS R

    IVER

    Bow Back Green

    Marshgate Lane Square

    Marshgate yard

    Bridgewater GreenPudding Mill Square

    Pudding Mill Lane Station

    Allotments

    Greenway

    P

    P

    P

    P

    Public Open Spaces and Play Areas

    Indicative Local PlayP

    PP

    PP

    P

    P

  • Pudding Mill Introductory Flip-Book | Summer 2016

    35

    Bow Back Green Visualisation - Board 6

    Illustrative Visualisation: Bow Back Green

    Indicative Local Play

  • Pudding Mill Introductory Flip-Book | Summer 2016

    36

    Illustrative Visualisation: Marshgate Lane Square

  • Pudding Mill Introductory Flip-Book | Summer 2016

    37

    1. River Bank Planting 2. Play space

    3. Public Squares 4. Landscaped Areas

    PRECEDENT IMAGES

  • Pudding Mill Introductory Flip-Book | Summer 2016

    38

  • Pudding Mill Introductory Flip-Book | Summer 2016

    39

    SUMMER 2016

    To ask any questions or to let us know you would like to recieve future updates, please contact the Pudding Mill team at Fluid on:

    020 7729 0770

    [email protected]

    Fluid148 Curtain RoadLondonEC2A 3AT

    You can also keep up to date on the web by visiting:

    FIND OUT MORE

    Queen Elizabeth Olympic Park websitehttp://queenelizabetholympicpark.co.uk/the-park/homes-and-living/pudding-mill