Luis Santos Gerente de ProyectosPrograma Superfondo

Agencia de Protección Ambiental Federal

Page 2: PUBLIC PRESENTATION SLIDES FOR OU1 AND OU2 (SPANISH ... · public presentation slides for ou1 and ou2 (spanish version) for the pesticide warehouse i site author: none / us environmental

OBJETIVOS GENERALES:Definir la naturaleza, alcance y fuentes de

la contaminación en el suelo.

Evaluar el riesgo a la Salud Humana y al Medio Ambiente.

Page 3: PUBLIC PRESENTATION SLIDES FOR OU1 AND OU2 (SPANISH ... · public presentation slides for ou1 and ou2 (spanish version) for the pesticide warehouse i site author: none / us environmental
Page 4: PUBLIC PRESENTATION SLIDES FOR OU1 AND OU2 (SPANISH ... · public presentation slides for ou1 and ou2 (spanish version) for the pesticide warehouse i site author: none / us environmental

Fase de Evaluación de Lugares

Descubrimiento del Lugar

CERCLIST

Estudio Preliminar del Lugar

(PA) Investigación del Lugar (SI)

Modelo Matemático (HRS)

Lista de PrioridadNacional (NPL)

No Plan de Acción de Remediación Requerido (NFRAP)

Acciones de Remoción pueden ocurrir en cualquier etapa

Fase de Remediación

NPLInvestigación de

Remediación/Estudio de Viabilidad

(RI/FS)

Operacióny Mantenimiento

Acciones de remoción pueden ocurrir en cualquier etapa

Record de Decisión (ROD) Diseño y Acción de Remediación (RD/RA)

Estamos aquí

PROCESO SUPERFONDO

Page 5: PUBLIC PRESENTATION SLIDES FOR OU1 AND OU2 (SPANISH ... · public presentation slides for ou1 and ou2 (spanish version) for the pesticide warehouse i site author: none / us environmental
Page 6: PUBLIC PRESENTATION SLIDES FOR OU1 AND OU2 (SPANISH ... · public presentation slides for ou1 and ou2 (spanish version) for the pesticide warehouse i site author: none / us environmental

Se muestreó el suelo y el agua subterránea para Todos los contaminantes listados; los contaminantes de interés se

encontraron en el Suelo; Estos son:

Contaminantes de Interés:◦Dieldrín◦Dioxinas/Furanos(2,3,7,8-TCDD TEQ)◦Arsénico

Page 7: PUBLIC PRESENTATION SLIDES FOR OU1 AND OU2 (SPANISH ... · public presentation slides for ou1 and ou2 (spanish version) for the pesticide warehouse i site author: none / us environmental

Riesgos

Facilidad Mita - NO HAY RIESGOS

Almacén de Plaguicidas- HAY RIESGOSo En el Suelo dentro del área verjada y en el

canal de drenaje

o Agua Subterránea; NO HAY RIESGO

Page 8: PUBLIC PRESENTATION SLIDES FOR OU1 AND OU2 (SPANISH ... · public presentation slides for ou1 and ou2 (spanish version) for the pesticide warehouse i site author: none / us environmental

Red de Muestreo

Dieldrín

Page 9: PUBLIC PRESENTATION SLIDES FOR OU1 AND OU2 (SPANISH ... · public presentation slides for ou1 and ou2 (spanish version) for the pesticide warehouse i site author: none / us environmental

Dioxinas/Furanos

Page 10: PUBLIC PRESENTATION SLIDES FOR OU1 AND OU2 (SPANISH ... · public presentation slides for ou1 and ou2 (spanish version) for the pesticide warehouse i site author: none / us environmental

Arsénico

Page 11: PUBLIC PRESENTATION SLIDES FOR OU1 AND OU2 (SPANISH ... · public presentation slides for ou1 and ou2 (spanish version) for the pesticide warehouse i site author: none / us environmental

Alternativa 1 – No Acción (para propósito de comparación)

Alternativa 2 – Alternativa Preferida

Alternativas 3 y 4 – Cumplen con los objetivos y fueron consideradas.

1Para conocer mas sobre las alternativas, accede aquí: www.epa.gov/superfund/pesticide-warehouse-1

Page 12: PUBLIC PRESENTATION SLIDES FOR OU1 AND OU2 (SPANISH ... · public presentation slides for ou1 and ou2 (spanish version) for the pesticide warehouse i site author: none / us environmental

Alternativa 2Excavación de Suelos Contaminados hasta 10 pies

por debajo de la superficie del suelo, Tratamiento en el Lugar y Disposición fuera del Lugar, Cubierta del

restante subsuelo contaminado y Controles institucionales .

Page 13: PUBLIC PRESENTATION SLIDES FOR OU1 AND OU2 (SPANISH ... · public presentation slides for ou1 and ou2 (spanish version) for the pesticide warehouse i site author: none / us environmental

¿Preguntas?