Page 1 of 3 PUBLIC INFORMATION BULLETIN NO. 17 FEBRUARY 2020 DOWSETT HIGHLANDS RELIEF SEWER PROJECTS NUUANU AVENUE (SCHOOL ST. TO WYLLIE ST.) & PALI HIGHWAY (WYLLIE ST. TO NUUANU PALI DR.) + DOWSETT AVE. JOB NOS. W5-17 & W6-17 INTRODUCTION This bulletin is published to the project website (www.palisewer.org) monthly to keep the community informed about construction work associated with the Dowsett Highlands Relief Sewer Projects. The contract Notice-To-Proceed was issued to Kiewit Infrastructure West Co. (KIWC) on June 7, 2018. Heavy construction is scheduled to continue through the summer of 2020. Refer to the attached maps and visit the project website for more detailed information about this project. To request hard copies of the monthly information bulletins please call the project hotline at (808) 793-7184. UPDATES FOR ONGOING ACTIVITIES KIWC performed the following work in January: School Street between Nuuanu Ave. & Waikahalulu Ln. (near H-1 off-ramp) Construction of a sewer manhole vault at the intersection of Nuuanu Ave. Installation of new sewer pipelines and manholes, including trench excavation and trench restoration, near the School St. and Nuuanu Ave. intersection. Nuuanu Ave. between School St. & Wyllie St. Construction and finishing of the interiors of manholes at various locations between School St. and Wyllie St. Pali Hwy. between Wyllie St. & Dowsett Ave. Restoration of underground utilities at various locations between Ahi Pl. and Ahipuu St. Installation of new sewer pipelines by guided bore methods between Country Club Rd. and Dowsett Ave.; and installation of new sewer pipelines by open excavation, including trench restoration, between Ahipuu St. and Country Club Rd. Installation of new sewer manholes and restoration of shafts between Ahipuu St. and Country Club Rd. Dowsett Ave. Construction of a guided bore pipe installation shafts near the lower Pali Hwy. intersection. Installation of new sewer pipelines and manholes, including trench excavation and trench restoration, at various locations between the lower Alika Ave. intersection and Pelekane Dr. FEBRUARY FORECAST OF ACTIVITIES The following activities are scheduled to continue and/or begin in February. The approximate locations and work hours for these activities are shown on the attached maps. School Street between Nuuanu Ave. & Waikahalulu Ln. (near H-1 off-ramp) Construction of a sewer manhole vault at the intersection of Nuuanu Ave. Installation of new sewer pipelines, including trench excavation and trench restoration, near the School St. and Nuuanu Ave. intersection. Nuuanu Ave. between School St. & Wyllie St. Relocation of an underground water line at the Judd St. intersection. Installation of new sewer pipelines, including trench excavation and trench restoration, at the Judd St. intersection. Construction and finishing within the new manholes at various locations between School St. and Wyllie St. Wyllie St. between Nuuanu Ave. & Burbank St. Installation of new sewer pipelines and manholes, including trench excavation and trench restoration, at various locations between Nuuanu Ave. and Burbank St. (continued on next page)

Upload: others

Post on 24-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PUBLIC INFORMATION BULLETIN NO. 17 FEBRUARY 2020 …palisewer.org/wp-content/uploads/Pali-Nuuanu... · 2/17/2020  · Dowsett Highlands Relief Sewer Projects. The contract Notice-To-Proceed

Page 1 of 3

PUBLIC INFORMATION BULLETIN NO. 17

FEBRUARY 2020

DOWSETT HIGHLANDS RELIEF SEWER PROJECTS

NUUANU AVENUE (SCHOOL ST. TO WYLLIE ST.) &

PALI HIGHWAY (WYLLIE ST. TO NUUANU PALI DR.) + DOWSETT AVE.

JOB NOS. W5-17 & W6-17

INTRODUCTION

This bulletin is published to the project website

(www.palisewer.org) monthly to keep the community

informed about construction work associated with the

Dowsett Highlands Relief Sewer Projects. The

contract Notice-To-Proceed was issued to Kiewit

Infrastructure West Co. (KIWC) on June 7, 2018.

Heavy construction is scheduled to continue through

the summer of 2020. Refer to the attached maps and

visit the project website for more detailed information

about this project. To request hard copies of the

monthly information bulletins please call the project

hotline at (808) 793-7184.

UPDATES FOR ONGOING ACTIVITIES

KIWC performed the following work in January:

School Street between Nuuanu Ave. & Waikahalulu

Ln. (near H-1 off-ramp)

• Construction of a sewer manhole vault at the

intersection of Nuuanu Ave.

• Installation of new sewer pipelines and manholes,

including trench excavation and trench restoration,

near the School St. and Nuuanu Ave. intersection.

Nuuanu Ave. between School St. & Wyllie St.

• Construction and finishing of the interiors of

manholes at various locations between School St.

and Wyllie St.

Pali Hwy. between Wyllie St. & Dowsett Ave.

• Restoration of underground utilities at various

locations between Ahi Pl. and Ahipuu St.

• Installation of new sewer pipelines by guided bore

methods between Country Club Rd. and Dowsett

Ave.; and installation of new sewer pipelines by

open excavation, including trench restoration,

between Ahipuu St. and Country Club Rd.

• Installation of new sewer manholes and restoration

of shafts between Ahipuu St. and Country Club Rd.

Dowsett Ave.

• Construction of a guided bore pipe installation

shafts near the lower Pali Hwy. intersection.

• Installation of new sewer pipelines and manholes,

including trench excavation and trench

restoration, at various locations between the lower

Alika Ave. intersection and Pelekane Dr.

FEBRUARY FORECAST OF ACTIVITIES

The following activities are scheduled to continue

and/or begin in February. The approximate locations

and work hours for these activities are shown on the

attached maps.

School Street between Nuuanu Ave. &

Waikahalulu Ln. (near H-1 off-ramp)

• Construction of a sewer manhole vault at the

intersection of Nuuanu Ave.

• Installation of new sewer pipelines, including

trench excavation and trench restoration, near the

School St. and Nuuanu Ave. intersection.

Nuuanu Ave. between School St. & Wyllie St.

• Relocation of an underground water line at the

Judd St. intersection.

• Installation of new sewer pipelines, including

trench excavation and trench restoration, at the

Judd St. intersection.

• Construction and finishing within the new

manholes at various locations between School St.

and Wyllie St.

Wyllie St. between Nuuanu Ave. & Burbank St.

• Installation of new sewer pipelines and manholes,

including trench excavation and trench

restoration, at various locations between Nuuanu

Ave. and Burbank St.

(continued on next page)

Page 2: PUBLIC INFORMATION BULLETIN NO. 17 FEBRUARY 2020 …palisewer.org/wp-content/uploads/Pali-Nuuanu... · 2/17/2020  · Dowsett Highlands Relief Sewer Projects. The contract Notice-To-Proceed

Page 2 of 3

Pali Hwy. between Wyllie St. and Dowsett Ave.

Note: Work hours on Pali Highway in the town bound

direction will be from 9:00 am to 3:30 pm, Monday

through Friday; in the Kailua bound direction, work

hours will be from 8:30 am to 3:00 pm, Monday

through Friday.

• Restoration of underground utilities, including

backfilling and paving of trenches.

• Installation of new sewer pipelines by guided bore

methods between Country Club Rd. and Dowsett

Ave.; and installation of new sewer pipelines by

open excavation, including trench restoration,

between Ahipuu St. and Country Club Rd.

• Installation of new sewer manholes and restoration

of shafts between Country Club Rd. and Dowsett

Ave.

• Construction and finishing within the new manholes

at various locations between Wyllie St. and Ahi Pl.

Dowsett Ave.

Note: Work hours will be from 8:30 am to 4:30 pm,

Monday through Saturday.

• Construction of guided bore pipe installation shafts

at various locations near the lower Pali Hwy.

intersection.

• Installation of new sewer pipelines and manholes,

including trench excavation and trench restoration,

at various locations between the lower Alika Ave.

intersection and Pelekane Dr.

Pali Hwy. between Dowsett Ave. and Nuuanu Pali

Dr.

Note: Work hours will be from 8:30 am to 3:00 pm,

Monday through Friday.

• Installation of new sewer pipelines and manholes by

open excavation, including trench restoration,

between Dowsett Ave. and Nuuanu Pali Dr.

Nuuanu Pali Dr. between Lower Pali Highway

Intersection and Niniko Stream

• Construction of a guided bore pipe installation shaft

on the east side of Niniko Stream.

TRAFFIC UPDATES FOR FEBRUARY

Daytime construction work will require relatively

isolated lane closures at several locations on School

St., Nuuanu Ave., Wyllie St., Pali Hwy., Dowsett

Ave., and Nuuanu Pali Dr. Work on Pali Hwy. will

involve temporary closure of travel lanes during

work hours. Detours will be involved with various

work locations on Pali Highway and Dowsett

Avenue; see below for the associated traffic detours.

Access to driveways will be maintained via right

turn motions from the open travel lanes fronting

them; however, access to some driveways via left

turn motions may not be available due to required

traffic control configurations. Please observe the

posted construction traffic signage. Thank you for

your patience!

• Traffic Detour for Work on Dowsett Ave. from

Lower Pali Hwy. Intersection to Pelekane Dr. 8:30 am to 4:30 pm, Monday through Saturday During work hours, the lower section of Dowsett

Ave. will be closed to all traffic between Pali

Hwy. and Pelekane Dr., with access into this

segment open to LOCAL TRAFFIC ONLY.

Drivers affected by this detour will be detoured

via Alika Ave. and Wood St.

KIWC has a 24-hr, 7 days a week, continuous

work staging area set up within the Pali Hwy.

median and left turn only lanes fronting the lower

Dowsett Ave. intersection.

• For town bound drivers entering the lower

Dowsett Ave. intersection, movements will be

detoured via u-turn at Laimi Rd.

• For town bound drivers leaving the lower

Dowsett Ave. intersection, movements will be

restricted to a right turn on Pali Hwy. (Kailua

bound), then onto the Pali Hwy. side road

fronting the upper Dowsett Ave. intersection,

and then a left turn on Pali Hwy (town bound).

• Traffic Detour for Work on Pali Hwy. near

Country Club Rd. Intersection 9:00 am to 3:30 pm, Monday through Friday The left turn lane into Country Club Road may be

closed during work in the town bound lanes near

the intersection. Drivers affected by this closure

(continued on next page)

Page 3: PUBLIC INFORMATION BULLETIN NO. 17 FEBRUARY 2020 …palisewer.org/wp-content/uploads/Pali-Nuuanu... · 2/17/2020  · Dowsett Highlands Relief Sewer Projects. The contract Notice-To-Proceed

Page 3 of 3

will be detoured via a slight right onto the Pali

Hwy. side road fronting the upper Dowsett Ave.

intersection, then a left turn onto Pali Hwy. town

bound, and then right turn onto Country Club Rd.

CONTACT INFORMATION

For more information about this project, please visit

the project website: www.palisewer.org or call the

project hotline at (808) 793-7184.

Page 4: PUBLIC INFORMATION BULLETIN NO. 17 FEBRUARY 2020 …palisewer.org/wp-content/uploads/Pali-Nuuanu... · 2/17/2020  · Dowsett Highlands Relief Sewer Projects. The contract Notice-To-Proceed

B

A

T

E

S

S

T

.

JU

D

D

S

T.

W

Y

LLIE

S

T

.

N

S

C

H

O

O

L

S

T

N

U

U

A

N

U

A

V

E

N

U

U

A

N

U

A

V

E

H

IA

L

O

A

S

T

K

A

E

N

A

L

N

IL

IA

H

I S

T

K

A

U

IL

A

S

T

K

U

A

K

IN

I S

T

P

A

U

O

A

R

D

C

R

A

I

G

S

I

D

E

P

L

R

O

B

IN

S

O

N

L

N

LU

NA

LILO

F

W

Y

P

A

L

I

H

W

Y

P

A

L

I

H

W

Y

K

A

W

A

N

A

N

A

K

O

A

P

L

B

U

R

B

A

N

K

S

T

N

IO

L

O

P

A

P

L

CO

ELH

O W

AY

K

A

W

A

N

A

N

A

K

O

A

P

L

A

Y

G

R

O

U

N

D

N

U

U

A

N

U

S

T

R

E

A

M

N

U

U

A

N

U

S

H

O

P

P

I

N

G

P

L

A

Z

A

O

A

H

U

C

E

M

E

T

E

R

Y

&

C

R

E

M

A

T

O

R

Y

C

O

M

M

U

N

I

T

Y

C

H

U

R

C

H

O

F

H

O

N

O

L

U

L

U

MAEMAE

ELEMENTARY

SCHOOL

M

A

E

M

A

E

L

N

DOWSETT HIGHLANDS RELIEF SEWER PROJECTS

NUUANU AVENUE (SCHOOL ST. TO WYLLIE ST.) AND

PALI HIGHWAY (WYLLIE ST. TO NUUANU PALI DR.) + DOWSETT AVE.

CITY AND COUNTY OF HONOLULU

DEPARTMENT OF ENVIRONMENTAL SERVICES

LEGEND:

NEW SEWER MANHOLE

PIPELINE INSTALLATION

BY OPEN EXCAVATION

PIPELINE INSTALLATION BY

GUIDED BORE METHODS

M

A

T

C

H

L

IN

E

FIGURE 1 OF 2

INSTALLATION OF NEW SEWER LINES AND MANHOLES AND

CONSTRUCTION AND FINISHING WITHIN NEWLY INSTALLED MANHOLES

(8:30 AM TO 3:30 PM,

MONDAY THROUGH FRIDAY)

IN

ST

AL

LA

TIO

N O

F N

EW

SE

WE

R L

IN

ES

A

ND

M

AN

HO

LE

S

(8

:3

0 A

M T

O 3

:3

0 P

M,

MO

ND

AY

T

HR

OU

GH

F

RID

AY

)

CONSTRUCTION ACTIVITIES SCHEDULED

FOR FEBRUARY 2020

CONSTRUCTION OF A

SEWER MANHOLE VAULT AND

INSTALLATION OF NEW SEWER LINES

(8:30 AM TO 3:30 PM,

MONDAY THROUGH FRIDAY)

RELOCATION OF A WATER LINE

(8:00 PM TO 4:00 AM ON

THURSDAY, FEBRUARY 6, 2020)

AND INSTALLATION OF NEW

SEWER LINES

(8:30 AM TO 3:30 PM,

MONDAY THROUGH FRIDAY)

AutoCAD SHX Text
NORTH
AutoCAD SHX Text
NOT TO SCALE
Page 5: PUBLIC INFORMATION BULLETIN NO. 17 FEBRUARY 2020 …palisewer.org/wp-content/uploads/Pali-Nuuanu... · 2/17/2020  · Dowsett Highlands Relief Sewer Projects. The contract Notice-To-Proceed

A

H

I P

L

.

L

A

I

M

I

R

D

.

P

U

IW

A

R

D

.

W

Y

L

L

I

E

S

T

.

P

E

LE

K

A

N

E

D

R

.

P

A

L

I

H

W

Y

A

K

A

M

U

P

L

M

O

A

N

A

W

A

I

P

L

P

A

L

I

H

W

Y

P

A

L

I

H

W

Y

P

A

L

I

H

W

Y

L

O

P

E

K

A

P

L

D

O

W

S

E

T

T

A

V

E

H

O

L

O

N

A

P

L

K

E

P

O

L

A

P

L

N

U

U

A

N

U

P

A

L

I D

R

B

U

R

B

A

N

K

S

T

N

I

O

L

O

P

A

P

L

C

O

E

L

H

O

W

A

Y

A

H

IP

U

U

S

T

C

O

U

N

T

R

Y

C

L

U

B

R

D

A

L

I

K

A

A

V

E

A

L

L

A

N

P

L

D

O

W

S

E

T

T

A

V

E

P

A

L

I

H

W

Y

L

U

A

K

I

N

I

S

T

JA

C

K

LN

JA

CK

LN

PA

RK

ST

C

O

M

M

U

N

I

T

Y

C

H

U

R

C

H

O

F

H

O

N

O

L

U

L

U

ELEMENTARY

N

U

U

A

N

U

V

A

L

L

E

Y

P

A

R

K

NUUANU

ELEMENTARY

SCHOOL

W

A

O

L

A

N

I

S

T

R

E

A

M

O

A

H

U

C

O

U

N

T

R

Y

C

L

U

B

D

O

W

S

T

NUUANU STREAM

H

E

N

R

Y

S

T

DOWSETT HIGHLANDS RELIEF SEWER PROJECTS

NUUANU AVENUE (SCHOOL ST. TO WYLLIE ST.) AND

PALI HIGHWAY (WYLLIE ST. TO NUUANU PALI DR.) + DOWSETT AVE.

CITY AND COUNTY OF HONOLULU

DEPARTMENT OF ENVIRONMENTAL SERVICES

LEGEND:

NEW SEWER MANHOLE

PIPELINE INSTALLATION

BY OPEN EXCAVATION

PIPELINE INSTALLATION BY

GUIDED BORE METHODS

ABANDONED SEWER LINE

MA

TC

HL

IN

E

FIGURE 2 OF 2

CONSTRUCTION ACTIVITIES SCHEDULED

FOR FEBRUARY 2020

INSTALLATION OF NEW

SEWER

PIPELINES AND

MANHOLES

(9:00 AM TO 3:30 PM,

MONDAY THROUGH

FRIDAY)

CONSTRUCTION OF SHAFTS

(8:30 AM TO 4:30 PM,

MONDAY THROUGH SATURDAY)

RESTORATION OF UNDERGROUND UTILITIES AND

CONSTRUCTION AND FINISHING WITHIN NEWLY INSTALLED MANHOLES

(9:00 AM TO 3:30 PM,

MONDAY THROUGH FRIDAY)

INSTALLATION OF NEW

SEWER

PIPELINES AND

MANHOLES

(8:30 AM TO 4:30 PM,

MONDAY THROUGH

SATURDAY)

CONSTRUCTION OF A SHAFT AND

INSTALLATION OF NEW SEWER

PIPELINES AND MANHOLES

(8:30 AM TO 3:30 PM,

MONDAY THROUGH FRIDAY)

AutoCAD SHX Text
NORTH
AutoCAD SHX Text
NOT TO SCALE