LILAMA PERMIT TO WORK APPLICATION PTW No..
Application Authorized Applicant Phone:
1.1 - 1.3 * Person responsible for performance of the work (name, company) .....
To be completed by authorized
applicant
Type and scope of work:
Desired date: . Extension :
Date of expiry: .. Auth. Applicant:
Name in print / date / signature
Appointment of senior authorized
person
Fault note No.: System ( KKS ): Room (KKS):
Senior authorized person (name/date/signature):
...
Name in print / date / signature
1.4*
Isolations Component(s) to be isolated .. Isolation list attached: YES / NO
Definition of EHS measures and
isolation actions
Special measures/requirements:
1.5,1.6*
Attach relevant EHS form: Category I ** Category II ** Category III** Category IV** Category V** Cat
(Excavation) (Operational Area) (Hot Work) (Radiography) (Conf.Space)
Senior
Authorized person approval PTW LILAMA E.E
M & civil
I&C
ELEC.
Confir
Name in print / date / signature
Check of the EHS measures and
isolation actionsd EHS
measur
E.E Safety
Officer
-------------------
LLM's
EHS
--------------2.1*
Name in print / date / signature
Relese and implementation of Release by site / com mgr/shift supervisor: Mechanical systems: Action implemented Electrical systems:Action implemented (Persons authorized to perform isolation actions)
Isolatio
2.2 - 2.4* (Senior Authorized Person or resp. site / commissioning mgr) Name in print / date / signature
Work release LILAMA/Fichtner/ E.E site / commissioning mgr / shift supervi
3.1*
Name in print / date / signature
Perfomence of work and
notification of completion
PTW received: Work completed as specified:
3.2 - 4.1*
Authorized applicant: Name in print/date/time/signature Authorized applicant: Name in print/date/tim
Resetling and restoration of
operational readinessSenior authorized person ..
Release by LLM/E.E shift supervisor: Mechanical systems: Action implemented Electrical systems: Action implemented
Name in print / date / signature
Funtional tersts performed / operational readiness restored YES / NOComments:
-
8/11/2019 PTW site instruction New.xlsx
4/17
LILAMA PERMIT TO WORK APPLICATION PTW No...
Application Authorized Applicant Phone:
1.1 - 1.3 * Person responsible for performance of the work (name, company) .....
To be completed by authorized
applicant
Type and scope of work:
Desired date: . Extension :
Date of expiry: .. Auth. Applicant:
Name in print / date / signature
Appointment of senior authorized
person
Fault note No.: System ( KKS ): Room (KKS):
Senior authorized person (name/date/signature):
...
1.4* Name in print / date / signature
Definition of EHS measures and
isolation actions
1.5,1.6*
Attach relevant EHS form: Category I ** Category II ** Category III** Category IV** Category V** C
M & civil
I&C
ELEC.
Name in print / date / signature
Check of the EHS measures and
isolation actions
2.1*
Name in print / date / signature
Perfomence of work and notification
of completion
3.2 - 4.1*
Authorized applicant: Name in print/date/time/signature Authorized applicant: Name in print/date/ti
Resetling and restoration of
operational readiness..
Release by LLM/E.E shift supervisor:
Mechanical systems: Action implemented Electrical systems: Action implemented
Name in print / date / signature
Funtional tersts performed / operational readiness restored YES / NO
Comments:
Senior authorized person: Name in print / date / signature
Release by site / com mgr/shift supervisor: Mechanical systems: Action implemented Electrical systems:Action implemented (Persons authorized to perform isolation actions)
2.2 - 2.4* (Senior Authorized Person or resp. site / commissioning mgr) Name in print / date / signature
k l
Identified EHS measures / isolation actions are
specified and described correctly and fully
E.E Safety Officer
--------------------------------
LLM's E
--------------------
Isolations Component(s) to be isolated .. Isolation list attached: YES / NO
Special measures/requirements:
(Excavation) (Operational Area) (Hot Work) (Radiography) (Conf.Space)
Senior authorized person (or resp.site
manager/commissioning engineer):
Authorized person approval PTW
LILAMA E.E
Confirmation by over Site/Comm. Manager
Senior authorized person
Relese and implementation of EHS
measures and isolation actions
Isolation actions and system-specific EHS
measures implemented or specified in
attachments:
PTW received: Work completed as specified:
-
8/11/2019 PTW site instruction New.xlsx
5/17
LILAMA EHS Form, Category I PTW No..
Excavatio
Measures Remarks
1. Instruction of personnel in hazards and working procedures (Attendance record at bac
2. Notification of other contractor
3. Barriers and safety precautions
4. Subsoil installations for mark up signs on site location
Tick as applicable
*Barriers, warning signs *Security guards *Dewatering pumps *
*Escape routes provided
+ keept clear*Safety belt + line *Miscellaneous *
*Covering required *Ventilation * *
* * * *
* * * *
* * * *
* * * *
Additional safety precautions / Remarks
Excavation includes digging of pits, ditches etc.,
boring and drilling as well as driving of objects into
The activities shall be coordinated in such a manner
that the exposure of personnel to hazards or the
impairment of plant safety can be ruled out
VUNG ANG I PROJECT
-
8/11/2019 PTW site instruction New.xlsx
6/17
LILAMA EHS Form, Category II PTW No...
VUNG ANG I PROJECT
Work in Operational Ar
These include:
Measures Remarks
1. Instruction of personnel in hazards and working procedures (Attendance record at back)
2. Instruction over possible dangers in the work areas (Attendance record at back)
Tick as applicable
*Height -> Scaffolding/belt *Confined spaces -> cf *Dewatering pumps *
*Chemicals -> protective clothing *Acoustic encs -> cf *
*High voltage -> distance *Miscellaneous *
*Observe barriers * *
*Noise -> protective clothing *Observe lablels and signed * *
Additional safety precautions / Remarks
*Rotating machines -> distance
*Explosion protection ->
special equipment
*Temperature ->
protective clothing
We, the undersigned, hereby confirm to perform the ab ove-mentioned work in compliance with the relevant legal requirements, industrial practices and site/fire protection regulations. Im plementatio
the above safety precautions shall be the sole responsibility of the contractor performing the work. The management of LILAMA assumes no liability in this regard.
Operational areas are sectuins which have been declared operational
per project site instructions or memoranda.
Areas with buried cables and gas pipes, chemical
storage areas, live high-voltage lines and piping, water
treatments systems and any operating plant sections.
Compliance with the following requirements must be
ensured to prevent accidents in operational areas:
-
8/11/2019 PTW site instruction New.xlsx
7/17
LILAMA EHS Form, Category III PTW No...
VUNG ANG I PROJECT Hot Work
Measures Remarks
1. Instruction of personnel in hazards and working procedures (Attendance record at back)
2. Notification of other contractor
3. Escape router to be provided + kept clear
4. Combustible materials to be removed/covered
Tick as applicable
*Fire extinguisher(s) at hand *Security guards *Explosion potential tests reqd *
*Bucket of water *Fire watch *Non sparking tools *
*Fire hose prepared *Post-work fire inspection *Safety extra- low voltage *
*Special fire extinguishers *Fire-resistant clothing *Protective disconects *
*Flying spark protection *Respirators *Miscellaneous *
*Barriers, warning signs *Safety harness+line * *
*Escape routes provided+kept clea *Ventilation * *
Additional safety precautions / Remarks
We, the undersigned, hereby confirm to perform the above-mentioned work in compliance with the relevant legal requirements, industrial practices and site/fire protection regulations. Im plementati
the above safety precautions shall be the sole responsibility of the contractor performing the work. The management of LILAMA assumes no liability in this regard.
Hot works are all activities in which welding,brazing, solderung, cutting,
grinding,asphalt work,etc. Is peformed directly on systems and/or
individual plant sections containing combustible materials such astimeber, cables, coated piping, paints, plastics, packaging metarial, etc.
The activities shall be coordinated in such a manner that the exposure of
personnel to hazards pr the impairment of plant safety can be ruled out.
It shall therefore be ensured that any activities associated with the
release of combustible substances, vapor, gases and liquids are not
permit adn in the area for which said hot work permit applies. The site
management shall be notified of any activities of this type, e.g. hydrogen
filling of the generator.
-
8/11/2019 PTW site instruction New.xlsx
8/17
-
8/11/2019 PTW site instruction New.xlsx
9/17
LILAMA EHS Form, Category IV PTW No...VUNG ANG I PROJECT Radiographic Examinations
Measures Remarks
2. Notification of other contractor
3. Escape router to be provided + kept clear
4. Barriers and safety precautions
Barrier distance (m)
Height (m)
Company Company
Signature Signature
E Complete on application Complete on performent of the work
Power(Ci) Act (Bq) kV mA
Restrictions:
A C
1. Instruction of personnel in hazards and working procedures
Contract Partner
Radiographics examinations include any activity involving the use of
isotopes or x-ray tubes. Any such activities may only be performed by
approved contractor and persons. The corresponding requirements are
specified in site regulations and site instructions. Radiographic
examinations may not be performed during normal work hours.
Building (KKS)
Radiantion
sourceX-ray tube Exposure timeIsotope
No. ISO No. / Weld No.
Person performing the work
B D
State No. of welds to be examined
Height (m)
No of axis
-
8/11/2019 PTW site instruction New.xlsx
10/17
Copies pf completed form to: applicant,QM, site sercurity
We, the undersigned, hereby confirm to perform the above-mentioned work in compliance with the relevant legal requirements, industrial practices and siteof the above safety precautions shall be the sole responsibility of the contractor performing the work. The management of LILAMA assumes no liability in
-
8/11/2019 PTW site instruction New.xlsx
11/17
LILAMA EHS Form, Category V PTW No...
VUNG ANG I PROJECT Confined Space
Measures Remarks
2. Notification of other contractor
3. Escape router to be provided + kept clear
Gas Test Results
Tick as applicable
*Continuous gas monitoring *Sercurity guards *Explosion potential tests *Extraction fan (s) working
*Respirators to be worn *Harness and lifeline pro- *Non sparking tools *Ventilation fan(s) working
*Breathing apparatus to be *Communications *Safety extra-low voltage *Miscellaneous
*Fire extinguisher (s) at hand *Electrical tools grounded *Protective disconnects *
Additional safety precautions/ Remarks
We, the undersigned, hereby confirm to perform the above-mentioned work in compliance with the relevant legal requirements, industrial practices and site/fire protection regulations. Im plementation of the
above safety precautions shall be the sole responsibility of the contractor performing the work. The management of LILAMA assumes no liability in this regard.
A "confined space" means any place, including any chamber,
tank, vat,silo, pit, trench, pipe, sewer, flue, well or other
similar space in which by virtue of its enclosed nature, there
arises a foreseeable specialn rick.
No person shall enter a confined space to do work unless it is
not practicalto achieve that purpose without entry.Entry of confined spaces shall be subject to the corresponding
local statutory requirements and shall be released by an
authormeasures. Work may not be started prior to issuance of
a PTW to an authorized applicant having the responsibility
for performing the work.
Reading Carried out by LLM HSSE/E.E EHS CorrdinatorLimit (without BA )
Others (H2S) 10 ppm Max
Explosivity 1 % LEL
Carbon Monoxide (CO) 50 ppm Max
Oxygen( O2 ) 19.5 - 21 %
1. Instruction of personnel in hazards and working procedures
-
8/11/2019 PTW site instruction New.xlsx
12/17
-
8/11/2019 PTW site instruction New.xlsx
13/17
-
8/11/2019 PTW site instruction New.xlsx
14/17
* Numbers refer to the PTW process step held with PTW Officer, ** Check as appropriate
-
8/11/2019 PTW site instruction New.xlsx
15/17
LILAMA EHS Form, Category II PTW No...
VUNG ANG I PROJECT
Work in Operational A
Bao gm:
Measures Remarks
1. hng dn ca nhn vin v cc mi nguy hi v quy trnh lm vic (Attendance record at back)
2. Hng dn qua nhng nguy him c th c trong khu vc lm vic (Attendance record at back)
Tick as applicable
*Cao -> gin gio/giy an ton * khng gian hn ch -> cf *bm kh nc *
*ha cht -> bo h *m thanh encs -> cf *
*in th cao-> khon cch *khc *
*ch hng ro cnh bo * *
*ting n-> bo h *ch thang leo v th * *
thm cnh bo an ton/ ghi ch
We, the undersigned, hereby confirm to perform the above-mentioned work in compliance with the relevant legal requirements, industrial practices and site/fire protection regulations. Im plementati
the above safety precautions shall be the sole responsibility of the contractor performing the work. The management of LILAMA assumes no liability in this regard.
Khu vc hot ng l khu vc c cng b trong hng dn cng
trng hoc bin bn ghi nh.Khu vc c cp chn v ng kh, khu vc kho hacht ,ng day cao th v ng, h thng x l ncv bt k khu vc hot ng khc.Ph hp vi cc yu cu sau y phi c m bo ngn nga tai nn trong hot ng
*my mc vn hnh -> khongcch
*chng chy n -> thitb c bit
*Nhit -> bo h
-
8/11/2019 PTW site instruction New.xlsx
16/17
-
8/11/2019 PTW site instruction New.xlsx
17/17