    LILAMA PERMIT TO WORK APPLICATION PTW No..

    Application Authorized Applicant Phone:

    1.1 - 1.3 * Person responsible for performance of the work (name, company) .....

    To be completed by authorized

    applicant

    Type and scope of work:

    Desired date: . Extension :

    Date of expiry: .. Auth. Applicant:

    Name in print / date / signature

    Appointment of senior authorized

    person

    Fault note No.: System ( KKS ): Room (KKS):

    Senior authorized person (name/date/signature):

    ...

    Name in print / date / signature

    1.4*

    Isolations Component(s) to be isolated .. Isolation list attached: YES / NO

    Definition of EHS measures and

    isolation actions

    Special measures/requirements:

    1.5,1.6*

    Attach relevant EHS form: Category I ** Category II ** Category III** Category IV** Category V** Cat

    (Excavation) (Operational Area) (Hot Work) (Radiography) (Conf.Space)

    Senior

    Authorized person approval PTW LILAMA E.E

    M & civil

    I&C

    ELEC.

    Confir

    Name in print / date / signature

    Check of the EHS measures and

    isolation actionsd EHS

    measur

    E.E Safety

    Officer

    -------------------

    LLM's

    EHS

    --------------2.1*

    Name in print / date / signature

    Relese and implementation of Release by site / com mgr/shift supervisor: Mechanical systems: Action implemented Electrical systems:Action implemented (Persons authorized to perform isolation actions)

    Isolatio

    2.2 - 2.4* (Senior Authorized Person or resp. site / commissioning mgr) Name in print / date / signature

    Work release LILAMA/Fichtner/ E.E site / commissioning mgr / shift supervi

    3.1*

    Name in print / date / signature

    Perfomence of work and

    notification of completion

    PTW received: Work completed as specified:

    3.2 - 4.1*

    Authorized applicant: Name in print/date/time/signature Authorized applicant: Name in print/date/tim

    Resetling and restoration of

    operational readinessSenior authorized person ..

    Release by LLM/E.E shift supervisor: Mechanical systems: Action implemented Electrical systems: Action implemented

    Name in print / date / signature

    Funtional tersts performed / operational readiness restored YES / NOComments:

  • 8/11/2019 PTW site instruction New.xlsx

    4/17

    LILAMA PERMIT TO WORK APPLICATION PTW No...

    Application Authorized Applicant Phone:

    1.1 - 1.3 * Person responsible for performance of the work (name, company) .....

    To be completed by authorized

    applicant

    Type and scope of work:

    Desired date: . Extension :

    Date of expiry: .. Auth. Applicant:

    Name in print / date / signature

    Appointment of senior authorized

    person

    Fault note No.: System ( KKS ): Room (KKS):

    Senior authorized person (name/date/signature):

    ...

    1.4* Name in print / date / signature

    Definition of EHS measures and

    isolation actions

    1.5,1.6*

    Attach relevant EHS form: Category I ** Category II ** Category III** Category IV** Category V** C

    M & civil

    I&C

    ELEC.

    Name in print / date / signature

    Check of the EHS measures and

    isolation actions

    2.1*

    Name in print / date / signature

    Perfomence of work and notification

    of completion

    3.2 - 4.1*

    Authorized applicant: Name in print/date/time/signature Authorized applicant: Name in print/date/ti

    Resetling and restoration of

    operational readiness..

    Release by LLM/E.E shift supervisor:

    Mechanical systems: Action implemented Electrical systems: Action implemented

    Name in print / date / signature

    Funtional tersts performed / operational readiness restored YES / NO

    Comments:

    Senior authorized person: Name in print / date / signature

    Release by site / com mgr/shift supervisor: Mechanical systems: Action implemented Electrical systems:Action implemented (Persons authorized to perform isolation actions)

    2.2 - 2.4* (Senior Authorized Person or resp. site / commissioning mgr) Name in print / date / signature

    k l

    Identified EHS measures / isolation actions are

    specified and described correctly and fully

    E.E Safety Officer

    --------------------------------

    LLM's E

    --------------------

    Isolations Component(s) to be isolated .. Isolation list attached: YES / NO

    Special measures/requirements:

    (Excavation) (Operational Area) (Hot Work) (Radiography) (Conf.Space)

    Senior authorized person (or resp.site

    manager/commissioning engineer):

    Authorized person approval PTW

    LILAMA E.E

    Confirmation by over Site/Comm. Manager

    Senior authorized person

    Relese and implementation of EHS

    measures and isolation actions

    Isolation actions and system-specific EHS

    measures implemented or specified in

    attachments:

    PTW received: Work completed as specified:

  • 8/11/2019 PTW site instruction New.xlsx

    5/17

    LILAMA EHS Form, Category I PTW No..

    Excavatio

    Measures Remarks

    1. Instruction of personnel in hazards and working procedures (Attendance record at bac

    2. Notification of other contractor

    3. Barriers and safety precautions

    4. Subsoil installations for mark up signs on site location

    Tick as applicable

    *Barriers, warning signs *Security guards *Dewatering pumps *

    *Escape routes provided

    + keept clear*Safety belt + line *Miscellaneous *

    *Covering required *Ventilation * *

    * * * *

    * * * *

    * * * *

    * * * *

    Additional safety precautions / Remarks

    Excavation includes digging of pits, ditches etc.,

    boring and drilling as well as driving of objects into

    The activities shall be coordinated in such a manner

    that the exposure of personnel to hazards or the

    impairment of plant safety can be ruled out

    VUNG ANG I PROJECT

  • 8/11/2019 PTW site instruction New.xlsx

    6/17

    LILAMA EHS Form, Category II PTW No...

    VUNG ANG I PROJECT

    Work in Operational Ar

    These include:

    Measures Remarks

    1. Instruction of personnel in hazards and working procedures (Attendance record at back)

    2. Instruction over possible dangers in the work areas (Attendance record at back)

    Tick as applicable

    *Height -> Scaffolding/belt *Confined spaces -> cf *Dewatering pumps *

    *Chemicals -> protective clothing *Acoustic encs -> cf *

    *High voltage -> distance *Miscellaneous *

    *Observe barriers * *

    *Noise -> protective clothing *Observe lablels and signed * *

    Additional safety precautions / Remarks

    *Rotating machines -> distance

    *Explosion protection ->

    special equipment

    *Temperature ->

    protective clothing

    We, the undersigned, hereby confirm to perform the ab ove-mentioned work in compliance with the relevant legal requirements, industrial practices and site/fire protection regulations. Im plementatio

    the above safety precautions shall be the sole responsibility of the contractor performing the work. The management of LILAMA assumes no liability in this regard.

    Operational areas are sectuins which have been declared operational

    per project site instructions or memoranda.

    Areas with buried cables and gas pipes, chemical

    storage areas, live high-voltage lines and piping, water

    treatments systems and any operating plant sections.

    Compliance with the following requirements must be

    ensured to prevent accidents in operational areas:

  • 8/11/2019 PTW site instruction New.xlsx

    7/17

    LILAMA EHS Form, Category III PTW No...

    VUNG ANG I PROJECT Hot Work

    Measures Remarks

    1. Instruction of personnel in hazards and working procedures (Attendance record at back)

    2. Notification of other contractor

    3. Escape router to be provided + kept clear

    4. Combustible materials to be removed/covered

    Tick as applicable

    *Fire extinguisher(s) at hand *Security guards *Explosion potential tests reqd *

    *Bucket of water *Fire watch *Non sparking tools *

    *Fire hose prepared *Post-work fire inspection *Safety extra- low voltage *

    *Special fire extinguishers *Fire-resistant clothing *Protective disconects *

    *Flying spark protection *Respirators *Miscellaneous *

    *Barriers, warning signs *Safety harness+line * *

    *Escape routes provided+kept clea *Ventilation * *

    Additional safety precautions / Remarks

    We, the undersigned, hereby confirm to perform the above-mentioned work in compliance with the relevant legal requirements, industrial practices and site/fire protection regulations. Im plementati

    the above safety precautions shall be the sole responsibility of the contractor performing the work. The management of LILAMA assumes no liability in this regard.

    Hot works are all activities in which welding,brazing, solderung, cutting,

    grinding,asphalt work,etc. Is peformed directly on systems and/or

    individual plant sections containing combustible materials such astimeber, cables, coated piping, paints, plastics, packaging metarial, etc.

    The activities shall be coordinated in such a manner that the exposure of

    personnel to hazards pr the impairment of plant safety can be ruled out.

    It shall therefore be ensured that any activities associated with the

    release of combustible substances, vapor, gases and liquids are not

    permit adn in the area for which said hot work permit applies. The site

    management shall be notified of any activities of this type, e.g. hydrogen

    filling of the generator.

  • 8/11/2019 PTW site instruction New.xlsx

    8/17

  • 8/11/2019 PTW site instruction New.xlsx

    9/17

    LILAMA EHS Form, Category IV PTW No...VUNG ANG I PROJECT Radiographic Examinations

    Measures Remarks

    2. Notification of other contractor

    3. Escape router to be provided + kept clear

    4. Barriers and safety precautions

    Barrier distance (m)

    Height (m)

    Company Company

    Signature Signature

    E Complete on application Complete on performent of the work

    Power(Ci) Act (Bq) kV mA

    Restrictions:

    A C

    1. Instruction of personnel in hazards and working procedures

    Contract Partner

    Radiographics examinations include any activity involving the use of

    isotopes or x-ray tubes. Any such activities may only be performed by

    approved contractor and persons. The corresponding requirements are

    specified in site regulations and site instructions. Radiographic

    examinations may not be performed during normal work hours.

    Building (KKS)

    Radiantion

    sourceX-ray tube Exposure timeIsotope

    No. ISO No. / Weld No.

    Person performing the work

    B D

    State No. of welds to be examined

    Height (m)

    No of axis

  • 8/11/2019 PTW site instruction New.xlsx

    10/17

    Copies pf completed form to: applicant,QM, site sercurity

    We, the undersigned, hereby confirm to perform the above-mentioned work in compliance with the relevant legal requirements, industrial practices and siteof the above safety precautions shall be the sole responsibility of the contractor performing the work. The management of LILAMA assumes no liability in

  • 8/11/2019 PTW site instruction New.xlsx

    11/17

    LILAMA EHS Form, Category V PTW No...

    VUNG ANG I PROJECT Confined Space

    Measures Remarks

    2. Notification of other contractor

    3. Escape router to be provided + kept clear

    Gas Test Results

    Tick as applicable

    *Continuous gas monitoring *Sercurity guards *Explosion potential tests *Extraction fan (s) working

    *Respirators to be worn *Harness and lifeline pro- *Non sparking tools *Ventilation fan(s) working

    *Breathing apparatus to be *Communications *Safety extra-low voltage *Miscellaneous

    *Fire extinguisher (s) at hand *Electrical tools grounded *Protective disconnects *

    Additional safety precautions/ Remarks

    We, the undersigned, hereby confirm to perform the above-mentioned work in compliance with the relevant legal requirements, industrial practices and site/fire protection regulations. Im plementation of the

    above safety precautions shall be the sole responsibility of the contractor performing the work. The management of LILAMA assumes no liability in this regard.

    A "confined space" means any place, including any chamber,

    tank, vat,silo, pit, trench, pipe, sewer, flue, well or other

    similar space in which by virtue of its enclosed nature, there

    arises a foreseeable specialn rick.

    No person shall enter a confined space to do work unless it is

    not practicalto achieve that purpose without entry.Entry of confined spaces shall be subject to the corresponding

    local statutory requirements and shall be released by an

    authormeasures. Work may not be started prior to issuance of

    a PTW to an authorized applicant having the responsibility

    for performing the work.

    Reading Carried out by LLM HSSE/E.E EHS CorrdinatorLimit (without BA )

    Others (H2S) 10 ppm Max

    Explosivity 1 % LEL

    Carbon Monoxide (CO) 50 ppm Max

    Oxygen( O2 ) 19.5 - 21 %

    1. Instruction of personnel in hazards and working procedures

  • 8/11/2019 PTW site instruction New.xlsx

    12/17

  • 8/11/2019 PTW site instruction New.xlsx

    13/17

  • 8/11/2019 PTW site instruction New.xlsx

    14/17

    * Numbers refer to the PTW process step held with PTW Officer, ** Check as appropriate

  • 8/11/2019 PTW site instruction New.xlsx

    15/17

    LILAMA EHS Form, Category II PTW No...

    VUNG ANG I PROJECT

    Work in Operational A

    Bao gm:

    Measures Remarks

    1. hng dn ca nhn vin v cc mi nguy hi v quy trnh lm vic (Attendance record at back)

    2. Hng dn qua nhng nguy him c th c trong khu vc lm vic (Attendance record at back)

    Tick as applicable

    *Cao -> gin gio/giy an ton * khng gian hn ch -> cf *bm kh nc *

    *ha cht -> bo h *m thanh encs -> cf *

    *in th cao-> khon cch *khc *

    *ch hng ro cnh bo * *

    *ting n-> bo h *ch thang leo v th * *

    thm cnh bo an ton/ ghi ch

    We, the undersigned, hereby confirm to perform the above-mentioned work in compliance with the relevant legal requirements, industrial practices and site/fire protection regulations. Im plementati

    the above safety precautions shall be the sole responsibility of the contractor performing the work. The management of LILAMA assumes no liability in this regard.

    Khu vc hot ng l khu vc c cng b trong hng dn cng

    trng hoc bin bn ghi nh.Khu vc c cp chn v ng kh, khu vc kho hacht ,ng day cao th v ng, h thng x l ncv bt k khu vc hot ng khc.Ph hp vi cc yu cu sau y phi c m bo ngn nga tai nn trong hot ng

    *my mc vn hnh -> khongcch

    *chng chy n -> thitb c bit

    *Nhit -> bo h

  • 8/11/2019 PTW site instruction New.xlsx

    16/17

  • 8/11/2019 PTW site instruction New.xlsx

    17/17