Page 1: PSB Beam Dump Cooling Radiation WG Glen Mason EN-CV 25 June 2013

PSB Beam Dump CoolingRadiation WG

Glen Mason EN-CV

25 June 2013

Page 2: PSB Beam Dump Cooling Radiation WG Glen Mason EN-CV 25 June 2013

2

Contents

PSB Dump Cooling System Radiation Instrumentation

25 June 2013EN-CV PSB Beam Dump Cooling – RADWG

Page 3: PSB Beam Dump Cooling Radiation WG Glen Mason EN-CV 25 June 2013

3 EN-CV PSB Beam Dump Cooling – RADWG

PSB Dump Cooling System

25 June 2013

Page 4: PSB Beam Dump Cooling Radiation WG Glen Mason EN-CV 25 June 2013

4

PSB Dump Cooling System

25 June 2013EN-CV PSB Beam Dump Cooling – RADWG

Dump cooling system supplies 1,800 m3/hr of air from the existing ventilation system

Air Handling Unit filter & dual fans – no coil Located under the stairs

Minimal controls design – conditioning of the air occurs in the main ventilation system in b.361.

Page 5: PSB Beam Dump Cooling Radiation WG Glen Mason EN-CV 25 June 2013

5

Location

25 June 2013EN-CV PSB Beam Dump Cooling – RADWG

Page 6: PSB Beam Dump Cooling Radiation WG Glen Mason EN-CV 25 June 2013

6 EN-CV PSB Beam Dump Cooling – RADWG

Radiation Levels

Marco Calviani The dose level at the level of the AHU is projected

to be in the order of ~150-200 Gy/year… I would like to stress that – in addition to the total ionising dose effects – due to the particle spectra expected in the dump area, the consequences of single event upsets has to be taken into account if active electronics is supposed to be placed there or close-by.

25 June 2013

Page 7: PSB Beam Dump Cooling Radiation WG Glen Mason EN-CV 25 June 2013

7 EN-CV PSB Beam Dump Cooling – RADWG

Instrumentation

25 June 2013

Page 8: PSB Beam Dump Cooling Radiation WG Glen Mason EN-CV 25 June 2013

8 EN-CV PSB Beam Dump Cooling – RADWG

Instrumentation

25 June 2013

UBAY - Dungs LGWA pressure switches filter monitoring fan status, fail detection Housing: polycarbonate IP54 Diaphragms: NBR Switching contacts: silver, goldplated Ag