    PROJECT SYSTEMS CYCLE

    FOR

    JAKSON

  • 8/6/2019 Ps Document Material

    2/25

    ORA

    Page 2 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    WORKFLOW DIAGRAM

    PROJECT

    PURCHASE

    REQUISITION

    PURCHASE

    ORDER

    GOODS RECIVE

    INVOICE

    SALES ORDER

    DELIVERY

    POST GOODSISSUE

    BILLING

  • 8/6/2019 Ps Document Material

    3/25

    ORA

    Page 3 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    T-CODE :- CJ20N

    y Use CJ20N to Create,change & view a project.

    y Go to the project tab, and click new, as shown below

  • 8/6/2019 Ps Document Material

    4/25

    ORA

    Page 4 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y To Find the last number being used in project, click on the tab circled in Left.

    y A new tab circled in right will open, use f4 in project defination.

    y You can see the last used project defination

  • 8/6/2019 Ps Document Material

    5/25

    ORA

    Page 5 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y Use the same format for project defination, which will be helpful in tracking of project.

    y In the control tab, the project profile is selected.

  • 8/6/2019 Ps Document Material

    6/25

    ORA

    Page 6 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y Circled tabs on the right are important fields, which should be checked, before savingthe project.

    y Create a WBS element, by a right click on project, as shown above.

  • 8/6/2019 Ps Document Material

    7/25

    ORA

    Page 7 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y The tabs on the right which has been circled, should be ticked.

    y Create a network, by right click on the WBS element, as shown above.

  • 8/6/2019 Ps Document Material

    8/25

    ORA

    Page 8 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y MRP controller is a mandatory field here.

    y Create an Activity by right click on the network.

  • 8/6/2019 Ps Document Material

    9/25

    ORA

    Page 9 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y Click on the tab been circled above, to view & enter the material codes & their

    quantity.

    y Enter the material code, quantity. Keep Item category as L, and Pur. Req. as 3, asshown above.

  • 8/6/2019 Ps Document Material

    10/25

    ORA

    Page 10 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y System will ask for purchase requisition, always use the option Preq+res-WBS

    elem. As shown above.

  • 8/6/2019 Ps Document Material

    11/25

    ORA

    Page 11 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y Give the requsitioner name as above.

    y Before MIGO, it is important to release the project, use the path as shown above.

  • 8/6/2019 Ps Document Material

    12/25

    ORA

    Page 12 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y T-Code :- ME21N ( Create Purchase order)

    y Create P.O by using the generated PR, as shown above.

  • 8/6/2019 Ps Document Material

    13/25

    ORA

    Page 13 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y Account assignment category should be Q.y At item level, give WBS element under the tab account assignment.

  • 8/6/2019 Ps Document Material

    14/25

    ORA

    Page 14 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y T- CODE :- MIGO

    y There are no changes during Migo.

  • 8/6/2019 Ps Document Material

    15/25

    ORA

    Page 15 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y T- CODE :- MMBE ( Stock Overview)

    y Check the stock after MIGO, the material should be stocked against the project.

    y Stock should be against the project, so that delivery could be done from the project.

  • 8/6/2019 Ps Document Material

    16/25

    ORA

    Page 16 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y T- CODE :- VA01 ( Create sales order )

    y Take order type as YOA.

    y Take Item category as YTPS.

    y Go to Procurement tab.

  • 8/6/2019 Ps Document Material

    17/25

    ORA

    Page 17 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y Schedule line category should be CN.

    y Requirement type should be left BLANK.

  • 8/6/2019 Ps Document Material

    18/25

    ORA

    Page 18 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y At the item level, under account assignment tab, give the WBS Element.

    y Rest every process remains same during creation of sales order.

    y WBS should be assigned at item level, and not at the header of document.

    y After Saving the sales document, we will do delivery from project.

  • 8/6/2019 Ps Document Material

    19/25

    ORA

    Page 19 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y T-CODE :- CNS0 ( To make delivery from project ).

    y Give WBS element and sales order number, then click components.

    y Give the goods movement date and click on COPY.

  • 8/6/2019 Ps Document Material

    20/25

    ORA

    Page 20 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y Select the line items to be delivered, and their quantity.

    y Click on the save tab, as shown above.

    y T-CODE :- VL02N ( To do a PGI )

    y Enter the Delivery number and press enter.

  • 8/6/2019 Ps Document Material

    21/25

    ORA

    Page 21 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y Check the delivery quantity, plant and storage location.

    y Click on Post goods issue tab.

    y You can check the stock by using MMBE, after a PGI.

  • 8/6/2019 Ps Document Material

    22/25

    ORA

    Page 22 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y T-CODE :- VF01 ( Create Billing document).

    y Take teh billing document type as YF2

    y Select the row/rows to be billed, and click on selection list, as shown above.

    y Choose Tax/Retail accordingly.

  • 8/6/2019 Ps Document Material

    23/25

    ORA

    Page 23 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y Again Select the required row/rows, and click on copy, as shown above.

  • 8/6/2019 Ps Document Material

    24/25

    ORA

    Page 24 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY

    y To see the header of billing document, click on Billing document overview.

    y Save the document, after checking the amount and taxes.

  • 8/6/2019 Ps Document Material

    25/25

    ORA

    Page 25 of 25

    Process no:

    JAKSON

    Project: IMPLIMENTATIONPS CYCLE

    Date: 07.07.2011

    Team: SAP

    Author: SWAROOP & AKSHAY