proposed works and schedule

2
Proposed Work & Payment Schedule Services M1 M2 M3 M4 M5 M6 1. Investigation 2. Conceptual design 3. Preliminary design 4. Detailed design 5. Tender documentation 6. % Work Progress 15 20 25 15 15 10

Upload: hong-ming

Post on 01-Oct-2015

214 views

Category:

Documents


1 download

DESCRIPTION

Rough Example of Gnatt Chart Timeline for Port Work

TRANSCRIPT

  • Proposed Work & Payment Schedule

    Services M1 M2 M3 M4 M5 M6

    1. Investigation

    2. Conceptual design

    3. Preliminary design

    4. Detailed design

    5. Tender documentation

    6. % Work Progress 15 20 25 15 15 10