PROPER INTEGRATION OF LEAN CONSTRUCTION WITH
THE CPM SCHEDULECharles V. Choyce, Jr., MRICS,CM-LEAN, PSP, PMP, CFCC
Managing Director, BRG
Robert Lamb, PSP, LEED APSenior Managing Consultant, BRG
Benjamin Crosby, CM-LEAN, CM-BIM, CCM Director, Virtual Design & Construction, The Yates Companies
Mason Statham, CM-LEAN, LEED APDirector of LEAN/Sustainability, The Yates Companies
Advantages of LEAN ConstructionAdvantages of LEAN Construction
1. Designed to minimize costs by improving efficiency of construction.
2.
Based on “pull”
planning –
a plan to achieve a reliable production workflow.
3.
Contrast with “push”
planning –
pushing work into a plan based on predetermined completion date.
Advantages of LEAN ConstructionAdvantages of LEAN Construction
Advantages of LEAN ConstructionAdvantages of LEAN Construction
Potential Conflict Between LEAN and CPM SchedulingPotential Conflict Between LEAN and CPM Scheduling
“In push planning, work is pushed into production
based on predetermined completion dates, regardless of whether workers are ready to start production of the work…There is no mystery about when the project needs to be done – it should be completed when the owner wants it and by contract –
workers have to figure out how to make it happen by the specified date.”Associated General Contractors of America, LEAN Construction Education Program, Vol. III “LEAN Restructuring”, p. 1-2 (2012)
Potential Conflict Between LEAN and CPM SchedulingPotential Conflict Between LEAN and CPM Scheduling
“Unlike push planning, pull planning depends on an understanding of the level of readiness of a project’s downstream activities…A true pull planning system introduces additional workload to the production process only when that work can be properly performed , which in turn releases work to other downstream activities.”Associated General Contractors of America, LEAN Construction Education Program, Vol. III “LEAN Restructuring”, p. 1-3 (2012)
Scheduling with LEAN in MindScheduling with LEAN in Mind
HOW TO PREPARE CPM USING TO WORK WITH LEAN
CONCEPTS
Scheduling with LEAN in Mind – Level 2Scheduling with LEAN in Mind – Level 2
Scheduling with LEAN in Mind – Level 3Scheduling with LEAN in Mind – Level 3
LEVEL 3 LEAN LAST PLANNER SCHEDULE – 2,991 ACTIVITIES
LEVEL 4 LAST PLANNER CPM - 3000+ ACTIVITIESLEVEL 4 LAST PLANNER CPM - 3000+ ACTIVITIES
REAL LIFE APPLICATION OF LEAN PLANNING –
PROJECT THOR
Scheduling with LEAN in MindScheduling with LEAN in Mind
Level 3 CPM - 2 4DLast Planner Master Sched.
Scheduling with LEAN in MindScheduling with LEAN in Mind
Level 4 Schedule DevelopmentLevel 4 Schedule Development
Level 4 Schedule DevelopmentLevel 4 Schedule Development
LEVEL 4 LAST PLANNER CPM - 3000+ ACTIVITIESLEVEL 4 LAST PLANNER CPM - 3000+ ACTIVITIES
Level 4 CPM - 2 4DPhase Sched.
Level 4 CPM - 2 4DPhase Sched.
Last Planner Implementation
Last Planner Weekly Work PlanLast Planner Weekly Work Plan
Last Planner Daily HuddlesLast Planner Daily Huddles
Last Planner Daily HuddlesLast Planner Daily Huddles
Last Planner Daily HuddlesLast Planner Daily Huddles
Last Planner Daily HuddlesLast Planner Daily Huddles
Last Planner – CPM Level 3-5. Push and Pull!!
Last Planner Daily Huddles – CPM Level 5 – Field
Should Do!
Can Do!
ROLLING 6 WEEK LOOK – PRODUCTIVITY CHARTS
DAILY LOOK / PPC
Last Planner Master Schedule – CPM Level 3 - Office – Buy out Buy in
Created by GC – general plan – many assumptions – initial approach – 4D!
Productivity used for durations – Logic Refined – Align SOV and CPM – Erection Plans – 4D!
Last Planner Phase Schedule – CPM Level 4 – Offices – Each Trade Buy In
Last Planner 6 Week look/Make Ready – CPM Level 4 – Jobsite
Jobsite specific feedback – Productivity refinedLast Planner Weekly Work Planning – CPM Level 5 – Jobsite
GC/CM
PMs/Supers Trades, Vendors
Trades Supers
Area Foremen
Area Foremen
P6 Synchro
P6 Synchro
Jobsite Wall
Jobsite Wall
Area Reports
SIGNED BASELINE / CONTROLS
WORKING SCHEDULE / COORDINATED PLAN
1 WEEK LOOK / PPC
Must Do!
Will Do!
Pull Sessions (as Desired)
Doing /Did!
Push and PullPush and Pull
Push
Use CPM to keep the project moving
forward.
Push and PullPush and Pull
Pull
Use Last Planner to pick up time as you
go.
Push and PullPush and Pull
Push Pull