Promoters Tunnel
Presentation
Tim Smart
Head of Engineering & Operations
20th October 2014 1
![Page 2: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/2.jpg)
Tunnel Briefing Agenda
1. Why tunnel? 2. Operational aspects of tunnels 2.1 Safety requirements 2.2 Noise and vibration 2.3 Aerodynamics and porous portals 2.4 Vent shafts and smoke control 2.5 Energy requirements
3. Construction 3.1 Tunnelling techniques 3.2 Shaft construction 3.3 Settlement 3.4 Rate of tunnelling 3.5 Construction aspects 4. Costs implications 4.1 Costs of tunnelling 4.2 Land costs 4.3 Impact on programme
2
![Page 3: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/3.jpg)
Tunnels Location
3
![Page 4: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/4.jpg)
1. Why Tunnel? Terrain
• Chiltern Tunnel
• Long Itchington
Surface Disruption
Cost effective
• Euston
• Northolt
• Bromford
Connectivity
• South Heath
• Wendover
• Burton Green
• Greatworth
4
![Page 5: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/5.jpg)
Terrain Example: Chiltern Tunnel
Chalfont St Peter
Chalfont St Giles
Amersham
Little Missenden
5
![Page 6: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/6.jpg)
Terrain Example: Chiltern Tunnel
6
![Page 7: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/7.jpg)
Surface Disruption Example: Northolt Tunnel
OOC Station
Northolt
7
![Page 8: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/8.jpg)
Surface Disruption Example: Northolt Tunnel
8
![Page 9: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/9.jpg)
Connectivity Example: Burton Green Plan View
9
![Page 10: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/10.jpg)
Connectivity Example: Burton Green Plan View
10
![Page 11: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/11.jpg)
Tunnels Phase One
• 7.4km
• London Clay Euston
• 14km
• London Clay/Lambeth/Chalk Northolt
• 13.4km
• Chalk Chilterns
• 1.5km
• Penarth Group/Mercia Mudstone
Long Itchington Wood
• 2.8km
• Penarth Group/Mercia Mudstone
Bromford
• 1.1km
• Chalk South Heath
• 1.3km
• Chalk Wendover
• 2.1km
• Glacial Till/Oolite/Whitby Mudstone
Greatworth
• 2.5km
• Low Jurassic Marlstone/Mudstone
Chipping Warden
• 0.4km
• Penarth Group/Mercia Mudstone
Long Itchington Wood
• 0.5km
• Lower Carboniferous Mudstone
Burton Green
Twin Bored Tunnel Cut & Cover
11
![Page 12: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/12.jpg)
2. Operational Aspects of Tunnelling
2.1 Safety Arrangements
2.2 Noise and Vibration
2.3 Aerodynamics and Porous Portals
2.4 Vent Shafts and Smoke Control
2.5 Energy Requirements
12
![Page 13: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/13.jpg)
2.1 Minimum Safety Requirements (TSI)
Safe Area
• to the surface every 1 km or
• adjacent to independent tunnel tube every 500m
Fire Fighting Points - Applies to all tunnels over 1 km and rolling stock dependent
• Tunnel Length 1 to 5 km - portals with minimum standing area 550 sq m
• Tunnels Length over 5km - every 5km depending on rolling stock characteristics
Fire Fighting Point defined as
• Location inside or outside tunnel where fire fighting equipment can be used and passengers can evacuate
• Water supply capacity requires a minimum of 800 l/min for 2 hrs.
13
![Page 14: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/14.jpg)
Tunnel Cross Passage
14
![Page 15: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/15.jpg)
Emergency Train Evacuation
15
![Page 16: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/16.jpg)
Evacuation Walkway
16
![Page 17: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/17.jpg)
Tunnel Cross Passage Opening HS1
17
![Page 18: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/18.jpg)
Typical Cross passage Door
18
![Page 19: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/19.jpg)
2.2 Vibration
19
1. Noise/ vibration of rail caused by train 2. Attenuation through trackform 3. Attenuation through tunnel and ground 4. Attenuation through building foundations 5. Attenuation through structure building 6. Possible amplification from resonance of
building structure
INDICATIVE
![Page 20: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/20.jpg)
Vibration mitigation via “booted sleeper” track
20
![Page 21: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/21.jpg)
Tunnel Operational Noise
HS2 vent shafts are designed, constructed, operated and maintained along with associated stationary equipment so that noise in the worst affected residential receptors, conforms to British Standard Guidance and achieves the aims of the Noise Policy Statement for England.
Mechanical equipment within the vent shaft is only operated under the following circumstances:
• During an emergency;
• During maintenance when required to maintain an acceptable air quality environment; and
• During tunnel congestion when required to maintain an acceptable air quality environment.
21
![Page 22: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/22.jpg)
2.3 Tunnel Aerodynamics
Tunnel aerodynamics are a function of the interaction of key infrastructure and rolling stock parameters such as:
• Diameter and roughness of tunnel • Length of tunnel • Provision of tunnel draught relief • Portal design • Train speed and length • Train aerodynamic profile
The primary controlling factors are the train speed and the “blockage ratio” (i.e. train area/tunnel area).
22
![Page 23: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/23.jpg)
Tunnel Aerodynamics
23
Propagation of pressure wave
![Page 24: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/24.jpg)
Porous Portal Slide
24
![Page 25: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/25.jpg)
Porous Portal
25
![Page 26: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/26.jpg)
Porous Portal
26
![Page 27: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/27.jpg)
2.4 Vent Shafts
Primary Purpose • Smoke extract and control • Pressure relief • Access for emergency services • Passenger comfort to keep air quality and temperature
within acceptable limits
Secondary Uses • Tunnel boring machine maintenance intervention • Access for railway maintenance
27
![Page 28: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/28.jpg)
Vent Shafts along Bored Tunnels
28
![Page 29: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/29.jpg)
DOWN TUNNEL
UP TUNNEL
FANS
DAMPERS
DAMPERS
DAMPERS ARE NORMALLY CLOSED
FANS ARE FIXED PITCH, VARIABLE SPEED, REVERSIBLE
UP TUNNEL
Shaft Fans
29
![Page 30: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/30.jpg)
DOWN TUNNEL
UP TUNNEL
FANS
DAMPERS
DAMPERS
Shaft Fans
30
![Page 31: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/31.jpg)
DOWN TUNNEL
UP TUNNEL
FANS
DAMPERS
DAMPERS
Shaft Fans
31
![Page 32: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/32.jpg)
In Line Tunnel Fan
32
![Page 33: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/33.jpg)
Fans for portal arrangement via “Saccardo Nozzle”
33
![Page 34: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/34.jpg)
“Saccardo Nozzle” viewed from the tunnel
34
![Page 35: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/35.jpg)
2.5 Increased energy use in Tunnels
Traction power • Energy required for the traction power of the trains increases in tunnels. • In the open air 80% of the energy used by the train goes into overcoming air
resistance. This increases to 90% in a tunnel.
Increased power for Mechanical and Electrical plant and equipment • Increase in energy costs for the railway due to the plant necessary for safety
arrangements, for example: ― fans ― lifts ― fire mains ― emergency lighting plus tunnel integrity plant (e.g pumps, cooling
arrangements)
35
![Page 36: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/36.jpg)
3. Construction
3.1 Types of Tunnelling Techniques Applicable to HS2
Bored Tunnels
• Shield type machines with precast segmental tunnel lining.
• Used when surface access is very limited at depths typically below one tunnel diameter.
• Longer tunnel lengths where economical to use machine.
Cut & Cover Tunnels (“Green Tunnels”)
• Typically concrete box structures constructed in excavated ground.
• Used at shallower depths where there is good surface access.
Mined/Sprayed Concrete Lining Tunnels
• Mechanically excavated with sprayed concrete lining.
• Used in shorter drives or more complicated shapes, also in soft rock ground conditions.
36
![Page 37: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/37.jpg)
Bored Tunnels Earth Pressure Balance Tunnel Boring Machine (EPBM)
37
![Page 38: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/38.jpg)
Bored Tunnels HS1 EPBM in factory showing back up arrangements
38
![Page 39: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/39.jpg)
Bored Tunnels Cutter Head
39
![Page 40: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/40.jpg)
Bored Tunnels Slurry or “Hydroshield” Tunnel Boring Machine
40
![Page 41: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/41.jpg)
Precast Tunnel Lining Manufacture
41 INDICATIVE
50m
100m
Size Length - 300m Width - 100m Scale Length - 3 football pitches Width - 2 foot ball pitches
100m
280m
![Page 42: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/42.jpg)
Bored Tunnels Tunnel Ring Segments
42
![Page 43: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/43.jpg)
Segment Yard & Drive Site Locations
Old Oak Common
M25
Northolt tunnel Harvil Road
Washwood Heath
43
![Page 44: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/44.jpg)
Mined tunnel
Excavator
44
![Page 45: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/45.jpg)
Sprayed Concrete Lining
45
![Page 46: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/46.jpg)
Cut & Cover “Green Tunnel”
46
![Page 47: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/47.jpg)
Construction of tunnels where all the ground above is cleared
Cut and Cover Cross Section
47
![Page 48: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/48.jpg)
Cut and Cover Construction Methodology 1
48
![Page 49: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/49.jpg)
Cut and Cover Construction Methodology 2
49
![Page 50: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/50.jpg)
HS1 Cut and Cover Under Construction
50
![Page 51: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/51.jpg)
HS1 Cut and Cover Completed
51
![Page 52: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/52.jpg)
Diaphragm Wall Construction
52
![Page 53: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/53.jpg)
Diaphragm Wall Construction
53
![Page 54: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/54.jpg)
Typical Plant for Cut & Cover Tunnel
54
![Page 55: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/55.jpg)
3.2 Shaft Construction
55
![Page 56: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/56.jpg)
Completed Shaft
56
![Page 57: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/57.jpg)
Shaft Construction
57
![Page 58: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/58.jpg)
Completed Shaft
58
![Page 59: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/59.jpg)
Shaft Construction
59
![Page 60: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/60.jpg)
Adit Construction
60
![Page 61: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/61.jpg)
3.3 Settlement
INDICATIVE 61
![Page 62: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/62.jpg)
Settlement Protective Measures • The primary form of settlement mitigation will be by good tunnelling
practice, including continuous working. Where required additional measures (e.g. grouting and structural solutions) will be carried out based on a three stage assessment as set out in Information Paper C3: Ground Settlement.
• Phase 1 Assessment: A preliminary assessment based on “green field” conditions will be undertaken. Where the predicted settlement is less than 10 mm or less than 1/500 slope, no further assessment is required.
• Phase 2 Assessment: In the case of predicted settlement of more than
10mm or 1/500 slope, an individual building assessment will be carried out. If the potential damage classification is Category 2 (slight) or below - no further assessment is required.
62
![Page 63: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/63.jpg)
Settlement Protective Measures
• Phase 3 Assessment: Where predicted settlement indicates potential damage classification of 3 (moderate) or higher, a detailed evaluation will be carried out with the aim to reduce the effects to acceptable levels. Where this is not possible further protective measures will be implemented.
• Settlement Deed. Properties within 30 metres of tunnels may apply for a Deed (as set out in information paper C3) to ensure that protective measures are implemented in accordance with the assessment criteria.
63
![Page 64: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/64.jpg)
3.4 Rate of Tunnelling • The rate of tunnelling is important in minimising settlement. This is achieved by
operating tunnel boring machines appropriately (such as using Earth Pressure Balance machines in “closed” mode).
• In order to keep settlement to acceptable limits, HS2 has specified a maximum of 1% volume loss for bored tunnels.
• Continuous 24 hour tunnelling also minimises settlement as it does not allow time for the ground to fully relax.
• Other methods of controlling settlement include grouting techniques, particularly compensation grouting.
64
![Page 65: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/65.jpg)
3.5 Construction Aspects
(1) Construction Sites
(2) 24 hours/ 7 days working
(3) Supporting logistics – including excavated material
(4) Noise and Vibration
65
![Page 66: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/66.jpg)
Construction Noise - Tunnel Drive Sites • Tunnel drive sites generate similar noise levels to other large construction
sites.
• Tunnelling activities and the associated local site material handling will be operated 24 hours a day.
• Noise mitigation is provided by the standard means such as hoarding, muffling, baffles and noise suppression on plant and equipment.
• Tunnel sites will be subject to the same HS2 procedures set out under the Code of Construction Practice and will be subject to Local Authority Approval under Section 61 of Code of Pollution Act 1974.
66
![Page 67: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/67.jpg)
Construction Noise - Tunnel Boring
• Sound and vibration from the tunnel boring machine will be perceptible inside properties for a few days either side of the TBM as it passes beneath them.
• The effects of ground‐borne sound and vibration
from the TBM on building occupants will be short‐term and hence they are not considered to be significant.
67
![Page 68: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/68.jpg)
4. Costs of Tunnelling Factors
• Tunnel Size • Ground Conditions (rate of progress) • Groundwater/aquifers • Material disposal methodology • Number of shafts • Cross Passages • Ground treatment • Settlement monitoring.
68
![Page 69: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/69.jpg)
Costs of Tunnelling
Fixed Costs • TBM typically £15 to £20m • Back up material handling similar costs order.
Linear Costs • Labour • Lining materials • Excavated material disposal
Incremental Cost dependent on • Surface arrangements for drive sites, reception sites, portal arrangements. • Increase in shafts, cross passages, shaft M&E systems. • Number of logistics vehicles
69
![Page 70: Promoters Tunnel Presentation - UK Parliament · Promoters Tunnel Presentation ... Costs implications 4.1 Costs of tunnelling 4.2 Land costs ... Tunnel Length 1 to 5 km](https://reader034.vdocuments.site/reader034/viewer/2022051407/5af6c4777f8b9a5b1e8f845b/html5/thumbnails/70.jpg)
Cost vs. Length
0 0 0
£
km
CO
ST
LENGTH
Shaft + M&E plant for vent & smoke control
INDICATIVE
Additional Shafts + M&E plant for vent & smoke control
Increase in cost per metre due to distance travelled by tunnel logistics requiring more spoil transport.