Total weight: Ÿ With Wheels - 207.5KG Ÿ Without Wheels - 187.5KG Disassemble Weights: Ÿ Hopper - 18KG Ÿ Top Mixing Bowl - 30KG Ÿ Paddles - 3KG Ÿ Rest of Machine - 156.5KG Dimensions: Ÿ With wheels - L-0.9M, W-0.9M, H-0.95M Ÿ Without wheels - L-0.85M, W-0.7M, H-0.95M Air pressure required - 3-4Bar (can also be supplied electrical) Machine output - 3000L/Hour Single drive system with 1X airmotor and 1X gearbox thus less air required and less maintenance. The Tunnel Guard Pump is a robust design that is tailor made to suit the rigorous demands of underground production. The SAMINE 3000 Pump and continuous mixer is designed for high output in any area. The pump can be disassembled in a matter of minutes, therefore making it easier to transport. The SAMINE 3000 pump can be supplied as a pneumatic or electric pump. WWW.SA-MINING.COM SAMINE 3000 PUMP REDUCE COSTS UP TO 40% ON SECONDARY SUPPORT WITH TUNNEL GUARD SS

Upload: others

Post on 04-May-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REDUCE COSTS UP TO 40% ON SECONDARY SUPPORT WITH TUNNEL …

Total weight:Ÿ With Wheels - 207.5KGŸ Without Wheels - 187.5KG

Disassemble Weights:Ÿ Hopper - 18KGŸ Top Mixing Bowl - 30KGŸ Paddles - 3KGŸ Rest of Machine - 156.5KG

Dimensions:Ÿ With wheels - L-0.9M, W-0.9M, H-0.95MŸ Without wheels - L-0.85M, W-0.7M, H-0.95M

Air pressure required - 3-4Bar(can also be supplied electrical)

Machine output - 3000L/Hour

Single drive system with 1X airmotor and 1X gearbox thus less air required and less maintenance.

The Tunnel Guard Pump is a robust design that is tailor made to suit the rigorous demands of underground production.The SAMINE 3000 Pump and continuous mixer is designed for high output in any area.The pump can be disassembled in a matter of minutes, therefore making it easier to transport.The SAMINE 3000 pump can be supplied as a pneumatic or electric pump.

WWW.SA-MINING.COM

SAMINE 3000 PUMP

REDUCE COSTS UP TO 40% ON SECONDARYSUPPORT WITH TUNNEL GUARD SS

Page 2: REDUCE COSTS UP TO 40% ON SECONDARY SUPPORT WITH TUNNEL …

Ÿ Reduce your material costs per m² by up to 20%Ÿ Labour costs reduced by up to 50%Ÿ Shaft time on materials handling reduced by up to 85%Ÿ Production on application increased by up to 260%Ÿ Saving of up to 85% on material transport costs to MineŸ Material application rebound costs reduced by up to 80%

Tunnel Guard is a thin cementitious spray on liner that provides robust structural secondary support and consolidates various problematic rock types. Tunnel Guard penetrates deep into the rock mass along open fractures and joints, acting as a hard rough gouge that fills and increases the cohesion across the fractures. This strengthens the rock mass and limits the ability of the rock fabric to move. (Key Block-interlocking) Tunnel Guard also seals the rock, preventing oxidation and weathering, thus preserving your excavations for long-term mining. Tunnel Guard is non-toxic, non-flammable and environment friendly.