project team - amazon web servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/... · lcor - 400...
TRANSCRIPT
LCOR - 400 ARMY NAVY DRIVE
PROJECT TEAMDeveloper: LCOR
Architect: SK+I Architectural Design Group
Counsel: Walsh Colucci Lubeley & Walsh, P.C.
Civil Engineer: Christopher Consultants, ltd.
Landscape Arch: Oculus
Traffic Consultant: Gorove/Slade
LEED Consultant: Architectural Energy Corporation
SPRC PRESENTATION # 3 - April 24, 2014
1
LCOR - 400 ARMY NAVY DRIVE
PRESENTATION GOALSApril 24, 2014
• DESIGN GOALS
• NEIGHBORHOOD CONTEXT
• NEIGHBORHOOD AMENITIES
• EXISTING CONDITIONS
• SECTOR PLAN REVIEW
• SITE PLAN EXISTING VS. PROPOSAL COMPARISON
SPRC PRESENTATION #3 - April 24, 2014
2
LCOR - 400 ARMY NAVY DRIVE
PRESENTATION GOALSApril 24, 2014
• DESIGN GOALS
• NEIGHBORHOOD CONTEXT
• NEIGHBORHOOD AMENITIES
• EXISTING CONDITIONS
• SECTOR PLAN REVIEW
• SITE PLAN EXISTING VS. PROPOSAL COMPARISON
SPRC PRESENTATION #3 - April 24, 2014
3
DESIGN GOALS AT 400 ARMY NAVY
• World-class Architecture
• Iconic residential building at landmark site
• Create sense of place and an active, desirable place to live
• Enhance the urban fabric with animated design
• Hierarchy of elements; variation in placement of projections,height of roof elements, and steps in building
• Diverse living opportunities with unique amenties
4
LCOR - 400 ARMY NAVY DRIVE
PRESENTATION GOALSApril 24, 2014
• DESIGN GOALS
• NEIGHBORHOOD CONTEXT
• NEIGHBORHOOD AMENITIES
• EXISTING CONDITIONS
• SECTOR PLAN REVIEW
• SITE PLAN EXISTING VS. PROPOSAL COMPARISON
SPRC PRESENTATION #3 - April 24, 2014
5
• The immediate neighborhood surrounding the project is undergoing a paradigm shift from an industrial / warehouse district to a vibrant, mixed-use community that will knit together Crystal City and Pentagon City
GREATER CONTEXT OF CRYSTAL CITY
• More than 2,000 new residential units are expected to be delivered in the neighborhood over the next five years, in addition to new retail, including Whole Foods, and infrastructure improvements along 12th and 15th Streets, including the Streetcar
6
CONTEXT DIAGRAM
Site
Convenient walking distance to Pentagon City Metro Station
Approx. 1600 FT / 3 blocks
7
1 PENTAGON ROW
THE LENOX CLUB385 Dwelling Units
MILLENIUM at Met Park300 Dwelling Units
BOEING Headquarters453,000 SF Office
THE ACADIA at Met Park411 Dwelling Units
NORTH TRACT LOFTS184 Dwelling Units
GRAMERCY at Met Park378 Dwelling Units
PENTAGON CENTRE420 & 297 Dwelling Units (Kimco)
1400 CRYSTAL DRIVE310,000 SF Office
PENPLACEHotel and Office Towers
1900 CRYSTAL DRIVE720,000 SF Office; 10,000 SF Retail
MET PARK Phase 4-5699 Dwelling Units
1720 S. EADS ST.203 Dwelling Units
2
9
3
1110 12 13
4 5 6 7
8
NEIGHBORHOOD DEVELOPMENT
Site
Site- Only 5.7% of existing Pentagon City / Crystal City inventory and 10.6% of the existing RB Corridor inventory was constructed within the last 5 years
- There are 10,500 existing units in the Pentagon City and Crystal City area, and in this submarket there will be 2,000 new dwellings delivered in the next 5 years
- The last new condominium was the Belle Vista in 1989 (202 dwelling units)
- The most recent condominium conversion was the Waterford House in 1993 (65 dwelling units)
8
LCOR - 400 ARMY NAVY DRIVE
PRESENTATION GOALSApril 24, 2014
• DESIGN GOALS
• NEIGHBORHOOD CONTEXT
• NEIGHBORHOOD AMENITES
• EXISTING CONDITIONS
• SECTOR PLAN REVIEW
• SITE PLAN EXISTING VS. PROPOSAL COMPARISON
SPRC PRESENTATION #3 - April 24, 2014
9
1 WHOLE FOODS
12th St. Revitalization
PENTAGON CITY MALL
15th St. Revitalization
CRYSTAL CITY DRIVEand Crystal City Underground
CYCLE TRACKSand Dedicated Bike Lanes
STREET CAR TRANSIT LONG BRIDGE PARK AQUATICS CENTER
NATIONAL AIRPORT
2
9
3
10
4 5 6 7
8
NEIGHBORHOOD AMENITIES
Site
Site
10
LCOR - 400 ARMY NAVY DRIVE
PRESENTATION GOALSApril 24, 2014
• DESIGN GOALS
• NEIGHBORHOOD CONTEXT
• NEIGHBORHOOD AMENITIES
• EXISTING CONDITIONS
• SECTOR PLAN REVIEW
• SITE PLAN EXISTING VS. PROPOSAL COMPARISON
SPRC PRESENTATION #3 - April 24, 2014
11
EXISTING SITE CONDITIONS
• Site Area 71,861 SF
• Curb Cuts 4 existing (2 on Old South Eads)
• Proximity to Metro 3 blocks (approx. 1600 feet)
• Grade Change (above sea level) 38 feet at Army Navy Drive 35 feet at 11th Street S.
• Sidewalk Clear Widths Army Navy Drive - 9.2’ and 10’ Old South Eads - 17.4’ 11th Street S. - 8.3’
• No significant landscaping with limited landscaped area
Pentagon ParkingArmy Navy Drive
12th Street S.
11th Street S.
10th Street S.
S. Eads Street
Marriott
Crystal CityCondominiumThe
Bennington
400 Army Navy Drive
TSA Headquarters
Pentagon City Metro
Pentagon Centre
Verizon
The Doubletree Hotel
12
EXISTING BUILDING CONTEXT
BA
A - Corner of S. Eads & Army Navy Drive B - Army Navy Drive looking West
Building Information• Built in 1963
• 235,445 SF Total Office Building
• Floor to Floor Height: 10’-2”
• Column Spacing: 20’ x 20’
• Vehicular drop-off at Old S. Eads
• Building Orientation North to South Direction
13
EXISTING BUILDING CONTEXT
C D
C - 11th Street S. Between Verizon & Site D - 11th Street S. between Site and Hotel
14
EXISTING BUILDING CONTEXT
E
Northwest Corner of Site Looking West On Interstate Looking South at adjacent site
F
15
EXISTING BUILDING CONTEXT
G
H
G - Corner of S. Eads & Army Navy Drive H - Army Navy Drive looking West
16
LCOR - 400 ARMY NAVY DRIVE
PRESENTATION GOALSApril 24, 2014
• DESIGN GOALS
• NEIGHBORHOOD CONTEXT
• NEIGHBORHOOD AMENITIES
• EXISTING CONDITIONS
• SECTOR PLAN REVIEW
• SITE PLAN EXISTING VS. PROPOSAL COMPARISON
SPRC PRESENTATION #3 - April 24, 2014
17
Crystal City Sector Plan
18
LCOR - 400 ARMY NAVY DRIVE
PRESENTATION GOALSApril 24, 2014
• DESIGN GOALS
• NEIGHBORHOOD CONTEXT
• NEIGHBORHOOD AMENITIES
• EXISTING CONDITIONS
• SECTOR PLAN REVIEW
• SITE PLAN EXISTING VS. PROPOSAL COMPARISON
SPRC PRESENTATION #3 - April 24, 2014
19
AERIAL SITE PLAN COMPARISON
Existing Old S. Eads Street Vacation of Old S. Eads
20
AERIAL SITE PLAN COMPARISON
Property Line with Vacation of Old S. Eads
21
AERIAL SITE PLAN COMPARISON
Property Line with Vacation of Old S. Eads
22
STREET SECTION
Street Section Looking North - Property Lines w/ Vacation of Old S. EadsKey Plan
23
COMPARISON SUMMARY SLIDE
PROPOSED CONDITIONS SHOWING VACATION
Key Plan
EXISTING CONDITIONS SHOWING RIGHT OF WAYS
PROPOSED CONDITIONS AFTER VACATION
24
LCOR - 400 ARMY NAVY DRIVE
THANK YOU
SPRC PRESENTATION # 3 - April 24, 2014
25