1.2 Project Information (1/2)
1. Project : 2 x 660 MW, Jawaharpur Thermal Power Station
2. Owner : Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL)
3. Location : Malawan Village, Etah, Uttar Pradesh, India
4. Nearest Railway Station : Etah (Northern Central Railway - 18 kms from site)
5. Nearest Seaport : Haldia seaport, Kolkata (12 hrs, 14 mts) - 722 kms
6. Nearest Town : Etah
.
8. Access thru Highway : NH-91
9. Seismic Zone : ZONE-III as per IS 1893 (earthquake resistant design of structure &
equipment of civil section)
10. Longitude / Latitude : 272824"N 7849'54"E
11. Wind Velocit Desi n : 47 m/sec as er IS:875 Part-III for wind resistance desi n
12. Land identified for site : In possession of UPRVUNL
13. Station Graded Level : Plant FGL RL(+) 162.0M El(-) 0.500M
Doosan
Power
Systems
India
2
Plant FFL RL(+) 162.5M El(+/-) 0.000M
2
-
7/25/2019 Project Summary.pdf
2/2
1.2 Project Information (2/2)
14. Project schedule (COD) : Unit #1 48mths & Unit #2 52mths. (from date of NOA)
15. Water Source : Lower Ganga Canal (22 km from site location)
16. Gross Coal Calorific Value : 3700 Kcal / Kg ( Unit Heat rate 2248 kcal/kWh)
17. Fuel Source (Coal) : Shahpur, Jamarpani Coal Mine, Jharkhand
18. Coal Transportation mode : Thru BOBR/BOXN wagons of Indian Railways (6.52 MTN per year)
19. Supporting Fuel : HFO / LDO thru existing unloading system of BTPS