c PROJECT SZFM Design Studio 2015 CLIENT PROJECT NUMBER SHEET TITLE ISSUE DATE ARCHITECT 601 Fourth Street Loft 211 San Francisco CA 94107 415-956-5515 Serra Center Aaron Brothers 5045 Junipero Serra Boulevard Colma, CA 94014 CRES Management Company, LLC 2000 Powell Street, Suite 1280 Emeryville, CA 94608 Planning Submittal 2/2/17 1529.05 5 10 15 20 25 30 KEY PLAN J U N I P E R O S E R R A BLVD. N S E R R A M O N T E B O U L E V A R D Design Intent Drawings C O N T E N T S A0.0 Sheet Contents and Vicinity Map A1.1 Existing Conditions A1.2 Existing Site Plan A2.1 Existing Floor Plan A2.2 Proposed Floor Plan A2.3 Partial Existing and Proposed Roof Plans A2.4 Partial Existing and Proposed Reflected Ceiling Plans A3.1 Existing and Proposed Elevations A4.1 Enlarged Plan, Elevation, and Section - Main Entry Trellis A5.1 Paint Patterns A5.3 Site Furniture Specifications DESIGN INTENT DRAWING PACKAGE/CONTRACTOR DESIGN BUILD DRAWINGS It is expected that the Contractor, shall execute the project on a Design Build basis and shall be responsible for any additional information or engineering not shown in this Design Build Drawing Intent Package required for Building Permit. It should be understood that Design Intent Documents are not Construction Documents or Permit Documents. The Contractor's Engineers and other Consultants will prepare the necessary documents to be submitted by the Contractor to the Building Department for permits as required. Such documents may include, but not be limited to: Title 24 Report Electrical drawings Demolition drawings Landscape drawings Civil Engineering drawings The contractor shall submit all shop and permit drawings, including awning, trellis structure, and storefront shop drawings to SZFM for review and approval prior to submittal for building permit. Sheet Contents and Vicinity Map A 0.0 VICINITY MAP N J U N I P E R O S E R R A B O U L E V A R D S E R R A M O N T E B O U L E V A R D S E R R A M O N T E B O U L E V A R D C O L L I N S A V E N U E S O U T H G A T E A V E N U E I N T E R S T A T E 2 8 0 APN: 008-373-380 008-373-410

Upload: nguyendat

Post on 06-Sep-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT Serra Center Aaron Brothers DESIGN INTENT … · design intent drawing package/contractor design build drawings It is expected that the Contractor, shall execute the project

c

PROJECT

SZFM

Desi

gn S

tudio

2

015

CLIENT

PROJECT NUMBER

SHEET TITLE

ISSUE DATE

ARCHITECT

601 Fourth Street Loft 211 San Francisco CA 94107 415-956-5515

Serra CenterAaron Brothers

5045 Junipero Serra Boulevard

Colma, CA 94014

CRES Management Company, LLC

2000 Powell Street, Suite 1280

Emeryville, CA 94608

Planning Submittal 2/2/17

1529.05

510

15

20

25

30

KEY PLAN

J U N I P E R O S E R R A BLVD.

N

S E R

R A

M O

N T

E

B O U L E V A R D

Design Intent DrawingsC O N T E N T S

A0.0 Sheet Contents and Vicinity MapA1.1 Existing ConditionsA1.2 Existing Site PlanA2.1 Existing Floor PlanA2.2 Proposed Floor PlanA2.3 Partial Existing and Proposed Roof PlansA2.4 Partial Existing and Proposed Reflected Ceiling PlansA3.1 Existing and Proposed ElevationsA4.1 Enlarged Plan, Elevation, and Section - Main Entry TrellisA5.1 Paint PatternsA5.3 Site Furniture Specifications

DESIGN INTENT DRAWING PACKAGE/CONTRACTOR DESIGN BUILD DRAWINGS

It is expected that the Contractor, shall execute the project on a Design Build basis and shall be responsible for any additional information

or engineering not shown in this Design Build Drawing Intent Package required for Building Permit. It should be understood that Design

Intent Documents are not Construction Documents or Permit Documents. The Contractor's Engineers and other Consultants will prepare

the necessary documents to be submitted by the Contractor to the Building Department for permits as required. Such documents may

include, but not be limited to:

Title 24 Report

Electrical drawings

Demolition drawings

Landscape drawings

Civil Engineering drawings

The contractor shall submit all shop and permit drawings, including awning, trellis structure, and storefront shop drawings to

SZFM for review and approval prior to submittal for building permit.

Sheet Contents andVicinity Map

A0.0VICINITY MAP

N

J U N

I P E R O S E R R A B

O U

L E V A R D

S E R

R A M O

N T E

B O

U L E V A R

D

S E R

R A

M O N

T E

B O

U L E V

A R

D

C O

L L I N

S

A V

E N

U E

S O U T

H G A T E

A V E

N U E

I N T E R

S T A T E 2 8 0

APN: 008-373-380 008-373-410

Page 2: PROJECT Serra Center Aaron Brothers DESIGN INTENT … · design intent drawing package/contractor design build drawings It is expected that the Contractor, shall execute the project

X

X

X

XX

X

X

X

X

X

X

X

XX

X

c

PROJECT

SZFM

Desi

gn S

tudio

2

015

CLIENT

PROJECT NUMBER

SHEET TITLE

ISSUE DATE

ARCHITECT

601 Fourth Street Loft 211 San Francisco CA 94107 415-956-5515

Serra CenterAaron Brothers

5045 Junipero Serra Boulevard

Colma, CA 94014

CRES Management Company, LLC

2000 Powell Street, Suite 1280

Emeryville, CA 94608

Planning Submittal 2/2/17

1529.05

510

15

20

25

30

KEY PLAN

J U N I P E R O S E R R A BLVD.

N

S E R

R A

M O

N T

E

B O U L E V A R D

EXISTING CONDITIONS - VIEW FROM JUNIPERO SERRA BOULEVARD

Existing Conditions

A1.1EXISTING CONDITIONS - NORTHEAST CORNER PERSPECTIVE EXISTING CONDITIONS - EAST ELEVATION

EXISTING CONDITIONS - WEST ELEVATION EXISTING CONDITIONS - NORTH ELEVATION

AutoCAD SHX Text
HCP
AutoCAD SHX Text
HCP
AutoCAD SHX Text
HCP
AutoCAD SHX Text
HCP
AutoCAD SHX Text
HCP
AutoCAD SHX Text
HCP
AutoCAD SHX Text
HCP
AutoCAD SHX Text
HCP
AutoCAD SHX Text
HCP
AutoCAD SHX Text
HCP
Page 3: PROJECT Serra Center Aaron Brothers DESIGN INTENT … · design intent drawing package/contractor design build drawings It is expected that the Contractor, shall execute the project

HC

P

HC

P

HC

P

J U N I P E R O S E R R A B O U L E V A R D

S E R R A M O N T E B O U L E V A R D

BEVMO

AARONBROTHERS

SIZZLER

BLACK BEAR DINER /DENTAL OFFICES

MANCINI'SSLEEPWORLD

H&RBLOCK /

ONOHAWAIIAN

BBQ

TARGET

MICHAELS

MULTI-TENANT

BUILDING

c

PROJECT

SZFM

Desi

gn S

tudio

2

015

CLIENT

PROJECT NUMBER

SHEET TITLE

ISSUE DATE

ARCHITECT

601 Fourth Street Loft 211 San Francisco CA 94107 415-956-5515

Serra CenterAaron Brothers

5045 Junipero Serra Boulevard

Colma, CA 94014

CRES Management Company, LLC

2000 Powell Street, Suite 1280

Emeryville, CA 94608

Planning Submittal 2/2/17

1529.05

510

15

20

25

30

KEY PLAN

J U N I P E R O S E R R A BLVD.

N

S E R

R A

M O

N T

E

B O U L E V A R D

Existing Site Plan

A1.2

N

AutoCAD SHX Text
HCP
AutoCAD SHX Text
HCP
AutoCAD SHX Text
HCP
AutoCAD SHX Text
HCP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
D
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A1.2
AutoCAD SHX Text
16
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Existing Site Plan
AutoCAD SHX Text
1" = 40'-0"
AutoCAD SHX Text
xsite.dwg
AutoCAD SHX Text
A2.2
AutoCAD SHX Text
16
AutoCAD SHX Text
A2.1
AutoCAD SHX Text
16
Page 4: PROJECT Serra Center Aaron Brothers DESIGN INTENT … · design intent drawing package/contractor design build drawings It is expected that the Contractor, shall execute the project

AARON BROTHERS

c

PROJECT

SZFM

Desi

gn S

tudio

2

015

CLIENT

PROJECT NUMBER

SHEET TITLE

ISSUE DATE

ARCHITECT

601 Fourth Street Loft 211 San Francisco CA 94107 415-956-5515

Serra CenterAaron Brothers

5045 Junipero Serra Boulevard

Colma, CA 94014

CRES Management Company, LLC

2000 Powell Street, Suite 1280

Emeryville, CA 94608

Planning Submittal 2/2/17

1529.05

510

15

20

25

30

KEY PLAN

J U N I P E R O S E R R A BLVD.

N

S E R

R A

M O

N T

E

B O U L E V A R D

Existing Floor Plan

2.1A

N

AutoCAD SHX Text
B
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
C
AutoCAD SHX Text
A3.1
AutoCAD SHX Text
1
AutoCAD SHX Text
A3.1
AutoCAD SHX Text
6
AutoCAD SHX Text
A3.1
AutoCAD SHX Text
16
AutoCAD SHX Text
A3.1
AutoCAD SHX Text
11
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Existing Floor Plan
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
xplan-exst.dwg
AutoCAD SHX Text
A2.1
AutoCAD SHX Text
16
AutoCAD SHX Text
A2.3
AutoCAD SHX Text
6
AutoCAD SHX Text
A2.4
AutoCAD SHX Text
6
Page 5: PROJECT Serra Center Aaron Brothers DESIGN INTENT … · design intent drawing package/contractor design build drawings It is expected that the Contractor, shall execute the project

AARON BROTHERS

A3.13

A3.18

A3.118

A3.113

A4.18

T

c

PROJECT

SZFM

Desi

gn S

tudio

2

015

CLIENT

PROJECT NUMBER

SHEET TITLE

ISSUE DATE

ARCHITECT

601 Fourth Street Loft 211 San Francisco CA 94107 415-956-5515

Serra CenterAaron Brothers

5045 Junipero Serra Boulevard

Colma, CA 94014

CRES Management Company, LLC

2000 Powell Street, Suite 1280

Emeryville, CA 94608

Planning Submittal 2/2/17

1529.05

510

15

20

25

30

KEY PLAN

J U N I P E R O S E R R A BLVD.

N

S E R

R A

M O

N T

E

B O U L E V A R D

Proposed Floor Plan

2.2

N

A

AutoCAD SHX Text
B
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
C
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Proposed Floor Plan
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
xplan-proposed.dwg
AutoCAD SHX Text
A2.2
AutoCAD SHX Text
16
AutoCAD SHX Text
A2.3
AutoCAD SHX Text
16
AutoCAD SHX Text
A2.4
AutoCAD SHX Text
16
AutoCAD SHX Text
A4.1
AutoCAD SHX Text
16
Page 6: PROJECT Serra Center Aaron Brothers DESIGN INTENT … · design intent drawing package/contractor design build drawings It is expected that the Contractor, shall execute the project

c

PROJECT

SZFM

Desi

gn S

tudio

2

015

CLIENT

PROJECT NUMBER

SHEET TITLE

ISSUE DATE

ARCHITECT

601 Fourth Street Loft 211 San Francisco CA 94107 415-956-5515

Serra CenterAaron Brothers

5045 Junipero Serra Boulevard

Colma, CA 94014

CRES Management Company, LLC

2000 Powell Street, Suite 1280

Emeryville, CA 94608

Planning Submittal 2/2/17

1529.05

510

15

20

25

30

KEY PLAN

J U N I P E R O S E R R A BLVD.

N

S E R

R A

M O

N T

E

B O U L E V A R D

Partial Existing andProposed Roof Plans

2.3

N

N

A

AutoCAD SHX Text
B
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
4
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
4
AutoCAD SHX Text
C
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Partial Proposed Roof Plan
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
xplanR-proposed.dwg
AutoCAD SHX Text
A2.3
AutoCAD SHX Text
16
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Partial Existing Roof Plan
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
xplanR-existing.dwg
AutoCAD SHX Text
A2.3
AutoCAD SHX Text
6
Page 7: PROJECT Serra Center Aaron Brothers DESIGN INTENT … · design intent drawing package/contractor design build drawings It is expected that the Contractor, shall execute the project

AARON BROTHERS

AARON BROTHERS

c

PROJECT

SZFM

Desi

gn S

tudio

2

015

CLIENT

PROJECT NUMBER

SHEET TITLE

ISSUE DATE

ARCHITECT

601 Fourth Street Loft 211 San Francisco CA 94107 415-956-5515

Serra CenterAaron Brothers

5045 Junipero Serra Boulevard

Colma, CA 94014

CRES Management Company, LLC

2000 Powell Street, Suite 1280

Emeryville, CA 94608

Planning Submittal 2/2/17

1529.05

510

15

20

25

30

KEY PLAN

J U N I P E R O S E R R A BLVD.

N

S E R

R A

M O

N T

E

B O U L E V A R D

Partial Existing andProposed ReflectedCeiling Plans

2.4

N

N

A

AutoCAD SHX Text
B
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
4
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
4
AutoCAD SHX Text
C
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Partial Proposed Reflected Ceiling Plan
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
xplan-proposed.dwg
AutoCAD SHX Text
A2.4
AutoCAD SHX Text
16
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Partial Existing Reflected Ceiling Plan
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
xplan-exst.dwg
AutoCAD SHX Text
A2.4
AutoCAD SHX Text
6
Page 8: PROJECT Serra Center Aaron Brothers DESIGN INTENT … · design intent drawing package/contractor design build drawings It is expected that the Contractor, shall execute the project

c

PROJECT

SZFM

Desi

gn S

tudio

2

015

CLIENT

PROJECT NUMBER

SHEET TITLE

ISSUE DATE

ARCHITECT

601 Fourth Street Loft 211 San Francisco CA 94107 415-956-5515

Serra CenterAaron Brothers

5045 Junipero Serra Boulevard

Colma, CA 94014

CRES Management Company, LLC

2000 Powell Street, Suite 1280

Emeryville, CA 94608

Planning Submittal 2/2/17

1529.05

510

15

20

25

30

KEY PLAN

J U N I P E R O S E R R A BLVD.

N

S E R

R A

M O

N T

E

B O U L E V A R D

Existing and ProposedElevations

3.1A

AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
4
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
B
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
B
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
Existing South Elevation
AutoCAD SHX Text
xelev-exst.dwg
AutoCAD SHX Text
A3.1
AutoCAD SHX Text
1
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
Existing East Elevation
AutoCAD SHX Text
xelev-exst.dwg
AutoCAD SHX Text
A3.1
AutoCAD SHX Text
6
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
Existing North Elevation
AutoCAD SHX Text
xelev-exst.dwg
AutoCAD SHX Text
A3.1
AutoCAD SHX Text
11
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
Existing West Elevation
AutoCAD SHX Text
xelev-exst.dwg
AutoCAD SHX Text
A3.1
AutoCAD SHX Text
16
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
Proposed South Elevation
AutoCAD SHX Text
xelev-proposed.dwg
AutoCAD SHX Text
A3.1
AutoCAD SHX Text
3
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
Proposed East Elevation
AutoCAD SHX Text
xelev-proposed.dwg
AutoCAD SHX Text
A3.1
AutoCAD SHX Text
8
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
Proposed North Elevation
AutoCAD SHX Text
xelev-proposed.dwg
AutoCAD SHX Text
A3.1
AutoCAD SHX Text
13
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
Proposed West Elevation
AutoCAD SHX Text
xelev-proposed.dwg
AutoCAD SHX Text
A3.1
AutoCAD SHX Text
18
AutoCAD SHX Text
A4.1
AutoCAD SHX Text
6
AutoCAD SHX Text
A4.1
AutoCAD SHX Text
18
Page 9: PROJECT Serra Center Aaron Brothers DESIGN INTENT … · design intent drawing package/contractor design build drawings It is expected that the Contractor, shall execute the project

T

c

PROJECT

SZFM

Desi

gn S

tudio

2

015

CLIENT

PROJECT NUMBER

SHEET TITLE

ISSUE DATE

ARCHITECT

601 Fourth Street Loft 211 San Francisco CA 94107 415-956-5515

Serra CenterAaron Brothers

5045 Junipero Serra Boulevard

Colma, CA 94014

CRES Management Company, LLC

2000 Powell Street, Suite 1280

Emeryville, CA 94608

Planning Submittal 2/2/17

1529.05

510

15

20

25

30

KEY PLAN

J U N I P E R O S E R R A BLVD.

N

S E R

R A

M O

N T

E

B O U L E V A R D

Enlarged Plan,Elevation & Section- Main Entry Trellis

4.1A

AARON BROTHERS

N

AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/2" = 1'-0"
AutoCAD SHX Text
Partial South Elevation
AutoCAD SHX Text
xelev-proposed.dwg
AutoCAD SHX Text
A4.1
AutoCAD SHX Text
6
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/2" = 1'-0"
AutoCAD SHX Text
Wall Section @ Main Trellis
AutoCAD SHX Text
xsect-proposed.dwg
AutoCAD SHX Text
A4.1
AutoCAD SHX Text
8
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/2" = 1'-0"
AutoCAD SHX Text
Partial Floor Plan @ Main Entry Trellis
AutoCAD SHX Text
xplan-proposed.dwg
AutoCAD SHX Text
A4.1
AutoCAD SHX Text
16
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/2" = 1'-0"
AutoCAD SHX Text
Partial South Elevation - Gate
AutoCAD SHX Text
xelev-proposed.dwg
AutoCAD SHX Text
A4.1
AutoCAD SHX Text
18
Page 10: PROJECT Serra Center Aaron Brothers DESIGN INTENT … · design intent drawing package/contractor design build drawings It is expected that the Contractor, shall execute the project

c

PROJECT

SZFM

Desi

gn S

tudio

2

015

CLIENT

PROJECT NUMBER

SHEET TITLE

ISSUE DATE

ARCHITECT

601 Fourth Street Loft 211 San Francisco CA 94107 415-956-5515

Serra CenterAaron Brothers

5045 Junipero Serra Boulevard

Colma, CA 94014

CRES Management Company, LLC

2000 Powell Street, Suite 1280

Emeryville, CA 94608

Planning Submittal 2/2/17

1529.05

510

15

20

25

30

KEY PLAN

J U N I P E R O S E R R A BLVD.

N

S E R

R A

M O

N T

E

B O U L E V A R D

Paint Patterns

A5.1

O-1 O-1 O-1

O-1 O-1 O-1

O-1 O-1 O-1 O-1

O-5 O-6 O-4 O-2 O-3 O-6 O-5 O-4 O-3O-2 O-5 O-2 O-6 O-3 O-4 O-2 O-5 O-3 O-4 O-2 O-5 O-2 O-3 O-5 O-6 O-4

O-2 O-3 O-6 O-5 O-6 O-3 O-2 O-4 O-6 O-5 O-4 O-3 O-2 O-6 O-3 O-4 O-2

O-5 O-3 O-5 O-6 O-4 O-2 O-3 O-2 O-5 O-4 O-3 O-2 O-3 O-6 O-5 O-2 O-4 O-5 O-3 O-4 O-2 O-6 O-3 O-4

O-5 O-6 O-4 O-2 O-3 O-6 O-5 O-4 O-3O-2 O-5 O-2 O-6 O-3 O-4 O-2 O-5 O-3 O-4 O-2 O-5 O-2 O-3 O-5 O-6 O-4

O-2 O-3 O-6 O-5 O-6 O-3 O-2 O-4 O-6 O-5 O-4 O-3 O-2 O-6 O-3 O-4 O-2

O-5 O-3 O-5 O-6 O-4 O-2 O-3 O-2 O-5 O-4 O-3 O-2 O-3 O-6 O-5 O-2 O-4 O-5 O-3 O-4 O-2 O-6 O-3 O-4

Pattern O-A Pattern O-B Pattern O-C

Pattern O-D Pattern O-E Pattern O-F

Pattern O-G Pattern O-H Pattern O-I Pattern O-J

Color A-1Dunn EdwardsDE6391Black Russian

Color A-2Dunn EdwardsDE6197Modern Ivory

Color O-1Dunn EdwardsDE5360Wheat Bread

Color O-2Dunn EdwardsDE5265Brown Eyes

Color O-3Dunn EdwardsDE5359Crossroads

Color O-4Dunn EdwardsDE5362Maple Syrup

Color O-5Dunn EdwardsDE5367Deserted Path

Color O-6Dunn EdwardsDE5328Driftwood

Color A-3Dunn EdwardsDE5657Midnight Garden

Color A-4

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

A-1

AutoCAD SHX Text
A5.1
AutoCAD SHX Text
17
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Paint Patterns
AutoCAD SHX Text
1/2" = 1'-0"
AutoCAD SHX Text
xdiagram-paintpattern.dwg
AutoCAD SHX Text
A5.1
AutoCAD SHX Text
7
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Paint Color Specification
AutoCAD SHX Text
N.T.S.
Page 11: PROJECT Serra Center Aaron Brothers DESIGN INTENT … · design intent drawing package/contractor design build drawings It is expected that the Contractor, shall execute the project

c

PROJECT

SZFM

Desi

gn S

tudio

2

015

CLIENT

PROJECT NUMBER

SHEET TITLE

ISSUE DATE

ARCHITECT

601 Fourth Street Loft 211 San Francisco CA 94107 415-956-5515

Serra CenterAaron Brothers

5045 Junipero Serra Boulevard

Colma, CA 94014

CRES Management Company, LLC

2000 Powell Street, Suite 1280

Emeryville, CA 94608

Planning Submittal 2/2/17

1529.05

510

15

20

25

30

KEY PLAN

J U N I P E R O S E R R A BLVD.

N

S E R

R A

M O

N T

E

B O U L E V A R D

Site FurnitureSpecifications

A5.3

Kornegay DesignAgave Series Landscape ContainerAS-18

Kornegay DesignCirque Series Landscape ContainerCS-44

Kornegay DesignRibbed Series Landscape ContainerRS-30

Kornegay DesignRibbed Series Commercial ReceptaclesRS-TR

AutoCAD SHX Text
A5.3
AutoCAD SHX Text
6
AutoCAD SHX Text
A5.3
AutoCAD SHX Text
1
AutoCAD SHX Text
A5.3
AutoCAD SHX Text
2
AutoCAD SHX Text
A5.3
AutoCAD SHX Text
5
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Landscape Container A
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Landscape Container B
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Landscape Container E
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
Receptacle A
AutoCAD SHX Text
N.T.S.