    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    PRESENTATION ON

    PROJECT PLANNING & CONTROLS

    (Part I & II)

    By VIJAY KAMBLE

  • 8/6/2019 Project Planning & Controls rEV. 2

    2/38

  • 8/6/2019 Project Planning & Controls rEV. 2

    3/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    1. INTRODUCTION1. INTRODUCTION

    Project Planning & Constrols

    1. WHY PLANNING IS IMPORTANT ?

    Systematic Approach

    Identifies the responsibility holder

    Identifies project critical areas Identifies progress trends

    Built up confidence / morale

    Acts as a catalyst in stakeholders co-ordination

    Works as a challenge / motivation

    2. WHAT ARE PLANNING & CONTROLS PROCESSES ?

    Technical Baseline

    Schedule Baseline Cost Baseline

    Control Procedures

    Basis for Project Success

  • 8/6/2019 Project Planning & Controls rEV. 2

    4/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    2. PROJECT PLANNING & CONTROLS - CONCEPT2. PROJECT PLANNING & CONTROLS - CONCEPT

    Project Planning & Constrols

    CORE PROCESSES

    Scope

    Planning

    Activity

    Definition

    Activity

    Sequencing

    Schedule

    Development

    Scope

    Definition

    Resource

    Planning

    ActivityDuration

    Estimating

    Cost

    Planning

    Risk

    Management

    Planning

    Cost

    Budgeting

    ProjectPlan

    Development

  • 8/6/2019 Project Planning & Controls rEV. 2

    5/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    2. PROJECT PLANNING & CONTROLS - CONCEPT2. PROJECT PLANNING & CONTROLS - CONCEPT

    Project Planning & Constrols

    FACILITATING PROCESSES

    Quality

    Planning

    Procurement

    Planning

    Solicitation

    Planning

    Organisational

    Planning

    Communication

    Planning

    Risk

    Identification

    Qualitative

    Risk

    Analysis

    Risk

    Response

    Planning

    Quantitative

    Risk

    Analysis

    Staffing

    Planning

    Risk

    Human ResourceProcurementQuality

    Communication

  • 8/6/2019 Project Planning & Controls rEV. 2

    6/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    3. PROJECT MANAGEMENT3. PROJECT MANAGEMENT

    Project Planning & Constrols

    Project Management is defined as a process of initiating, planning,

    organizing, monitoring and controlling the organization / other

    resources in order to complete the PROJECT within contractual

    time period within allocated budget to the satisfaction of client.

    Project is defined as a temporary endeavor undertaken, which is

    having definite start and finish dates.

    Generally Project requirements include,

    Completion of project / defined milestones within contractual

    completion dates.

    Completion of project within the budgeted man-hours and

    budgeted cost.

    Building up the customers/clients confidence

    PROJECT GOALSPROJECT GOALS

    SS pecificpecific

    MM easurableeasurable

    AA chievablechievable

    RR elevantelevant

    TT -- imelyimely

  • 8/6/2019 Project Planning & Controls rEV. 2

    7/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    3. PROJECT MANAGEMENT3. PROJECT MANAGEMENT

    Project Planning & Constrols

    SAMPLE GENERIC PROJECT LIFE CYCLE

    Scope /

    Efforts

    Initial

    PhaseIntermediate

    Phase

    Final

    Phase

    Each Project phase normally include a set of defined deliverables designed to establish the

    desired level of management control

    The phase cycles generally involves some form of technology transfer or handoff such asrequirements to design, construction to operation or design to manufacturing

    The project phases may sequentially linked or they may overlap. Overlapping project phases is

    called as Fast Tracking.

    The project phase varies with projects.

    TIME

  • 8/6/2019 Project Planning & Controls rEV. 2

    8/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    3. PROJECT MANAGEMENT3. PROJECT MANAGEMENT

    Project Planning & Constrols

    PROJECT LIFE CYCLE FOR EPIC CONTRACT

    Cumulative

    Progress Feasibility,

    Initiation,

    Planning,

    Design

    Procurement,

    Sub-Contracts Installation,

    Commissioning,

    Close-out

    Generally, During Phase-1, the feasibility of project is evaluated, the transfer of as bid documents and details

    to project manager takes place along with detailed planning and cost finalization. All the stakeholders are

    agreed on to the liabilities and timely completion of their responsibilities which is also called as Kick-Off.

    This also consists of the planning and designing the contractual requirements.

    Completion of designing of the project requirements may or may not get overlapped by next phase-2, during

    which, the procurement of the materials and placing of sub-contracts for various works is carried out and the

    receipt of all necessary material to start the fabrication / construction activities.

    The next project phase-3 witnesses the receipt of all materials and other services from sub-contractors to

    complete the fabrication / construction of the final product to make it ready for load out / installation.

    The final phase-4 witnesses completion of installation and commissioning of the product / systems to the

    requirements of clients and closing out of the project.

    TIME

    Fabrication,

    Construction,

    Testing,

    Logistic

    100%

  • 8/6/2019 Project Planning & Controls rEV. 2

    9/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    3. PROJECT MANAGEMENT3. PROJECT MANAGEMENT

    Project Planning & Constrols

    Project Management calls for :

    Working as a Team keeping single goal in mind e.g. completion of

    project within provided time frame within budgeted cost.

    Building up good rapport with client from long term prospects.

    Effective use of historic data and creating new data for future use.

    Adhering to the commitments made to client / customers / vendors /

    sub-contractors

    Maintaining the quality and standards set by the company

    Increasing the expertise and knowledge of various new areas

  • 8/6/2019 Project Planning & Controls rEV. 2

    10/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    4. PROJECT PLANNING & CONTROLS - TERMS4. PROJECT PLANNING & CONTROLS - TERMS

    Project Planning & Constrols

    WORK BREAKDOWN STRUCTURE

    is a smaller, identifiable groups of work modules, which put together entire project scope.

    CPM (CRITICAL PATH METHOD)

    is a network analysis technique used for calculating the start and finish dates of activities and to

    work out the limit for an activity or group of activities by which it can be delayed, without

    affecting the project completion date.

    CRITICAL PATH

    is a longest path or group of interrelated activities which are can not be delayed any further to

    maintain the contractual project completion date. It is the path where the inter-related activities

    having float as zero.

    MILESTONES, FLAGS, TASKS

    Milestones & Flags represent the significant events in the project, hence have durations zero,

    Tasks differentiate the normal activity from Milestones / Flags

  • 8/6/2019 Project Planning & Controls rEV. 2

    11/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    4. PROJECT PLANNING & CONTROLS - TERMS4. PROJECT PLANNING & CONTROLS - TERMS

    Project Planning & Constrols

    ORIGINAL DURATIONS, REMAINING DURATIONS

    work period required for completion of an activity/task based on working days

    PERCENT COMPLETION

    Amount of work that has been completed. it is a progress status indicator in terms of

    percentages.

    EARLY AND LATE DATES

    Activity dates worked out based on the forward pass method and backward pass method

    respectively

    FREE FLOAT

    Amount of work period available for an activity to delay without affecting the early start of the

    successor activity.

    TOTAL FLOAT

    Amount of work period available for any activity from the group of activities inter-related, to

    delay, without affecting the project completion.

  • 8/6/2019 Project Planning & Controls rEV. 2

    12/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    4. PROJECT PLANNING & CONTROLS - TERMS4. PROJECT PLANNING & CONTROLS - TERMS

    Project Planning & Constrols

    ARROW DIAGRAMMING METHOD (ADM)

    It is a method used to represent the ACTIVITY oriented network. Every activity is represented

    with starting point and ending point called as nodes. The inter-dependences shown in the form of

    the arrows. Dummy activities indicates the inter-dependences among activities wherever the

    dependences can not be shown by an activity arrow.

    ADM

    Arrow Diagramming Method

    1 2

    3 4 5 6

    7 8 9 0

  • 8/6/2019 Project Planning & Controls rEV. 2

    13/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    4. PROJECT PLANNING & CONTROLS - TERMS4. PROJECT PLANNING & CONTROLS - TERMS

    Project Planning & Constrols

    PRECEDENCE DIAGRAMMING METHOD (PDM)

    It is a method used to represent the EVENT oriented network. Every event is represented by

    box, also called as nodes, having start dates and finish dates with other details related to an

    event. The inter-dependencies shown in the form of the arrows.

    PDM

    Precedence Diagramming Method

    Act1 Act2 Act3 Act4 Act5 Act11

    Act6 Act7 Act8 Act9

  • 8/6/2019 Project Planning & Controls rEV. 2

    14/38

  • 8/6/2019 Project Planning & Controls rEV. 2

    15/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    4. PROJECT PLANNING & CONTROLS - TERMS4. PROJECT PLANNING & CONTROLS - TERMS

    Project Planning & Constrols

    PROGRESS MEASUREMENT MODELS

    Control Technique used to measure the progress of activities for a period (usually for current

    week) and the overall progress for each module and for total project.

    S-CURVES

    Control Technique used to plot the baseline/planned progress vs. actual progress against time to

    assess the trend of the project activities and the likely date of completion. S-Curves are plotted

    for progress as well as for the manhours / cost.

    MANPOWER HISTOGRAM

    Control Technique used to plot the manhours planned vs. actual utilisation against time in bar /

    stacked bar format.

    LOOK AHEAD SCHEDULE

    Control Technique to assess the activities planned for certain periods along with their present

    completion status.

  • 8/6/2019 Project Planning & Controls rEV. 2

    16/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    4. PROJECT PLANNING & CONTROLS - TERMS4. PROJECT PLANNING & CONTROLS - TERMS

    Project Planning & Constrols

    BASELINE PLAN / SCHEDULE

    It is an original approved plan. Once set it is supposed to be adhered to till the completion of

    project unless otherwise any change in the scope needs to be incorporated.

    REVISED PLAN / SCHEDULE

    It is an addition or deletion to the baseline plan, incorporated with the changes as suggested /

    agreed by the client - because of addition or deletion in the scope.

    CATCH-UP PLAN / SCHEDULE

    It is a modified baseline plan based on the periodic progress updates to achieve the committed

    completion date.

  • 8/6/2019 Project Planning & Controls rEV. 2

    17/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    5. REPORTS5. REPORTS

    Project Planning & Constrols

    AZERI PROJECT

    PHASE-II DESIGN ENGINEERING PROGRESS

    Mar-04

    ACTIVITIES % WEIGHTWEEKLY CUMMULATIVE

    PLAN % EARN % PLAN % EARN %

    GENERAL EXECUTION PLANS & OIL RISK STUDIES 15.04% - - 100.00% 89.72%

    30" P-II OIL TRANSPORT PIPELINE 21.57% - - 100.00% 97.96%

    WEST AZERI INTERFIELD PIPELINES 24.94% - - 100.00% 100.00%

    EAST AZERI INTERFIELD PIPELINES 28.07% - - 100.00% 100.00%

    PHASE-II SUBSEA STRUCTURAL DESIGN 10.38% - - 100.00% 100.00%

    TOTAL 100.00% - - 100.00% 98.01%

    Engineering Management, Administration & Control 100.00%

    PROGRESS BY - LINE

    ACTIVITIES % WEIGHTWEEKLY CUMMULATIVE

    PLAN % EARN % PLAN % EARN %

    30" P-II OIL TRANSPORT PIPELINE 28.92% 0.00% 0.00% 100.00% 96.94%

    WEST AZERI INTERFIELD PIPELINES 33.44% 0.00% 0.00% 100.00% 98.45%

    EAST AZERI INTERFIELD PIPELINES 37.64% 0.00% 0.00% 100.00% 98.45%

    Microsoft

    cel Worksheet

  • 8/6/2019 Project Planning & Controls rEV. 2

    18/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    5. REPORTS5. REPORTS

    Project Planning & Constrols

    AZERI PROJECT

    PHASE-II DESIGN ENGINEERING PROGRESS / MANHOURS STATUS

    Activity ID

    Activity description Man Hrs % WeightOriginalduration

    ACTUAL PROGRESS % PLANNED PROGRESS %

    WEIGHTED

    DELTA14-Mar-04 TOTAL 14-Mar-04 TOTAL

    10520 PIPELINE MECHANICAL DESIGN 745 5.69% - 100.00% - 100.00% -

    6 Bottom Roughness Analysis - CAL 150 1.15% 20 100.00% - 100.00% -

    7 30 inch Phase 2 Pipeline Design Report - REP 100 0.76% 51 100.00% - 100.00% -

    8 30 inch CP Design - TEC 70 0.53% 25 100.00% - 100.00% -

    9 Stability Analysis (CAL & TEC) 150 1.15% 30 50.00% - 100.00% 0.57%

    10 30 inch Anode Details - DTL 70 0.53% 25 100.00% - 100.00% -

    CUMMULATIVE PROGRESS % 13,098 100% - 98.01% 100.00% X%

  • 8/6/2019 Project Planning & Controls rEV. 2

    19/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    5. REPORTS5. REPORTS

    Project Planning & Constrols

    (A) MANHOURS SUMMARY As on : 14-Mar-04

    DISCIPLINE PLANNEDMHRS

    EARNEDMHRS

    ACTUALMHRS

    PRODUCTIVITY

    EXPECTEDAT COMPLN

    ( + / - )

    Engineering Management, Administration & Control3,750 3,750 4,093 4093 343

    Lead Engineer (LE) 2,800 2,748 2,453 0.89 2506 (295)

    Engineer (EE) 4,213 4,188 5,102 1.22 5126 914

    Drafting Controller (DC) 1,748 1,726 1,099 0.64 1121 (627)

    Draftsman (DF) 4,112 4,089 4,418 1.08 4441 329

    Material/Corrossion Specialist 225 212 84 0.40 97 (128)

    TOTAL 16,847 16,712 17,249 1.03 17383 536

  • 8/6/2019 Project Planning & Controls rEV. 2

    20/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    5. REPORTS5. REPORTS

    Project Planning & Constrols

  • 8/6/2019 Project Planning & Controls rEV. 2

    21/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    5. REPORTS5. REPORTS

    Project Planning & Constrols

  • 8/6/2019 Project Planning & Controls rEV. 2

    22/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    5. REPORTS5. REPORTS

    Project Planning & Constrols

  • 8/6/2019 Project Planning & Controls rEV. 2

    23/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    6. TOOLS & TECHNIQUES6. TOOLS & TECHNIQUES

    Project Planning & Constrols

    MICROSOFT PROJECT PLANNER

    PRIMAVERA PROJECT PLANNER

    MS-EXCEL

    PERT / CPM (CRITICAL PATH METHOD)

    FORWARD PASS / BACKWARD PASS METHOD

  • 8/6/2019 Project Planning & Controls rEV. 2

    24/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    Project Planning & Constrols

    Information Available :

    Activity ID Description Duration Predecessor

    Act1 Start 0

    Act2 Static Pipelay Analysis 15 FS1

    Act3 Internal Review (SPA) 2 FS2

    Act4 Clients for Review (SPA) 7 FS3

    Act5 Approved for Construction (SPA) 7 FS4

    Act6 Weld Repair Analysis 7 FS3

    Act7 Internal Review (SPA) 2 FS6

    Act8 Clients for Review (SPA) 7 FS7

    Act9 Approved for Construction (SPA) 7 FS8

    Act10 Dummy Activity - 1 0 FS5

    Act11 Completion 0 FS9,FS5

  • 8/6/2019 Project Planning & Controls rEV. 2

    25/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    Project Planning & Constrols

    1 2

    3 4 5 6

    7 8 9 0

    ES: 1/4

    EF: 1/4

    ES: 1/4

    EF: 15/4

    ES: 16/4

    EF: 17/4

    ES: 18/4

    EF: 24/4

    ES: 25/4

    EF: 1/5

    ES: 18/4

    EF: 24/4

    ES: 25/4

    EF: 26/4

    ES: 27/4

    EF: 3/5ES: 4/5

    EF: 10/5

    ES: 10/5

    EF: 10/5

    Early Start and Early Finish Date - Computation

    Forward Pass Method

  • 8/6/2019 Project Planning & Controls rEV. 2

    26/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    Project Planning & Constrols

    1 2

    3 4 5 6

    7 8 9 0

    LS: 1/4

    LF: 1/4

    LS: 1/4

    LF: 15/4

    LS: 16/4

    LF: 17/4

    LS: 27/4

    LF: 3/5

    LS: 4/5

    LF: 10/5

    LS: 18/4

    LF: 24/4

    LS: 25/4

    LF: 26/4

    LS: 27/4

    LF: 3/5

    LS: 4/5

    LF: 10/5LS: 10/5

    LF: 10/5

    Late Start and Late Finish Date Computation

    Backward Pass Method

  • 8/6/2019 Project Planning & Controls rEV. 2

    27/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    Project Planning & Constrols

    Act1 Act2 Act3

    Act4 Act5

    ES:1/4, EF:1/4LS:1/4, LF:1/4

    FF: 0 TF: 0

    ES:1/4, EF:15/4LS:1/4, LF:15/4

    FF: 0 TF: 0

    ES:16/4, EF:17/4LS:16/4, LF:17/4

    FF: 0 TF: 0

    ES:18/4, EF:24/4LS:27/4, LF:3/5

    FF: 0 TF: 9

    ES:25/4, EF:1/5LS:4/5, LF:10/5

    FF: 9 TF: 9

    ES:10/5, EF:10/5LS:10/5, LF:10/5

    FF: 0 TF: 0

    ES:18/4, EF:24/4LS:18/4, LF:24/4

    FF: 0 TF: 0

    ES:25/4, EF:26/4LS:25/4, LF:26/4

    FF: 0 TF: 0

    ES:27/4, EF:3/5LS:27/4, LF:3/5

    FF: 0 TF: 0

    Act6 Act7 Act8 Act11Act9

    ES:4/5, EF:10/5LS:4/5, LF:10/5

    FF: 0 TF: 0

    PDM

    Precedence Diagramming Method

  • 8/6/2019 Project Planning & Controls rEV. 2

    28/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    Project Planning & Constrols

  • 8/6/2019 Project Planning & Controls rEV. 2

    29/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    Project Planning & Constrols

    Manhours Required

    Act ID Description Durations PE FE Management Administration

    LIMIT FOR RESOURCES8-10

    hrs/day8-10

    hrs/day8-10

    hrs/day8-10

    hrs/day

    Act1 Start - - - - -

    Act2 Static Pipelay Analysis 15 120 - - -

    Act3 Internal Review (SPA) 2 - 16 16 4

    Act4 Clients for Review (SPA) 7 - - - 28

    Act5 Approved for Construction (SPA) 7 28 - 28 56

    Act6 Weld Repair Analysis 7 56 - - -

    Act7 Internal Review (SPA) 2 - 16 16 4

    Act8 Clients for Review (SPA) 7 28 - - 28

    Act9 Approved for Construction (SPA) 7 - - 28 56

    Act10 Dummy Activity - 1 - - - - -

    Act11 Dummy Activity - 2 - - - - -

    TOTAL 528 232 32 88 176

  • 8/6/2019 Project Planning & Controls rEV. 2

    30/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    Project Planning & Constrols

    Cost of Manhours RequiredAct ID Description Durations PE FE Management Administration

    $ / MHrs - X Y Z W

    Act1 Start - - - - -

    Act2 Static Pipelay Analysis 15 9,000 - - -

    Act3 Internal Review (SPA) 2 - 1,200 1,600 100

    Act4 Clients for Review (SPA) 7 - - - 700

    Act5 Approved for Construction (SPA) 7 2,100 - 2,800 1,400

    Act6 Weld Repair Analysis 7 4,200 - - -

    Act7 Internal Review (SPA) 2 - 1,200 1,600 100

    Act8 Clients for Review (SPA) 7 2,100 - - 700

    Act9 Approved for Construction (SPA) 7 - - 2,800 1,400

    Act10 Dummy Activity - 1 - - - - -

    Act11 Dummy Activity - 2 - - - - -

    TOTAL 17,400 2,400 8,800 4,400

    Budgetary Allocations

    TOTAL PE FE Management Administration

    Manhours 528 232 32 88 176

    Cost 33,000 17,400 2,400 8,800 4,400

  • 8/6/2019 Project Planning & Controls rEV. 2

    31/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    Project Planning & Constrols

    Performance Monitoring

    Activity Description DurationsMan

    hours

    %Weight-

    age

    PlannedProgress

    ActualProgress

    PlannedMan

    hours

    EarnedMan

    hours

    ActualMan

    hours

    Productivity

    TOTALMan

    hoursTO GO

    Varia-nce

    PIPELAY ANALYSIS

    Static Pipelay Analysis

    Static Pipelay Analysis 15 120 22.73% 100.00% 100.00% 120 120 150 1.25 150 30

    Internal Review 2 36 6.82% 100.00% 100.00% 36 36 10 0.28 10 -26

    Client Review 7 28 5.30% 100.00% 50.00% 28 14 20 1.43 34 6

    Approved forConstruction 7 112 21.21% 0 0 0 - 112 0

    Weld Repair Analysis

    Weld Repair Analysis 7 56 10.61% 100.00% 0 0 0 - 56 0

    Internal Review 2 36 6.82% 0 0 0 36 0

    Client Review 7 56 10.61% 0 0 0 56 0

    Approved forConstruction 7 84 15.91% 0 0 0 84 0

    TOTAL 528 100.00% 45.45% 32.20% 240 170 180 1.06 538 10

  • 8/6/2019 Project Planning & Controls rEV. 2

    32/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    7. SAMPLE PLAN FOR PIPELINEINSTALLATION ANALYSIS

    Project Planning & Constrols

    VARIATION ORDER REGISTER

    SNoMCCI

    VONO

    MSTS VOR NOSub-

    missionStatus

    CTR Reference TitleEstimated

    Mhrs

    Completion

    Status

    ActualMhrs

    Remarks

    1VO-043

    VOR-C011-MSTS-100

    S 10850Base

    Scope(Missed)

    Additional tie-in analysis for WA & EASpool @ C&WP

    800 C 690AIOC Final Approval

    awaited

    2VOR-C011-MSTS-

    101S 10910

    East Azeri & West Azeri FO/Power CableStudy

    335

    C 572 -

    3VO-028

    VOR-C011-MSTS-102

    - 10920 Phase 3 Support O 31 -

    4

    VO-043

    VOR-C011-MSTS-103

    S 10930Valve Gear Box Development RecoveryFrame (Dantorque actuator installationframe for subsea installation )

    600 O 320 A3 issued

    5VOR-C011-MSTS-

    104S 10960

    East Azeri pipeline global buckling studyusing FE analysis

    200 O 91

    6VOR-C011-MSTS-

    105S 11010

    30" Phase-2 pipeline additional crossing(SOCAR DU500)

    50 C -Manhours Booked

    against CTR 10660 -to be segregated

    7VOR-C011-MSTS-

    106S 10980

    KP 8 tie-in spool for Phase-2, 30" exportpipeline (see IR6, Detail Design andFabrication of a tie in spool)

    300 O 108 A3 issued

    8 VOR-C011-MSTS-107

    S 11040 Exension of shore approach burial from5m to 7m WD

    100 C 207 -

    9VOR-C011-MSTS-

    108S 10990

    Revised Crossing Design to suit DSVinstallation

    300 O Started

    10VOR-C011-MSTS-

    109S

    10970 /10660

    WA Infield Pipeline Crossings 200 O 239Proceeding wi th

    Steel Sleeper Design

    TOTAL 2885 2258

  • 8/6/2019 Project Planning & Controls rEV. 2

    33/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    8. FEATURES OF PRIMA-VERA8. FEATURES OF PRIMA-VERA

    Project Planning & Constrols

    PRIMARY GOALS OF PROJECT TEAM / MANAGEMENT

    1. TO COMPLETE PROJECT IN TIME, WITHIN BUDGETED MANHOURS AND WITHIN

    BUDGETED COST

    2. PROFIT MAXIMISATION

    3. AS BID PERFORMANCE

    PROJECT SPECIFIC INFORMATION FLOW CAN BE GROUPED AS :

    1. TOP MANAGEMENT

    2. MIDDLE MANAGEMENT

    3. OPERATING LINE MANAGEMENT

  • 8/6/2019 Project Planning & Controls rEV. 2

    34/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    8. FEATURES OF PRIMA-VERA8. FEATURES OF PRIMA-VERA

    Project Planning & Constrols

    TOP MANAGEMENT MIDDLE MANAGEMENT OPERATING LINE MANAGEMENT

    Purpose

    Information related to ProgressTrends, Productivity, Cash Flow,

    Payment Received, ExpectedProfit

    Information for Monitoring, Controlling ProjectActivities

    Information for day to day work relatedactivities for operating usage

    InformationPreferred

    Overall Progress List of Activities, Start & Finish Dates,

    Floats List of Activities with relevant details

    Productivity Report Bar Charts / Gantt Chart Look ahead Schedule

    Cash Flow Statement Progress Measurement Model List of activities with slippage in

    progress

    Manhours / Cost - TO GO Weighted Delta Summary List of Critical Activities

    Executive Summary Productivity Report

    Milestone Status Target Vs Current Progress (Slippage of

    activities)

    Financial Status List of Critical Activities

    Areas of Concern List of nearly critical activities

    Project Likely Completion Date

    Look ahead Schedules

    Resource / Manhours Loading Data (tocheck Manhours Overloading)

    Resource / Manhours Consumption Data

    Projected Resource / Cost data

  • 8/6/2019 Project Planning & Controls rEV. 2

    35/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    8. FEATURES OF PRIMA-VERA8. FEATURES OF PRIMA-VERA

    Project Planning & Constrols

    WBS

    List Activities,

    Define Durations & Relationships

    RESOURCES

    Define Resources

    Assign Units, Calendar, Limits for

    Unit resources, Price / Cost per Unit

    SET

    Global Calendar

    Other Specific Calendars

    Activity Codes

    Cost Accounts

    TO GET :-

  • 8/6/2019 Project Planning & Controls rEV. 2

    36/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    8. FEATURES OF PRIMA-VERA8. FEATURES OF PRIMA-VERA

    Project Planning & Constrols

    OUTPUT

    1. Bar Chart / Network Diagram -

    2. Early / Late Start & Finish Dates

    3. Free Float & Total Float

    4. List of Activities

    5. List of Critical / Near Critical Activities6. Target Vs Current Schedule

    7. Look Ahead Schedule

    8. Resource Profile / Table (to know resource overloading)

    9. Projected Resource / Cost S-Curve

    10. Level 0, 1, 2, 3, Schedules

    11. Earned Value Report

    12. Manhours / Cost Histogram

    13. Productivity Report

    14. Likely Completion Date Details

    15. Resourcewise Activity List and Vice Versa

    Adobe

    Adobe

    Adobe

    Adobe

    Adobe

    Adobe

  • 8/6/2019 Project Planning & Controls rEV. 2

    37/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    8. FEATURES OF PRIMA-VERA8. FEATURES OF PRIMA-VERA

    Project Planning & Constrols

    OTHER FEATURES

    1. Resource Crashing

    2. Splitting of Activity

    3. Compatibility with any RDBMS data

    4. User Friendly Excellent for Presentation Data

    5. Multi Project Links

    6. Single Resource data linked to multi project requirements

    7. Supplementary Packages such as Monte-Carlo analysis, Time Sheet System

    8. Different activity types : Task, Independent, Meeting, Milestones, Flags etc

    9. Independent setting of individual resource calendars

    10. Different resource profile curves such as Bell Shape, Linear, Triangular11. Filtering of Activities as per WBS Groups, Activity Codes

    12. Sub-Project Option for monitoring / controlling

  • 8/6/2019 Project Planning & Controls rEV. 2

    38/38

    J. Ray McDermott Middle East, Inc.J. Ray McDermott Middle East, Inc.

    THANK YOU..