project overview, objectives, components and targeted outcomes asghar m. fazel, global project...
TRANSCRIPT
Project Overview, Objectives, Components and Targeted Outcomes
Asghar M. FAZEL, Global Project Coordinator
Final Project Implementation Review Workshop and Steering Committee Meeting of the UNEP/GEF Project “Piloting Integrated Processes and Approaches to Facilitate National Reporting to Rio Conventions” (FNR_Rio)
16th November 2013, Nairobi, Kenya
Project Details Project Title: Piloting Integrated Processes and
Approaches To Facilitate National Reporting to Rio Conventions
Project Short Title: FNR_Rio Pilot Countries: Afghanistan, Eritrea, Lao PDR,
Liberia, Mauritius, Palau GEF Agency: UNEP/DGEF International Executing Agency: UNEP-WCMC GEF Approval date: September 2009 Implementation Start: 1 January 2010 Project Global Launching: 9 February 2010 Original Project Closing Date: 31 December
2012 Extended Project Closing Date: 31 December
201316 November
20132Project Overview, Objectives, Components and Targeted Outcomes
Project Budget (US):
840,000 GEF700,880 In-kind Co-financing by six countries50,000 Cash Co-financing by Eritrea50,000 In-kind Co-financing by UNEP
$1,640,880 TOTAL
16 November 2013
3Project Overview, Objectives, Components and Targeted Outcomes
Project Objectives
The overall objective (goal) of the project is to pilot nationally-driven integrated processes and approaches to reporting to the three Rio Conventions (CBD, UNCCD and UNFCCC).
16 November 2013
4Project Overview, Objectives, Components and Targeted Outcomes
Project Components
Component 1: Situational analysis and reporting process design:
to find out common reporting elements in terms of process, content and format among the three Conventions with the possibility of exploring benefits to other closely related Conventions building on the “clustering” approach developed by UNEP.
16 November 2013
5Project Overview, Objectives, Components and Targeted Outcomes
Project ComponentsComponent 2: Implementation of integrated reporting processes and experimenting options for report design:
to design a nationally-driven integrated and coordinated process for integrated reporting without compromising either guidance from the Conventions COPs on content and format, or quality of reports submitted, and to establish and/or enhance existing national convention-related data and information management systems with the objective of making these systems more integrated, cost-efficient and allowing for more cooperative institutional mechanisms to be established and sustained.
16 November 2013
6Project Overview, Objectives, Components and Targeted Outcomes
Project Components
Component 3: Sharing of experience and upscaling:
to explore upscaling to other countries of integrated reporting processes through sharing of lessons learned and good practices.
16 November 2013
7Project Overview, Objectives, Components and Targeted Outcomes
Component 4 (admin)
•M&E (see Appendix 7) •Appointment of GPC and Secretariat set-up •Recruitment of IC •formation of 6 National teams •Recruitment of 6 NCs and 6 NPAs •Financial planning and management •Drafting and submitting workplans and reports•Organising meetings, workshops and side events •Travels/missions •website (maintenance and updating)
16 November 2013
8Project Overview, Objectives, Components and Targeted Outcomes
Project Components
16 November 2013
9Project Overview, Objectives, Components and Targeted Outcomes
Component 1: Expected Outcomes • Improved cost-effectiveness achieved for
reporting to Rio Conventions • Linkages and synergies for reporting to the
Rio Conventions at national level identified and strengthened
• Duplication in reporting processes identified and eliminated
16 November 2013
10
Project Overview, Objectives, Components and Targeted Outcomes
Component 1: Outputs
Output 1.1: Inventory and analysis report of convention reporting requirements in terms of institutional arrangement, linkages, content and format is prepared. (e.g. TEMATEA)
Output 1.2: Analysis report of existing data and information management systems at the country level with recommendations for designing more integrated systems is prepared. (e.g. CHM and Conservation Commons)
Output 1.3: Manual on implementation of Integrated Reporting approach is produced. (national level)
16 November 2013
11
Project Overview, Objectives, Components and Targeted Outcomes
Testing the joint reporting format: additional outputs (added to output 1.3/ national manual)
International Consultant: Assessment of options for joint reporting Draft joint reporting format for the three Rio
Conventions
Pilot countries: Completed report using the draft joint reporting
format Questionnaire on experience with testing the
draft joint reporting format
13 March, 2012
12
Project situation analysis and technical reporting
Component 2: Expected Outcomes• Enhanced country capacities to identify cross-
convention programmes and projects for cost-effective financing and MEA implementation
• A more cooperative environment for information sharing among national institutions involved in convention implementation
16 November 2013
13
Project Overview, Objectives, Components and Targeted Outcomes
Component 2: OutputsOutput 2.1: Institutional frameworks for integrated reporting to Conventions is established and/or strengthened. (in collaboration with research centres and NGOs)
Output 2.2: National convention-related data collection, analysis and information management systems with agreed standardized collection and analysis procedures are established or Enhanced. (e.g. National CHM)
Output 2.3: Capacities (systemic, institutional and individual) of relevant institutions for data collection, analysis and information management through provision of necessary training and computing equipment are enhanced. (CEPA strategy)
Output 2.4: Assessment report of the quality of national reports is prepared. (QC at the national level)
16 November 2013
14
Project Overview, Objectives, Components and Targeted Outcomes
Component 3: Expected Outcome • Better informed policy decision-making at the
national and global level, supporting efficient and integrated reporting to Rio Conventions
16 November 2013
15
Project Overview, Objectives, Components and Targeted Outcomes
Component 3 : Outputs
Output 3.1: Technical Working Group (TWG) on Integrated Reporting from countries participating in the project established for information and experience sharing is established and met.
1. to discuss design issues in the inception phase (1st TWG meeting),
2. to assess lessons learned and elaborate the Manual on Integrated Reporting (2nd TWG meeting);
3. to improve the integrated reporting processes and results and also sharing experiences and lessons learned including finalizing the National Manuals at the end of the current project life (3rd TWG meeting).
Output 3.2: International events on lesson learned and best practices for integrated reporting organized are held. (e.g. Side events)
16 November 2013
16
Project Overview, Objectives, Components and Targeted Outcomes
Key Activities: Years 1&2• National Inception workshop • National workshop on results of studies 1 (national
assessments) and 2 (data and information collection, analysis and management)
• First and second Technical Working Group meetings• Review of national legislation, policies, plans and
financing mechanisms, and development and promotion of alternative options
• Data collection in support of reporting mechanisms, and filling of gaps.
• Provision of necessary computing equipment to national governments
• Development and enhancement of intersectoral networks at the national level
• Analysis of the current reporting requirements and formats of the three Rio Conventions
16 November 2013
17
Project Overview, Objectives, Components and Targeted Outcomes
Key Activities: Year 3
• Dissemination of information and results of project activities (more side events)
• Producing the National Integrated Reporting Manual. • Confirmation of information management systems in
the six countries to ensure the sustainability of project actions.
• Continued training and supporting of related networks.• Compiling the lessons learned.• International dialogue on lessons learned and the
exploration of scaling up opportunities of the approach.
16 November 2013
18
Project Overview, Objectives, Components and Targeted Outcomes
Replication
• to provide experience that is relevant for other LDCs and SIDS for addressing the reporting burden
• to develop models for integrated reporting to MEAs that could be used by other countries with similar challenges to national reporting.
• to link activities with other relevant ongoing project-based or national development activities to ensure that project activities are appropriate, relevant and replicable.
16 November 2013
19
Project Overview, Objectives, Components and Targeted Outcomes
Communication and Mainstreaming • A comprehensive CEPA needs assessment will be
conducted of project implementation to define these needs
• The needs assessment will be led by the National Project Coordinators (NPCs) and conducted by consultants at national (with additional consultation with the government agencies, NGOs, private sector and other main stakeholders for each pilot country )
• international awareness activities will target current and potential donors
16 November 2013
20
Project Overview, Objectives, Components and Targeted Outcomes
16 November 2013
21
Project Overview, Objectives, Components and Targeted Outcomes
Thank You [email protected]