Project Management Boiler Inspection
SCOPE OF WORK AND BOILER REGULATION
THE INSTITUTION OF ENGINEER INDONESIA
(PERSATUAN INSINYUR INDONESIA)
Boiler :
The equipment to produce steam, which used by out-side of the equipment itself.
Boiler :
Indonesia National Regulation 1930, clause 1.
Consist of :
1. Economizer
2. Superheater
3. Heater
REVIEW
NATIONAL REGULATION BOILER INSPECTION
Undang-Undang No. 13 Tahun 2003
Undang-Undang No. 1 Tahun 1970
Undang-Undang Uap Tahun 1930
Undang-Undang Dasar Tahun 1945
Peraturan Uap Tahun 1930
Permenaker No. 33 Tahun 2016
MAIN BOILER INSPECTION
Design
Fabrication
Transportation
Installation or Construction
Operation
Maintenance
Modification
Preventif, Sistematic, and Comprehensive
MAIN ISSUES :
(National Regulation 1930)
1.Safety Design
2.Safety Construction
3.Safety Equipment
4.Safety Personnel
5.Safety Procedure
6.Safety Environment
Designer /
Fabricator Inspection Office Ministry of
Manpower
APPLICATION DOCUMENT
• Application Letter • Construction Drawing • Strength Calculation • Other required document
SUPERVISION
Document Evaluation
Recommendation Letter to MOM
Document Evaluation
Validation
PROCEDURE OF BOILER DRAWING DESIGN VALIDATION
Other Req. Document
Fabricator Inspection Office Ministry of
Manpower
P.V. drawing design validation
SUPERVISION
Technical Doc. Verification
Supervision Report
Technical Doc. Verification
Certificate of Fabrication Properness
PROCEDURE OF BOILER FABRICATION AND IT’S SUPERVISION
Mill Certificate
Fabrication Process
MDR
Examination 1. Visual, NDT, etc 2. Hydro test
Product Buyer
PROCEDURE OF BOILER OPERATING PERMIT AND ITS SUPERVISION
User Regional Office Ministry of
Manpower
SUPERVISION
Document
verification
Pressure Vessel
Appointed Operator
Examination
1. Visual
2. NDT (if req.)
3. Testing
• Hydro static
APPLICATION DOCUMENT
• Form Application
• P.V Design Validation
• MDR
• Other required document
Examination and Testing
Report
Operating Permit
*
Fire Tube Boiler Water Tube boiler Ketel Uap Combi
BOILER INSPECTION regulation
Act no. 1 (1970)
Steam Regulation (Stoom Ordodinantie 1930) & (Stoom Verordening 1930 )
ASME Section I
(Ruler of Cons. Power Boiler
Code)
ISO 16528 GB 150, etc
ASME Sect. II part D (Material)
ASME Sect. IX (Welding)
ASME Sect. V (NDT Examination)
ASTM A 370
WELDING GAUGE & DEPTH GAUGE UT THICKNESS
UT FLAW DETECTOR PERMANENT YOKE
CAMERA RADIOGRAPHY EDDY CURRENT
BOROSCOPE INSITU METALLOGRAPHY
SCOPE OF WORK BOILER INSPECTION
INSPECTION WATER TUBE BOILER
SCOPE OF WORK BOILER INSPECTION
BOILER INSPECTION
Hardness and Metallography
SCOPE OF WORK BOILER INSPECTION
SCOPE OF WORK BOILER INSPECTION
Location 1 Location 2 Location 3 Location 4
Location 5 Location 6 Location 7 Location 8
SCOPE OF WORK BOILER INSPECTION
Location 9 Location 10 Location 11
Location 12 Location 13
Corrosion Rate Resume
(year)
(mm
/yr)
Corrosion Rate Resume
Company : Petrochemical Industries (on Cilegon, Jawa Barat)
No. Material Unit Temperature Time (Year)
Remark
(23 oC or 73 F) 1 5 10 15 20 25 30 35 40 45 50
1 SS316L mm/year room 0.370 1.800 3.200 5.230 7.120 9.130 11.005 12.567 14.670 16.650 16.650
2 SM490YB (marine) mm/year room 0.080 0.350 0.780 1.100 1.670 1.900 2.450 2.760 3.000 4.000 4.000
3 SM490YB (Industrial) mm/year room 0.060 0.300 0.600 0.900 1.200 1.500 1.800 2.100 2.400 2.700 3.000
4 SS304L mm/year room 0.030 0.150 0.300 0.450 0.599 0.749 0.899 1.049 1.199 1.349 1.499
5 A516 Gr. 70 Plate mm/year room 0.400 2.000 4.000 6.000 8.000 10.000 12.000 14.000 16.000 18.000 20.000
6 A516 Gr. 60 Plate mm/year room 0.350 1.750 3.500 5.250 7.000 8.750 10.500 12.250 14.000 15.750 17.500
SUMMARY
1. BOILER IS MAIN EQUIPMENT AND MANY INSTALLED ON INDUSTRIAL BUSINESS FOOD AND
BEVERAGE, PETROCHEMICAL, BULDING, POWER PLANT.
2. THE CRITICAL ISSUE DURING INSPECTION IS THE ALLOWANCE FOR CORROSION
3. THE DESIGN OF CORROSION SHALL REFER TO COROSION RATE WHICH CALCULATE ON
DESIGN STAGE.
4. THE CORROSION RATE SHALL CONSIDER THE ENVIRONMENT, OPERATION, AND
MAINTENANCE.
5. THE CORROSION RATE SHALL RELEASED ON 1 YEAR OPERATION, 2 YEAR OPERATION, ETC
6. THE DESIGNER SHALL CONSIDER CORROSION RATE (YEARLY) ON CALCULATION ANALYSIS, SPECIFICATION, AND RELATED DOCUMENT.