Project Information FORM Form Type: PWC-100 Project Award Date: 12/5/2019 AWARDING BODY INFORMATION Name: County of Ventura Primary Contact: Terry Smith Address: 800 S. Victoria Ave. Primary Email: [email protected] Attention ESD Dept. L1670 Work Phone: 8056543984 Ventura,CA 93009 PROJECT INFORMATION Project Name: Project #: P6042532 Brief Description: Contract #: WP19-14(I) Contract Amount: Number of Prime Contractors: 1 Total Project Cost: Alternative Model: Franklin Barranca Maintenance 2019 Pollution prevention and diversion of channel flows, the removal and replacement of five, 20 feet wide trapezoidal walls $96,793.00 $96,793.00 None Apply Description of Location: Franklin Barranca channel, between Darling Road and Santa Clara River. County: VENTURA Project Information 2 PWC-100 Project Name: Franklin Barranca Maintenance 2019 Project #: P6042532 Contract #: WP19-14(I) Status: New Submission PROJECT INFORMATION Project Dates First Advertised Bid: 11/7/2019 Estimated or Actual Start: 1/2/2020 Estimated or Actual Completion: 2/14/2020 Propositions Will this project receive (or has it received) any funding from Proposition 84 (The Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection Bond Act of 2006)? No Will this project receive (or has it received) any funding from Proposition 39 (California Clean Energy Jobs Act of 2012)? No Compliance and Agreements: Is language included in the Contract Award to effectuate the requirements of Section 1771, 1774 - 1776, 1777.5,1813 and 1815 of the Labor Code? Yes Will you operate a DIR-Approved Labor Compliance Program(LCP) for this project? No Is there a Project Labor Agreement (PLA) associated with this project? No Contractor Information Project Manager Email Address Name Title Work Phone [email protected] Chris Smith Project Manager 805-672-2104 General Contractor1 CSLB/Certificate Number NAME Address Email Classification 1000004413 SOUTHWEST GENERAL ENGINEERING INC 3625 PLACENTIA LN RIVERSIDE, CA 92501 [email protected] LABORERS 1000039685 GMZ ENGINEERING INC 5655 LINDERO CANYON RD STE 430 WESTLAKE VILLAGE, CA 91362 [email protected] LABORERS 1000002410 TORO ENTERPRISES INC. 2101 E. VENTURA BLVD. OXNARD, CA 93036 [email protected] LABORERS PRIME

Upload: others

Post on 06-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Information 2 - s29422.pcdn.co€¦ · Franklin Barranca Maintenance 2019 Pollution prevention and diversion of channel flows, the removal and replacement of five, 20 feet

Project InformationFORM

Form Type: PWC-100 Project Award Date: 12/5/2019

AWARDING BODY INFORMATIONName: County of Ventura Primary Contact: Terry Smith

Address: 800 S. Victoria Ave. Primary Email: [email protected]

Attention ESD Dept. L1670 Work Phone: 8056543984

Ventura,CA 93009

PROJECT INFORMATION

Project Name: Project #: P6042532  

Brief Description: Contract #: WP19-14(I)

Contract Amount: Number of Prime Contractors: 1

Total Project Cost:

Alternative Model:

Franklin Barranca Maintenance 2019

Pollution prevention and diversion of channel flows, the removal and replacement of five, 20 feet wide trapezoidal walls  

$96,793.00  

$96,793.00

None Apply

Description of Location: Franklin Barranca channel, betweenDarling Road and Santa ClaraRiver.

County: VENTURA

Project Information 2PWC-100

Project Name: Franklin BarrancaMaintenance 2019

Project #: P6042532 Contract #: WP19-14(I) Status:  New Submission

PROJECT INFORMATION       Project Dates

First Advertised Bid: 11/7/2019 Estimated or Actual Start: 1/2/2020

Estimated or ActualCompletion:

2/14/2020

PropositionsWill this project receive (or has it received) any funding from Proposition 84 (The Safe Drinking Water, WaterQuality and Supply, Flood Control, River and Coastal Protection Bond Act of 2006)?

No

Will this project receive (or has it received) any funding from Proposition 39 (California Clean Energy JobsAct of 2012)?

No

Compliance and Agreements:Is language included in the Contract Award to effectuate the requirements of Section 1771, 1774 - 1776,1777.5,1813 and 1815 of the Labor Code?

Yes

Will you operate a DIR-Approved Labor Compliance Program(LCP) for this project? No

Is there a Project Labor Agreement (PLA) associated with this project? No

Contractor InformationProject Manager

Email Address Name Title Work Phone

[email protected] Chris    Smith Project Manager 805-672-2104

General Contractor1

CSLB/CertificateNumber

NAME Address Email Classification

1000004413 SOUTHWEST GENERALENGINEERING INC

3625 PLACENTIA LNRIVERSIDE, CA 92501

[email protected] LABORERS

1000039685 GMZ ENGINEERING INC 5655 LINDERO CANYON RD STE430WESTLAKE VILLAGE, CA 91362

[email protected] LABORERS

1000002410 TORO ENTERPRISES INC. 2101 E. VENTURA BLVD.OXNARD, CA 93036

[email protected] LABORERS

PRIME

102203
Text Box
Safety Information: NONE Traffic Information: Project work will not affect traffic on any public way, Supervisor District #1 Supervisor Steve Bennett