Project Detail of PilibhitDivision – Pilibhit Tiger Reserve
Particulars Target Achievement
JFMC(Joint Forest Management committee)
Phase-I 10 10
Phase-II 0 0
Ph III 5 5Phase-III 5 5
SHG(Self help Group)
Phase-I 30 30
Phase-II 0 0Phase II 0 0
Phase-III 15 15
SHG Funding - 30 30
Total Target Achieved = 100%Total Target Achieved 100%
Project Components/ Activities
Unit Target Year
2009-10
Achievement 2009-10
Target Year
2010-11
Achievement 2010-11
Target year
2011-12
Achievement 2011-12
Target year
2012-13
Achievement 2012-13
Target Year
2013 -14
Achievemen2013-14
2009 10 2010 11 2011 12 2012 13 2013 14
Preparatory Works(Demarcation &
Survey)
JFM/Ha 0 0 10/
120010/
1200 25 25 99 99 0 0
Institutional Strengthening of DMU/ 1/ 1/Strengthening of DMU/
PMU/FMU(ARM/ NO of Building/
Furniture)
No 0 01/
14/6
1/14 (part)/
6 0 14 (part)/ 0 14 (part)/ 01 01
Capacity Building of JFMC/SHG/NGO Batc 0 0 02 02 05 05 06 06 03 03
JFMC/ SHG TrainingExposure visit
h 0 0 02 02 05 05 01 01 02 02
JFMC/EDC Community
Development and Livelihood
JFM 0 0 10 10 0.25 0.25 15 15 30 30Livelihood
ImprovementDepartmental Forest
Development and Management
(Maintenance of ANR &
Km/Ha/ N
600/2700
600/2700
1200/ANR4500/Agro05 - NUR
Renovation
1200/ANR4500/Agro05 - NUR
Renovation 1200/ANR 1200/ANR3030 ANR
4500 S i
3030 ANR4500 Species 1200ANR
630 F.P.1200ANR
630 F.P(Fire lines)
No 05- fire fighting set
05- fire fighting set
Species
JFM Forest Development and
Management Ha 0 0 375 ASW 375 ASW 375 375 397 397 397 397(Plantation in JFM
Mode)Wildlife Conservation
and Management (Cottage & NIC
W t h T t W t Ha/ 0 0 0 0
02010202
02010202
00000204
00000204
000001
02Km
000001
02Km
Project Components/ Activities
Unit Target Year
2009-10
Achievement 2009-10
Target Year
2010-11
Achievement 2010-11
Target year
2011-12
Achievement 2011-12
Target year
2012-13
Achievement 2012-13
Target Year
2013 -14
Achievemen2013-14
2009 10 2010 11 2011 12 2012 13 2013 14Preparatory Works
(Demarcation & Survey)
JFM/Ha 0 0 157133/
102862157133/102862 1630 1630 25085 25085 0 38216
Institutional Strengthening of DMU/Strengthening of DMU/
PMU/FMU(ARM/ No of Building/
Furniture)
No 0 0 6176095 4247746 0 2909127 0 626670 368018 368018
Capacity Building of JFMC/SHG/NGO Batc 0 0 102000 102000 400085 400085 318775 318775 393510 393510JFMC / SHG Training
Exposure visith 0 0 102000 102000 400085 400085 318775 318775 393510 393510
JFMC/EDC Community
Development and Livelihood
JFMC 0 0 2882576 2882576 527803 527803 1809951 1809951 2498500 2498500
Livelihood Improvement
Departmental Forest Development and
Management(Maintenance of ANR &
Ha/ No
287414512339
287414512339 14480200 14480200 226388 226388 4282800 4282800
Allotted –1787429Released-1500000
1500000(Maintenance of ANR &
Fire lines)1500000
JFM Forest Development and
Management (Plantation in JFM
Ha 0 0 5918500 5918500 2538000 2538000 1344397 1344397 2405925 1365357
Mode)
Wildlife Conservation and Management
Ha/No. 0 0 0 0 2151621 2151621 1182853 1182853
Allotted –1735899Released-1620899
1620899
InnovationsEco Tourism activity – Joint forest management committee Mustafabad provide Guides,
Hospitality and Protection in Chuka eco tourist spot. Total people visited from year 2011 are 33948
and Total revenue to JFMC is 11,29,909 till march 2014.
Women empowerment (adult education) – Women although illiterate, are able to sign their names,
and express their views in general meetings.p g g
Deputy Director of NABARD Lucknow has shown interest in funding to JFMC Mustafabad &
Maharajpur. ( Ban Making, Poultry Farm & expansion of Chuka eco tourist spot.)
DM Pilibhit i D L A C ti h ti d P bli T il t H d d B d llDM Pilibhit in D.L.A.C. meeting has sanctioned Public Toilets, Hand pumps and Boundary wall
of Graveyard in JFMC’s.
Convergence of JFMC with Handicraft Department, Govt. of India; Department has issued ID
cards to members of JFMC Mustafabad for marketing and soft loaning.
Work in progress - To link the SHG of Turmeric powder with “Chaupal Sagar” of ITC.
Insured regular meetings of JFMC.
Frequent visits of DMU & ADMU along with PNGO to JFMC.
Monitoring meeting of regional conservator.
Insures implementation of correction of all errors done during past yearInsures implementation of correction of all errors done during past year.
Regular discussion & monitoring with PNGO, ADMU & DMU.
Insured Transparency in financial & physical targets and achievements.
SR.NO.
RANGE JFMC SHG NAME WORK TOTAL LOAN
RETURNING EMI
TOTAL RETURN AMOUNT
1 Mala Shejaniya Vikas Purush Kheti 80000 4764 * 3 14292
2Mahof Mustafabad
Sayeed Baba Mahila Vaan Making 100000 6100 * 18 109692
3 Purush Gausiya Vegetable 100000 18300 * 3 549003 Purush Gausiya gFaming 100000 18300 * 3 54900
4
Haripur
KhirakiyaBargadhiya
Maa DurgaMahila Mat Making 100000 6100 * 13 79300
5 Krantiveer Turmeric 100000 6100 * 13 79300Haripur5 Purush Powder 100000 6100 * 13 79300
6 Huseinapur Shiv ShaktiPurush Kheti 100000 5914 * 4 20000
7 Deoriya Meerpur Laxmi Mahila Cow milk 100000 5914 * 1 59147 Deoriya pRatanpur Laxmi Mahila Production 100000 5914 * 1 5914
8
B hi M h j
KhusiyaanMahila Sabji Kheti 100000 6100 * 7 42700
9 Pragati Mahila Poultry Farm 100000 18300 * 4 73200Barahi Maharajpur9 g y
10Swaraswati
VandanaMhaila
Cow Milk Production 100000 5914 * 2 11828
SR.NO.
RANGE JFMC SHG NAME WORK TOTAL LOAN
RETURNING EMI
TOTALRETURN AMOUNT
11 Maharajpur Ujjwaja Mahila VegetableFaming 100000 17742 * 1 17742
12NaujalhaN k h
MahatamaGandhi Mahila
Cow Milk Production 100000 6100 * 12 73200
Barahi
Naktha13 Shri Govindo
PurushBanana Farming 100000 5914 * 8 47312
14Shri Shri
SwaraswatiMahila
Vegetable Farming 100000 5914 * 3 17742
NagariyaKhurd Kala
Mahila g
15 Samaj KalyanPurush
Banana Farming 100000 5914 * 1 5914
16 Anmol Purush Banana Farming 100000 5914 * 1 5914Farming
Total 15,80,000 6,58,950
Note : Total Fund given to 30 SHGs. Repayment started by 16 SHGs. F t 14 SHG ti f t h t t t dFor rest 14 SHGs, time of repayment has not started.
Sayeed Baba Mahila SHG working in Ban making and selling in the market. JFMCprovided Rs. 10,000/- Support fund & Rs. 1,00,000/- Seed fund as loan. From this, SHGpurchase Beb Grass of Rs. 90,000/- in one go and rest amount was used in maintenance.They purchased Beb Grass Rs. 1500 per Quintal and after completing final product theysold it in Rs. 3000 per Quintal.In the process they returned the whole loan in 18 months to their J.F.M.C. as per theguideline of project They got best SHG Award of Pilibhit District by the CDO in 2012 13guideline of project. They got best SHG Award of Pilibhit District by the CDO in 2012-13
Ban Preparation Ban Marketing
A prominent and beautiful tourist destination is Chuka Beach situated between Sharda SagarA prominent and beautiful tourist destination is Chuka Beach situated between Sharda SagarDam and Sharda canal. The main attraction, reservoir is about 2.5 km in width and around 22 kmin length, Situated at the bank of Sharda Canal, the Chuka spot extends to a length of 10 kmmeandering within the thick forest. Because of this, it is look like as beech- thus the namebecome Chuka Beach This is a beautiful location with all the natural beauties of forest underbecome Chuka Beach. This is a beautiful location with all the natural beauties of forest underMahof Forest Range.JFMC Mustafabad maintaining this Chuka Eco Tourism Spot from 2011, all the revenuecollected by parking and Cottage bookings from the Chuka Beach, submit all in the VDF accountof Chuka.of Chuka.There is a need of some training for best services given to the persons coming to Chuka
Training of Hotel ManagementTraining of CookingTraining of GuidesTraining of Guides
One post of ADMU is vacant & other ADMU is getting retired on 31/07/2014.
SDO is over burden therefore a separate ADMU for JICA Project is urgentlySDO is over burden therefore a separate ADMU for JICA Project is urgently
required. (Post of two SDOs – one Vacant).
Very Less money for stationary & internets facility.
SUCCESS IMPLEMENTATION
In Pilibhit Tiger Reserve, 600 ha plantation in departmental mode &
627.085 ha in JFMC mode has been done in last three years.
Forest Department is motivating JFMC and has provided technical inputs and
G d Pl i M i l f NGood Planting Material from Nursery.
Protection of plantation from grazing and fire was done by members of respective
JFMC’s.
Insufficient funds to start SHG (Only 1.10 lacks). The amount should be at least
Rs. 5.00 lacks per SHG.
Insufficient money for P.O.L. & maintenance of JICA vehicles as area is not
compactcompact.
Staff has to travel approximately 190 kms to reach one Khirkiya Bragadhiya
JFMC, therefore, more funds are required for their residence, travel &
transportation.
SUGGESTIONS :Need to have a Government order for imparting training to SHG’s by the differentdepartments like Horticulture Animal husbandry Handicraft and Poultry farmingdepartments like Horticulture, Animal husbandry, Handicraft and Poultry farming.
IGA experts are required throughout the project time as they are good helping hands.
Some special training should be given like -
1. Eco tourism training (Catering, House keeping)
2. Banana Farming (Tissue culture method).
3. Mushroom cultivation and food Preservation training etc.3. Mushroom cultivation and food Preservation training etc.
To develop a SHG under the project, Rs. 1.10 lack is insufficient. There is a need to increase
this amount up to Rs 5 lacks.