project design - lab sistem dan manajemen file12/02/2009 · project design product design & ......

38
dwipurnomo 1 Project Design Product Design & Process Planning Need Identification Operation Design

Upload: hanga

Post on 01-Apr-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

dwipurnomo 1

Project Design

Product Design &Process Planning

Need Identification

Operation Design

dwipurnomo 2

PERANCANGAN PROYEKDWI PURNOMO,MT

dwipurnomo 3

PRODUCT DESIGN

dwipurnomo 4

The Four C’s of Design

CreativityRequires creation of something new

ComplexityRequires decision on many Variables and Parameters

ChoiceRequires making choices between many possibsolution

CompromiseRequires balancing multiple conflicting requirements

dwipurnomo 5

Types of Design Project

Variation of Existing ProductImprovement of Existing ProductDevelopment of New Product One-of-a-Kind Design

dwipurnomo 6

Morphology of Design

1. Conceptual Design2. Embodiment Design3. Detail Design4. Planning For Manufacture5. Planning For Distribution6. Planning for Use7. Planning for Retirement of the Product

dwipurnomo 7

Product Design Process

Problem Definition

-Problem Statement-Benchmarking

-QFD-PDS

-Project Planning

GatherInformation

-Internet-Patent-Trade

-Literature

ConceptGeneration

- Brainstorming- Functional

Decomposition-Morphological Chart

Evaluation ofConcept

--Pugh Concept

Selection-Decision Matrices

Parametric Design

-Robust Design -Tolerances

-Final Dimension-DFM

ConfigurationDesign

-Prelim. SelectionMaterials and

Manufacturing-Modeling/sizing of

part

Product Architecture

- Arrangement ofPhysical Elements

to Carry outFunction

Detail Design

- Detail Drawing sand

Specifications

Conceptual Design

Embodiment Design

dwipurnomo 8

Identifying Customer Needs

Gathering Information From Customers

Interview, Focus Group, Customer Survey, and Customer Complaint

Constructing Survey InstrumentEvaluating Customer Needs

dwipurnomo 9

Dimension of Quality for Manufactured Product

PerformanceFeatures

ReliabilityDurability

ServiceabilityConformance

AestheticsPerceived Quality

dwipurnomo 10

Customer RequirementsExpected

There are basic attributes that one would expect to see in the product

SpokenThere are specific features that customer defines the product in terms of these attributes that one would expect to see in the product

dwipurnomo 11

Customer RequirementsUnspoken

These Are Specific Features That Customers Say They Want in the Product.

ExcitersThese Are Product Features That Make the Product Unique and Distinguish It From the Competition

dwipurnomo 12

Quality Function Deployment

A Planning and Problem Solving Tool for Translating Customer Requirements Into the Engineering Characteristics of Product ( Engineering Parameters)

dwipurnomo 13

5Correlation Matrix

4Engineering Characteristic

6Relationship Matrix

7. Absolute Importance8. Relative Importance

9. Technical Competitive Assessment

10. Technical Difficulty11. Target Value

1CustomerReq’ment

“What?”

2CompetitiveAssessment

3Impor-tance

Rating

dwipurnomo 14

Conceptual Design

Process by which the design is initiated, carried to the point of creating a number of possible solution, and

narrowed down to a single best concept

dwipurnomo 15

Product Design Specification

A Document Which Contains All of the Facts Related to the Outcome

of the Product Development

In Use Purpose and MarketFunctional Requirements

Corporate ConstraintSocial, Political, and Legal

Requirements

dwipurnomo 16

Process Planning

Planning of production processes based on

the product design starting from raw

material in to finish good

dwipurnomo 17

Operation Process Chart

Chart describe the operation making process from the beginning ( material

input) to the finish (finished good)ASME symbol:

OperationInspectionOperation and InspectionStorageFlow

dwipurnomo 18

Operation Process Chart

5

4

3

2

1•Cutting•Circular Saw

•Forming•Press

•Make Screw•Drilling

•Cutting•Circular Saw•Polishing•Grinding

•Painting•Sprayer

7 •Make Screw•Drilling

6

I-1

I-218

•Assembly & Inspection

•Mannual

5’

3’

10’

2’

3’

15’

5’

15’

Plywood Pipe

dwipurnomo 19

OPERATION SYSTEM DESIGN

dwipurnomo 20

PERANCANGAN SISTEMAnalisis Permintaan

Perancangan Produk Dan Proses

Penentuan Kapasitas

Penentuan Lokasi

Perancangan Lay Out

dwipurnomo 21

Analisis PermintaanAnalisis Peluang Pasar

Proyeksi Demand Potential (Do)

Market Share ( S )

Proyeksi Demand Effektif (De )De = S.Do

dwipurnomo 22

Sumber PeluangThe UnexpectedThe IncongruityProcess NeedChange

Struktur Industri dan struktur pasarDemografiPersepsi, “mood” dan makna

New Knowledge

dwipurnomo 23

Prinsip InovasiDimulai Dengan Analisis PeluangBersifat Konseptual Dan PerseptualSederhana Dan TerpusatMulai Dengan Yang KecilDitujukan Untuk Menjadi Leader

dwipurnomo 24

Persyaratan

Berorientasi Pada PasarBekerja Hanya Pada Satu BidangSajaMembangun BerdasarkanKekuatan Sendiri

dwipurnomo 25

Demand PotentialTotalitas permintaan produk/jasatanpa memperhatikan siapa yang

akan memasok

Market Size

dwipurnomo 26

Metoda Proyeksi

Market ResearchKwalitatifKwantitatif

Time SeriesCausal

dwipurnomo 27

Demand EffectiveJumlah permintaan produk/jasa

yang diminta konsumen yang dapat diraih oleh pemasok tertentu

Merupakan bagian daridemand potential

dwipurnomo 28

Demand Effective

Do

De

10

dwipurnomo 29

Analisis Market ShareAnalisis Persaingan

5 Forces ( Porter )SubstituteSupplierBuyerNew EntranceCompetitor

dwipurnomo 30

Pengertian KapasitasKapasitas Adalah Kemampuan Maksimum

Dari Suatu Fasilitas Persatuan Waktu

Design(Co) Effektif(Ce) Aktual(Ca)( Designer ) ( Planner ) ( Executor)

dwipurnomo 31

Keterkaitan Antar Kapasitas

Co

Ce

Ca

dwipurnomo 32

Langkah Perhitungan CoDemand Effective

Kapasitas Effektif

Strategi Kapasitas

Kapasitas Design

Loses (L)

Effisiensi (E)

CCR ( R )

dwipurnomo 33

Kapasitas Effektif

Ce = De/(1-L)

Dimana L: loses karena- Kerusakan di gudang- Kerusakan transportasi- Waranty- Sales program

dwipurnomo 34

Policy A : Capacity leads demand

Policy B : Capacity in approximate with demand

Policy C : Capacity legs demand

Capacity DemandsUnits

Time

Time

Time

Units

Units

Capacity

Demands

Demands

Capacity

Strategi Kapasitas

dwipurnomo 35

Capacity Cushion Ratio

R = ( Cx – Cs )/Cx

Dimana:R : Capacity Cushion RatioCx : Marginal ProfitCs : Marginal Production

dwipurnomo 36

Strategi Kapasitas

Lead Demand R > 0.5Lag Demand R < 0.5Equal Demand R = 0.5

dwipurnomo 37

Kapasitas Design

Co = Ce/EDimana

E : Effisiensi Pabrik

dwipurnomo 38

Design LAY - OUT