project delivery safety • performance • quality

2
Project Delivery Safety • Performance • Quality

Upload: others

Post on 17-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Delivery Safety • Performance • Quality

Project DeliverySafety • Performance • Quality

Page 2: Project Delivery Safety • Performance • Quality

Oil & Gas, Marine & Industrial

AmericasHarris Pye5177 Richmond Avenue Suite1065 HoustonTexas, 77056United States of AmericaTel: + 1713 600 8371Contact: Mark TamlinE-Mail: [email protected]

EuropeHarris Pye SouthamptonSolent Business Center Unit103 Millbrook Road WestSouthamptonUnited KingdomTel: + 44 2380 631100Contact: Glyn HallE-Mail: [email protected]

Middle EastHarris Pye DMCCPO Box 12796912th Floor Mazaya BB-1Jumeirah Lakes TowersDubai, United Arab EmiratesTel: + +971 4324 1535Contact: Mike Wallace-RivettE-Mail: [email protected]

AustralasiaHarris Pye Singapore Pte Ltd31 International Business Park#04 - 03A Singapore609221Tel: + 65 6863 3188

www.harrispye.com

Services

• Full turnkey solutions & project management• FEED study, Design engineering & Draughting• Stainless Steel Fabrication• HP & LP pipework fabrication• Copper to GF Pipework replacement works• Furniture supply & manufacture• Cabin & Public area refurbishment• Riding squads• Exhaust Gas Scrubber Installation• Electrical • HVAC-R

installation of marine accommodation systems, soft furnishings, HVAC-R & Stainless steel fabrication.

We pride ourselves on the ability to conduct our services worldwide with our skilled technicians during service as well as assisting in dry dock work and new build construction.

Stainless Steel Fabrication

for the supply and installation of any Galley, Pantry, Bar & Restaurant requirements. This includes all pre- design, 3D visualization and technical detailing. All equipment and services are carried out to current IMO and USPH