project 2013 - how to manage support work in a set time frame

8
Project 2013 How to manage support work in a set time frame Jakub Marciniak Solution Consultant DeltaBahn LLC

Upload: deltabahn

Post on 12-Jan-2017

576 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: Project 2013 - How to manage support work in a set time frame

Project 2013How to manage support work in a set time frame

Jakub MarciniakSolution ConsultantDeltaBahn LLC

Page 2: Project 2013 - How to manage support work in a set time frame

Agenda

Create

the support task

Set to

fixed duration

Set “Star

t” and

“Duration”

Set “Finish no later than” constr

aint

Assign Resources

Online: Track

progress

Log in as team

member

Enter “Actual Work”

Turn in Final

Timesheet

Project 2013: Track

progress

Open the Task Usage

View

Show “Actual Work”

Enter “Actual Work”

Setting up the task

Set “Actual Start”

Page 3: Project 2013 - How to manage support work in a set time frame

1. Setting up the support task 1

Create the new task and double-click it:

Set it to “Auto Scheduled” mode: Set it to “Fixed Duration”

Set only a “Start” date and a “Duration” – The “Finish” will be calculated by Project:

Page 4: Project 2013 - How to manage support work in a set time frame

2. Setting up the support task 2Set a “Finish No Later Than” Constraint to the “Finish” date:

Assign some Work Resources:

Page 5: Project 2013 - How to manage support work in a set time frame

3. Assign an “Actual Start” date

Add a new column for “Actual Start”:

Set the “Actual Start” date to equal the “Start” date:

Page 6: Project 2013 - How to manage support work in a set time frame

4a. Track Progress in Project Online

Log into Office 365 Projects and navigate to the Timesheet:

Enter “Actual Work” for a date after the “Start” date:

Turn in the Final Timesheet for Approval:

After the Timesheet has been approved, note that the “Start” date didn’t change:

Page 7: Project 2013 - How to manage support work in a set time frame

4b. Track progress in Project 2013

View tab Details Task Usage:

Right-click in the Task Usage View and select “Actual Work”: Enter some “Actual Work”:

Page 8: Project 2013 - How to manage support work in a set time frame

Thank [email protected] (281) 344-0437

www.deltabahn.com