project 2
DESCRIPTION
Prepared by : En’am Sab’ Elaish Nour Kananh Majdolin Yasen Submitted to: Sami Al- Hijawe. Project 2. Support excavation systems. Case study. 1- Retaining walls : 2- Big Boulder Foundations 3- Soil Nailing 4- Solider Pile 5- Sheet piles 6- Freezing. - PowerPoint PPT PresentationTRANSCRIPT
TYPE OF EXCAVATION SUPPORT SYSTEM ( IN GENERAL)
1 -Retaining walls :2 -Big Boulder Foundations
3 -Soil Nailing4 -Solider Pile5 -Sheet piles
6 -Freezing
EXCAVATION PARAMETER
Depth=7.5 m
Assumed : Surcharge load= 10 KN/m2
Water depth =20m Water density=9.81 KN/m2
Min. fluid density=5 KN/m2
CHECK OVERTURNING
qall=400kN/m^2 Ka=0.2 Kp=5 ф=40° C=0ɣ=19 KN/m3 =(2/3)*ɸ=26.7q1=ɣ*h*k=21*7.51*0.2=31.542KN/m2q2=kw=0.2*10=2 KN/m2p1=0.5*q1*h=0.5*31.542*7.51=118.44KNp2=q2*w=2*7.51=15.02KNp1+p2=133.46KN
Moverturning=p1(h/3)+p2(h/2)=296.5+7.51=304.01KN
W=∑Wn=493KNMn=1665KN.M∑=mresisting
F.S=mresisting/moverturning
1665/304.01=5.5>2.…
weight(kN) arm(m) moment(KN.m)
W1=.5*.4*6.71*25=3
35.5
(.4/3)+.3+1.3=1.733
581.4
W2=6.71*.3*25=50.3
25
(.3/2)+1.3=1.45 73
W3= 4*.8*25=80 2 160
W4=.5*.4*6.71*21=2
8.2
1.6+(2/3)*.4=1.9 53.6
W5=2*6.71*21=281.
8
3 845.4
W6=1.3*1*21=27.3 1.3/2 17.75
W7=10*2.4=24 2.8 6.72
CHECK SLIDING
Presisting/Psliding>or=1.5
psliding=133.46 kN
Presisting=(∑w*friction factor)+(ɣ*h*kp )
)= 493*0.5)+(21*1.8*5=(602.5KN
=4.5 >1.5 Ok
THE FOLLOWING CONCLUSIONS CAN BE MADE:
1- The two alternatives of protection are goal for the required purpose .
2- The using of piles requires less time Of the excavation
3- The distance between the adjacent piles in the row is recommended to be less than 3*D 4- Piles are recommended to connect on the top y means of a reinforced concrete beam.