Page 1: Proj Plan

Tinyurl.com/DIDA2009

Getting Organised

Planning

Keeping Track

Use the headings on the left hand side of the DIDA2009 website as your MAIN TASKS in your project plan

Page 2: Proj Plan

Tinyurl.com/DIDA2009

Getting Organised

Planning

Keeping Track

Use the blue arrows on each page of the DIDA2009 website as your SUB TASKS in your project plan

Page 3: Proj Plan

Time allowed

• Can be classified into 1 of 6 categories:

Task type

Time allowed (approx)

Small 5 minsMedium 15 minsLong 30 minsXL 1 lessonXXL 2 lessonsXXXL 4 lessons

Page 4: Proj Plan

Quick Quiz

What would the following tasks be classified as:

1.Design and build a database2.Save a picture (as a JPEG)3.Perform 4 searches (queries) in a database4.Add 5 new records to a database5.Make a presentation (4 slides)

Small Medium Long XL XXL XXXL5 mins 15 mins 30 mins 1 lesson 2 lessons 4 lessons

Page 5: Proj Plan

IdeaFor time allowed, you can either write in the

time in minutes/lessons.

Or simply write:–S, M, L, XL, XXL, XXL

Then use V LOOKUP to automatically insert the times later.

Page 6: Proj Plan

Further Notes

• Remember some of the work, you will have to assign for homework. E.g. updating your project plan and project diary

• Rough Guideline: The finish date should lie between July 2009 and March 2010.

• There is no “correct” answer for the plan, just be sensible with your estimates- you will all work at different rates.