progress report of planning interconnection sub working group presented to the 8 th meeting of hapua...

9
Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia 6 th October 2010 by Dr. Thana Boonyasirikul

Upload: rodger-poole

Post on 31-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia

Progress Report of

Planning Interconnection Sub Working Group

Presented to

The 8th Meeting of HAPUAWorking Group No.2 - Transmission

Kuala Lumpur, Malaysia6th October 2010

by

Dr. Thana Boonyasirikul

Page 2: Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia

Presented to The 8th Meeting of HAPUA Working WG No.2-Transmission 2

The Meeting of APGCC#5 & HAPUA WC#11(9-11 November 2009, Chiang Mai, Thailand)

Presented the generation results of AIMS-II based on the input of 11 September 2009

The Meeting of PI SWG - Transmission Team #2(1-3 December 2009, Bangi, Malaysia)

Set up the Transmission Study Methodology

The Special Meeting of PI SWG - Transmission Team : Sub System A(29 December 2009, Udon Thani, Thailand)- Transmission analysis was partially done for selected years- Transmission data of Laos System were received- Agreed to simplify transmission data of Myanmar and Vietnam

The Meeting of PI SWG - Transmission Team #3(3-4 March 2010, Bandung, Indonesia)- Discussion on preliminary results of Power System Study - Agreed on minor changes of criteria and assumption on Power System Study- Updated APGCC Work Plan

The Special Meeting of WG2:Transmission-PI SWG (Discussion on AIMS-II)

(28 June 2010, Petchburi, Thailand)- Key Finding and Issues of AIMS-II Generation Report- Discussion on AIMS-II Transmission - Results of the Steady State and Dynamic Simulation

Related Meeting Events (2009-2010)

Page 3: Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia

Presented to The 8th Meeting of HAPUA Working WG No.2-Transmission 3

Completion of AIMS-II* Report on Generation System Study was circulated to Member

Countries on 24 May 2010* Minor corrections were made upon member comments and

resubmitted to all members on 14 September 2010* Member countries accepted AIMS-II results and reports prepared by

PI SWG.* Submission of AIMS-II Final Results to member countries on

November 2010* AIMS-II can be used as a reference for implementation by concerned

parties. Further studies are required to be carried out as necessary.

Conclusions and Recommendations- The study indicates a saving of 788 MUSD with ASEAN

interconnection network which is based on the data dated 29 September 2009.

- It is noted that the nature of input for AIMS-II study is dynamic. The result should be referred to the date of data availability.

- The final AIMS-II report shall be composed of 4 reports, Generation System Study, Transmission System Study, Appendix and Executive Summary.

Works Accomplished and Outcomes

Page 4: Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia

Presented to The 8th Meeting of HAPUA Working WG No.2-Transmission 4

Work Plan for AIMS-II Report

AIM-II Report Leader Status Submission

Generation System Study Report

EGAT, Thailand

Completed 6th APGCC, 12th HWC and 26th Council

Transmission System Study Report

TNB, Malaysia

Completed 8th Meeting of HAPUA WG No.2

Appendix EGAT and TNB

Completed 8th Meeting of HAPUA WG No.2

Executive Summary

NPC,

Philippines

In progress Prior the 13th Working Committee Meeting

Page 5: Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia

Presented to The 8th Meeting of HAPUA Working WG No.2-Transmission 5

Issues to be completed by a week after the 4th Meeting* The PI SWG Leader requested all member countries to provide the

statistical data of peak demand (MW) and energy demand (GWh) for the first 6 months of 2010 to Thailand delegate for the data collection.

Issues to be examined by a week after the 4th Meeting- Assumptions for Energy Price/Fuel Price shall be examined/identified

to be put in the generation study report

AIMS – II Report Structure is changed to:

Volume I – Executive SummaryVolume II – Generation Study ReportVolume III – Transmission Study ReportVolume IV – Appendices

- Terms of Reference - Power Interconnection Sub working Group- Work Plan of Power Interconnection Sub Working Group- Power Development Plans of ASEAN Member Countries- Power Flow/Stability Diagrams (hard copy / CD files)

Findings from the 4th Meeting of PI SWG

Page 6: Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia

Presented to The 8th Meeting of HAPUA Working WG No.2-Transmission

6

Harmonization of Reliability Criteria for ASEAN Countries

Future Work Plan

Discussion on reliability criteria and data requirement for Planning Criteria

Establishment of common reliability criteriaand assumption

Data collection and implementation

Discussion on harmonization and validation of results

Establishment of reliability criteria for the benchmarking of planning criteria among ASEAN countries

Comparison reliability criteria among ASEAN countries

Amendment and fine-tune

Not Applicable

Applicable

Page 7: Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia

Presented to The 8th Meeting of HAPUA Working WG No.2-Transmission 7

Harmonization of Reliability Criteria

Tentative Schedule

Page 8: Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia

Presented to The 8th Meeting of HAPUA Working WG No.2-Transmission 8

Harmonization of Reliability Criteria

Tentative Schedule

Page 9: Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia