progress report of ongoing schemes for projects date:aug

34
9/30/2020 MPR Report :: Aug_2020 1/34 Bihar Rajya Pul Nirman Nigam Ltd, Patna Progress Report of Ongoing Schemes for Projects Date:Aug_2020 Printed on: 30/09/2020 Approved by SPE Achievement for the month / till month Physical Financial 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 0.00 M 0.00/ 100.00 0.00/ 100.00 0.00/ 0.00 0.00/ 0.00 0.00/ 30.38 2 0.00/ 0.00 0.00/ 0.00 0.00/ 0.00 0.00/ 0.00 0.00/ 0.00 3 0.00 M 0.00/ 0.00 0.00/ 0.00 0.00/ 0.00 10.00/ 100.00 0.00/ 204.35 Sl.No Division Name Of Work Head / Sub Head Distirct Administrative Approval Type/Length Of Bridge(M) Agreement Amount Length of Approach (in M) Date of Commen cement Date Of Scheduled completion Revised Date of completion Likely date of completion Remarks Foundation (in %) Sub-Structure (in %) Super-Structure (in %) Approach (in %) Cumulative 3 19 External Division-2 (Kishanganj) Construction of Karpuri hostel under Kishanganj District (Chhahar Divari nirman work) Ganesh Contruction Araria Non-Plan Kishanganj 66.380000 / 2591 / 26 Dec 2017 Others/1.00 41.43 25 Sep 2018 24 Jan 2019 31 Aug 2020 Work Completed External Division-2 (Kishanganj) Construction of 4x16.00m R.C.C. Bridge of 21th Km Bahadurganj-Thakurganj Road in the District of Kishanganj. Plan Kishanganj 986.000000 / 7321(s) / 08 Aug 2019 RCC/280.00 01 Jan 1900 "1. LOA issued 2. Work started shortly" External Division-2 (Kishanganj) Repair of Pre Stress Girder Bridge (10 Span) over river Mahananda in 8th km of Kishanganj - Bahadurganj road near Mastan Chowk in the District of Kishanganj. [Rebuild Struct Associates, Mumbai] Plan Kishanganj 262.690000 / 347(s) / 09 Jan 2019 Others/425.00 269.00 09 Mar 2019 08 Mar 2020 30 Sep 2020 Work Completed

Upload: others

Post on 12-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

1/34

Bihar Rajya Pul Nirman Nigam Ltd, PatnaProgress Report of Ongoing Schemes for Projects Date:Aug_2020

Printed on: 30/09/2020 Approved by SPEAchievement for the month / till month

Physical Financial

1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 0.00 M 0.00/100.00

0.00/100.00

0.00/0.00

0.00/0.00

0.00/30.38

2 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

3 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

10.00/100.00

0.00/204.35

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

3 19

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of Karpuri hostel underKishanganj District (Chhahar Divari nirman

work) Ganesh Contruction Araria Non

-Pla

n

Kis

hang

anj

66.3

8000

0 / 2

591

/ 26

Dec

201

7

Oth

ers/

1.00

41.4

3

25 S

ep 2

018

24 Ja

n 20

19

31 A

ug 2

020

Work Completed

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 4x16.00m R.C.C. Bridge of21th Km Bahadurganj-Thakurganj Road in the

District of Kishanganj. Plan

Kis

hang

anj

986.

0000

00 /

7321

(s) /

08

Aug

201

9

RC

C/2

80.0

0

01 Ja

n 19

00

"1. LOA issued 2. Work started shortly"

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Repair of Pre Stress Girder Bridge (10 Span)over river Mahananda in 8th km of Kishanganj- Bahadurganj road near Mastan Chowk in the

District of Kishanganj. [Rebuild StructAssociates, Mumbai]

Plan

Kis

hang

anj

262.

6900

00 /

347(

s) /

09 Ja

n 20

19

Oth

ers/

425.

00

269.

00

09 M

ar 2

019

08 M

ar 2

020

30 S

ep 2

020

Work Completed

Page 2: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

2/34

Achievement for the month / till month

Physical Financial

4 185.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/166.91

5 525.00 M 0.00/100.00

0.00/100.00

0.00/100.00

1.00/96.00

0.00/1425.78

6 210.00 M 0.00/95.00

0.00/80.00

6.00/60.00

0.00/22.00

0.00/779.67

7 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/201.84

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 2x16.50m R.C.C. Bridge overKathliya Kochpara Dhar in Kishanganj Block

in the District of Kishanganj. [StarConstruction] M

MSN

Y

Kis

hang

anj

261.

5300

00 /

6868

(s) /

23

Jul 2

014

RC

C/3

3.00

244.

23

03 O

ct 2

014

02 O

ct 2

015

31 O

ct 2

020

"1. Contractor Debared vide MD lt. No.1015 dt 15.03.2016 2. SPE recommendedto rescind the contractor. vide lt. No. 488(WE) dt 07.06.2019 3. Many time Notice

given for final measurement. 4. Workresumed and wearing coat and approach

slab done.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 6X24.00M H.L.R.C.C Bridgein 11th km. of Muraligach-Thakurganj Road

over Chenga river at Chenga Ghat inKishanganj District. [Shiv Kishore

Construction]

Plan

Kis

hang

anj

2085

.000

000

/ 129

2(s)

/ 18

Feb

201

7

RC

C/1

47.7

8

1682

.17

11 Ja

n 20

18

10 Ja

n 20

20

30 O

ct 2

020

"1. Work Progress affected due toscarcity of sand & chips, delay in well

sinking (heavy wooden log found duringsinking), public hindrance (Land

dispute), flood & water logging, andCOVID-19 Lockdown. 2. LD imposed -

Rs.- 25.23 Lacs."

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 5X16.00M H.L.R.C.C Bridgeover Kankai river under Kochadhaman Block in

15th km. of Mastan Chowk-Bagalbari-Rahmatpara-Alta-Barbatta road in the District

of Kishanganj [Navin Chandra Sarkar, Katihar]

Plan

Kis

hang

anj

1648

.000

000

/ 120

71(s

) / 2

7 D

ec 2

017

RC

C/8

3.05

1009

.22

06 O

ct 2

018

05 A

pr 2

020

31 M

ar 2

021

1. Work Progress affected due to delay inwell sinking (change of strata), public

hindrance flood & water logging,widening & strengthing of road by RCDand Lockdown 2. Work stopped w.e.f-

24.02.20 due to dispute of title betweenland owners. 3. W.I.P

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of HL RCC bridge (2x16.00m)including approach road, diversion and

protection work in place of damaged road byflood in 2017 in the 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road inthe district of Kishanganj. [Tirupati Balajee

Earth Work Pvt. Ltd.]

FDR

Kis

hang

anj

442.

7300

00 /

1196

8(s)

/ 21

Dec

201

7

33.2

2

304.

12

24 M

ar 2

018

23 Ju

n 20

19

10 Ju

n 20

20

work completed

Page 3: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

3/34

Achievement for the month / till month

Physical Financial

8 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

5.00/90.00

0.00/301.10

9 300.00 M 0.00/100.00

0.00/100.00

6.00/100.00

5.00/45.00

0.00/383.61

10 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/269.90

11 400.00 M 0.00/68.00

0.00/36.00

0.00/22.00

0.00/0.00

31.35/274.04

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of H.L. R.C.C. bridge (3x16.00m)including approach road, diversion and

protection work in place of damaged road in 9thkm of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of Kishanganj.

[Bidyanand Gupta]

FDR

Kis

hang

anj

570.

9100

00 /

1207

2(s)

/ 27

Dec

201

7

49.8

3

397.

06

24 M

ar 2

018

23 Ju

n 20

19

31 O

ct 2

020

"1. Work Progress affected due to flood& water logging, scarcity of sand &

chips, widening & strengthing of road byRCD and COVID-19 Lockdown 2.

Bridge work completed- approach WIP.3. LD imposed - Rs.- 3.98 Lacs 4.

Recommended for Debar.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of of H.L. RCC bridge (5X16.00m) in 6th km. of Kishanganj-Bahadurganj road

under FDR in the District of Kishanganj.[Balram Singh]

FDR

Kis

hang

anj

791.

4400

00 /

47 (S

) / 0

2 Ja

n 20

18

83.0

5

585.

10

28 M

ar 2

018

27 S

ep 2

019

31 D

ec 2

020

"1. Work Progress affected due to publichindrance, flood & water logging,

scarcity of sand & chips and COVID-19Lockdown 2. Contractor debar vide MD.lt. no. 723 dt.- 07.07.2020 3. LD imposed

- Rs.- 8.78 Lacs."

Sara

n W

orks Construction of 2x16.00 m H.L. R.C.C Bridge

over Hathua Branch Canal crossing Mirganj-Bhagipatti-Samaur road Damaged in 2017

Flood under Gopalganj District. Agency- M.KEnterprises Mob.-9431212686

FDR

Gop

alga

nj

549.

0700

00 /

895(

S) /

30 Ja

n 20

18

RC

C/3

2.00

306.

65

03 O

ct 2

018

02 Ja

n 20

20

02 M

ar 2

020

02 M

ar 2

020

Work Completed.

Sara

n W

orks Construction of 4x18.75m H.L. R.C.C Bridge

including Approach Road, rotection Work &Miscellaneous work over Bashi river crossing

1st KM of Tamkuhi-chhitauni road Damaged in2017 Flood under Gopalganj Distric.

FDR

Gop

alga

nj

808.

7400

00 /

687(

s) /

19 Ja

n 20

18

RC

C/7

5.00

524.

42

03 O

ct 2

018

02 A

pr 2

020

20 F

eb 2

021

super structure in 1span completed.Sinking and bottom plugging of 1well

completed and sinking of 2well inprogress. Notice issued vide Lt No. 400Dt. 10.7.20 for 4th mile stone failure.

EOT Upto 20.2.21 granted by DCE videLt No 1396 Dt 1.9.20

Page 4: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

4/34

Achievement for the month / till month

Physical Financial

12 200.00 M 0.00/100.00

0.00/100.00

0.00/95.00

0.00/10.00

0.00/430.26

13 200.00 M 0.00/75.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/227.34

14 400.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/25.00

0.00/464.25

15 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/902.87

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Sara

n W

orks Construction of 4x14.00 m HL R.C.C Bridge

over Saran Main Canal crossing Gopalganj-Barhariya road Damaged in 2017 Flood under

Gopalganj District. Agency- Sona Engicon Pvt.Ltd. Mob.-9431407389

FDR

Gop

alga

nj

790.

3000

00 /

686(

S) /

19 Ja

n 20

18

RC

C/5

6.00

535.

09

03 O

ct 2

018

02 A

pr 2

020

30 N

ov 2

020

30 N

ov 2

020 Up to Deck slab bridge complete.

Balance work is in progress. Timeextension up to 30.11.2020 granted by

D.C.E vide letter No. 725 Dt. 27.04.2020without L.D.

Sara

n W

orks Construction of 4x16.00 m H.L. R.C.C Bridge

over Saran Main Canal crossing Bagauch-Kotnarahwan road Damaged in 2017 Flood

under Gopalganj District. Agency- M/s TirupatiBala ji Earth Work Pvt. Ltd. mob.-9431011120

FDR

Gop

alga

nj

852.

1800

00 /

685(

S) /

19 Ja

n 20

18

RC

C/6

4.00

03 O

ct 2

018

02 A

pr 2

020

31 M

ar 2

021

31 M

ar 2

021

NOC. Received from Engineer in Chief,WRD Headquarter vide Letter No. 319

Dt. 07.03.2019. Pile complete 44/44 Pilecap 1/5 Completed. Work stopped due to

running water in canal.

Sara

n W

orks Construction of 5X18.75m H.L. R.C.C Bridge

over Dabra river in between AhimanpattiKanakpur to Shitalpur Station in Dighwara

block in Saran District Nab

ard

RWD

Sara

n

765.

1500

00 /

1360

/ 26

Apr

201

8

RC

C/7

3.75

553.

73

29 O

ct 2

018

28 A

pr 2

020

30 N

ov 2

020 Bridge Complete approach Road work in

progress. Notice issued vide letter No.407 Dt. 16.07.2020 for 3rd mile stone

failure.

Sara

n W

orks

Construction & Resetting of new PontoonBridge and Maintenace of Pontoon Bridge form

Year 2016-17 to 2020-21 and Dismentling ofPontoon Bridge form the Alignment and storing

the Pontoon sets at safe place on the side ofriver embankment at Pahleza Ghat inbetweenGaddipatti to Ramsapur during rainy season.

Agency- Shrishti Developers Pvt. Ltd.Mob.-9431014606

Plan

Sara

n

1076

.720

000

/ 29

(s) /

06

Jan

2016

293.

00

1061

.37

22 A

pr 2

016

21 A

pr 2

022

01 Ja

n 19

00

Pontoon Bridge opened on 24.06.2020

Page 5: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

5/34

Achievement for the month / till month

Physical Financial

16 2000.00M

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/448.00

17 1100.00M

0.00/95.00

0.00/90.00

0.00/62.00

0.00/0.00

0.00/3883.25

18 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/823.65

19 60.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/92.00

0.00/190.71

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Muz

affa

rpur Construction of Pontoon Bridge in river Ganga

between Chakosanghat to Jamindari Ghat(including opening & Resetting for 5 Years) of

Bidupur in district Vaishali.

Plan

Vais

hali

3013

.650

000

/ 233

8(S)

/ 31

Mar

201

6

Pont

oon

Brid

ge/5

97.0

0

7660

8900

.00

06 F

eb 2

018

05 F

eb 2

023 Traffic has been suspended from dated

20.06.2020. Due to rise in water level.Dismantling of pontoon bridge has been

completed.

Muz

affa

rpur

Construction of R.C.C H.L Bridge ChandauliGhat in Bagmati River District of Sitamarhi. Pl

an

Sita

mar

hi

7089

.380

000

/ 739

4(S)

/ 10

Aug

201

6

RC

C/4

32.0

0

4443

6794

3.00

10 F

eb 2

016

09 A

pr 2

019

30 Ju

n 20

20

31 D

ec 2

020

Due to heavy flood situation work hasbeen disrupted. Date of proposal for L/A

27.01.17 Date of proposal for P/L06.02.19 Total area to be acquired

14.365.

Remarks for LA: Proposal to start L/Ahas been sent to Dist.Collector,Sitamarhiin view of instruction RCD in monthlyreview meeting of 23.09.19 and again

reminder has been sent vide ltno 572 dt12.06.2020 L/A issue has been brought to

notice of DM,Sita dt 20.06.20

Muz

affa

rpur

Construction of R.C.C H.L Bridge Belsand-chhitauni-Tariyani Road in 2nd Km. 4x21.00M

District of Sitamarhi. Nab

ard

Sita

mar

hi

851.

4600

00 /

1012

5 / 1

0 Se

p 20

12

RC

C/8

4.00

7562

9157

.00

30 D

ec 2

012

30 Ju

n 20

14

30 Ju

n 20

20

Bridge work has been completed &Agreement closed. A revised estimate is

under process of sanction in RCD.

Remarks for LA: Land Classificationreport has been received from DLAO and

LPC/Valuation is under process.

Muz

affa

rpur

Construction of 2x10.37M size Bridge overCanal to Siman chakjamal Siman Road in ward

No. 33 of Vaishali District MM

SNY

Vais

hali

169.

0400

00 /

6066

(S) /

08

Jul 2

014

RC

C/2

2.00

1297

4000

.00

21 N

ov 2

014

20 N

ov 2

015

15 S

ep 2

020

Work in Progress. Earth Work,G.S.B.,W.M.M. completed in approach

road.

Remarks for LA: Total No of LPC- 02Nos. Registred LPC- 01 Nos. LPC

(Under Legal objection)- 01 L/A issuehas been resolved with holding meeting

with all land onwer.

Page 6: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

6/34

Achievement for the month / till month

Physical Financial

20 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/454.39

21 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/449.30

22 700.00 M 0.00/100.00

0.00/100.00

0.00/95.00

5.00/90.00

0.00/711.55

23 2030.00M

0.00/100.00

0.00/100.00

0.00/97.00

0.00/60.00

0.00/3538.22

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Muz

affa

rpur "Construction of 3x18.75m H.L.R.C.C. Bridge

in 3rd km of Aurai- Jale Road in the district ofMuzaffarpur. Ram Swarth Rai, Mob-

9471091378"

FDR

Muz

affa

rpur

590.

4000

00 /

277(

S) /

10 Ja

n 20

18

RC

C/5

8.12

4350

3004

.00

24 M

ay 2

018

23 A

ug 2

019

01 Ja

n 19

00 Work Completed. Inugurated of Hon'bleC.M. of Bihar.

Muz

affa

rpur "Construction of 3x18.75m H.L.R.C.C. Bridge

in 7th km of Aurai- Jale Road in the district ofMuzaffarpur. Ram Swarth Rai, Mob-

9471091378"

FDR

Muz

affa

rpur

588.

4700

00 /

152(

S) /

05 Ja

n 20

18

RC

C/5

8.12

4415

5189

.00

24 M

ay 2

018

23 A

ug 2

019

01 Ja

n 19

00 Work Completed. Inaugurated by Hon'bleC.M. of Bihar.

Muz

affa

rpur "Construction of 4x24.00m H.L.R.C.C. Bridge

in 1st km of Meenapur Belsand Road in thedistrict of Muzaffarpur. Jay Shankar Kumar,

Mob-9431006580 "

Plan

Muz

affa

rpur

1246

.610

000

/ 842

8(S)

/ 22

Sep

201

7

RC

C/9

6.00

9642

9600

.00

24 M

ay 2

018

23 M

ay 2

020

15 S

ep 2

020

Work in Progress. Due to heavy floodsituation work has been disrupted.

Muz

affa

rpur "Construction of 12x24.00 m H.L.R.C.C.

Bridge in Athar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district of

Muzaffapur. (Plan) Ganesh Ram Dokania,Mob- 9471637819"

Plan

Muz

affa

rpur

3554

.810

000

/ 181

7(S)

/ 28

Feb

201

4

RC

C/2

97.0

0

2815

5918

6.00

22 N

ov 2

014

21 N

ov 2

016

31 M

ar 2

020

31 D

ec 2

020

Main Bridge of the project has beenalmost completed. Approach road will be

completed in December 2020.

Remarks for LA: Total Nos of LPC- 75under P/L. Registred LPC- 53 Rest-22LPC under subjudice- 07 LPC (out ofvillage)-06 LPC (Document not madeavailable for registry)-03 LPC (under

Controversy)- 06 Total - 22 Nos.

Page 7: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

7/34

Achievement for the month / till month

Physical Financial

24 1306.00M

0.00/100.00

0.00/100.00

0.00/97.00

0.00/0.00

0.00/2528.14

25 150.00 M 0.00/100.00

0.00/100.00

0.00/100.00

25.00/50.00

0.00/251.80

26 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

15.00/50.00

0.00/596.62

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Muz

affa

rpur

"Construction of 12x24.00 m H.L.R.C.C.Bridge in Dr Jagarnath Mishra College inbetween Soda Godaun to Ahiyapur with

approach road in the district of Muzaffarpur.(Nabard). Ganesh Ram Dokania, Mob-

9471637819"N

abar

d

Muz

affa

rpur

4329

.610

000

/ 788

9(S)

/ 03

Jan

2013

RC

C/3

00.0

0

3107

1017

1.00

19 F

eb 2

014

18 F

eb 2

016

30 Ju

n 20

20

31 D

ec 2

020

Bridge Portion of the project is almostcompleted.Work of app.road couldn'tstarted due to LA issue.No.of Land

owners(Raiyat)-38 Nos.(3 Mauza) Landowners didn't agree on six member

committee.Hence proposal to start L/Ahas been submitted to DLAO

Remarks for LA: Muz vide ltno 1407,dt01.10.19 Compliance of queries sent toDLAO vide ltno127,128,129&130 dt

10.02.20 and again compliance of queriessent vide ltno 607,609,611,613 dt

09.06.20 to DLAO L/A issue has beenbrought to notice of DM,Muz in review

meeting

Ara

Construction of four lane H.L. RC Bridge(1x16.00) in place of Damaged Bridge at 27thKm of Ara-Sasaram Road near Charpokhari

Thana under Bhojpur District.(VISHWANATHSHARMA)

Plan Ara

435.

0000

00 /

1162

(S) /

06

Feb

2020

RC

C/1

6.60

3810

7089

.00

06 F

eb 2

020

05 Ju

l 202

0

20 A

ug 2

020

Traffic on. Remaining work in progress.

Ara

Construction of H.L. RCC Bridge over RiverDurgawati at Gorsara Village at Ramgarh Blockfrom H.Q to Parsathua N.H-30 in the District of

Kaimur(JAWAHAR LAL YADAV) Nab

ard

RWD

Kai

mur

(Bha

bua)

751.

3900

00 /

2049

/ 12

Jun

2018

RC

C/9

6.60

6529

4682

.00

05 F

eb 2

019

04 A

ug 2

020

19 S

ep 2

020

Traffic on. Remaining work in progress

Page 8: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

8/34

Achievement for the month / till month

Physical Financial

27 200.00 M 0.00/100.00

0.00/100.00

10.00/20.00

0.00/35.00

60.08/515.28

28 250.00 M 0.00/100.00

0.00/90.00

0.00/0.00

0.00/30.00

0.00/175.53

29 350.00 M 0.00/100.00

0.00/100.00

5.00/100.00

5.00/40.00

0.00/444.06

30 440.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Ara

Construction of High Level RCC Bridge5x18.75 M in Goraipur Village over RiverDurgawati in Bhabhua Block in Kaimur

(Bhabhua) District.(BASANT VANIJYA LTD.) Nab

ard

RWD

Kai

mur

(Bha

bua)

697.

7100

00 /

5620

/ 07

Dec

201

8

RC

C/9

6.60

6474

1460

.00

01 M

ar 2

019

31 M

ay 2

020

15 Ju

l 202

0

30 N

ov 2

020 Work in progress. Rs 3,23,705.00

withheld vide Letter No-475, Dated-15.07.2020

Ara

CONSTRUCTION OF PROPOSED H.L RCCBRIDGE ON KARMANASA RIVER, AT

CHAINPURA VILLAGE ( ADHAURA), INKAIMUR DISTRICT(ALOK KUMAR) N

abar

d RW

D

Kai

mur

(Bha

bua)

399.

0300

00 /

9216

/ 01

Dec

201

7

RC

C/5

0.72

4558

5577

.00

04 Ju

n 20

19

03 Ju

n 20

20

18 Ju

l 202

0

30 N

ov 2

020 Work in progress. Rs 4,55,850.00

withheld vide Letter No-473, Dated-13.07.2020

Ara

Construction of High Level RCCbridge(3x18.75m) over river Gangi in lieu of

Damaged Balbatra Lakri pul at Ward No-03 inAra Block in the District of Bhojpur (Ara).

(SUDHIR KUMAR SINGH)

Plan Ara

639.

3400

00 /

7459

(S) /

26

Sep

2018

RC

C/4

3.50

5302

6140

.00

05 F

eb 2

019

04 A

ug 2

020

19 S

ep 2

020

Work in progress.

Ara

Construction of High Level RCC Bridge(4x18.0)m in 40th K.M. of Bhabhua AdhauraRoad (At Tala Village) across Suara River inKaimur (Bhabhua) District.Jai Mata Dee &

Maa sita construction

Plan

Kai

mur

(Bha

bua)

560.

0000

00 /

9156

(S) /

03

Dec

201

8

RC

C/7

2.00

5412

9785

.00

17 Ja

n 20

20

16 A

pr 2

021

01 Ju

n 20

21 Diversion work completed. Permissionfor Blasting of rock for foundation likely

to be granted soon. Issue-Re-Design.

Page 9: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

9/34

Achievement for the month / till month

Physical Financial

31 360.00 M 0.00/100.00

2.00/67.00

0.00/0.00

0.00/0.00

0.00/756.73

32 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

33 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

34 30.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Ara

Construction of H.L.RCC Bridge at 19th K.M.of Mohania-Ramgarh road (2x18+4x26)m

across Durgawati River in Kaimur District. JaiMata Dee Maa Sita Construction. Mob-

9934462616

Plan

Kai

mur

(Bha

bua)

1751

.040

000

/ 902

6(s)

/ 13

Oct

201

7

RC

C/1

40.0

0

1227

3009

8.00

21 A

ug 2

018

20 A

ug 2

020

05 O

ct 2

020 Work in progress. Rs 6,13,650.00

withheld vide Letter No-504, Dated-05.08.2020

Cha

mpa

ran(

Mot

ihar

i)

Plan

East

Cha

mpa

ran(

Mot

ihar

i)

1492

.480

000

/ 287

/ 08

Mar

201

9

1.00 LOA Issued

Cha

mpa

ran(

Mot

ihar

i)

Plan

Pach

im C

ham

parn

1431

.000

000

/ 303

/ 08

Mar

201

9

1.00 LOA Issued

Cha

mpa

ran(

Mot

ihar

i)

Construction of High Level R.C.C. Bridge(5x18.00 Mtr.) with approach road and

Protection work on 4.05 KM of Manuapul -Yogapatti-Nawalpur-Ratwal Road over Tirhut

Canal in the District of West Champaran,Bridge Length - 93.00 Mtr. Pile Foundation.

CR

F

Pach

im C

ham

parn

1324

4.54

0000

/ 12

53(S

) / 1

5 Fe

b 20

18

RC

C/9

3.00

30 Ja

n 20

19

29 Ju

l 202

0

29 Ju

l 202

0

For NOC awaited from WRD, Patna

Page 10: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

10/34

Achievement for the month / till month

Physical Financial

35 2713.13M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/55.00

0.00/1027.40

36 2340.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/67.00

0.00/1355.00

37 20.00 M 0.00/100.00

0.00/100.00

0.00/0.00

0.00/0.00

0.00/260.34

38 40.00 M 0.00/100.00

5.00/100.00

0.00/0.00

0.00/15.00

0.00/514.50

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x24.75M R.C.C. brdige overTrimuhan river in Dhankutawa village (SikataBlock)-Shivpur (Lauria or Chanpatia Block)

Road. Well foundation. Chankya constructionPvt. Ltd.

Nab

ard

Pach

im C

ham

parn

1998

.200

000

/ 221

1(s)

/ 27

Feb

201

7

RC

C/1

27.0

0

24 Ja

n 20

13

23 Ju

l 201

4

31 A

ug 2

020 Bridge Completed and App. Road after

E/W filling as Ramp, Traffic movementstarted and balance work is to be finished

after payment of raiyat. Under L.A.AWARD declared to Rayait

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x24.75M R.C.C. brdige overSikarhana river in Maheshara village (SikataBlock) - Sarisawa bazar (Majhaulia Block)

Road. Well foundation Barhonia Engicon Pvt.Ltd.

Nab

ard

Pach

im C

ham

parn

1927

.090

000

/ 237

0(s)

/ 12

Mar

201

2

RC

C/1

27.0

0

13 S

ep 2

012

12 S

ep 2

014

31 A

ug 2

020

Bridge Completed and Sarisawa bazarside approach road completed and

Maheshara side approach uncompleted.due to L.A. but traffic movement through

Kachchi road. Under L.A. AWARDdeclared to Rayait

Cha

mpa

ran(

Mot

ihar

i)

Construction of H.L. R.C.C. 2x30.00 mtr. In thedistrict of West Champaran under Indo-Nepal

Border Ch. 5.819 km. Near Inerwa Bazar. Nab

ard

Pach

im C

ham

parn

990.

9700

00 /

5590

(s) /

27

May

201

7

RC

C/4

0.00

05 Ju

l 201

8

04 A

ug 2

019

31 O

ct 2

020

Work has been stopped due to flood L.D.deducted and Agency debarred

Cha

mpa

ran(

Mot

ihar

i)

Construction of 7x25M size Bridge inMadanpur-Bhangha Road in Chainage 43.400Km Pakage No. 03.C.K.Infra structure(Indo-

Nepal)

Nab

ard

Pach

im C

ham

parn

1402

.910

000

/ 216

0(s)

/ 14

Mar

201

3

RC

C/1

75.0

0

30 N

ov 2

016

30 Ju

l 201

8

31 D

ec 2

020 Work has been stopped due to flood L.D.

deducted and Agency debarred andNotice sent to Agency for Rescind

Page 11: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

11/34

Achievement for the month / till month

Physical Financial

39 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

56.35/874.93

40 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/386.15

41 1700.00M

0.00/30.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/621.31

42 770.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/95.00

0.00/2616.94

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x21.00 m H.L. R..C.C. Bridgework in 11th km. of Motihari-Madhubani ghat

Road in East Champaran. Well Foundation.M/S Royal Engineers b

FDR

East

Cha

mpa

ran(

Mot

ihar

i)

1523

.870

000

/ 130

0(s)

/ 16

Feb

201

8

RC

C/1

07.0

0

15 O

ct 2

018

14 O

ct 2

020

14 O

ct 2

020 Bridge Work Completed and BM work

balance Work has been stopped due toflood but Traffic continued on bridge

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x21.75 m H.L. R..C.C. Bridgewith Approach Road, Safety work, Diversion

work and Misclaneous work in 5th km. ofSugauli - Piparpati Road in East Champaran.

FDR

East

Cha

mpa

ran(

Mot

ihar

i)

1259

.860

000

/ 474

(s) /

15

Oct

201

8

RC

C/1

08.7

5

05 M

ay 2

018

04 M

ay 2

020

31 Ju

l 202

0 Bridge Work Completed and BM workbalance Work has been stopped due toflood but Traffic continued on bridge

Cha

mpa

ran(

Mot

ihar

i) Construction of HL RCC Bridge (Sizes12x24.5M) over River Sikarahana with

approach road at Semara Ghat in Block Mehasiin Dist.- East Champaran under NABARD.Type of Foundation - Well, Bridge Length -304.32M. M/S AMBER INFRA PROJECT

PVT. LTD.

Nab

ard

RWD

East

Cha

mpa

ran(

Mot

ihar

i)

4596

.000

000

/ 36

/ 03

Jan

2019

RC

C/3

04.3

2

05 M

ar 2

019

04 S

ep 2

021

04 S

ep 2

021

Work has been stopped due to flood andMile stone with held.

Cha

mpa

ran(

Mot

ihar

i)

Construction of HLRCC bridge with approachroad at kataha ghat in sikrahna river under

mehsi block in the district of Eastchamparan(12 x 24.750 M), Well foundation.

M/S Jay shankar rai,9934867236

Nab

ard

East

Cha

mpa

ran(

Mot

ihar

i)

3539

.550

000

/ 807

9(s)

/ 07

Oct

201

3

RC

C/2

97.0

0

30 M

ar 2

014

30 M

ar 2

016

30 Ju

n 20

19

31 A

ug 2

020 Bridge work Completed and BM work

balance L.A. under Section -21 inProgress E.O.T. to be Submitted

Page 12: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

12/34

Achievement for the month / till month

Physical Financial

43 520.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/100.00

0.00/746.84

44 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/25.00

0.00/402.32

45 240.00 M 0.00/75.00

0.00/35.00

0.00/10.00

0.00/0.00

0.00/711.35

46 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/26.85

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Gay

a

Construction of H.L.R.C.C. 7 x 16.50 m Bridgeincluding approach road, Protection work and

Miscellaneous work over Punpun Riverbetween Shahganj & Gohra in Kurtha Block ofArwal District Under NABARD Scheme.(M/SLAXMAN KUMAR,PATNA,09431383203) N

abar

d RW

D

Arw

al

918.

5000

00 /

3099

/ 14

Aug

201

8

RC

C/1

19.8

5

763.

41

07 M

ar 2

019

06 S

ep 2

020

06 S

ep 2

020

Work completed.

Gay

a

Construction of H.L.R.C.C. 5x18.75m Bridgeincluding approach road and protection workover Punpun River between Bhagwatipur -

Kusre village in Arwal District underNABARD Scheme. (R.A.S. Enterprises,

9199245601)

Nab

ard

Arw

al

569.

2900

00 /

7135

(s) /

05

Sep

2013

RC

C/9

7.00

492.

67

10 D

ec 2

013

10 Ju

n 20

15 Rate for registration received. Consentletter received from land owner.

Gay

a

Construction of H.L.R.C.C. 19 x 18.00 mBridge inplace of damaged bridge Over Falgu

River at Ratan Bigha Village includingapproach road, Protection work, Diversion

Work and Miscellaneous work in 16th K.M. ofGhoshi-Islampur-Giriyak Road in Jehanabad

District.(R.A.S ENTERPRISESPVT.LTD,PATNA,099346616231)

Plan

Jeha

naba

d

2331

.040

000

/ 560

1 (S

) / 2

1 Ju

l 201

8

RC

C/3

53.4

0

2007

.07

21 F

eb 2

019

20 F

eb 2

021

20 F

eb 2

021 Bridge work is in progress. 101/132 pile

work completed. 8 nos pile cap, 7 nosshaft, 4 nos hammer head & 2 nos deck

slab work completed.

Gay

a

Construction of Retaining wall & addional laneapproach road for newely Constructed H.L.R.C.C. Bridge over Falgu River at Barari

village in Mashauri-Okri-Telhara-Ekangarsarairoad in Jehanabad District Under NON PLAN

(2 x 120.00 M).

Non

-Pla

n

Jeha

naba

d

249.

8400

00 /

217(

s) /

04 Ja

n 20

12

RC

C/1

20.0

0 Land possession handed over by DLAO,Jehanabad vide his letter no.-558 dt.

11.07.2020. Revised estimate on currentSOR is preparing for revised AA.

Page 13: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

13/34

Achievement for the month / till month

Physical Financial

47 1300.00M

0.00/100.00

0.00/100.00

5.00/100.00

0.00/80.00

0.00/854.36

48 200.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/60.56

49 300.00 M 0.00/100.00

0.00/100.00

5.00/75.00

0.00/25.00

0.00/726.89

50 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/69.41

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Gay

a

Construction of H.L.R.C.C. 7 x 18.75 m Bridgeover river Punpun with approach road,

Protection work and Miscellaneous work inbetween Khudwa - Kalen village in

Aurangabad District Under MMADY Scheme.(JAI MATA DI ROAD CONSTRUCTION

PVT. LTD., PATNA,09431427109)

MM

AD

Y

Aur

anga

bad

1318

.000

000

/ 111

0 / 3

0 A

pr 2

018

RC

C/1

35.5

6

1110

.00

25 D

ec 2

018

24 Ju

n 20

20

15 N

ov 2

020

Bridge work Completed. Approach roadwork is in progress.

Gay

a

Construction of H.L.R.C.C. Bridge includingapproach road, Protection work and

Miscellaneous work over Dhadhar River ofGaya-Fatehpur-Gopi More-Murli Road (Gaya-Rajauli Road SH-70) in Gaya District Under

Plan Scheme. (Baban Kumar Singh,Gaya,9431224261)

Plan

Gay

a

700.

0000

00 /

960

(S) /

01

Feb

2018

RC

C/1

25.0

0

898.

18

07 M

ar 2

019

06 S

ep 2

020

06 S

ep 2

020 Revised design & drawing vetted from

N.I.T., Patna vide their letter no.-5819 dt.03-07-2020. Revised TS approved.

Gay

a

Construction of H.L.R.C.C. 9x21.00m Bridgeincluding approach road and protection workover Morhar River Between Chitabkala and

Gendabag village in Sherghati Block in GayaDistrict.(RAMIYA CONSTRUCTION

LTD.,GAYA,09431226444)

Plan

Gay

a

1610

.870

000

/ 353

(s) /

01

Feb

2018

RC

C/1

94.4

0

928.

98

10 M

ay 2

018

09 F

eb 2

020

31 D

ec 2

020

Bridge & Approach road work inprogress. 6 deck slab work completed.Request letter for E.O.T. recommendedupto 31.12.2020 submitted vide T.O.L.

No.-751 (we) dt. 13.07.2020 to Dy. C.E.,W.C.-1., Patna.

Gay

a

Construction of H.L.R.C.C. 3x21.00m Bridgeincluding approach road and protection work in

Bhalua to Paharpur Road (K.M. 0 to K.M.26.325) in Chainage 600 M in Gaya Districtunder PLAN Scheme. (Ramiya Construction

Pvt. Ltd., Gaya,09431226444)

Plan

Gay

a

556.

2800

00 /

1146

6(s)

/ 28

Nov

201

1

RC

C/6

4.84

315.

23

10 M

ay 2

018

09 N

ov 2

019

31 O

ct 2

020

Bridge work is completed. Approachroad work is in progress. L.D. imposed@ 1% i.e. Rs.-3,15,230.00 vide T.O.L.

No.-74 dt. 16.01.2020 for slow progress.It will be deducted from incoming bill.Request letter for E.O.T. recommended

upto 31.10.2020

Page 14: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

14/34

Achievement for the month / till month

Physical Financial

51 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/116.69

52 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/85.00

0.00/162.79

53 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/9.00

54 240.00 M 0.00/60.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/352.65

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Gay

a

Construction of H.L.R.C.C. 3x14.00m Bridgeincluding approach road and protection work inDhangai Bazar to B.B. Pesra-Sobh to G.T. Road(K.M. 0 to K.M. 14.10) in Chainage 13970 Min Gaya District under PLAN Scheme. (M/s.

JAY SHANKAR RAY, Muzaffarpur)

Plan

Gay

a

429.

7300

00 /

1153

9(s)

/ 01

Dec

201

4

RC

C/5

5.84

227.

03

26 D

ec 2

016

25 M

ar 2

018

30 A

pr 2

019

30 N

ov 2

020 Bridge work is completed. Approach

road work is in progress. E.O.T.sanctioned vide Dy. C.E. Letter no.-983dt. 23.06.2020 upto 30.11.2020 without

L.D. & Price Escalation.

Gay

a

Construction of H.L.R.C.C. 3x14.00m Bridgeincluding approach road and protection work inDhangai Bazar to B.B. Pesra-Sobh to G.T. Road(K.M. 0 to K.M. 14.10) in Chainage 4545 M in

Gaya District under PLAN Scheme. (ShreeTirupati Balaji Enterprises, 9470664329)

Plan

Gay

a

450.

6200

00 /

1153

9(s)

/ 01

Dec

201

4

RC

C/4

3.84

280.

78

18 F

eb 2

016

17 M

ay 2

017

31 M

ar 2

019

30 S

ep 2

020

Bridge work is completed. Approachroad work is in progress. Contractor hasdebarred for slow progress. L.D. imposevide T.O.L. No.-21 dt. 07.01.2020 @ 2%i.e. Rs.-4,61,551.00. It will be deducted

from incoming bill.

Nal

anda

Construction of (1) Boundary wall (2) RoadDevelopment(3) Drainage(4) Electric Light-High Mast/Road/Street light (5) Repair of

Existing Building if any (6) Entrance Gate &Guard Room (7) Toilet Block of Bazar krishi

samiti, Biharsharif, Phase-I

Plan

Nal

anda

1453

.000

000

/ 284

/ 07

Mar

201

9

1.00

0.00

31 D

ec 2

020

Boundary Wall work in progress.

Nal

anda

Construction of H.L. R.C.C. Bridge 8 x 18mtr.In place of Old Screw pile bridge connecting

Rajauli Bazar to NH 31 across river DhanarjayUnder Block - Rajauli in Dist. Nawada. M/s K.

ANDI & ASS0CIATES Mob. - 7004501271

Plan

Naw

ada

1143

.000

000

/ 718

2(s)

/ 05

Aug

201

9

RC

C/1

48.8

0

850.

00

30 O

ct 2

019

29 A

pr 2

021

29 A

pr 2

021 1.) Pilling work has been completed. 2.)

Pile cap work is in progress. 3.) WaterLevel rise in river.

Page 15: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

15/34

Achievement for the month / till month

Physical Financial

55 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/404.73

56 1700.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/3469.44

57 620.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/40.00

0.00/349.48

58 132.00 M 0.00/8.00

0.00/0.00

0.00/0.00

0.00/0.00

118.03/186.62

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Nal

anda

Construction of H.L.R.C.C Bridge 3x16.00mwith diversion, Protection work , dismantlingwork and Approach Road in the 20th km of

Sheikhpura –Arha Road.

Plan

Shei

khpu

ra

601.

7500

00 /

1192

(s) /

01

Feb

2019

HL/

49.8

3

538.

45

14 A

ug 2

019

13 N

ov 2

020

13 N

ov 2

020 1.) Bridge work has been completed. 2.)

Rest work is in progress. 3.) Protectionwork is in progress. 4.) Approach work

about to start.

Nal

anda

Protection Work of Piers of High Level RCCBridge 18 x 24.75 m in Kiul river between

Maliya Nagardar & Tetarhat Block-Ramgarhchowk in Dist- Lakhisarai. Contractor

- Praphulla Kumar

Nab

ard

Lakh

isar

ai

3854

.810

000

/ 114

95 (s

) / 1

7 O

ct 2

011

RC

C/4

56.4

8

2419

.48

12 S

ep 2

019

11 Ju

n 20

20

30 Ju

n 20

21

1.) Bridge with approach road hascompleted. 2.) 25% protection of pier has

been completed. 3.) Payment in L.Aabout 8.00 Cr. And other payments aremade in other contigent item. 4.) EoTproposal submited to HQ, BRPNNL.

Nal

anda Construction of H.L. Bridge 5 x14.50 m

Berma-Arai Road of Karai-Parsurai block undernalanda district. district of Nalanda

Nab

ard

RWD

Nal

anda

536.

0000

00 /

1760

/ 29

May

201

8

RC

C/7

2.50

434.

83

19 Ja

n 20

19

18 A

pr 2

020

18 A

pr 2

020

31 Ja

n 20

21

1.) Bridge work has been completed. 2.)Approach Road- E/W is in progress. 3.)

EoT proposal received. 4.) AmountRs.2,17,000/- is withheld due to slow

work in 3rd Milestone.

Dar

bhan

ga Construction of H.L.R.C.C. Bridge(19x24.00M) over river Kareh at Phuhiya Ghat

in the district of Samastipur.(B.K.BuildersP.V.T.Ltd,09955056922) N

abar

d RW

D

Sam

astip

ur

5809

.000

000

/ 615

/ 13

Feb

201

9

HL/

467.

44

3962

6260

1.00

26 O

ct 2

019

25 O

ct 2

022 Work stopped due to flood

Remarks for LA: L.A Proposal submittedto D.L.A.O office, Samastipur

Page 16: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

16/34

Achievement for the month / till month

Physical Financial

59 600.00 M 0.00/18.00

0.00/0.00

0.00/0.00

0.00/0.00

80.11/470.04

60 65.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/162.25

61 780.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/30.00

0.00/426.45

62 585.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/230.13

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Dar

bhan

ga Construction of H.L.R.C.C. Bridge(10x24.75M) over Budhi Gandank at PatparaGhat in the district of Samastipur,(Mukesh &

Anand,07979087453) Nab

ard

RWD

Sam

astip

ur

2453

.000

000

/ 845

/ 28

Feb

201

9

HL/

253.

60

1858

5929

6.00

31 O

ct 2

019

29 O

ct 2

021

Work Stopped due to flood.

Dar

bhan

ga costruction of HLRCC bridge in NH-28through chand chourdih to pathan tol before

river under ujiyarpur block (2x14.50).SriRajesh Kumar,94308343626 M

MSN

Y

Sam

astip

ur

204.

5900

00 /

7370

(s) /

06

Aug

201

4

RC

C/3

0.26

1576

5739

.00

30 S

ep 2

014

30 S

ep 2

015

30 Ju

n 20

20

31 D

ec 2

020

Traffic Started

Remarks for LA: L.A Completed

Nal

anda Construction of H.L.R.C.C Bridge 6x14.50 m

over lokine river Near Radhil Chhilka ofEkangarsarai Block under Nalanda district.

Nab

ard

RWD

Nal

anda

692.

0000

00 /

1761

/ 29

May

201

8

RC

C/8

7.00

519.

00

19 Ja

n 20

19

18 Ju

l 202

0

18 Ju

l 202

0

31 D

ec 2

020 1.) Bridge work has been completed. 2.)

Approach Road- E/W is in progress. 3)EoT proposal received.

Nal

anda

Construction of H.L.R.C.C Bridge 3x14.50 mover Mohane river Near Sitabigha village ofParwalpur Block under Naward Scheme of

Nalanda district. Nab

ard

RWD

Nal

anda

366.

6500

00 /

4115

/ 07

Sep

201

8

RC

C/4

3.50

276.

32

09 F

eb 2

019

08 M

ay 2

020

08 M

ay 2

020

28 F

eb 2

021

1.) Bridge work has been Completed. 2.)Approach Road- E/W is in progress. 3.)

Encroachment- local hindrance inapproach road. 4.) EoT proposal

received.

Page 17: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

17/34

Achievement for the month / till month

Physical Financial

63 1500.00M

0.00/100.00

0.00/98.00

0.00/89.00

0.00/37.00

0.00/5629.36

64 650.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/85.00

0.00/3086.48

65 480.00 M 0.00/100.00

0.00/100.00

0.00/100.00

1.00/97.00

0.00/2563.10

66 780.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/1469.39

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Dar

bhan

ga

Construction of HLRCC bridge with Landacquisition ,approach road and protection workin kareh river between hasanpur to soharwa sati

ghat in samastipur distrcit(21x24.00 m)RamKripal Singh Constructon Pvt Ltd., RCD

Plan

Sam

astip

ur

6813

.400

000

/ 717

1(s)

/ 05

Aug

201

5

RC

C/5

16.6

4

5917

3775

9.00

01 A

ug 2

015

30 O

ct 2

018

30 Ju

n 20

20

31 A

ug 2

020

Work Stopped due to flood.

Remarks for LA: L.A Completed

Dar

bhan

ga Construction of HLRCC bridge at kakar ghat inrosra morwara road in kareh river(16x24.75 m)

Shiv Kishore Construction Pvt.Ltd.,9431858543

Nab

ard

Sam

astip

ur

3009

.420

000

/ 780

2(s)

/ 13

Jul 2

012

RC

C/4

05.8

0

2199

2700

5.00

30 D

ec 2

012

30 M

ar 2

015

31 D

ec 2

020 Traffic Started.

Remarks for LA: Section-37(2) is inprogress. Payment being made to Raiyat

Nal

anda

construction of HL RCC bridge 9x24.75M onHarohar river in Sadaibigha village at Barahiyablock in Lakhisarai district. NARAYAN DAS

CONSTRUCTION Mob. - 9431815725 /9431815726

Plan

Lakh

isar

ai

3068

.390

000

/ 182

1(s)

/ 28

Feb

201

4

RC

C/2

53.6

0

2322

.58

08 N

ov 2

014

07 N

ov 2

016

31 Ju

l 201

9

31 D

ec 2

020

1.) Bridge work & Via-duct work hasbeen completed. 2.) Approach work is inprogess. 3.) Additional payment made inL.A and other activities 4.) EoT proposal

received.

Dar

bhan

ga Construction of HLRCC bridge at angar ghat inthe budhi gandak river (10x24.75 m) Braj

Kishor Rai,9430800861 Nab

ard

Sam

astip

ur

2096

.720

000

/ 158

3(s)

/ 09

Feb

201

2

RC

C/2

53.6

4

1385

3592

1.00

30 M

ar 2

012

30 Ju

l 201

4

31 D

ec 2

020

Traffic Started

Remarks for LA: L.A Completed.

Page 18: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

18/34

Achievement for the month / till month

Physical Financial

67 100.00 M 0.00/100.00

0.00/100.00

0.00/100.00

20.00/20.00

42.46/230.24

68 1620.00M

0.00/78.00

0.00/65.00

0.00/55.00

0.00/2.00

0.00/2878.44

69 330.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/429.77

70 410.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/25.00

0.00/1257.25

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Nal

anda

Construction of HL RCC bridge 4x10.00m inplace of old bridge over Panchane river at 126

th km Biharshariff-Bakhtiyarpur road inNalanda district.

CR

F

Nal

anda

320.

8000

00 /

5679

(s) /

25

Jun

2015

RC

C/4

0.00

256.

23

18 A

pr 2

018

17 A

pr 2

019

31 D

ec 2

020

1.) Bridge work has been completed. 2.)EoT Proposal awaited from agency.

Dar

bhan

ga

Construction of HLRCC bridge with Landacquisition ,approach road and protection worknear jhanjharpur at old NH-57 in kamala balanriver in madhubani distrcit(9x24.00 m)Tushar

Construction Company, Gaziabad., RCD

Plan

Mad

huba

ni

4197

.050

000

/ 622

0(S)

/ 09

Jul 2

015

RC

C/2

21.4

4

2772

8170

7.00

27 A

pr 2

016

27 D

ec 2

018

30 Ju

n 20

20

31 M

ar 2

021 Work stopped due to flood.

Remarks for LA: Section-37(2) is inprogress. Payment being made to Raiyat.

Dar

bhan

ga costruction of HLRCC bridge at damla ghat inbisfi block (3x21.75 m) Sri Krishna Kant

Thakur,9430897941 MM

SNY

Mad

huba

ni

470.

4700

00 /

8291

(s) /

01

Sep

2014

RC

C/6

7.12

3747

6383

.00

01 O

ct 2

014

01 Ja

n 20

16

30 Ju

n 20

20

31 D

ec 2

020 Work stopped due to flood.

Remarks for LA: Section-19 is inprogress

Dar

bhan

ga

Construction of HLRCC bridge with Landacquisition ,approach road and protection work

near naiyam gram at pachphutiya ghat inBagmati river (7x24.75 m) Hari Construction &

Associate Pvt. Ltd., Begusarai

BD

F

Dar

bhan

ga

2319

.190

000

/ 181

6(s)

/ 28

Feb

201

4

RC

C/1

77.5

6

1295

9003

1.00

03 M

ar 2

014

02 M

ar 2

016

30 Ju

n 20

20

31 D

ec 2

020

Remarks for LA: Darbhanga Sec- 37(2)in progress & Samastipur Sec-11 in

progress

Page 19: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

19/34

Achievement for the month / till month

Physical Financial

71 1110.00M

0.00/2.30

0.00/0.00

0.00/0.00

0.00/0.00

0.00/834.74

72 350.00 M 0.00/70.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/681.43

73 240.00 M 0.00/80.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/256.55

74 0.00 M 0.00/75.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/579.87

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Dar

bhan

ga Construction of H.L.R.C.C. Bridge in Ch.- 4.4,5.5 & 9th KM at Kuseshwarasthan to Phultora

road in the district of Darbhanga.(LalConstruction Company,09810112481)

Plan

Dar

bhan

ga

1046

5.00

0000

/ 70

25(S

) / 1

1 Se

p 20

18

HL/

684.

00

7763

4413

4.00

02 M

ar 2

019

01 M

ar 2

022

01 M

ar 2

022

Work stopped due to flood.

Dar

bhan

ga Construction of H.L.R.C.C. Bridge (5x21.00M)at Ch.- 18th Kusheshwarasthan to Phultora in

the district of Darbhanga.(B.K.BuildersPvt.Ltd,09955056922)

Plan

Dar

bhan

ga

1928

.000

000

/ 541

5(S)

/ 17

Jul 2

018

HL/

108.

00

1245

3583

8.00

02 M

ar 2

019

01 M

ar 2

021

Work stopped due to flood.

Dar

bhan

ga Construction of H.L.R.C.C. Bridge (3x21.00M)at Ch.- 19.8 Kuseshwarasthan to Phultora in the

district of Darbhanga.(BalramSingh,09431082277)

Plan

Dar

bhan

ga

974.

5000

00 /

5416

(S) /

17

Jul 2

018

HL/

64.8

0

7828

4294

.00

02 M

ar 2

019

01 S

ep 2

020

Work stopped due to flood.

Dar

bhan

ga Construction of High Level R.C.C. Bridge in3.8th k.m. (3x21.00m) of Kusheshwarsthan to

Phultora road in the District of Darbhanga.(BrajKishore Rai,09430800861)

Plan

Dar

bhan

ga

1512

.000

000

/ 542

8(S)

/ 17

Jul 2

018

RC

C/6

4.80

1051

2833

5.00

02 M

ar 2

019

01 M

ar 2

021

Work stopped due to flood.

Page 20: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

20/34

Achievement for the month / till month

Physical Financial

75 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/1143.04

76 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/525.96

77 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/219.75

78 1050.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/1843.33

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Dar

bhan

ga

Construction of HL RCC bridge (4X18.75M) in15 Km of Bathiya-Narayanpur- Kakodha-Devena-Rajkharwar with approach road,

Diversion work and Miscellaneous work in theDistrict of Darbhanga.(Laxman

Kumar,09006276101)

FDR

Dar

bhan

ga

1067

.000

000

/ 292

(s) /

12

Jan

2018

RC

C/7

7.48

8029

7962

.00

11 A

pr 2

018

10 O

ct 2

019

31 Ju

l 202

0

15 O

ct 2

020

Work stopped due to flood.

Dar

bhan

ga Construction of HL RCC bridge(4x14.50M)Ujjan PWD Road in Ghanshyampur Kathbara-Lagma Kkora Macheta-Lalpatti Road of 12.10

KM in the District of Darbhanga.

FDR

Dar

bhan

ga

816.

7100

00 /

290(

s) /

10 Ja

n 20

18

RC

C/6

0.48

5939

5815

.00

10 O

ct 2

018

07 A

pr 2

020

07 A

pr 2

020

Traffic started.

Bha

galp

ur

Re-setting, Repairing, Dissmentalling,maintainence work during flood available 28

ests module of Pontoon bridge on Koshi river atVijay Ghat between Naugachhia & Dholbajjabazar in Bhagalpur District Pontoon Bridge on

Koshi river at Vijay Ghat between Nougachia &Dholbajja bazar Year 2017-21-22 M/s ShaileshKumar, Gopal Goshala, Nogachia, Bhagalpur.

Mob No. 9431871130

Plan

Bha

galp

ur

394.

7500

00 /

1179

4(s)

/ 19

Dec

201

7

28.0

0

3753

8000

.00

18 F

eb 2

018

17 F

eb 2

023 Due to rainy season pipa bridge has been

dismantled and kept safely by concernContractor.

Bha

galp

ur

Balance work (Approach Road) forConstruction of H.L. RCC Bridge 14x18.75 mon gerua river near baisa village in Sanhaula-

Baisa-Hanwara road in Sanhaula Block districtBhagalpur under Nabard loan project (RIDF-XVIII) M/s Sri Ram Enterprises, Bhagalpur.

Mob.no. 9431422278

Nab

ard

Bha

galp

ur

2296

.080

000

/ 250

1(s)

/ 25

Mar

201

3

RC

C/2

51.6

8

2500

0000

.00

12 Ju

n 20

19

11 O

ct 2

019

Work completed and Traffic Started.

Page 21: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

21/34

Achievement for the month / till month

Physical Financial

79 350.00 M 0.00/80.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/787.62

80 350.00 M 0.00/80.00

5.00/10.00

0.00/0.00

0.00/0.00

0.00/787.62

81 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/1912.06

82 160.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/913.72

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L., R.C.C. Bridge(3X25)with its approach road over Tilyuga river in

Theho village-Sonapur road in DagmaraPanchyat of Nirmali block in the District of

Supaul.(Devraha Construction Pvt. Ltd.,Goutam Nagar, Ward No.-12, Saharsa-852201)

(PKG-38 B)

WB

P Ph

ase-

2

Supa

ul

867.

7700

00 /

770

/ 25

Sep

2014

HL/

75.0

0

15 F

eb 2

017

14 F

eb 2

019

31 M

ar 2

021

1. Abutment A1-P2 Well Cap completed.2. P1 & A2 stenning work in progress. 3.

Amount Rs.8,33,379/- withheld due todelay in work. 4. Recomendation for

Debar.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L., R.C.C. Bridge(4X25)withits approach road over Tilyuga river besides

screw pile bridge in Kewtapatti-Nirmali Bazarroad in Nirmali Block in the district of Supaul.

(Devraha Construction Pvt. Ltd., GoutamNagar, Ward No.-12, Saharsa-852201)(PKG-38

A)

WB

P Ph

ase-

2

Supa

ul

1172

.780

000

/ 770

/ 25

Sep

201

4

HL/

100.

00

1514

4542

5.00

15 F

eb 2

017

14 F

eb 2

019

31 M

ar 2

021

1. Abutment A1 Plugging Completed. 2.Pier P1 in plugging stage. 3. P2 well

stenning in progress. 4. P3 Hammer HeadComplete 5. A2 cap (HH) completed. 6.

Land Acquition by perpetual lease isunder process and request has been sent

to RWD for allotm

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(7X33) withits approach road in 5th K.M. of Chhatapur-

Girdharpu-Chunni road in the district of Supaul.(Lall Construction Co., AA-105, Shalimar

Bagh, Delhi-110088)(PKG-25) WB

P Ph

ase-

2

Supa

ul

1988

.260

000

/ 404

/ 28

May

201

4

HL/

231.

00

2072

4033

4.00

14 F

eb 2

017

13 F

eb 2

019

31 D

ec 2

020 1. Amount Rs.3,90,110/- withheld due to

delay in work. 2. Bridge Completed. 3.G.S.B. work in progress.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(1X33) withits approach road in 3rd K.M. Sesouni-East

Koshi Embankment (near Khakhi) in thedistrict of Supaul.(Tirupati Balaji Earth WorkPvt. Ltd., A/230, P.C. Colony, Kankarbagh,

Patna-800020)(PKG-21B ) WB

P Ph

ase-

2

Supa

ul

387.

2900

00 /

404

/ 28

May

201

4

HL/

33.0

0

1184

1392

0.00

27 F

eb 2

016

26 F

eb 2

018

30 A

pr 2

019

31 D

ec 2

020 1. Amount Rs.5,03,478/- withheld due to

delay in work. 2. Protection work inProgress.

Page 22: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

22/34

Achievement for the month / till month

Physical Financial

83 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

132.37/1770.59

84 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/30.00

132.37/1770.59

85 320.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/800.13

86 320.00 M 0.00/100.00

0.00/100.00

0.00/100.00

5.00/65.00

0.00/800.14

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(2X25) in4th K.M. of Perserma-Chikni road in Palce ofdamaged Old S.P. Bridge (on Khardaha Dhar)

in the district of Supaul. (Lall Construction Co.,AA-105, Shalimar Bagh, Delhi-110088)(PKG-

16B) WB

P Ph

ase-

2

Supa

ul

550.

6600

00 /

404

/ 28

May

201

4

HL/

50.0

0

1990

4733

7.00

12 A

ug 2

017

11 A

ug 2

019

31 D

ec 2

020 1. Amount Rs.13,26,489/- withheld due

to delay in work. 2.Work stopped due towater logging.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(1X33)withits approach road in 1st K.M. of Parsarma-chinkni road in the district of Supaul. (LallConstruction Co., AA-105, Shalimar Bagh,

Delhi-110088)(PKG-16A) WB

P Ph

ase-

2

Supa

ul

531.

8800

00 /

404

/ 28

May

201

4

HL/

33.0

0

1990

4733

7.00

12 A

ug 2

017

11 A

ug 2

019

31 D

ec 2

020 1. Amount Rs.13,26,489/- withheld due

to delay in work. 2.Work stopped due towater logging.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(2X21) withits approach road in 5th K.m of Alamnagar-

Budhma- Mali road in the district ofMadhepura. (Haque Construction Co., SaraiSyed Ali, Muzaffarpur-842001)(PKG-7B) W

BP

Phas

e-2

Mad

hepu

ra

595.

8000

00 /

404

/ 28

May

201

4

HL/

42.0

0

1119

9173

6.00

07 D

ec 2

016

06 D

ec 2

018

31 Ju

l 201

9

31 D

ec 2

020

1. Amount Rs.5,81,867/- withheld due todelay in work. 2. Debared from Division.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(4x25) withits approach road in 10th K.m in Khurhan-

Parel-Ratwara-Kapasia road in the district ofMadhepura (Extended part of RCD road 0 to 15k.m.) (Haque Construction Co., Sarai Syed Ali,

Muzaffarpur-842001 (PKG.7A) WB

P Ph

ase-

2

Mad

hepu

ra

851.

6700

00 /

404

/ 28

May

201

4

HL/

100.

00

1119

9173

6.00

07 D

ec 2

016

06 D

ec 2

018

31 Ju

l 201

9

31 D

ec 2

020 1. Amount Rs.5,81,867/- withheld due to

delay in work. 2. WMM Work inProgress.

Page 23: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

23/34

Achievement for the month / till month

Physical Financial

87 100.00 M 0.00/90.00

0.00/50.00

0.00/0.00

0.00/20.00

24.98/719.19

88 475.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/748.39

89 475.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/95.00

0.00/748.39

90 495.00 M 0.00/100.00

0.00/100.00

5.00/95.00

0.00/30.00

30.09/416.64

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(3X25) withits approach road in along Kakurwa Dhar in24th Km of Chandradei-Bangama-paktola-

Matiary-Mongra road in the district of Araria.{Nirman Engicons Pvt. Ltd., At + P.O.-

Mohanpur, District-Begusarai (Bihar)-851131}(PKG41)

WB

P Ph

ase-

2

Ara

ria

757.

7600

00 /

404

/ 28

May

201

4

75.0

0

7433

2455

.00

27 F

eb 2

016

26 A

ug 2

017

30 Ju

n 20

19

30 Ju

n 20

21

1. A2 & P2 shaft casted. 2. A1-AbutmentShaft under progress. 3. P1 stenning

work in progress. 4. AmountRs.6,86,398/- withheld is imposed due todelay in work. 5. Contractor is debarred.6. Notice served to contractor why not

agreement be rescined.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(2X25) withits approach road in 25th K.M. of Falka-Sripur-

Bhawanipur-Karman Chowk road (at BaliaGhat) in the District of Purnea.{Basant Vanijya

Limited, Lakhibagh, Manpur, Gaya-825003(Bihar)}(PKG-19B) W

BP

Phas

e-2

Purn

ia

608.

4500

00 /

404

/ 28

May

201

4

50.0

0

1091

0071

8.00

27 F

eb 2

016

26 F

eb 2

018

31 M

ay 2

019

31 D

ec 2

020 1. Amount Rs.8,21,070/- withheld due to

delay in work. 2. BT Work Remaining. 3.Work stopped due to Rainy Season.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(2x25) withits approach road in 4th K.M. of Falka-Sripur-

Bhawanipur-Karman Chowk road in theDistrict of Purnea. {Basant Vanijya Limited,Lakhibagh, Manpur, Gaya-825003 (Bihar)}

(PKG- 19 A) WB

P Ph

ase-

2

Purn

ia

685.

3300

00 /

404

/ 28

May

201

4

HL/

50.0

0

1091

0071

8.00

27 F

eb 2

016

26 F

eb 2

018

31 M

ay 2

019

31 D

ec 2

020 1. Amount Rs.8,21,070/- withheld due to

delay in work. 2. Protection workremaining.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(5X21) withits approach road in 11th K.m of Chandradei-

Bangama-Matiyari-Mogra road in the district ofAraria.(PKG-10) {Nirman Engicons Pvt. Ltd.,

At + P.O.- Mohanpur, District-Begusarai(Bihar)-851131}(PKG-10) W

BP

Phas

e-2

Ara

ria

857.

6100

00 /

404

/ 28

May

201

4

HL/

105.

00

6799

1774

.00

27 F

eb 2

016

26 A

ug 2

017

30 Ju

n 20

19

31 D

ec 2

020 1. Amount Rs.3,30,996/- withheld due to

delay in work. 2. Contractor Debared. 3.Work in Progress.

Page 24: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

24/34

Achievement for the month / till month

Physical Financial

91 300.00 M 0.00/100.00

0.00/100.00

0.00/60.00

0.00/10.00

0.00/958.90

92 300.00 M 0.00/100.00

0.00/90.00

10.00/70.00

0.00/30.00

0.00/945.93

93 350.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/362.15

94 300.00 M 0.00/100.00

0.00/100.00

0.00/75.00

0.00/20.00

0.00/1687.23

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L. R.C.C.-P.S.C. Bridge withits approach road in 9th K.m of Sour-Patarghatroad in the district of Saharsa.(PKG-29 ) (M/s

Jai Mata Di Construction, Shri Krishnapuri(South), Begusarai (Bihar)-851101) W

BP

Phas

e-2

Saha

rsa

1265

.510

000

/ 404

/ 28

May

201

4

HL/

99.0

0

9546

3313

.00

08 M

ar 2

019

07 M

ar 2

021

07 M

ar 2

021

1. New Scheme started in March 2019. 2.9/9 Girder casted & Prestresssed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L. R.C.C.-P.S.C Bridge withits approach road in 3rd Km of Baluwahat

Kosibandh via Aghori-Sakra-Paharpur-Baghwaroad in the district of Saharsa.(PKG-13 ) (M/s

Jai Mata Di Construction, Shri Krishnapuri(South), Begusarai (Bihar)-851101) W

BP

Phas

e-2

Saha

rsa

1031

.430

000

/ 404

/ 28

May

201

4

HL/

112.

00

1280

3685

8.00

08 M

ar 2

019

07 M

ar 2

021

07 M

ar 2

021

1. New Scheme Started in March, 2019.2. Work is Progress.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(2X28)withits approach road in 14th K.M. of Chaudhara-

Amha-Lokha-Saharsa road in Place of damagedOld R.C.C Bridge in the district of Saharsa.

(Sincon Infrastructure Pvt. Ltd., S.K Puri, LG-1& 2, Majestic Plaza, West Boring Canal Road,

Patna-800001)(PKG-32)

WB

P Ph

ase-

2

Saha

rsa

870.

0000

00 /

609

/ 25

Jul 2

014

HL/

56.0

0

6059

2396

.00

27 F

eb 2

016

26 A

ug 2

017

30 Ju

n 20

19

31 D

ec 2

020 1. 2/2 Deck Slab Casted. 2. Approach

road work in Progress. 3. AmountRs.2,10,577/- withheld due to delay in

work. 4. Contractor Debared.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(4X33) withits approach road in 15th K.M. of Ranginiya-Sonbarsa Road in Palce of Old S.P. Bridge inthe district of Saharsa. (Lall Construction Co.,

AA-105, Shalimar Bagh, Delhi-110088) (PKG-24) W

BP

Phas

e-2

Saha

rsa

1549

.360

000

/ 404

/ 28

May

201

4

HL/

132.

00

1549

3600

0.00

29 Ju

n 20

17

28 Ju

n 20

19

30 Ju

n 20

20

30 Ju

n 20

21 1. Amount Rs.4,01,903/- withheld due todelay in work. 2. Work stopped due to

flood in river.

Page 25: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

25/34

Achievement for the month / till month

Physical Financial

95 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

72.00/1601.19

96 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

72.00/1601.19

97 225.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/860.68

98 310.00 M 0.00/6.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/13.50

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(2X25) withits approach road in 7th K.m of Panchgachhiya-Nauhatta road in Palce of damaged Old R.C.C

Bridge in the district of Saharsa. (LallConstruction Co., AA-105, Shalimar Bagh,

Delhi-110088)(Package- 3 B) WB

P Ph

ase-

2

Saha

rsa

764.

6700

00 /

609

/ 25

Jul 2

014

HL/

50.0

0

1838

0898

4.00

21 D

ec 2

016

20 D

ec 2

018

30 Ju

n 20

19

31 D

ec 2

020 1. Amount Rs.9,20,831/- withheld due to

delay in work. 2. WMM Work inProgress.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.C Bridge(2X33) withits approach road in 3rd K.M. of Panchgachhiya- Nauhatta Road in Palce of Old S.P. Bridge inthe district of Saharsa. (Lall Construction Co.,

AA-105, Shalimar Bagh, Delhi-110088)(Package- 3 A) W

BP

Phas

e-2

Saha

rsa

1018

.280

000

/ 404

/ 28

May

201

4

HL/

66.0

0

1838

0898

4.00

21 D

ec 2

016

20 D

ec 2

018

30 Ju

n 20

19

31 D

ec 2

020 1. Amount Rs.9,20,831/- withheld due to

delay in work. 2. B.T Work Remaining.3. Work stopped due to rainy season.

Kha

garia costruction of HLRCC bridge in the river Balan

at basahi ghat under bhagwanpur block(6x21.75m)Mansa Engicom Pvt. Ltd.,9431060060 RWD M

MSN

Y

Beg

usar

ai

658.

7200

00 /

9410

(s) /

23

Jun

2010

RC

C/3

4.20

07 M

ay 2

010

05 M

ar 2

012

Work Completed

Kha

garia

Construction of HL RCC Bridge over BagmatiRiver at Nawada Ghat in Chautham Block ofKhagaria district.M/S Ganesh Ram Dokaniya,

Banka Bihar 9931130066 Nab

ard

RWD

Kha

garia

5614

.000

000

/ 885

/ 01

Mar

201

9

RC

C/5

07.2

0

5013

.54

27 A

ug 2

019

26 F

eb 2

022

Work was effected due to COVID-19Lockdown & flood in river Bagmati.

Executive Engineer, RWD, WorksDivision Gogri has submitted proposal

for land acquisition in 4 copy to DLAO,Khagaria vide letter no. 1038 (Anu), dt -

16.08.2019.

Page 26: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

26/34

Achievement for the month / till month

Physical Financial

99 0.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/783.52

100 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/193.98

101 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

5.00/60.00

0.00/178.68

102 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/808.87

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kha

garia Construction of H.L. RCC Bridge over Chanha

River at Chhanch Ghat in 3rd km. ofBishanpur-Sumbha Road of Khagaria District Pl

an

Kha

garia

1817

.490

000

/ 300

(S) /

10

Jan

2018

RC

C/1

08.0

4

1038

3277

9.00

23 O

ct 2

018

22 A

pr 2

020

31 O

ct 2

020

Work was effected due to COVID-19Lockdown & Monsoon. ExecutiveEngineer, RCD, Works Division

Khagaria has submitted proposal for landacquisition in 4 copy to DLAO, Khagaria

vide letter no. 103, dt - 13.02.2019

Remarks for LA: Demanded SIA amountRs. 2,09,990.00 is made available to

DLAO Khagaria on 15.07.2020

Saha

rsa

Construction of High Level RCC Bridge(2x16.50M) at 3rd KM of Balthi Musharniyanviya N.H.-107 to Bund Road in the district ofSaharsa including Approach road, Protection

Work, in flood effected damage year 2017Balram Singh-9431082277

FDR

Saha

rsa

386.

7100

00 /

483(

S) /

15 Ja

n 20

18

RC

C/3

3.50

288.

06

03 A

ug 2

018

02 A

ug 2

019

30 Ju

n 20

19 Agg - 288.06 Lac Bridge work Complete.Approach raod Earth Work is in progress

Saha

rsa

"Construction of High Level RCC Bridge(2x16.50M) at 1st KM of Fatehpur-Kashnagar

Road in the district of Saharsa includingApproach road, Protection Work in floodeffected damage year 2017 Balram Singh-

9431082277"

FDR

Saha

rsa

317.

0000

00 /

482(

S) /

15 Ja

n 20

18

RC

C/3

3.50

241.

26

03 A

ug 2

017

02 A

ug 2

019

30 Ju

n 20

19 Agg - 241.26 Lac Bridge Work iscomplete. Earth work progress in

approach road.

Saha

rsa "Constraction of HL RCC (6x18.00M) Bridge

on tilyuga River in 1st KM of Lalminia-simraharoad under Plan Head Marouna block in supaul

distt. Raj Construction 9430883767"

Plan

Supa

ul

1359

.630

000

/ 300

7(S)

/ 31

Mar

201

5

RC

C/1

11.6

0

821.

36

30 D

ec 2

015

30 D

ec 2

017

Agg - 821.36 Lac Only BM and SDBCRemaining

Page 27: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

27/34

Achievement for the month / till month

Physical Financial

103 250.00 M 0.00/100.00

0.00/75.00

0.00/15.00

0.00/15.00

0.00/1624.40

104 300.00 M 0.00/100.00

0.00/100.00

0.00/80.00

0.00/30.00

0.00/1257.83

105 370.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/205.75

106 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/70.00

0.00/349.64

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Saha

rsa Construction of High Level RCC (10x24.75)

Bridge at Dakra Dhar of Mahishi Block on theEna to Kanadiya Road (NABARD) Shankar

Sharma 9934756142 Nab

ard

RWD

Saha

rsa

1810

.680

000

/ 129

3 / 1

6 A

pr 2

018

RC

C/6

34.0

0

1418

.23

11 M

ar 2

019

10 M

ar 2

021

Work has been Stop due to flood

Kat

ihar

Construction of 6X24.00m H.L. R.C.C. Bridgeover Bakra river at 1st km. of Udahat Tekniroad under PLAN in the District of Araria.

Tirupati Balajee Earth Work Pvt. Ltd.

Plan

Ara

ria

2211

.730

000

/ 129

3(s)

/ 16

Feb

201

7

RC

C/1

47.8

5

1487

.67

01 Ja

n 20

18

01 Ja

n 20

20

31 D

ec 2

020

Two mile stone with held to contructorfor Rs.7,43,838 for Delay of work. byletter no- 1991 dt- 15-12-18. 2nd Mile

stone with held of 0.5% Rs. 7,43,838.00vide Lt No.- 859 dt. 02.08.19.6th span

work & Earth work started.

Kat

ihar

Construction of 2x30m Size of H.L. R.C.C.bridge at (Velbwa River) Mieerganj Railwaycrossing to Dhabeli Road Chainage 30.75 ofIndo-Nepal Border Road in the District of

Araria. Baba Const.

Nab

ard

Ara

ria

570.

8000

00 /

2160

(s) /

13

Mar

201

3

RC

C/6

0.00

509.

41

30 A

pr 2

013

30 Ju

n 20

14

30 Ju

n 20

20

Bridge work cmplt. App. road transfer toEE RCD Araria ltr no-586 dt-25-06-2019

by order of Jt. Sec. lt-4706(s) dt-14.05.19. Mile stone with held Ltr No-1407 dt-31-12-19 for Rs-10,19,000.00.

Arbitration case in under Honorablejustice Jyotisaran.

Kat

ihar

Construction of 3x18.75m H.L R.C.C bridge inriver Barjan near Palasmani of Kursakanta

block in the District of Araria. ARZU CONST.LTD, PATNA N

abar

d RW

D

Ara

ria

475.

0700

00 /

1095

(s) /

28

Mar

201

8

RC

C/5

8.08

374.

62

18 O

ct 2

018

17 Ja

n 20

20

31 O

ct 2

020

Bridge work completed. Approach roadwork in progress. Two Mile stone withheld Letter No-486 dt-29-04-2019, Rs-1,87,312.00 , Letter No-860 dt-02-08-

2019 Rs-1,87,312.00. Traffic OpenThrough Bridge.

Page 28: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

28/34

Achievement for the month / till month

Physical Financial

107 420.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/162.40

108 415.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/1685.33

109 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/254.20

110 250.00 M 0.00/100.00

0.00/50.00

0.00/0.00

0.00/0.00

0.00/386.06

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar Construction of 2x12.50m span R.C.C. Bridge

over hara dhar in between Gogra-Lalganj ofKatihar District. Ashwani Kr. Singh, Katihar. M

MSN

Y

Kat

ihar

251.

6400

00 /

1026

5(s)

/ 13

Sep

201

2

RC

C/3

0.00

155.

56

30 D

ec 2

012

30 D

ec 2

013

31 D

ec 2

020

Lease L/A is under Process. OldAgreement Closed. New Contractor

Baijnath Sharma started work in Approchin E/W. Work will be completed upto

12/2020

Kat

ihar Construction of H.L. R.C.C. bridge in 10th Km

of Barsoi Banbhui-Dhachana Road of KatiharDistrict. Shankar Sharma N

abar

d

Kat

ihar

1965

.650

000

/ 958

5(s)

/ 13

Dec

201

3

RC

C/1

94.0

0

1599

.75

30 M

ar 2

014

30 M

ar 2

016

31 D

ec 2

020 Bridge work completed. one End

Approach completed. other end L/Aproblem. Target to complete 12/2020.L/A is also in final stage registry level.

Kat

ihar

"Construction of 4x16.50m span H.L. R.C.C.Bridge over on BakhriKola Dhar in Bakhrikolto Vishhariya in the District of Purnea. Baba

Construction."

Nab

ard

Purn

ia

421.

1400

00 /

1807

(s) /

06

Mar

201

3

RC

C/6

8.44

309.

52

30 Ju

n 20

13

30 S

ep 2

014

31 D

ec 2

020

6 Officers committee framed by DM,Purnea vide latter no 4775 dated.

13.11.2019 site visit by committeecompleted. It is under Approval process.

Approach would be completed up to12/2020

Kat

ihar

"Construction of RCC HL bridge (3X24.75 m)including approach road, diversion and

protection work in place of damaged by floodin 2017 in the 1st Km of Belgachi PWD Road

Via Nitendra-Macharhatta-goria road in thedistrict of Purnea. M/S SHIV SHAKTI

CONST. PURNEA"

FDR

Purn

ia

1185

.000

000

/ 138

4(S)

/ 21

Feb

201

8

76.0

8

571.

44

10 O

ct 2

018

17 A

pr 2

020

31 D

ec 2

020

4 Mile stone with held vide, Ltr no-2097date-23-12-2018, Rs-2,85,721.00 vide ltrno-571 dt-25-05-2019 Rs.= 2,85,721.00,

vide, Ltr no-525 date-20-06-2020 Rs5,71,440.00.A debar Letter given toconstructor vide ltr no-738 dt-06-08-

2020. work stoped

Page 29: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

29/34

Achievement for the month / till month

Physical Financial

111 500.00 M 0.00/100.00

0.00/100.00

0.00/65.00

0.00/50.00

0.00/1759.91

112 300.00 M 0.00/100.00

0.00/100.00

0.00/60.00

0.00/15.00

0.00/1222.69

113 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/277.37

114 230.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/85.00

0.00/315.41

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

"Construction of RCC HL bridge includingapproach road, diversion and protection work inplace of damaged by flood in 2017 in 1st Km of

Palsa- Kali Mandir-Baraili Road(4x21.00m)span (Ch. 245m to 340m) and

(5x21.00m) span in (Ch. 480m to 600m ) in thedistrict of Purnea. HAQUE CONSTRUCTION

Muzaffarpur"FD

R

Purn

ia

2791

.300

000

/ 130

7(S)

/ 16

Feb

201

8

218.

40

1953

.79

10 O

ct 2

018

17 Ja

n 20

20

31 O

ct 2

020

Super structure work in progress. Milestone with held vide Letter No- 2009 dt-17.12.2018 0.5% and Rs 9,76,899/- Date

of Start-18-10-2018 & Date ofcompletion- 17-10-2020, Please correct

as per this correction

Kat

ihar

Construction of RCC HL bridge (6x21.00m) at28th KM of Belauri-Shivganj-Sonaili-SalmariBazar road in this district of Katihar. ARJUN

PRASAD,

FDR

Kat

ihar

1471

.000

000

/ 254

1(s)

/ 28

Mar

201

8

129.

60

1180

.60

10 O

ct 2

018

17 O

ct 2

020

31 O

ct 2

020

Two Mile stone with held to contractorfor Rs.5,90,304 for delay of work vido ltrNo-238 Dt-22.2.19 & Rs.5,90,304 vide

Ltr No-491 dt-03.05.2019. SuperStructure work Started.

Kat

ihar

Construction of RCC HL bridge (2x21.75m) at9th KM of Kadwa Block headquarter-chowkivia bharri Aashiyani road including approachroad diversion, protection work and road sefty

in place of dmaged road by flood in 2017 in thedistrict of Katihar. M/S SHIV SHAKTI

CONST. PURNEA

FDR

Kat

ihar

517.

1100

00 /

1390

(s) /

21

Feb

2018

44.7

2

357.

59

24 A

ug 2

018

23 A

ug 2

019

31 O

ct 2

020

Super structure Completed. 1.5 Milestone amount with held Mile stone withheld Letter No-2007 Dt- 17-12-2018 for

Rs-1,78,800.00 Mile stone with heldLetter No-1097 dt-28-09-2019 for Rs-3,57,600.00 Approach road work in

progress.

Kat

ihar

Construction of H.L. RCC bridge (3X16.00 M)in Belauri-Shivganj-Salmari Bazar 19th km. of(1st Cutting) in the district of Katihar. BABAN

KUMAR SINGH

FDR

Kat

ihar

639.

7300

00 /

294(

s) /

10 Ja

n 20

18

49.8

3

415.

50

13 Ju

n 20

18

12 S

ep 2

019

31 O

ct 2

020

Bridge work completed. Traffic runningover bridge. BT Work Remaining.

Page 30: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

30/34

Achievement for the month / till month

Physical Financial

115 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/75.00

0.00/456.18

116 280.00 M 0.00/100.00

0.00/100.00

20.00/100.00

0.00/75.00

0.00/227.55

117 260.00 M 0.00/100.00

0.00/100.00

0.00/20.00

0.00/10.00

0.00/194.07

118 260.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/2.13

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of of H.L. RCC bridge (3X14.00m) including approach road, diversion and

protection work in place of damaged by floodin 2017 in 15th Km of Parwaha-Mirdaul PWD

road in the distrtict of Araria. AAKASHKUMAR, PATNA

FDR

Ara

ria

685.

1500

00 /

476(

s) /

15 Ja

n 20

18

43.8

0

517.

20

19 O

ct 2

018

18 Ja

n 20

20

31 O

ct 2

020

Mile stone with held to contractor videLtr No- 476 dt-29.04.19 and Rs-

2,58,600/- .2nd Mile stone with held tocontractor of amount 2,58,600/ vide ltr

no-556, dt-23-05-2019 Rs2,58,600/-.Deck slab completed.

Approach Road work progress. Trafficopen.

Kat

ihar

Construction of of H.L. RCC bridge (2X18.00m) including approach road, diversion and

protection work in place of damaged by floodin 2017 in 82Km of Refujee colony-Meerganjchowk (NH57A) road in the district of Araria.

ARJU CONST. PATNA

FDR

Ara

ria

557.

6900

00 /

478(

s) /

15 Ja

n 20

18

37.2

0

388.

63

19 O

ct 2

018

18 Ja

n 20

20

31 O

ct 2

020

Bridge work completed. Approach roadwork in progress. 2 Mile stone with heldvide (1) Letter No- 490, dt- 03-05-2019for Rs- 1,94,315 (2) Letter No-1406, dt-31-12-2019 Rs- 1,94,315. Traffic open

through bridge.

Kat

ihar

Construction of of H.L. RCC bridge (2X16.00m) in Place of Damaged by flood in 2017 in the

9th Km of Bairagachi-Banglacol road in theDistrict of Araria. MS SONACONSTRUCTION, SUPAUL

FDR

Ara

ria

547.

0800

00 /

287(

s) /

10 Ja

n 20

18

33.2

2

395.

50

19 A

ug 2

018

18 N

ov 2

019

31 D

ec 2

020

1% Mile stone with held Rs 3,95,708/-vide ltr N0-831 Dated- 30.07.2019. 2nd1% Mile stone with held Rs 3,95,708/-

vide lt no-1096 dt-28-09-2019. So causenotice for debar to constructor vide ltr

no-739 dated-06-08-2020. Work stop dueto flood.

Kat

ihar

Construction of of H.L. RCC bridge (2X16.00m) in Place of Damaged by flood in 2017 in the

12th Km of Bairagachi-Banglacol road in theDistrict of Araria. ARZU CONST. LTD,

PATNA

FDR

Ara

ria

557.

0700

00 /

286(

s) /

01 Ja

n 20

18

33.2

2

386.

42

19 A

ug 2

018

18 N

ov 2

019

31 D

ec 2

020

Letter written to Dy. C.E to cancel 12thKM A/A & Give New A/A for 17th K.M

vide ltr no-752(we) dated-08-08-2020.Bridge at km 12 shifted to km 17 as per

site requirement. Approval in underprocess at engineer in chief level.

Page 31: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

31/34

Achievement for the month / till month

Physical Financial

119 320.00 M 0.00/100.00

0.00/100.00

0.00/0.00

0.00/0.00

0.00/216.51

120 0.00 M 5.00/65.00

10.00/20.00

0.00/0.00

0.00/0.00

0.00/0.00

121 115.00 M 3.00/25.00

1.00/7.00

0.00/0.00

0.00/0.00

124.16/202.68

122 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/180.45

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of 3x21.75m span R.C.C. Bridgeover Dhiwha (Chakka) dhar in front of Yogipurin farhi to kanholi Road of Narpatganj block inthe District of Araria District. Pankaj Kumar M

MSN

Y

Ara

ria

331.

9400

00 /

9346

(s) /

24

Aug

201

2

RC

C/6

5.00

338.

76

30 D

ec 2

012

28 F

eb 2

014

31 D

ec 2

020

Contractor given a affidavit Letter tocompleted the work up to 31-12-2020

vide ltr No-0 dt-07-08-2020 Report sentto Dy. C.E to vide ltr no-743 dt-7-8-20. 4

Mile stone with held Letter No-2019dated-21-12-2018 Rs-6,78,000.00. Work

slow due to flood.

Patn

a-1

Construction of Renovation work NH Divisionoffice of RCD, Rajbanshi Nagar, Patna

Non

-Pla

n

Patn

a

215.

0000

00 /

6023

(S) /

01

Jul 2

019

44.8

8

22 A

pr 2

020

21 Ja

n 20

21

21 Ja

n 20

21

Work in Progress.

Patn

a-1

Construction of Cable Suspension Bridge(Laxman Jhula) across Punpun River at Punpun

ghat at the east side of Railway bridge indistrict Patna(APICON-BCPL (JV),INDORE

MP)

Plan

Patn

a

4677

.290

000

/ 116

6(S)

/ 31

Jan

2019

Oth

ers/

320.

00

5051

.00

31 A

ug 2

019

02 M

ar 2

021

02 M

ar 2

021

02 M

ar 2

021

Well Curb Casting is Completed. 1st WellStaining is Continue, 2nd Well Curb is

Continue and Piling work is alsoContinue. Slow Progress due to rise in

water level in Punpun River.

Patn

a-1 (b) Construction of Jan Nayak Karpuri

Chhatrawas Chahar Diwari (Hostel) in districtPatna.(RAMESH KUMAR,PATNA)

Wel

fare

Dep

artm

ent

Patn

a

375.

8700

00 /

38(S

) / 1

3 A

pr 2

018

Oth

ers/

0.00

0.00

25 M

ar 2

019

24 D

ec 2

020

Completed

Page 32: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

32/34

Achievement for the month / till month

Physical Financial

123 0.00 M 0.00/100.00

15.00/80.00

10.00/85.00

0.00/0.00

29.22/209.67

124 0.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/1506.67

125 580.00 M 0.00/70.00

0.00/10.00

0.00/0.00

0.00/0.00

0.00/369.56

126 100.00 M 0.00/85.00

0.00/70.00

0.00/0.00

0.00/0.00

0.00/418.04

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Patn

a-1 (a) Construction of Jan Nayak Karpuri

Chhatrawas (Hostel) in district Patna.(RAMESH KUMAR,PATNA)

Wel

fare

Dep

artm

ent

Patn

a

375.

8700

00 /

38(S

) / 1

3 A

pr 2

018

Oth

ers/

0.00

362.

31

25 M

ar 2

019

24 D

ec 2

020

24 D

ec 2

020

24 D

ec 2

020

4th Roof Casting is Completed.

Patn

a-1 Construction of Incubation Centre I.I.T. Patna

(Bihta)(KALSHI BUILDCONPVT.LTD.,HINOO,RANCHI,JHARKHAND) O

ther

s

Patn

a

1640

.700

000

/ / 1

7 N

ov 2

016

Oth

ers/

0.00

1489

.38

06 O

ct 2

018

05 A

pr 2

020

31 A

ug 2

020

31 A

ug 2

020

Finishing work & Painting work is inProgress.

Patn

a-1

Construction of H.L. R.C.C. Bridge (6x18.00m)over river Punpun between Nashopur

(Naubatpur Block) Poaawan Ghat (MasaudhiBlock) in Kahaguri-Khaurat Road in the district

of Patna.(PRABHAT KUMAR,PATNA)

Plan

Patn

a

1369

.000

000

/ 229

6(S)

/ 05

Mar

201

9

RC

C/1

11.6

0

816.

46

14 A

ug 2

019

13 F

eb 2

021

13 F

eb 2

021

13 F

eb 2

021

Work stopped due to rise in water level inPunpun River.

Patn

a-1

Construction of H.L. R.C.C. Bridge (6x18.00m)in place of damaged bridge in 12th Km of Pali-Ullar-Masaudhi Road under Pali Block in the

district of Patna.(SATYENDRAKR.YADAV,RAMPUR,GAYA)

Plan

Patn

a

1346

.310

000

/ 746

1(S)

/ 26

Sep

201

8

RC

C/1

08.0

0

900.

84

06 M

ar 2

019

05 M

ar 2

021

05 M

ar 2

021

05 M

ar 2

021

Work stopped due to rise in water level inPunpun River.

Page 33: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

33/34

Achievement for the month / till month

Physical Financial

127 290.00 M 0.00/90.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/389.39

128 0.00 M 0.00/100.00

0.00/100.00

15.00/95.00

0.00/0.00

36.49/570.97

129 585.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/340.69

130 400.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/202.77

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Patn

a-1

Construction of H.L. R.C,.C. bridge Musnaperto Masaurhi-Noubatpur via duct NH-83 Potahi

& Patna Gaya Railway line cross 20 km inbetween Shahwajpur, Block-Punpu and

Chakkan Bigha, Block-Noubatpur Approachroad, Protection work with LA (6x18m)on thepunpun river.(RAKESH CONSTRUCTIONPVT.LTD.JAMSHEDPUR,JHARKHAND)

Plan

Patn

a

1427

.170

000

/ 446

4(s)

/ 14

Jun

2018

RC

C/1

11.6

0

748.

01

05 M

ar 2

019

04 M

ar 2

021

04 M

ar 2

021

04 M

ar 2

021

Work Stopped due to rise in water levelin Punpun River.

Patn

a-1

Construction of left turning ramp 9 Extra Arm)connecting Newly constructed Mithapur-

Chiraiyatand via Railway Station Flyover (P30-P31) with Chiraiyatand Exhibition Road

Flyover in Patna.(S.P.SINGLACONSTRUCTION

PVT.LTD.,PANCHKULA,HARYANA)

Plan

Patn

a

818.

0000

00 /

8573

(S) /

15

Nov

201

8

RC

C/2

10.0

0

859.

69

09 M

ar 2

019

08 D

ec 2

019

15 Ju

l 202

0

30 S

ep 2

020

Work in Progress.

Patn

a-1

Construction of Pontoon Bridge in river Gangabetween Kachidargah to Rustampur (Raghopur)

(including setting, Resetting for 5 Years) ofRaghopur Block in district Vaishali.(RAJNISH

KUMAR,SHAHPUR,DANAPUR,PATNA)

Plan

Patn

a

751.

5700

00 /

1180

4(s)

/ 19

Dec

201

7

Pont

oon

Brid

ge/0

.00

625.

72

06 F

eb 2

018

15 Ju

n 20

22

15 Ju

n 20

22

15 Ju

n 20

22 Pontoon sets are removed dated-15.06.2020 vide office letter no.1151

dated-30.05.2020

Patn

a-1

Construction of Pontoon Bridge in river Gangabetween Gyaspur to Kaladiyara Diyara

(including opening & Resetting for 5 Years) ofBakhtiyarpur Block in district Patna.(RUBIINDUSTRIAL FASTNERS,PATLIPUTRA

COLONY,PATNA)

Non

-Pla

n

Patn

a

582.

2300

00 /

1196

4(s)

/ 21

Dec

201

7

Pont

oon

Brid

ge/0

.00

472.

72

06 F

eb 2

018

15 Ju

n 20

22

15 Ju

n 20

22

15 Ju

n 20

22 Pontoon sets are removed dated-15.06.2020 vide office letter no.1151

dated-30.05.2020

Page 34: Progress Report of Ongoing Schemes for Projects Date:Aug

9/30/2020 MPR Report :: Aug_2020

34/34

Achievement for the month / till month

Physical Financial

131 2000.00M

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/834.79

132 60.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.56

133 120.00 M 0.00/85.00

0.00/75.00

0.00/65.00

0.00/40.00

0.00/147.44

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Patn

a-1

Construction of Pontoon Bridge in river Gangabetween Danapur to Panapur Diyara (including

opening & Resetting for 5 Years) in districtPatna.(SHIBU CONSTRUCTION

PVT.LTD,DANAPUR,PATNA)

Non

-Pla

n

Patn

a

1114

.990

000

/ 119

65(s

) / 2

1 D

ec 2

017

Pont

oon

Brid

ge/0

.00

873.

73

06 F

eb 2

018

15 Ju

n 20

22

15 Ju

n 20

22

15 Ju

n 20

22 Pontoon sets are removed dated-15.06.2020 vide office letter no.1151

dated-30.05.2020

Patn

a-1

(b) Construction of Balance work of one spanout of three span H.L.R.C.C. Bridge

(1x16.50M) across Dhaba River in 4th Km. ofKhusrupur-Nagarnausa Road at Nirmali chak

Middle Vidayalay in Patna Dist. IncludingApproach in both side and Bituminous work

thereof.(NARAYAN INFO VENTUREPVT.LTD.,PATNA)

Nab

ard

Patn

a

418.

9800

00 /

1871

(s) /

03

Mar

201

4

RC

C/1

6.50

0.00

31 M

ar 2

021 The L.A. is in Progress. S.I.A. Process is

Completed & notification has beenPublished on dated 28.08.2020. Action

will be taken as per rul.

Patn

a-1

(a) Construction of H.L.R.C.C. Bridge,3x16.50M and approach road work in 4th Km.

of Khusrupur-Nagarnausa Road at Nirmali chakMiddle School of Khusrupur Block, in the

District of Patna.(RECON,PATNA)

Nab

ard

Patn

a

418.

9800

00 /

1871

/ 03

Mar

201

4

RC

C/5

1.38

204.

39

24 N

ov 2

014

23 N

ov 2

015

23 N

ov 2

015

Completed.