Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva [email protected] uropa.eu

Upload: rosaline-davis

Post on 20-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva Alessandro.Marotta@jrc.ec.europa.eu

Progress report from VTFValidation Phase 2 and Next Steps

DTP-12, 16th January 2013, Geneva

[email protected]

Page 2: Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva Alessandro.Marotta@jrc.ec.europa.eu

Summary

2

Validation Phase 21. What has been accomplished so far2. What is needed to complete it

Next Step: Confirmation test (?)

Page 3: Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva Alessandro.Marotta@jrc.ec.europa.eu

Background (1)

At the DTP-9 meeting, held on 29-30 March 2012 in Ispra, Validation 1.b was declared complete for ICE vehicles and it was agreed to start Validation Phase 2 (VP2)

Initial timetable: April – September 2012

Subgroup EV/HEV needed more time to complete its part of the Info Package (Test Matrix + Test procedure), thus VP2 for EV/HEV was planned to start from 2nd half of May 2012.

In April 2012 India started a Validation Phase 1 on LPV, on the basis of the freshly released driving cycles for Class 1 and Class 2 vehicle.

3

Page 4: Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva Alessandro.Marotta@jrc.ec.europa.eu

Background (2)At the DTP-10 meeting, held in June 2012 in Geneva, a revised timetable of the VP2 was proposed and agreed

Revised timetable: April – December 2012

The revised VP2 plan included also Validation 3 (Road Load Determination)

Item Actor(s) w23 w24 w25 w26 w27 w28 w29 w30 w31 w32 w33 w34 w35 w36 w37 w38 w39 w40 w41 w42 w43 w44 w45 w46 w47 w48 w49 w50 w51 w52

Experimental tests (ICE + EV/HEV + LPV)

Participating Labs

Upload of lot 1 test results to JRC ftp server

Participating Labs

Preparation of VP2-DB ver.1

VTF (H. Steven)

Analysis and assessment of lot 1 results

DTP subgroups

RLD tests (Validation 3) preparation

Japan (w. VTF)

Tests Japan (w. VTF)

Analysis of RLD tests Japan (w. VTF)

Upload of lot 2 test results to JRC ftp server

Participating Labs

Preparation of VP2-DB ver.2

VTF (H. Steven)

Analysis and assessment of lot 1 & lot 2 results

DTP subgroups

Discussion and agreement on all DHC and DTP open issues

DHC / DTP / VTF WLTP SG

Bi-monthly phone/web conferences of DHC and DTP subgroups

lot 1 lot 2

WLTP - Validation Phase 2 timetable (June - December 2012)June July August September October November December

Interim Report

DHC 14 + DTP 11

Final Report

4

Page 5: Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva Alessandro.Marotta@jrc.ec.europa.eu

Background (3)

At the DTP-11 meeting, held on 25-26 September 2012 in Ispra, a further extension of VP2 was agreed (end of VP2 by week 3 of 2013).

The experimental phase of VP2 and the delivery of the final version of the VP2 database have been accomplished according to this new plan (final version of VP2 database available from 3rd December 2012).

However it was pointed out by the DTP subgroups that the time allocated to the assessment of the VP2 test results and closure of the open issues was not sufficient.

At the DTP audio-web conference held on 14 December 2012, it was agreed to postpone the conclusion of VP2 to the second half of March 2013 (DTP-13 in Tokyo) and to start Confirmation phase / Round Robin on April 2013.

5

Page 6: Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva Alessandro.Marotta@jrc.ec.europa.eu

Update

Validation Phase 2

• The VP2 database (H. Steven)

• The assessment of the VP2 test results and procedure to close the Open Issues of all DTP Subgroups (and RLD/DHC/MCTF)

6

Page 7: Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva Alessandro.Marotta@jrc.ec.europa.eu

7

Page 8: Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva Alessandro.Marotta@jrc.ec.europa.eu

Next Steps

The VTF has been requested also to prepare and coordinate the Confirmation Phase

On Tuesday 15th January a VTF meeting has been held to discuss the matter.

• Outcome of the meeting is:

8

Page 9: Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva Alessandro.Marotta@jrc.ec.europa.eu

Next Steps

• At the moment, not only there are insufficient elements to prepare a Confirmation phase, but there is not yet a clear evidence that a Confirmation is needed.

• Based on the outcome of the assessment phase of Validation 2 (closure of Open Issues, foreseen by DTP-13 in Tokyo) we see 3 (4) possible scenarios.

9

Page 10: Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva Alessandro.Marotta@jrc.ec.europa.eu

Next Steps (scenarios)1. All open issues solved, except some of them that have

not been fully covered in VP2 (ex. mode construction for EV). This would require a Confirmation phase.

2. All open issues solved, except some open issues that are vehicle specific (ex. vehicle top speed margin vs. cycle top speed and impact on CO2 emissions). This would require a new Validation phase.

3. A combination of situation 1 and 2. This would bring to some labs performing a Confirmation phase and some others carrying out a new validation phase.

4. All open issues solved (or just slightly different from VP2 parameter setting), no need to either confirm or validate, then it would be possible to run the Round Robin test directly.

10

Page 11: Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva Alessandro.Marotta@jrc.ec.europa.eu

Next Steps

Whatever the outcome of the assessment phase of Validation 2, there are some decisions and preparatory steps that can be taken between now and April 2013:• Find a few labs willing to participate

• Book a preliminary “working period” (mid April to end of May 2013) to be dedicated to the post-VP2 phase

• Define the combination of lab/vehicle/test and organize the procurement of the proper vehicle.

• As the closure of the Open Issues progresses, the VTF will follow its development and organize the planning of the post-VP2 phase accordingly. 11