Page 1: Progress on implementation of TAMP. The take-off Familiarization tour in the river basin (6-18 May 2005) with the purpose to: –Present the outline of

Progress on implementation of TAMP

Page 2: Progress on implementation of TAMP. The take-off Familiarization tour in the river basin (6-18 May 2005) with the purpose to: –Present the outline of

The take-offFamiliarization tour in the river basin (6-18 May 2005) with the purpose to:

– Present the outline of TAMP to various stakeholders

– Identify and discuss current intervention with stakeholders

– Identify areas needing assistance for more effective intervention

Page 3: Progress on implementation of TAMP. The take-off Familiarization tour in the river basin (6-18 May 2005) with the purpose to: –Present the outline of

2. Local and international consultancy missions

Natural Resource Management including GIS (Tanzania and Uganda)

Anne C. Woodfine (25-April May 2005)Objectives: Provide support for technical execution of the project GIS/ RS natural resource assessment

Natural Resource Management Jeremy N. Burgess (16-18 May 2005)

Objective: To provide support for technical execution of the project

Page 4: Progress on implementation of TAMP. The take-off Familiarization tour in the river basin (6-18 May 2005) with the purpose to: –Present the outline of

Missions cont…….

• Local consultancy on lessons for watershed management

Femke GriffioenTo learn from other river basin participatory

catchments management

• GIS team contracted

Page 5: Progress on implementation of TAMP. The take-off Familiarization tour in the river basin (6-18 May 2005) with the purpose to: –Present the outline of

3. Design of methodology for field study and site selection

Methodology developed by a team of experts from Rwanda, Uganda, Tanzania, the international consultants and the project leader in Kigali

Methodology tested and refined by the same team in Ngara

Page 6: Progress on implementation of TAMP. The take-off Familiarization tour in the river basin (6-18 May 2005) with the purpose to: –Present the outline of

Transects and PRA in selected communities

Bukoba- Buyango (Kafunjo),- Nsunga (Igayaza)

Karagwe- Kaisho- Nyaishozi (kahanga)

Ngara- Bugufi (Kirushya)- Bushubi (Mururama)

Page 7: Progress on implementation of TAMP. The take-off Familiarization tour in the river basin (6-18 May 2005) with the purpose to: –Present the outline of

1st TAC meeting (September, 2005)

Stake holder meeting (November, 2005)

• Discuss results of Transect and PRA

• Discuss the best practices

• Priority setting (issues for consideration in full TAMP project.

Meetings

Page 8: Progress on implementation of TAMP. The take-off Familiarization tour in the river basin (6-18 May 2005) with the purpose to: –Present the outline of

Relevance

Activities of project in line with Communities, Districts and Country priorities, but no capacity to implement

i) High expectations!

ii) multiple stakeholders

how to co-ordinate

Page 9: Progress on implementation of TAMP. The take-off Familiarization tour in the river basin (6-18 May 2005) with the purpose to: –Present the outline of

Problems with implementation

• Indisposition of the NPM

• Delay in setting-up and convening the TAC

• Bureaucracy in remitting funds