Procurement of Services Request for Services for preventive and
Corrective Maintenance under a three
year framework contract
LOT 1: Preventive and Corrective maintenance of Active devices
(Network and Compute infrastructure)
LOT 2: Preventive and Corrective maintenance of the Datacenters
electrical power supply, fire-fighting system and air conditioners.
Procurement Number: AUC/MIS/NC/005
Date of Issue: 14th May 2019
– Datacentre Air conditioner and electrical power supply maintenance – Access control
devices and WI
Section I. Invitation for Bids
Request for Provision of Services for preventive and Corrective
Maintenance under a three year framework contract
Procurement Number: AUC/MIS/NC/005
The African Union Commission has allocated funds for the procurement of services and now
invites sealed bids from eligible bidders for the Provision of services for Provision of Services
for preventive and Corrective Maintenance under framework contract as per attached Terms of
Reference. A Contractor shall be selected under Least cost selection criteria. Bids that are
responsive, qualified, technically compliant will be ranked according to price.
Interested bidders may obtain further information and download the bidding document at
https://au.int/en/bids.
Bids must be delivered to the address below on or before Friday 14th June 2019 at 1500
hours. All bids must be accompanied by:
Valid tax certificate;
Valid business registration documents
Proof of previous experience of the Company
ONE (1) Original and ONE Copy of the Technical and financial proposal (Refer to
TORs attached for details. Assessment criteria is elaborated in the TOR)
Other relevant information indicated in the TOR.
Technical Proposal (indicating the Company’s previous experience and personnel
experience)
Financial proposal
Bid Validity: Bids should be valid for at 90 days from the closing date.
Bid Opening: Bids will be opened immediately after the bid closing hours, in the presence of
bidders or bidders’ representatives who choose to attend, at the African Union Commission
Premises, Building C, 3rd Floor, Administration and Human Resource Management Meeting
Room. Late bids will be rejected and returned unopened to bidders.
Submission of bids: This is a TWO envelope bidding. FINANCIAL AND TECHNICAL
Bids MUST BE SUBMITTED IN TWO SEPARATE ENVELOPES enclosed in one
outer Envelope. The Outer envelope should be clearly marked with the Title of the bid
and Procurement Number.
Address for bid submission:
The Head Procurement, Travel & Stores Division
African Union Commission, Roosevelt Street,
Building C, 3rd Floor, P.O. Box 3243, Addis Ababa, Ethiopia
Tel+251115517700; Email; [email protected]
Clarification Requests: Clarification requests should be addressed to tender@africa-
union.org.
SECTION II: Bid Submission Sheet {Complete this form with all the requested details and submit it as the first page of your bid.
Ensure that your bid is authorised in the signature block below. If any documentation is
attached, a signature and authorisation on this form will confirm that the terms and conditions
of this bidding document prevail over any attachments. If your bid is not authorised, it may be
rejected.}
Bid Addressed to (Employer):
Date of Bid:
Procurement Number:
Subject of Procurement:
We offer to provide the Services detailed in the Terms of Reference/Statement of Requirements,
in accordance with the terms and conditions stated in the contract.
We confirm that we are eligible to participate in this procurement process.
The validity period of our bid is: _______________ days/weeks/months from the time and date
of the submission deadline.
We confirm that the rates quoted in the Activity Schedule are fixed and firm for the duration of
the validity period and will not be subject to revision or variation.
We understand that you are not bound to accept the lowest or any bid you may receive.
Services will commence within _______________ days/weeks/months from date of Contract.
Services will be completed within _______________ days/weeks/months from date of
Contract.
Dated this ________________ day of ________________ 20______.
[signature] [in the capacity of]
Duly authorised to sign Bid for and on behalf of ________________________________
Section III: Terms of Reference/Statement of Requirements
The African Union, established as a unique Pan African continental body, is charged with
spearheading Africa’s rapid integration and sustainable development by promoting unity,
solidarity, cohesion and cooperation among the peoples of Africa and African States as
well as developing a new partnership worldwide. Its Headquarters is located in Addis
Ababa, capital city of Ethiopia
African Union is using a number of electronics equipment and high value assets that
include: Nessus router (2K and 5K), Dell EMC server farm infrastructure, Fortigate and
Cisco Firepower firewalls, Electrical power rescue (UPS) and Air conditioning assets for
its datacentre, that require the services of the Maintenance providers to service on routine
basis (Preventive maintenance) also repair faults (Corrective Maintenance) at a minimum.
The Objective of this project is to contract an experienced ICT service provider (Firms
only), for a duration of three (3) years, to provide Preventive/Corrective Maintenance for
all Network and System equipment and to respond to the demand of business continuity
plan. The project will be divided into two (2) lots:
Lot 1: Preventive and Corrective maintenance of Active devices (Network and
Compute infrastructure)
This lot includes the maintenance of the following active devices (Network and Compute
infrastructure): Item Quantity
available
Cisco 9500 series 4
Cisco 9300 series 2
Cisco Nexus 2000 2
Cisco Nexus 3000 2
Cisco Nexus 5000 2
Cisco Firepower 2110 UTM 6
Cisco ASR 7000 2
Cisco 4000 series 22
Dell EMC VMAX 10K 1
Dell EMC VMAX 250F ALL Flash 1
HP B22 10
HP BL660C-Gen 9 16
HP BL685-Gen 7 16
Dell EMC DD2500 1
Quantum Tape Library Scalar i80 1
Dell EMC VxRail 120 with 4 nodes 1
Lot 2: Preventive and Corrective maintenance of the Datacenters electrical power
supply, fire-fighting system and air conditioners.
1. BACKGROUND
2. OBJECTIVES
This part of the project includes the maintenance of the following assets:
Item Quantity
available
1 Huawei Data Collector (ECC500)
1
2 Huawei 160KVA UPS5000E – with 40KVA Power Modules and Battery Bank 2
3 Huawei Precision Air-conditioner, 35KW Netcol5000-A – In Row Cooling split
Type AC
4
4 FM200 Agent Based Fire Suppression System
3
Contractor shall:
a) Provide the services set forth in the TOR i.e. chooses the most suitable processes,
methods and equipment to perform its services under this contract, at competitive costs.
b) Undertake to perform the services with the highest standards of professional, ethical
competence and integrity.
c) Be responsible for any damages done to equipment as a result of the service provider’s
negligence.
d) Notify MIS in writing within a maximum of 2 days in case it’s unable to respect a
contractual stipulation indicating the reasons.
Equipment Spare Parts philosophy:
a) Spare parts of the same brand, model, features and functionalities shall be made
available and operational within (24) hours from the time the problem is reported by the
MIS for the equipment undergoing repair. Repair shall not exceed two (2) weeks,
beyond which, the spares provided by the Contractor shall be forfeited in favour of the
AU as permanent replacement.
b) Defective units/parts shall be replaced with the same quality and specifications and
operating systems/licenses shall be re-installed / reconfigured and made operational
within four (24) hours from the time the problem is reported by the MIS at no additional
cost to the MIS
c) All replaced equipment/units/parts diagnosed to be unserviceable shall be returned to
the MIS for proper disposal.
d) The contractor shall provide information on product alerts, notices, and latest product
versions as well as any updates/upgrades available.
e) Where spare parts are needed, prior to undertaking the repairs, the Contractor shall
provide and seek written approval from the AUC with an estimated cost of parts. The
total price quoted in any estimate may not be exceeded without advance written
approval from the AUC. If during the course of the originally estimated repairs it is
noted that further repairs will be needed, another estimate will be prepared for the
additional work under the same terms and conditions.
3. Contractor’s Responsibilities and spare parts philosophy for Lot 1 and 2
a) The services provided by the Contractor shall be on quarterly for preventive
maintenance. The corrective maintenance shall be on-call basis
b) Total duration of the contract is 3 years renewable for another 3 years upon satisfactory
performance and availability of funding.
c) The Service Site shall be at AU premises (Addis-Ababa Headquarters).
4. Expected date of commencement of contract: The contract is expected to commence
in July 2019.
5. Contract Award: The frame Work Contract/s will be awarded for an initial period of
3 years with an option to extend for one year based on satisfactory performance.
The contract shall be a Non Exclusivity contract meaning the AUC can exercise the right
to invite other contractors for a specific assignment.
6. Selection Method: Least cost Selection.
Lot 1: Preventive/corrective maintenance of Active devices (Network and Compute
infrastructure)
Criteria
1 Legally registered organization, Business Company with requisite experience
and background (core business) 10
2 Minimum of 7 years of experience in providing IT support services (software
and hardware, networking services) 10
3 Experience in providing IT support services for multi-national organizations,
inter-government organizations, business companies, and the United Nations
Agencies is an advantage
10
4 Excellent skills in the planning and execution of preventive and
remedial/corrective maintenance
10
5 Relevant experiences in deployment of Core Switches and Datacentre
infrastructure under Cisco, Dell EMC, HP and VMware technologies
30
6 The company must have IT support personnel with the following
qualifications
University degree or diploma in Information Technology, Computer
Sciences, Engineering or any other related fields;
Minimum of five years working experience as IT support staff ;
Hands-on experience in trouble-shooting, networking, hardware and
software maintenance ;
Previous working experience in or with UN/NGO is an asset ;
Good command of English, both written and spoken ;
Able to work under challenging circumstances with minimum
supervision.
30
Pass mark: for the technical evaluation is 70 points
7. Evaluation criteria
Lot 2: Preventive and Corrective maintenance of the Datacentre’s electrical power
supply, fire-fighting system and air conditioners
Criteria Max
score
1 Legally registered organization, Business Company with requisite experience and
background
10
2 Minimum of 7 years of experience in providing IT support services (software and
hardware, UPS System, Air conditioners for Datacentre) 10
3 Experience in providing IT support services for multi-national organizations, inter-
government organizations, business companies, and the United Nations Agencies is an
advantage
10
4 Excellent skills in the planning and execution of preventive and remedial/corrective
maintenance
10
5 Relevant experiences in deployment and maintenance of Datacentre power, fire-fighting
and air conditioners infrastructure under Huawei technologies
30
6 The company must have IT support personnel with the following qualifications +
30:
University degree or diploma in Information Technology, Computer Sciences,
Engineering or any other related fields;
Minimum of five years working experience as IT support staff ;
Hands-on experience in trouble-shooting, hardware and software maintenance ;
Previous working experience in or with UN/NGO is an asset ;
Good command of English, both written and spoken ;
Able to work under challenging circumstances with minimum supervision.
30
Pass mark: for the technical evaluation is 70 points
PREPARATION OF FINANCIAL PROPOSALS
Financial Proposal
The bid should be accompanied by a detailed Pricing proposal. The pricing proposal should state
the Unit rates for different categories of tasks.
The bidder shall provide a financial offer for each LOT.
Section IV: Pricing Proposal
Item
No. Description Unit of
Measure
Unit Price in
Specified
Currency
Relevant Services Carried Out in the Last Five Years
That Best Illustrate Qualifications
Using the format below, provide information on each assignment for which your
firm/entity, either individually as a corporate entity or as one of the major companies
within an association, was legally contracted.
Assignment Name:
Country:
Location within Country:
Professional Staff Provided by Your
Firm/Entity(profiles):
Name of Client:
No. of Staff:
Address:
No. of Staff-Months; Duration of
Assignment:
Start Date (Month/Year):
Completion Date (Month/Year): Approx. Value of Services (in Current
US$):
Name of Associated Consultants, If Any:
No. of Months of Professional Staff
Provided by associated Consultants:
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:
Narrative Description of Project:
Description of Actual Services Provided by Your Staff:
Firm’s Name:
SECTION IV: FORM OF CONTRACT
FRAMEWORK AGREEMENT FOR PREVENTIVE AND CORRECTIVE MAINTENANCE UNDER A THREE YEAR
FRAMEWORK CONTRACT
FRAMEWORK AGREEMENT FOR: ……………………………………………………………. AFRICAN UNION FRAMEWORK AGREEMENT NUMBER: ………………………………………. This Framework agreement (the Agreement) dated ………………….. is made between: 1. The African Union Commission (hereinafter referred to as the African Union) and 2. ……………………………………………………………………………………………………………. (hereinafter referred to as the Contractor) Whereas: The African Union may require the Contractor to undertake the activities, under the terms
of the Agreement, as defined in the Statement of Requirements hereto (Appendix 1) and as defined in the subsequent individual Calldown Contracts which shall be placed pursuant to the Agreement.
1. Terms of Agreement This Agreement and any Calldown Contracts shall be subject to the General Conditions of
Contract for Framework Agreements for Goods (attached) (hereinafter referred to as the General Conditions).
No variation in the terms or scope of this Agreement, or any Calldown Contracts agreed
under this Agreement, shall be valid or binding unless previously expressly agreed in writing by the Contract Officer and the Contractor in the form of letters entitled "Amendment to Framework Agreement" or "Amendment to Calldown Contract" respectively.
The African Union takes no responsibility for any goods supplied outside of those expressly
contained in this Agreement and more particularly defined in the Calldown Contracts made under this Agreement.
2. Duration of Agreement The Agreement shall commence on ……………… and expire on …………………unless terminated
earlier in accordance with the provisions of Clause 13 of the General Conditions or extended by an “Amendment to Framework Agreement”
3. Place and Timeframe for Commencement
Except where expressly altered by a Calldown Contract, the place and timeframe of commencement of activities under this Agreement shall be as defined in Appendix 1.
4. Defects Liability
The Defects Liability period applicable to activities undertaken under this Agreement will be ………………………………….
5. General Administration The African Union will appoint a Contract officer who will be responsible for maintaining,
negotiating and issuing any amendments to this Agreement. 6. Notices
Any notice given by one party to the other pursuant to this Agreement shall be sent to the other party in writing by personal delivery or e-mail.
A notice shall be effective when delivered or on the notice's effective date, whichever is later.
7. Acknowledgement The Consultants shall confirm acceptance of the terms of this Agreement by signing and
returning to the Contract Officer the duplicate copy enclosed herewith within a period of 30 days.
For and on behalf of the Name: African Union Position: Signature: Date: For and on behalf of Name: The Consultants Position: Signature: Date:
APPENDIX 1
STATEMENT OF REQUIREMENTS
FOR FRAMEWORK AGREEMENT NUMBER: …………………………..
Item No.
Type of work (detailed descriptions as per attached)
Currency Unit of measure
Price per Unit
Site
Signed as agreed: For and on behalf of the Name: African Union Position: Signature: Date: For and on behalf of Name: The Consultants Position: Signature: Date:
CALLDOWN CONTRACT
Framework Agreement with: Framework Agreement for: Framework Agreement Number: Calldown Contract Number: Dear Sirs We refer to the above mentioned Agreement dated ………………………………….and confirm that you are now required to undertake the activities defined in Annex A hereto, under the terms and conditions of the above mentioned Agreement which shall apply to this Calldown Contract as if expressly incorporated herein.
Amount of Calldown Contract In accordance with the prices contained in the Framework Agreement the total amount of this Calldown Contract is ……………………………………………………... Delivery period In accordance with the Framework Agreement you are required to commence the activities by …………………….. Acknowledgement You are required to confirm acceptance of this Calldown Contract by signing and returning to the Contract Officer the duplicate copy enclosed herewith within a period of 5 days. For and on behalf of the Name: The African Union Position: Signature: Date: For and on behalf of Name: The Contractor Position: Signature: Date:
ANNEX 1
FRAMEWORK AGREEMENT NUMBER: ……………….
CALLDOWN CONTRACT NUMBER: ………………
Item No.
Type of work (detailed descriptions as per attached)
Currency Unit of measure
Price per Unit
TOTAL PRICE
TOTAL AMOUNT OF THIS CALLDOWN CONTRACT