Processor SchedulingAlgorithms for Minimizing
Buffer Requirements inMultimedia Applications
S. RampalD. P. Agarwal
D. Reeves
.Center for Communications and Signal ProcessingDepartment. of Electrical and Computer Engineering
.North Carolina State University
TR-94j16July 1994
Processor Scheduling Algorithms for Minimizing BufferRequirements in Multimedia Applications
Center for Communications and Signal ProcessingNorth Carolina State University
Technical Report TR 94/16
Sanjeev Rampal, Dharma P. Agrawal, and Douglas Reeves,Dept. of Electrical & Computer Engineering,North Carolina State University, Box 7911,
Raleigh, NC 27695-7911Tel: 919-515-3984Fax: 919-515-5523
E-mail: (sdrampal,dpa,reeves)@eos.ncsu.edu
1
Processor Scheduling Algorithms for Minimizing Buffer Requirements in Multimedia Applications.
Sanjeev Rampal, Dharma P. Agrawal, and Douglas S. Reeves
Abstract
The increasing use of audio, video and other multimedia applications on workstations, mandates the use of real-time processor scheduling techniques. Real-time scheduling algorithmshave mostly concentrated on seeking to meet application deadlines (such as those required forvideo playback for example). Another important requirement of such applications is large buffermemory due to the high data rates involved. We investigate priority allocation algorithms forstatic priority based preemptive real-time scheduling of periodic task sets. These algorithms aredirected at applications in which worst case execution latency is not critical so that priority allocation should be directed towards buffer minimization rather than meeting deadlines. Examplesof such applications include video and audio playout/ recording, browsing through a databasewith audio/ video data and all types of non-interactive real-time applications (we refer to theseas throughput oriented real-time applications). The techniques developed retain the simplicity ofimplementation of static priority scheduling while eliminating their drawback of not being ableto achieve 100% processor utilization. In addition, we are able to obtain hard bounds on worstcase execution time which are low enough for most practical deadline based applications also.We show that the standard Rate-monotone priority allocation algorithm is not optimal in termsof our goal of minimising input buffer size. Approximate algorithms are then derived, whichperform better than the rate-monotone algorithm and bounds on their performance are derived.Average case performance is studied using simulation. The best performance is seen in an algorithm which combines rate-monotone and shortest job first type of priority orderings. Finally,it is shown that these approaches can also be used to obtain deadline-based scheduling algorithms for task sets with arbitrary deadlines. The existence of an optimal buffer minimizationalgorithm is left as an open problem.
Keywords: Static Priority Preemptive Scheduling, Real-time Applications, Buffer Minimization
1 Introduction
1.1 Motivation
Multimedia based systems are expected to dominate the workstation environment in the near
future. Such systems will be expected to readily handle audio, video and other forms of time
constrained data often referred to as real-time data [1], [2]. Real-time data is typically required
to be processed within a given time bound or deadline for it to be useful. For instance, in order
to play out a movie stored on disk, the video processor has to set a playback point. Each frame
from the video stream has to be received, processed and made available for display no later than
its playback point in order for the user to perceive a continuous and smooth display. Conventional
operating systems and processor scheduling techniques do not provide for such real-time constraints.
Consequently, real-time processor scheduling techniques have been developed for deadline based
2
task systems. In particular, processor scheduling algorithms for periodic real-time sustems have been
studied extensively [3], [4]. Such task systems consist of a number of jobs (say n jobs numbered as
Ji' i = 1, .. .n). Each job J, arrives (i.e. is ready for execution) periodically with a period Ti. Each
such invocation of a job is referred to as a task. Associated with each job J£ is a start time I, and a
deadline Di, Thus the k th task corresponding to job J, is ready at time I, + (k - 1) X T, and must
complete execution by time I, +(k -1) xT,+Di, In the case of multimedia applications, the deadline
of a job is set according to some user-dependent criteria. For instance, in a real-time conferencing
application, the deadlines could be set according to the maximum allowable latency without having
the participants' talk spurts start interfering with each other (as happens in an overseas telephone
call for instance). Real-time scheduling techniques can directly be applied in such cases. However
in non-interactive type of applications, it is not clear as to how the deadlines are to be set or if any
deadlines should be set at all. For example, latency is not important to the user when viewing a
movie stored on disk. The only requirement is that playout be smooth and continuous. We refer
to such applications as throughput oriented real-time applications. In such cases, deadline-based
real-time scheduling (by introducing artificial deadlines) may not be the best approach. However,
we note that some kind of processor scheduling has to be performed even here because of the on-line
nature of many of these applications e.g. a movie is being viewed on-line as it is being retrieved,
decompressed etc. Even though latency is not critical, this processing cannot possibly be done
offline because of the large amounts of data and high data rates involved. Different scheduling
policies will differ in the amount of input buffer requirements. In this paper, \ve investigate the
use of static priority based scheduling algorithms for such applications (Priority based real-time
scheduling algorithms are briefly reviewed in the following subsection). The criterion which will
be minimized will be the size of the buffer memory required to hold tasks waiting to be processed.
We note that this can be an important issue considering that typical video images can have upto
the order of a megabyte of data per frame and consequently, having to buffer even a few frames
worth of input data will require a lot of workstation memory. Some other examples which 111ay be
classified as throughput-oriented real-time applications include encoding a real-time audio/video
stream and outputting compressed data to disk, browsing through a audio/video database and all
types of non-interactive multimedia applications involving real-time data such as audio and video.
Outside the domain of multimedia systems, examples include instrumentation, real-time control
and data acquisition systems in which input arrives periodically, and a statistical summary of the
data is stored to disk for offline evaluation.
3
An important characteristic of our analysis is that we are interested in the peak buffet requirement
and not average buffer requirements. We assume that buffer memory is statically allocated and
must account for the maximum instantaneous buffer requirement. This corresponds to a hard
real-time system where the buffer must not overflow in any case. This is also true in situations
where it is not possible to dynamically allocate and deallocate memory because of the high data
rates involved (as in video applications) and a static memory allocation must be made with peak
requirements in mind. Consequently, we cannot use results from queueing theory which look at
average buffer requirements. For average buffer minimization, shortest job first type allocations are
known to be optimal, In contrast to queueing type approaches, the method of analysis used here
is similar to that used for scheduling of hard real-time applications [3],[4],[.5] i.e. exarnining a worst
case interaction of task invocations.
1.2 Review of Preernpt.ive Real-time Processor Schcduling Algorithrns
Preemptive scheduling algorithms for real-time applications are generally classified as being either
static priority based or dynamic priority based. Static priority allocation algorithms assign fixed
priorities to jobs and at any instant of the schedule, the processor executes the task with the highest
priority from among all ready tasks. In a dynamic scheme, the priorities of tasks are allowed to
vary during the schedule. Dynamic priority based algorithms are able to obtain full processor
utilization but this is not true in general for static algorithms. In this paper, vve will always deal
with preemptive resume type scheduling, in which a task which has been preempted earlier resumes
execution at the point where it was preempted (and not re-executed from the beginning). For
the case where deadlines are equal to the invocation periods (i.e. each task has to be completed
before the arrival of the next task of the same job), the rate-monotone priority allocation algorithm
has been shown [3] to be an optimal static priority allocation algorithm in the sense that if this
algorithm does not lead to a schedule in which every deadline is met (i.e. a feasible schedule), then
no priority allocation algorithm will result in a feasible schedule. This algorithm assigns priorities
to jobs in increasing order of arrival rate, i.e. the lower the invocation period of a job, the higher is
its assigned priority. This algorithm although optimal in the sense described above, cannot always
achieve 100% processor utilization. For a large number of jobs, the achievable utilization may be
as low as 69% [4]. In contrast, the optimal dynamic priority algorithm for the same problem viz.
the Earliest Deadline First (EDF) algorithm is always able to find a feasible schedule as long as
total utilization of the task set is no more than 100%. At every instant, this algorithm dynamically
4
assigns highest priority to a task which has the earliest execution deadline from among all ready
tasks. The inverse deadline monotone priority allocation algorithm, has been shown to be optimal
for the case of deadlines less than or equal to the invocation periods [7]. Not much work has been
reported on static priority scheduling for the case of arbitrary deadlines. Lehoczky [.5] has analyzed
the performance of the rate-monotone algorithm for the case where all dea.dlines are a constant
multiple of the periods but has also shown that the rate-monotone algorithm is not an optimal
algorithm even for this special case.
Clearly, using the EDF scheduling algorithm will always ensure schedulability and no buffering
will be required because tasks will always complete execution no later than the arrival time of the
next task of the same job. However static priority scheduling has some advantages over dynamic
schemes such as ensuring that the timing requirements of the most important jobs are met during
transient overloads, easier implmentation of task synchronization protocols such as the priority
ceiling protocol [4] and most importantly, ease of implementation in processors, I/O controllers
and communication switches. Analysis of static priority schemes is hence an important problem.
1.3 Overview of the Paper
In the next section we introduce some definitions which are used throughout the paper. Non
optimality of the standard rate-monotone algorithm for this problem is illustrated with a simple
example. In section ;3, bounds on the amounts of buffering are obtained and priority allocation
algorithms are defined which minimize these bounds. The priority allocation algorithms turn out
to be combinations of rate-monotone allocation with other allocation algorithms. Existence of an
optimal algorithm is left as an open problem. Section 4 then introduces an approach for obtaining
scheduling algorithms for the case of arbitrary deadlines using these approaches. Section S describes
some simulation experiments which demonstrate the average case behaviour of these algorithms.
The best performance is seen in an algorithm which combines rate-monotone and shortest job first
type of priority allocation. The concluding section summarizes the results and suggests issues for
further investigation.
5
2 Definitions and the performance of Rate-Monotone PriorityAllocation
Consider a set of n periodic jobs. Job J, has a computation time C, and is invoked with a period
T, after a start time Ii, In this paper ~ we refer to each invocation of a job as a task. In case of
scheduling with deadlines, each job has a deadline D, associated with it. For most of this paper,
we will consider throughput oriented applications as mentioned earlier and hence there are no task
deadlines. Additionally, we will assume that all the start times (the I, 's ) are equal to o. Such job sets
are also referred to as being synchronous [7]. Input buffer size is determined by the number of tasks
which have arrived but for which processinq has not yet begun. An inherent assumption is thus that
buffer memory required for tasks being processed is not considered. Because of multiprogramming,
any priority allocation algorithm will require n units of buffer space for tasks being processed, so
only the buffering required for waiting tasks can be optimized. Another way of looking at this is
that the input data corresponding to a task is consumed as soon as the task starts processing. We
additionally assume that task preemption and context switching times are negligibly small.
Given a set of jobs and an input buffer size, if it is possible to obtain a priority assignment using
which the peak buffer requirement can be accomodated, then we will refer to the set as being
buffer-schedulable with respect to the given buffer size. A given job set can be treated as if it had
deadlines equal to the periods. Now, zero buffering is required if and only if the rate-monotone
priority assignment is able to yield a feasible schedule for this job set with these deadlines. Hence,
a task set which requires no buffering will be referred to in the paper as being LL-schedulable (for
"Liu-Layland Schedulable" [3]).
Lemma 2.1 A necessary and sufficient condition for the buffered-schedulability of a job set using
an appropriately large but finite buffer is that the total processor utilization (Li=l (C1:/Ti)) be no
more than 1.
Proof: The necessary condition is straightforward while sufficiency follows from the fact that due
to the periodicity of the application, any work conserving scheduler 1 will always be able to "empty
out" any tasks accumulated in the buffer in finite time. Hence a sllfficiently large but finite buffer
will always do the job. This will be true even if the total utilisation is exactly 100% (in contrast to
conventional queueing systems in which waiting times rise infinitely as total utilisation approaches
lOne that never keeps the processor idle if there is any outstanding processing
6
100%). 0
For simplicity, let us assume that the input data requirement for each task of each job is the same,
say c units. (We also look at the unequally weighted jobs problem in the paper). We use the
term late tasks to denote all active tasks (i.e. those that have already been invoked) for which the
previous task of the same job has not yet completed execution. Buffer allotment to incoming tasks
can be either partitioned or shared. In a partitioned allotment, each job is assigned a buffer for
itself, while in the shared case, a common memory is used for all incoming tasks irrespective of
which job they belong to. For the case of equally weighted jobs and shared buffer allotment clearly,
minimization of buffer space is equivalent to minimizing the maximum number of late tasks at any
instant. For partitioned buffer allotment, it is equivalent to minimizing the sum over all jobs of the
maximum number of late tasks of a job at any instant. Let N LT t denote the total number of late
tasks at some instant t and let NILT be its maximum value over the entire schedule. Similarly, let
N LTl denote the number of late tasks of job i at time t and M LTi be its maximum value over
the schedule. Clearly, for minimizing partioned buffer memory allotment. vve need to minimize
L:i=l lvl L T i , while for the shared case, we need to minimize AiLT. For most of the paper, we look
at the equally weighted jobs case, so that the number of late tasks is itself taken to be a measure
of the amount of buffering.
Let the jobs be numbered according to priority so that job J1 has the highest priority, ,J2 has the
second highest and so on. Using terminology introduced by Lehoczky [,5], we first define a level-i
busy period.
Definition: A level-i busy period is a time interval [a,b] within which jobs of priority i or higher
are processed throughout [a,b] but no jobs of level i or higher are processed in (a - e~ a) or (b, b+ f)
for sufficiently small f > O.
Lemma 2.2 There 'must be at least one instant during the level-i busy period initiated by the critical
instant II == 12 == ... == I; == 0 at which there are M LTi late tasks. Also, there must be at least
one instant during the level-n busy period initiated by the critical instant II == 12 == ... == In == 0 at
which there are M LT late tasks.
Proof: The proof is similar to that of Theorem 1 in [,5] and is not included here for lack of space.
The rate-monotonic (RM) scheduling algorithm has been shown to be optimal for scheduling job
sets when the deadlines equal the invocation periods [3]. The following example shows that it is
7
not all optimal algorithm for minimizing the buffer requirements for buffer-scheduling a given job
set.
Example 1: Consider a set of three periodic jobs with the parameters : C\ == 20; T1 == 50; C12 == 40;
T2 == 70; C3 == 2; T3 == 80.
If we allocate priorities using R.M-ordering, job J I will be assigned highest priority followed by .J2
and finally J3 . The completion times and the number of late tasks of job 3, N LTj are shown below
starting from the critical instant II == /2 == 13 == 0 . (N LT{ and N LT~ are zero for all t.)
Task No. Task arrival t ime Task completion t ime N LT~ at completion t ime - f
1 00 342 -42 80 344 ;3
3 160 346 24 240 348 1.5 ;320 350 0
6 400 692 37 480 694 :28 .560 696 19 640 698 0
The level-3 busy period ends at time 698, hence we need not examine further. 111,(lxt(NLT~) ==
M LT3 == M LT == 4. Hence, if each task requires c units of buffer space, 4c units of buffer memory
are required. Consider however, a priority ordering in which .JI has highest priority, .J3 is next
and J2 is lowest. (Note that this is neither rate-monotone ordering nor shortest job first). The
corresponding completion times and N LTi values are shown below (here N LTf and N LT,{ are zero
for all t).
Task No. Task arrival t irne Task completion t ime N LT~ at cornplet ion t ime - f
1 0 84 1
2 70 144 1
3 140 226 1
4 210 288 1
.5 280 3.50 0
6 350 432 1
7 420 494 1
8 490 576 1
9 .560 636 1
Here, only c units of buffer memory are required. Clearly, R.M ordering is not an optimal algorithm
since it required higher buffering.
Some important observations can be drawn from the above example in connection with obtaining
an optimal algorithm for our buffer minimization problem.
8
• The optimal algorithm for the buffer minimization problem will have to behave like the
rate-monotone algorithm for job sets which are Ll.vschedulable, since this is the only known
optimal algorithm for such job sets. (In other words an optimal buffer minimization algorithm
must result in zero buffering for LL-schedulable job sets). This eliminates many algorithms
including shortest job first since these are not optimal for LL-schedulable job sets .
• For job sets which are not LL-schedulable, rate-monotone ordering does not yield minimal
buffering as shown in the example above. This implies that the optimal priority allocation
algorithm for our problem, if it exists, will have to produce rate-monotone ordering for LL
schedulable job sets and some different ordering for jobs sets which are not LL-schedulable.
3 Bounds on the Amount of Buffering and their Minimization
3.1 A First Upper Bound and a Priority Allocation Strategy
3.1.1 Equally Weighted Jobs
Consider first the case where the storage required to buffer any task of any job is the same. At
some time t during the during the level - 'i busy period initiated by the critical instant, let there
be M LTi late tasks of job i, A necessary condition for this to happen is given by relation 1.
i-I
(ft/Til « u ir.«: + I:f(t)/TjlCj > tj=1
(1)
(2)
At time t, there have been ft/Til invocations of job Ji. Clearly, since \ve are dealing with the
necessary case, even if all tasks of higher priority have completed execution, there are at least
lvILTi tasks of job J, which have not even started execution (the l\ILT i late tasks). Sta.rting fr0111
the critical instant II == 12 == ... == I, == 0, the entire period [0, t] is part of the level-i busy period,
so there is no processor idle time. Hence relation 1 follows.
Alongwith the necessary condition for schedulability, ...ri
(C\/T1 ) + (C'2/T2 ) +.,.+ (C'i/Td <1 - I: (C'k/Tk)k=i+l
... using the identity rx1 < x + 1 and the fact that the instant t at which M LT; occurs must be
greater than Ti, we can simplify to obtain an upper bound on M LTi·
L:t=1 Ck - Ti L:j=i+l(Cfj/Tj)MLTi < c.
9
For the partitioned buffer allocation case, M LT is the sum of the M LTi 's over all i, while for
the shared allocation case, the sum of all Ai LTi is an upper bound for the maximum number of
simultaneous late tasks. Hence, we choose as upper bound U'Bl given by the following expression.
(3)
Theorem 3.1 The upper bound UBI in ( 3 ) is minimized if the priority based ordering of the jobs
is such that higher priority is assigned to a job with a louier value of (C'f /Tk) i.e.
(We shall refer to this priority ordering as the ICTM ordering [or inverse C'2 by T Monotonic
orderinq.}
Proof: Consider two different priority orderings which differ only in the relative priorities of jobs
Ji and Ji+l. Let Ci2/ T i > Ci + 12/ T i+l . Let ordering 1 have J, at a higher priority than .Ii+1 while
ordering 2 has Ji+l at a higher priority than Ji. All other jobs have the same priorities in both
orderings. Let if possible, the value of [TBi be lower for ordering 1 than ordering 2. Examination
of the R.H.S. of equation 3 shows that each job contributes a term to the overall SU111. Clearly, the
contributions of jobs other than J'i and Ji+l will be the same for both orderings. Hence we have,
~i C' T'~~' Si-Ij=l J - t i-IJ=t+l TJ
Ci~i-l C' +C' T (~n c, + c1
)LJj=l j i+l - i+l ,i-Ij=i+2 r; Ti
Ci+l
+
+
~i+l C. T. ~n SLJj=l 'J - 'l+l LJj=i+2 T
J----------<C"i+1
~i+l C'. T. ~n c,LJj=l J - 'l LJj=i+2 Tj
c.
This contradicts our earlier assumption. Hence the value of UBi for ordering 1 must be greater
than that for ordering 2. Now given any priority ordering, this shows that if the priorities of two
jobs are swapped such the job with higher value of C;[T, is assigned lower priority, the value of
UBi will always decrease. Hence the value of UBi is minimized by the ICTM priority ordering.
o
10
We note that as a consequence of the integral nature of the quantities M LTi' the expression for
UBl can be simplified to
(4)
3.1.2 Unequally weighted Jobs
In general, different jobs will require differing amounts of storage per task buffered. Let l/ff} ~ l1V2 , ... '1 111'11
be the weights associated with the corresponding jobs representing the amount of storage required
for buffering a task of the corresponding job.
Following a reasoning similar to the equally weighted case, the value of [TBl can be derived as
UBl =t Wi X I:i=l Ck - Ti ~j=i+l(Cj/Tj)i=2 C,
(.5 )
Theorem 3.2 The upper bound UBI in ( 5 ) is minimized if the priority based orderinq of the jobs
[ollouis the relation
Proof: Similar to that of the equally weighted jobs case (Not included here for lack of space).
We shall refer to this ordering as the Weighted Inverse C2 by T or W-ICTM ordering.
From this point on we consider only the equally weighted jobs case as SOUle of the derivations can be
extended to the unequally weighted jobs case in a straightforward manner. (e.g. by using W-ICTM
ordering wherever ICTM ordering is used and using the appropriate bounds etc.). However in many
cases unequal weights make the problem much more difficult and further analysis is required.
3.2 A second upper bound
The upper bound derived in the previous subsection was taken as the sum of the upper bounds on
the amount of buffering required by each job. While this is reasonable for the case of partioned
buffer allocation, in general there may not be any instant in the schedule at which all jobs have
the maximum number of late tasks. Thus for the shared buffer allocation case. a second bound is
derived below which has a lower value for some job sets.
Let there be N LTi late tasks of job 2, N LT~ late tasks of job 3 and so on up to JV LT~ late tasks
of job n at some time t in the level-n busy period after the starting the schedule at the critical
11
instant at t = O. Then, a necessary condition for this to happen is
n
ftlT11C1+L(ftlTjl - N LTJ'(}j > tj=2
Making use of the identity fxl < x + 1, alongwith the necessary condition \:"''0_ (C' IT-) < 1 weL......J-I J J - ~
have the necessary condition,
n
L C, > (N LTi +N LTj +...+N LT~) x mini. Cf2~ C'3, . . . , C'n)j=l
Since this is true at every instant t, ill the level-n busy period, we have the second upper bound.
(6)
3.3 Combined Priority Allocation Algor-ithrns
In the previous two subsections, upper bounds were derived for the number of late tasks assuming
all jobs except the highest priority one overflow (i.e. have some late tasks) at SOl11e time. In practice
most of the tasks in a job system will require zero buffering. These jobs form a LL-schedulable
set and must all execute at higher priorities than the remaining jobs. An optimal algorithm for
allocating priorities to these LL-schedulable jobs is ofcourse the rate-monotone (RM) algorithm
[3]. The key point is how to partition a given job set into the set which can be LL-scheduled and
another set consisting of jobs which will overflow so that the total amount of buffering is minimized.
Fig. 1 lists an algorithm which we will call the CP (i.e. Combined Priority allocation) algorithm.
Given a set of jobs S, the algorithm partitions it into sets Srm and 51
ot her . 51
rm consists of jobs
which can be LL-scheduled will be allocated priorities using the RM algorithm. 51
0t her consists of
jobs which will be allocated priorities using a possibly different algorithm. All jobs in Srm will
operate at higher priority than jobs in Sather. In particular, we will investigate two algorithms for
allocation of priorities to the jobs in 51
0t her viz. ICTM i.e. Inverse C2 by T Ivlonotonic and ICM
i.e. Inverse Computation Monotonic algorithms (the corresponding CP algorithms being referred
to as CP-I and CP-II).
TIle CP algorithm can be seen to be a greedy algorithm which picks the job with the largest value
of parameter from the current set 51
rm and tests the remaining jobs for LL-schedulability. In the
next few subsections, we will see that with appropriate choice of the value of parameter ~ the CP
algorithm will minimize the upper bounds derived in the earlier subsections. However, we need to
modify the expressions for UBi and UB2 to reflect the fact that only a few jobs can overflow.
12
/* S denotes tile given job set;Srm denotes the set of jobs allocated priorities in RM order;Sother denotes the set of jobs allocated priorities using the IC~TMI IC~NI algorithms *ISrm == S; Sother == ¢Evaluate parameter, , i == 1, ... , n
Step 1: Test the jobs in Srul for LL-schedulability using the necessary and sufficient tests derivedin [6]. If successful, goto Step 3.Step 2: From the set S1'1'n 1110ve the job with the largest value of parameter, to the set 51
oth e1>'
Goto Step 1.Step 3: Schedule jobs in 5'rm using R.ate monotonic priority ordering., and jobs in 's'icm usingrCTM/ rCM priority ordering.
Figure 1: The COlnbined Priority Allocatioll Algorithill
Upper bound UBi is simply the sum of the maximum amounts of buffering required by each job.
If on the execution of the CP-I algorithm, k jobs are found to be in 's'1'm and the remaining n - k
in Sother, UBi for equally weighted jobs will become
n ,,",-i. C· - T· ,,","!-. (C'·IT·)UBI = I:: (fL.-]=1 J t L.-]=t+! J J 1- 1)
C·i=k+1 z
Similarly it may be verified that the second bound UB2 becomes
n
UB2 == fI::(Cjlm'in(Ck+l, . . . ,Cn)l-lj=l
(7)
(8)
We note that both bounds are tight. For instance in case of the example job set of section 2., both
bounds yield a value of 1 for M LT which is its actual minimal value. In general for a given job set,
UBmin == min(UBl,UB2), (the minimum of the two upper bounds) should be used as the bound
on the amount of buffering.
3.4 Some properties of the CP Algor-ithms
3.4.1 Minimization of upper bounds & tightness of bounds
Theorem 3.3 The CP-II algorithm minimizes the upper bound UB2 defined in ( 8 ).
Proof: The value of UB2 can be seen to be inversely proportional to the Inini111U111 value of C,
from all jobs in the set Sother. If the algorithm terminates with l: jobs in the set STill and the jobs
are reordered according to their new priorities, a lower value for UB2 would have been possible
only if the algorithm had terminated after transferring one of the jobs ·h+2 through .In to the set
13
Sother- Clearly this is not possible else the CP-II algorithm would not have needed to move the job
Jk+ 1 to the set 5fothe1" 0
3.4.2 Worst Case Buffer Requirement & Optimality for the 2 Job Case
Lemma 3.1 If priorities are allocated using the CP-II alqoritliui, 1\-1 LTi < i., Vi the uiorst case
buffer requirement is in O(n2 ) and can be as low as 0(71,).
Proof: From relation 2~ when c. ~ Cj,j < i, A!fLTi:::; i, I-Ience, 1\,1LT:::; I:i=l1\,fLTi == n{TL-l)/2.
Also, from ( 8 ) A!fLT :::; n CmaJ.~/ Cm in which is approximately in O(n) when the ratio of maximun
to minimum C values is small.
Lemma 3.2 The CP-II algorithm is an optimal algorithm for miniinizinq the amount of buffering
required by a two job application.
Proof: The detailed proof is omitted for lack of space. Briefly however this may be verified by
examining equation 8 for C'2 > C1 and checking that the (;P-II ordering will result in only unit
buffer requirement for non- LL-schedulable job sets which is the minimum possible.
3.4.3 Time Complexity & Polynomial time algorithms
The time complexity of both the (;P-I and CP-II algorithms is in O( nT1na~r) (Tmax is the maximum
period of any job in the set). Hence these are pseudopolynomial algorithms (polynomial running
time if the maximum period is bounded). This is mainly because of the pseudo-polynomial time
complexity of the schedulability check in step 1 of fig 1. A Cf'<like priority allocation algorithm
based on RM-ordering can also be derived. We will refer to this as the (;p-R.Ivr algorithm. This
algorithm would work exactly as in Fig 1, with the value of parameter, == T, i.e. jobs are 1110ved to
the set 5f
ot h er in order of decreasing periods.
Polynomial algorithms can also be derived along the same lines. If in step 1 of the (;P algorithm
(Fig. 1) , instead of using the necessary and sufficient conditions of [6] we usc the sufficient conditions
presented in [3] using only the worst-case total utilization bounds, the running times of the (;P-I~
CP-II and CP-RM algorithms become polynomial. Liu & Layland [:3] have proved that an TL job set
is Ll.-schedulable if the total utilization is no more than the value n(2 1/
n- 1). Using this sufficient
14
test at each step 1 will result in the CP algorithms having a running time in O( 1/2) (O( n) operations
for the evaluation of total utilization at most O(n) times). We will refer to these algorithms as
the P -CP-I, P -CP-II and P -CP-RM algorithms algorithms. These polynomial-time algorithms are
expected to result in higher amounts of buffering than their pseudo-polynomial versions since in
general more jobs will be transferred to the set 5fother than necessary.
3.5 A t hird upper bound for t he P _CP-RM algor-ithm
Lehoczky [.5] has derived worst-case utilization bounds for scheduling jobs with deadlines given by
D, == ~ X T, using rate-monotone priority ordering. According to this formulation, a. job set with
deadlines of the form D, == ~ X Ti, Vi is schedulable relation 9 below is satisfied.
t CT:j <~(n -1)((~+ 1)1/(n-l) -1), ~ = 2,3, ...j=1 j ~
(9)
Clearly, if each task of a job J; can execute for a maximum time ~Ti, no more than 6. - 1 tasks
of the same job will need to be buffered. On execution of the P-C~P-R.M algorithm, if k jobs are
found to be LL-schedulable, a sufficient amount of buffering for equally weighted jobs, is given by
the upper bound below (multiplied by the amount of storage per task).
UB3
~min
(n-k+l)x(~min-l) (10)
min{~1t ~j <~(n - 1)(( ~: 1 )l/(n-l) - 1), ~ = 2,3, ...} k = ISrml)=1 )
4 A Static Priority Scheduling Algorithm for High Utilizationjob sets
Here, by a high utilization job set, we imply a set which is not LL-schedulable since job sets with
total utilisations below the Liu & Layland bound can always be scheduled by the rate-monotone
algorithm. Currently, the only known approach to this problem is a sufficient (but not necessary)
condition based on the worst case utilization bounds formulated by Lehoczky [5] as discussed above.
The bounds in [.5] have been derived assuming rate-monotone ordering of job priorities even though
it is known that this is not an optimal ordering. In addition, it is valid only for the case where the job
deadlines are a constant multiple of the invocation periods independent of the job (Di == 6.Ti' Vi).
Consider the problem of finding a priority allocation for a job set in which the deadlines are arbitrary
15
(less than, equal to or greater than the invocation periods) such that all deadlines are met in the
resultant schedule. In using the worst case utilization bound based approach, one would find a
minimal ~ such that D, ~ ~ X Ti, i == 1, ... n. If then, total job utilization is no more than the
worst case bound derived using ~min as found in 11, the job set will be deemed schedulable using
rate-monotone priority ordering.
The buffer-minimization problem with equally weighted jobs is related to this scheduling problem.
For instance, if we know that a job set is buffer-schedulable with some values for the AI LTi 's then
if each job J, has a deadline D, 2: (1\11 LTi + 1) X Ti, all tasks will meet their deadlines (recall that
1\11 LTi can be seen as the maximum number of full invocation periods that the execution of a task
of job J, call span). Relation 2 can be used to obtain the M LTi . Note that this approach is also
only a sufficient test for schedulability of job set with arbitrary deadlines.
5 Sirnulation Results
None of the algorithms discussed in this paper have been proved to be optimal in terms of yielding
the minimal buffering required for a given job set. These algorithms minimize the upper bounds
on buffering which we have derived and the upper bounds have also been shown to be tight. Also
the CP-II algorithm has been shown to be optimal for the two job case. Hence we expect that
heuristics based on these algorithms will also perform well in terms of minimizing the actual amount
of buffering. Simulations can help in better characterizing their performance on an average over a
large number of job sets.
5.1 Simulation Procedure
Job sets with up to 25 jobs were examined. For each value of n (the number of jobs), a total of 2,50
different job sets were generated with the total utilization varying uniformly between liT!C [1Band
1 where WC'U B is the worst case upper bound of Liu & Layland for LL-schedulability [3]. This
was done since no buffering is required anyway for job sets with total utilization below this bound.
A random search algorithm (RAND_OPT) was additionally used to get some idea of the "optimal"
amount of buffering. This algorithm started with the minimum buffering already obtained by the
other algorithms being compared and tried random permutations of the prioritu orderinq in order
to try and find a lower value for the buffering required. For each priority ordering tried, this
16
Avg of Peak Buffering (Pseudo-polynomial algorithms)
o
< , .:
25
B
c
201510A
5
1.8
1.6
1.4
1.2QOc::
·C~~
:3~
QO 0.8>«
0.6
0.4
0.2
00
Number of jobs
Key: A: Random Search B: CP-II C: CP-I D: CP-RM
Figure 2: Buffering required versus number of jobs (Equally weighted jobs, Shared Buffer Allocation)
algorithm determined the exact amount of buffering by executing the entire schedule and computing
the maximum instantaneous value of number of late tasks (executing each such schedule takes
exponential time). Only .5n random permutations were examined for each set of n jobs in order
to obtain an approximate estimate of the optimal amount of buffering without performing an
exhaustive search.
5.2 Analysis of results
Fig. 2 shows the average values of (peak) buffering required by the (~P-I, (~P-II, (~P-RlvI and
RAND_OPT algorithms. For the first 3 algorithms, the average over all job sets of [1 Em'in (the
minimum of the upper bounds UBi and [1B2) for the priority ordering produced by the algorithms,
is plotted for each value of the number of jobs. The values obtained for the R.AND_OPT algorithm
are the actual values using the exponential time procedure described above .
• Among the three algorithms, the values of the bounds are lowest for the priority ordering
produced by the CP-II algorithm. The values are generally the highest for the CP-RM
ordering. This is in accordance with the fact that the CP algorithms were specifically designed
using the formulations for the upper bounds in mind. The C~P-II ordering minimizes the value
of UB2 while the CP-I ordering produces a low value of [TBl in general as discussed earlier.
17
Avg buffering (Polynomial Algorithms) & Upper bound UB350
45
40
35
ei) 30·2~
25='lJ:lc.o>
20~
15
10
5
00
(UB3:)
10 15 20 25
Number of tasks
Figure 3: Averages of Peak Buffering required by the Polynomial-time Algorithms & Avg [TB3values
• The average values of the bounds as produced by the various algorithms vary from 2 to
6 times the value obtained by the exponential time RAND_OPT algorithm indicating that
there is some room for better algorithms. However, overall the values were quite low since
even at high values of total utilization, there are many job sets which are LL-schedulable
and hence require no buffering at all. (This is in accordance with the results in [4] in which
the average total utilisation for LL-schedulability was found to be about 83%.) The average
values produced by the CP-II algorithm are between 20 and .50 ~J of those produced by the
other algoritthms.
Next the relative performance of the polynomial versions of the same algorithms was evaluated.
Fig. 3 show the plots of the amounts of buffering required as predicted by the P _C~P-I, P _C~P-II
and P _CP-R.M algorithms. As mentioned in the previous section, a third upper bound [TBS can
be formulated for the C~P-RM algorithm. The fourth curve shows the the values of the buffering
required as predicted by this bound. The UB3 values are very high and out of range for most of
the values of n. The actual values can be obtained from table .5.2 .
• Here too, the polynomial version of the CP-II algorithms viz. the P _C;P-II algorithm results
in the least amount of buffering (requiring on the average 40 to 60 Cj(l of the buffering required
by the other algorithms). These figures are considerably higher than those in fig. 2. These
18
n (~P-I CP-II CP-R.M UB32 1.7 1.0 1..5 2.04 3.6 2.3 3.4 17.96 7.0 3.8 .5.8 58.98 9.0 5.4 8.4 60.110 10.9 6.8 11.0 149.012 15.1 8.5 13.8 174.61~ 18.6 10.0 15.1 308.516 17.2 11.6 19.9 296.418 23.8 13.3 20.9 288.720 29.1 15.1 25.4 7:37.:322 2.5.2 16.6 26.9 .539.424 28.0 18.1 31..5 4.52.9
Table 1: Averages Values of Peak Buffering required by the Polynomial-time Algorithms & avgUB3 values
figures seem to indicate that on the average the required buffering as predicted by the pseudo
polynomial (;P-I, CP-II and CP-RM algorithms is approximately an order of magnitude less
than that predicted by the polynomial time versions .
• The required buffering as predicted by UB3for RM-ordering is much more than that predicted
by UBi or UB2 for any ordering (P _CP-I, P _CP-II or P _CP-RM). This seems to indicate that
the formulation based on worst case utilization is very pessimistic. These values would also
seem to indicate that the scheduling algorithm introduced in section 4 would do much better
than one based on worst case utilization bounds. A possible explanation of this observa.tion
can be made by examining relation 9. As the total job utilization approaches unity, the va.lue
of Ll required as predicted by this formula shoots up very rapidly. Since in our simulations,
for each value of n, we simulate about 25 job sets for 10 different total utilization values
uniformly distributed between the Liu & Layland bound and unity, the job sets with total
utilization close to 1 will result in very large values of ~, and dominate the resulting a.verage
values of required buffering (since the buffering required directly increases with the value of
Ll).
19
6 Conclusions
We have looked at the problem of static priority allocation for the minimization of buffer space for a
class of multimedia applications which we have referred to as being throughput oriented. Examples
of such applications include audio and video playoutj recording, multimedia database browsing and
any kind of non-interactive multimedia application involving periodic real-time data such as audio
and video. Worst case execution latency is not critical in such applications and deadline based real
time scheduling should not be used. Instead we modify real-time processor scheduling techniques
to result in reduced buffer memory requirement which is a more important criterion than latency
in SUCll applications. Using these techniques we are able to utilize the simplicity of implementation
of static priority based scheduling techniques and also achieve 10091c1 processor utilization (which
is not true in general for conventional deadline based static priority schedulers). In addition the
latencies are observed to be low enough for these techniques to be usable even for interactive
multimedia applications. Upper bounds on the amounts of buffering required were obtained and
heuristics derived which minimize these upper bounds. Some properties of these heuristics were
analyzed. The complexity of these heuristics being pseudo-polynomial, polynomial time versions
of the same algorithms were developed. The performance of these heuristics was then studied
using simulation. Their performance was compared to that of an exponential time randomized
"global" search based algorithm (which was expected to produce close to optimal values). The CP
II algorithm (a combination of rate-monotone and shortest job first priority orderings) was observed
to have the best performance yielding buffer values between ,50 and 7.5% of those required by the
standard rate-monotone based priority ordering. The randomized search algorithm produced buffer
values less than half of those produced by the approximate heuristics indicating that there is room
for improvement of these heuristics. In case of the polynomial-time versions of these algorithms,
buffer requirements were found to be much higher (of the order of the number of jobs). Here too,
the polynomial-time version of the CP-II algorithm had the best performance.
The priority allocation algorithms for buffer minimization were also ShOWl1 to be usable to obtain
real- time scheduling algorithms for job sets with arbitrary deadlines (not necessarily related to the
invocation periods in any way). Analysis of the buffering requirements of these approaches indicate
that these require much less buffer space than that required by existing scheduling algorithms
that have been proposed for this case, indicating much lower response times and consequently
improved schedulability. Scheduling algorithms based on input buffer minimization techniques will
20
also be applicable to a more general class of applications since the deadlines will not be restricted
to be a multiple of the task periods as in [5]. A detailed evaluation of this approach was beyond
the scope of this paper and is a topic for further investigation. The question of intractability
of the problem (obtaining an optimal priority allocation in polynomial time, which minimizes
buffering requirements) is open. Getting an optimal algorithm See111S difficult even for the case of
a synchronous job system and equally weighted jobs. Detailed analysis of the unequally weighted
jobs case is also an issue for further work.
References
[1] E.A. Fox, "The COIning Revolution in Interactive Digital Video," Comrnun. of the AC,'j1l, July
1989, pp.794-801.
[2] P.V. Rangan, H.Nl. Vin and S. Ramanathan, "Designing an On-Demand Multimedia Service,"
IEEE Communications Mag., July 1992, pp.56-6.5.
[3] C.L. Liu and J .W. Layland, "Scheduling algorithms for multiprogramming in a hard real-time
environment," Journal of the ACM, 20, 1973, pp. 46-61.
[4] L. Sha and J. Goodenough, "Real time scheduling theory and ADA," IEEE Computer, April
1990, pp..53-62.
[5] J.P. Lehoczky, "Fixed priority scheduling of periodic task sets with arbitrary deadlines," Proc.
IEEE Real Time Systems Symposium, 1990, pp. 201-209.
[6] J.P. Lehoczky, 1. Sha, and Y. Ding,"The rate monotonic scheduling algorithm: Exact char
acterization and average case behaviour," Proc. IEEE Real Time E;ysten~8 Sinnposium, 1989,
pp. 166-171.
[7] J. Leung and J. Whitehead, "On the complexity of fixed-priority scheduling of periodic real
time tasks," Performance Evaluation, 2, 1982, pp. 237-2.50.
21