    Process for Incident Investigation

  • 8/3/2019 Process - PIB

    2/5

    Process for Incident Investigation

    Process for Incident Investigation

    1.0 Objective:

    To ensure the immediate notification and investigation of all incidents affecting the safety of any personor equipment.

    2.0 Scope:

    Applicable to all employees of Ltd. Directly involved in the day-to-day operational activities of an aircraft.

    Start Point: Incident information received

    End Point: Incident List updated and case closed.

    3.0 Records:

    RecordNumber

    Record Title File Name Location of Record

    Responsibility RetentionPeriod

    Reference Documents:

    4.0 Process Metrics:

    Parameter OperationalDefinition

    Standard ofPerformance

    Method ofMeasurement

    Responsibility Frequency

    5.0 Process Flow:

    On the next page.

    FS-PIB-P-01 Ver: 0.0 dated 01-Aug-2010 Page 2 of 5

  • 8/3/2019 Process - PIB

    3/5

    Process for Incident Investigation

    Start

    Receive information aboutaccident / incident

    MCCinformation

    Collect Relevantdocuments

    Flight SafetyReport

    Pilot SpecialReport

    Bird StrikeReport

    MX 16 report

    Other sources

    Reportable Incident?

    Director Air Safety(DGCA)informed

    DGCA IncidentIntimation Letter

    Update Incident ListIncident List Incident List

    InvestigationRequired?

    Notify PIB members

    Flight Safety Manual

    PIB ContactList

    Yes

    No x5

    Process for Incident Investigation Respo

    Yes

    No

    Ass

    ManaFlight

    x2

    x2

    Collect all relevantinformation

    Flight Plan

    Individual Statements

    Reference documents

    CVR dataDFDR data

    FlightOff

    Deputy

    of FliSafe

    Deputy

    of FliSafe

    FlightOffi

    Deputof FliSaf

    Deputof FliSaf

    FlightOffi

    FS-PIB-P-01 Ver: 0.0 dated 01-Aug-2010 Page 3 of 5

  • 8/3/2019 Process - PIB

    4/5

    Process for Incident Investigation

    x1

    Prepare draft of report Draft PIB ReportICAO

    Annexure 13

    Formulate the Investigation Team

    PIB MembersList

    InvestigatorContact List

    Conduct incident investigationICAO

    Annexure 13

    PIB Report

    InvestigationReport

    Process for Incident Investigation Respo

    Annex 13 Report

    Prepare report of findings

    x3

    Analyze Findings

    Provide recommendations where

    applicable

    x4

    AsMan

    Flight

    AsMan

    Flight

    AsMan

    Flight

    AsMan

    Flight

    AsMan

    Flight

    AsMan

    Flight

    FS-PIB-P-01 Ver: 0.0 dated 01-Aug-2010 Page 4 of 5

  • 8/3/2019 Process - PIB

    5/5

    Process for Incident Investigation

    Process for Incident Investigation Respo

    Action required based onrecommendation(s)?

    Receive Corrective Actions fromrelevant departments

    Yes

    Circulars

    Caution/Warning Letters

    Corrective Training

    Certificates

    Corrective action adequate?No

    Corrective action sent to DGCA(where applicable) and filed in

    Corrective Action File

    Circulars

    Caution/ WarningLetters

    Corrective TrainingCertificates

    Corrective Action

    FileDGCA CorrectiveAction template

    DGCA Corrective

    Action taken letter

    Yes

    DGCA clearance received? No x4

    No

    Update Incident List and inform

    relevant stakeholders withclearance (where applicable) about

    Case Closed

    Yesx5

    Report CirculationMetrics

    Circulate Report to pertinentstakeholders with

    recommendations where applicable

    PIB ReportInvestigation

    Report

    Annex 13 Report

    DGCA PIB reportLetter

    Report details adequate?

    Yes

    x3

    No x4Deputy

    of FliSafet

    Deputy

    of FliSafet

    Deputyof FliSafet

    Deputy

    of FliSafet

    Asst.ManagFlight S

    Deputyof FliSafet

    Deputyof FliSafet

    Flight SOffic

    FS-PIB-P-01 Ver: 0.0 dated 01-Aug-2010 Page 5 of 5