PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR THE PORT OF MANTA Delegation of the Multipurpose Deepwater Terminal Logistic Activity Zone, LAZ

Upload: others

Post on 07-Aug-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

PROCESS OF

DELEGATION UNDER THE

GRANT METHOD FOR

THE PORT OF MANTA

Delegation of the Multipurpose

Deepwater Terminal

Logistic Activity Zone, LAZ

Page 2: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

Index:

1. Background

1.1 Situation in the Pacific Coast

1.2 Situation in Ecuador

2. Purpose and approach of the delegation

3. Growth Program

4. Logistics Corridors

Delegation under the grant method for theMultipurpose Deepwater Terminal of the

Port of Manta

5. Manta Logistics Platform and Central Logistics Corridor

6. National Infrastructure Logistics Plan (ZEDE)

7. Multimodal Corridor Manta - Manaus

8. General Proposed of highway

9. Current and future network port

Page 3: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

1.1 Situation in the Pacific coast

BalboaBuenaventura

Callao

Valparaíso /San Antonio

Guayaquil

CartagenaColón

Colombia

Perú

Chile

Ecuador

Panamá

1.2 Situation in Ecuador1. Background

South America – Pacific CoastContainers Traffic by country (TEUS)

5,1 – 6,8 mTEU2030

2,8 – 3,3 mTEU2020

3,8 – 4,8 mTEU2025

2,0 mTEU2015

Containers Traffic Evolution in Ecuador

An

nu

alTr

affi

c(T

EU)

YEAR

Page 4: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

2. Purpose and approach of the delegation:

Objective

Having a Multipurpose Deepwater Port that integrates into theNational Port System to improve the competitiveness of the nationalforeign trade.

• Building a Project "appropriately" attractive to theprivate sector.

• Rate treatment that, while respecting the corporatebusiness, contribute to improving the competitivenessof the Ecuadorian trade permanently.

• Achieve recovery by the State of the investment withsome benefit.

Page 5: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

3. Growth program

2013

• Expansion of the International Quay 1 and thebreakwater (100 m.)

• 12 meters dredging (the access channel)

• New breakwater ande tha site of the new concoursewon the sea. Once completed the site will star fillingwith sand dredged from the new dock access -16.Dredging was completed pouring the material usedas filler in the open sea.

Phase 0Capacity: 50.000 TEU/year

Current SituationCapacity: 0 TEU/year

Page 6: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

2015 - 2017

3. Growth program

2020 - 2022

Phase 1Capacity: 300.000 TEU/year

• Completion of the breakwater

• Construction of the deepwater quay length of350 meters and depth of -16 meters.

• Installation of 2 post-panamax gantry at thenew quay

• Installation of necessary equipment tomeet demand

• Installed a third post-panamax gantry cranesat the new quay.

Phase 2Capacity: 700.000 TEU/year

• Once traffic reaches the figure of 250,000 TEU withina year, it will begin the construction of the secondquay with a length of 250 meters, with an extensionof the breakwater.

• Installation of a fourth post-panamax gantry craneat the new quay.

• 25 acres for container yard and services.

• Installation of necessary equipment to meetdemand.

Page 7: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

COLOMBIA

PERÚ

Relaciones funcionales Nivel 1

Distribución

Nodos de actividad petrolera

Leyenda

Producción manufacturera

Consumo

Relaciones funcionales Nivel 2

Guayaquil

Quito

Machala

TulcánEsmeraldas

Santo

Domingo

Latacunga

Ambato

Riobamba

Cuenca

Loja

Manta

Portoviejo

Nueva Loja

Quevedo

Ibarra

Babahoyo

Huaquillas

4. Logistics Corridors

Current situation Forecast 2015

COLOMBIA

PERÚ

Corredores logísticos consolidados

Corredores logísticos con potencial

de consolidación

Eje Estructurante nacional

Guayaquil

Quito

Machala

Tulcán

Esmeraldas

Santo

Domingo

Latacunga

Ambato

Riobamba

Cuenca

Loja

Manta

Portoviejo

Nueva Loja

Quevedo

Ibarra

Babahoyo

Huaquillas

Providencia

Puerto Morona

LMacará

Page 8: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

ZEDE

Deepwater Port

Int. AirportCargo and passangers

Manta

ZEDE Industrial Logistics and

petrochemical

AgrocentroPortoviejo

Dry portSanto

Domingo

WaterwaysPort

Providencia

WaterwaysPort - Nuevo Rocafuerte

WaterwaysPort - Pebas

Pijuayal

Int. Airportcargo and

passangersLatacunga

Airpotpassengers

Tena

Regional distributionCenter of Quevedo

5. Manta Logistics Platform and Central Logistics Corridor

Page 9: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

Local level

National -regional level

International level

Port Logistics areas

Logistic areas to support border

Consolidation Platforms of

regional cargo

Container transfer station

Multipurpose Agribusiness: distribution market, storage facility, and agricultural storage. Value added.

SEZ

Dry portsmultimodal

platform

Air cargo center

6. National Infrastructure Logistics Plan (ZEDE)6.1 SEZ characterization

Page 10: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

6.2 Location analysis

AccessibilityE1

O1.1. Connection to the main road axes

Port Logistics E2

O2.1. Port logistics optimization

Urban and Industrial LogisticsE3

O3.1. Accessibility to the Main Centers of Production and Consumption

InvestmentE4

O4.1. Minimization of the Investment Cost

EnvironmentE5

O5.1. Maximization of environmental sustainability

Social and Urban EnvironmentE6

O6.1. Maximization of the Positive Impact of the Platform in the Municipality

Page 11: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

6.3 Location Plant of SEZ

First Stage of ALZ

Page 12: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

6.4 Highways

ROAD NETWORK OF MANTA

Circunvalacion av. since University Av. Eloy Alfaro

until the axis to Rocafuerte

Lanes = 2 +2 lanes

Operational speed = 49.6 miles/h

Culture Av. since manta river mouth until

Circunvalacion av. following its course

Lanes = 3 +3 lanes

Operational speed = 49.6 miles/h

Montecristi-Portoviejo road by November 4th Av

IMD = 9,000 vehicles

Lanes = 2 +2, except start 3 +3

Operational speed = 37.2 miles/h

Road to Rocafuerte-Pichincha through 108th ave

IMD = 5,000 vehicles

Lanes = 2 +2 lanes before reaching the airport

Operational speed = 80km / h

Port-Airport Connection

Lanes= 3 +3 lanes before reaching the airport

Operational speed = 49.6 miles/h

The most important highways of manta as shown below:

Page 13: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

7. Multimodal Corridor Manta-Manaus

Central Corridor Manta-Manaus

International Airport

Deepwater port

Special Economic

Development Zone

Agribusiness development

center (Portoviejo)

Road Axis

Waterway

Page 14: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

7.1 Components of Multimodal Corridor Manta - Manaus

The Project have three strategic components:

Napo River navigation Improved

1

Port and Logistics Infrastructure

2 3

Promotion and Facilitation

Promotion andFacilitation

Geographic multimodal road axis

5 shipments arrived at Leticia; Colombia, increasing capacity shipping

of 780 Mt, with returning cargo in process (scrap). Container shipment

scheduled to 2012.

Page 16: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

8. General proposed of highway

MANTA – GUAYAQUIL 180,00 545.400.00,0

MANTA – QUEVEDO 200,00 606.000.00,0

PROJECTSDIST. (KM) PROJECT COST

Page 17: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

MANTA

FREEWAY MANTA-QUEVEDO Y RING ROAD OF QUEVEDO (DISTANCE: 150 KMS)

9. Current and future network port

QUEVEDO

Page 18: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

MANTA

GUAYAQUIL

FREEWAY MANTA-GUAYAQUIL (DISTANCE: 190 KMS)

9. Current and future network port

Page 19: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

Guillermo Morán VelásquezGeneral ManagerAutoridad Portuaria de MantaOffice: (593) [email protected]

Roberto Salazar BraccoBoard PresidentAutoridad Portuaria de MantaOffice: (593) 52623626E-mail: [email protected]

Address:

Av. Malecón Jaime Chávez Gutiérrez s/n,

Edificio Administrativo

Manta-Manabí-Ecuador

Office number:

Central number: (593) 52627161

(593) 52627162

General Management: (593) 52620993

Commercial: (593) 52627161

Operations: (593) 52629826

Press: (593) 52627161

Fax: (593) 52621861

[email protected]

[email protected]

http://www.puertodemanta.gob.ec

Follow us : @APortuariaManta

CONTACT US:

Page 20: PROCESS OF DELEGATION UNDER THE GRANT METHOD FOR … · 2012. 1. 11. · Autoridad Portuaria de Manta Office: (593) 52620993 gerente@apm.gob.ec Roberto Salazar Bracco Board President

Manta Ports Authority appreciates your trust and offers its multiporpose port.

“ Your best partner in logistic port, contributing to the enrichment of the business in the continent”.