prj566 : project planning and management project initiation document: scope, constraints, legal,...
TRANSCRIPT
![Page 1: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/1.jpg)
PRJ566 :Project Planning and Management
Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management
![Page 2: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/2.jpg)
What is a project? temporary—specific timeframe a goal: a product/service/result (scope) activities (scope, plan) resources (scope, plan) Budget (CBA) specifications (scope)
![Page 3: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/3.jpg)
A project has: Scope
Includes the goal of the project Describes the project perimeter (what deliverables the
project includes) A plan
Includes activities/tasks, resources (who does what), milestones, deadlines, quality assurance
A budget For human resources and other costs
Risks
![Page 4: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/4.jpg)
Project Challenges Common Problems and Causes
Scope too big (“scope creep”) or not well defined Tasks take longer than planned (“effort creep”)—
usually due to poor estimating, planning and management
Developers add “gold plating” (“feature creep”) E.g. very flashy user interfaces
![Page 5: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/5.jpg)
Top Reasons for project failure… Poor specifications Poor planning/estimating Poor risk management of “use of new
technology” risk Poor project management
This includes poor communication Poor risk management of “lack of skills”
risk
![Page 6: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/6.jpg)
In PRJ566 and PRJ666… Poor specifications Poor planning/estimating Poor risk management of “use of new
technology” risk Poor project management
This includes poor communication Poor risk management of “lack of skills”
risk
![Page 7: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/7.jpg)
Examples Ontario’s Welfare Computer System
“riddled with errors” Incorrect actions and data (threatening letters sent
to innocent clients) Very high down time Workers developed new and creative ways to
“work around” the computer system in order to get cheques mailed on time
Source: Toronto Star, July 10 & 13/2004
![Page 8: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/8.jpg)
Examples cont’d Ontario’s Welfare Computer System
Cost of down time? $2M in lost productivity (16 working days)
Cost of errors? $10M to Accenture PLUS cost to clients, workers
to fix error that did not allow increases
Source: Toronto Star, July 10 & 13/2004
![Page 9: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/9.jpg)
Examples cont’d Ontario’s Welfare Computer System
The total cost for this system to date--$500M What it could have been built for--$5M
(as per Robert Bernecky, Snake Island Research) Real cost is100 x what it should have cost and far
over budget.
Source: Toronto Star, July 10 & 13/2004
![Page 10: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/10.jpg)
The Project Life Cycle
Scope Plan Execute
Control
Close
![Page 11: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/11.jpg)
The Project Life Cycle Scope
Create a baseline “SCOPE” by gathering requirements, doing analysis
Manage changes to SCOPE Create a project plan
Carry it out and manage it making changes as required Finish the project
Lessons learned?
![Page 12: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/12.jpg)
You need to manage Scope Time Budget Quality COMMUNICATION People Risks …and so on
![Page 13: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/13.jpg)
The Pain Curve
Pain
Time
GoodScope/Plan
PoorScope/Plan
![Page 14: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/14.jpg)
Project Initiation Document
Date Submitted:
January 6, 2008
Team Number: 1
Team Members: Tom Tank / Anna Ko / Connie Long / Lee McKinnon
Project Title:
Client Information:
Ms. Freda Energy (Owner)
Target Completion Date:
![Page 15: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/15.jpg)
Scope of System being developed:
Functions/features that the will computerize for the client 1. Generate specified forms and reports Echocardiography study form Vascular study form Diagnostic report Billing status report Patients/physician report Pathology tracking report 2. Maintain patient and physician data Add/delete/view/print 3. Maintain system security and data integrity Maintain/add user access privileges Database backup Synchronize remote and local databases Read/store OHIP health card information 4. Static self-promotional Web site
Project Initiation Document
![Page 16: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/16.jpg)
Scope of System being developed (cont’d):
Systems the new system is to be designed to interface with No current computerized system Manual form/report generation Manual storage of patient/physician data as Word 2000
documents Any special requirements or processing OHIP card reader Self promotional Web site (targeted to US clients) Cross-referencing of data for medical studies (pathology
tracking) Mobile access (laptop) with system Include everything that you should do for the client to put the system into place (e.g. are there any networking requirements? who will set the network up?) Will install the system at both client locations: 111 King Street
and 222 Bloor Street Will create a quick update function to allow the client to enter
initial data quickly. Will train the client
Project Initiation Document
![Page 17: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/17.jpg)
Constraints Constraint is a limitation imposed on motion
or action Constraints that apply to the System
Constraints that apply to the system are factors that restrict how you run your project, how you build your system, or what methods and tools (hardware/software) you use. For example, the client might have specific software that you must use (E.g. Microsoft Access). Must use Windows Vista operating system Must use MySQL database Software language will be based on the knowledge of the
developers
![Page 18: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/18.jpg)
Risk Management
A risk is some future happening that results in a change, either positive or negative, to a project
Risk is usually associated with a loss which can be estimated
Estimation is a combination of two factors: The probability that the event will occur The severity of the loss if the event occurs
![Page 19: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/19.jpg)
Risk Management
As a project manager, need to mitigate (lessen) the risk and reduce the loss that could occur
Need to identify the risks, identify the probability they will occur and determine how the losses can be reduced or eliminated
Goes on throughout the whole life cycle of the project.
![Page 20: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/20.jpg)
Risk Management
PlanEstimate
Initiate Close(Re)Schedule
Carry out tasks
Monitor, adjust
Execute
For each phase of system development life cycle (SDLC)
Risk Management
![Page 21: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/21.jpg)
Identifying Risks
Lack of user involvement Lack of management support Poor definition of Scope Lack of proper planning Unrealistic expectations
![Page 22: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/22.jpg)
Identifying Risks
Too much new technology Lack of required skills Poor communication Poor estimating Poor project management
![Page 23: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/23.jpg)
Risk Symptoms
You know you are in trouble when: Scope starts creeping... Time starts to slip…critical path! “This isn’t what I asked for!” (client) “I’m really busy…can we meet later?” (client) “By the way…I can’t afford all
that stuff you said you needed...” (client)
![Page 24: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/24.jpg)
Risk Response Control
Scope creeps Review; negotiate Time slips Review estimates, resources Deliverable unacceptable
Revise; re-plan
Can’t get hold of client
Negotiate; Give something for client to critique – email?
Client budget gone
Renegotiate scope
What do you do?
![Page 25: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/25.jpg)
Risk Symptoms You know you are in trouble when:
“I don’t want to work with HIM/HER…” (team)
“Oops…this isn’t quite how I thought this technology would work…”
“I’m too busy to attend the project management meeting….”
I’m too busy to update the wbs, create the meeting minutes, update the project status…”
![Page 26: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/26.jpg)
Risk Response Control
Team interaction problems
Revisit contract; team rules/training; new team members?
Technology problems
Consult an expert; review plan
Team members too "busy"
Reinstate planning meetings; Reinstate control; New project manager?
What do you do?
![Page 27: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/27.jpg)
Risk Response Control
Risk tracking - part of project status Risk Assessment and Planning
In this section list all risks that you may encounter in carrying out your project. For each risk list how you plan to address it (to either minimize its impact or to eliminate it). Note: A risk is a circumstance that exists, or for which there is evidence that it may occur in the future, that has the potential of affecting the delivery of the project on time, on budget and with the agreed upon deliverables. Unfamiliar hardware (e.g. card reader)
Remedy: Arrange for training on how to use harware Team member inexperience with project scale, development
tools, etc. Remedy: Provide training to team members and track progress through weekly project status meetings
![Page 28: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/28.jpg)
Risk Response Control Risk
tracking - part of project status
![Page 29: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/29.jpg)
Risk Management Types of Projects:
Implementing a new POS system in a national retailer
Implementing a new online trading system for a financial institution
![Page 30: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/30.jpg)
Moral/Ethical/Legal Issues Moral
concerned with the distinction between right and wrong
Ethics treating of moral questions science of human behaviour
Legal Recognized by law
![Page 31: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/31.jpg)
Moral/Ethical/Legal Issues Ethics
many professions have a code of ethics, e.g. doctor’s, investment dealers, lawyers, accountants
CIPS standards: http://www.cips.ca/ethics Ethics and software development:
http://www.ibm.com/developerworks/rational/library/may06/pollice/index.html
![Page 32: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/32.jpg)
Moral, Ethical and Legal Issues
These are issues to consider in minimizing moral or legal complications during system creation or after system completion. All patient data will remain confidential Not responsible for post system implementation data
integrity/loss System ownership: System will belong to Super Solutions
Moral/Ethical/Legal Issues
![Page 33: PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649efc5503460f94c0fc39/html5/thumbnails/33.jpg)
Moral/Ethical/Legal Issues Types of Projects:
Online Clinic Implementing a new student records processing
system. (Move mainframe-based data to pc servers available online)
Implementing a new online trading system for a financial institution