private limited - 2.imimg.com · pdf filesaveair technologies private limited ......
TRANSCRIPT
SAVEAIR TECHNOLOGIES SAVEAIR TECHNOLOGIES PRIVATE LIMITEDPRIVATE LIMITED
• INCORPORATED IN YEAR 2005INCORPORATED IN YEAR 2005• DEVELOPED A STRONG CUSTOMER BASE DEVELOPED A STRONG CUSTOMER BASE • EXPOSURE TO INTERNATIONAL EXPOSURE TO INTERNATIONAL
CUSTOMERSCUSTOMERS• CARRIED OUT NUMBER OF ENERGY CARRIED OUT NUMBER OF ENERGY
SAVING PROJECTSSAVING PROJECTS• WELL VERSED IN LATEST Energy saving WELL VERSED IN LATEST Energy saving
TECHNIQUES/PRODUCTSTECHNIQUES/PRODUCTS
VISION VISION ““TO PROVIDE TO PROVIDE
Advanced Technology Advanced Technology AtAt
Affordable cost Affordable cost by by
EstablishingEstablishingAA
World Class customer centric World Class customer centric Organization“Organization“
MISSIONMISSION
• To SAVE All Important Resources “SAVE A I R” To SAVE All Important Resources “SAVE A I R” • To be a Leader in Power quality, Energy conservation Techniques & To be a Leader in Power quality, Energy conservation Techniques &
Energy management solutionsEnergy management solutions• To develop a CUSTOMER CENTRIC ORGANISATION To develop a CUSTOMER CENTRIC ORGANISATION • To constantly update the resources to suit the ever changing needs of To constantly update the resources to suit the ever changing needs of
the environmentthe environment• To be a leader in the field of CUSTOMISED AUTOMATION SOLUTION To be a leader in the field of CUSTOMISED AUTOMATION SOLUTION • To inculcate a culture of OPEN MINDED COMMUNICATION at all levels of To inculcate a culture of OPEN MINDED COMMUNICATION at all levels of
organisationorganisation• To Constantly develop global networks based on “WIN-WIN” relationshipTo Constantly develop global networks based on “WIN-WIN” relationship• To provide excellent Products & services in the field of CNC,PLC, DRIVES To provide excellent Products & services in the field of CNC,PLC, DRIVES
& ROBOTICS& ROBOTICS• To provide excellent Electrical products & services for both Consumer & To provide excellent Electrical products & services for both Consumer &
Medium IndustriesMedium Industries• To provide consultancy in the field of System Integration for all types of To provide consultancy in the field of System Integration for all types of
IndustriesIndustries• To Provide professional training in CNC,PLC & Drives for EngineersTo Provide professional training in CNC,PLC & Drives for Engineers
MAJOR PROJECTSMAJOR PROJECTS• Installation of Robotic welding cell for Scooter chassis welding Line-2005Installation of Robotic welding cell for Scooter chassis welding Line-2005• Installation of Fuel tank welding Line-2005Installation of Fuel tank welding Line-2005• Establishment of 5s & Quality system for an Automotive plant(2006)Establishment of 5s & Quality system for an Automotive plant(2006)• Revamping of Used Automatic welding cell & computerized Wheel Truth Revamping of Used Automatic welding cell & computerized Wheel Truth
analyzer(2007)analyzer(2007)• Energy Saving to the tune of 8000 units per day for a Continuous Paper Energy Saving to the tune of 8000 units per day for a Continuous Paper
Mill (2007-08)Mill (2007-08)• Saving of Energy cost of Airconditioners inSaving of Energy cost of Airconditioners in
– Semiconductor plant(2009)Semiconductor plant(2009)– Tractor manufacturer(2009)Tractor manufacturer(2009)– International Consulting group across India(2010)International Consulting group across India(2010)– Major Publishing house in Chennai(2011)Major Publishing house in Chennai(2011)
• Non-contact Sensor based Steam saving system for a starch polymer Non-contact Sensor based Steam saving system for a starch polymer processing unit(2010) processing unit(2010)
• Turnkey Design & supply of Vehicle testing system for reputed truck Turnkey Design & supply of Vehicle testing system for reputed truck manufacturer(2011)manufacturer(2011)
• Rectification of ABB IRC5 robot 2011Rectification of ABB IRC5 robot 2011
CURRENT PROJECTS CURRENT PROJECTS
• Energy saving project for an International Publishing Energy saving project for an International Publishing co( savings 15lakh/annum)co( savings 15lakh/annum)
• Continual Energy saving project for popular resort Continual Energy saving project for popular resort group in India( 7.7 lakh per annum as on date)group in India( 7.7 lakh per annum as on date)
• Energy saving project for a vehicle manufacturerEnergy saving project for a vehicle manufacturer• Revamping of 3 no Used CNC Machine Tools for Revamping of 3 no Used CNC Machine Tools for
various customersvarious customers• Turnkey integration of PLC Communication using IP Turnkey integration of PLC Communication using IP
protocol over steel wireprotocol over steel wire
ORGANISATION STRUCTUREORGANISATION STRUCTUREBUSINESS HEAD
DESIGN MANAGER HEAD MANUFACTURING HEAD SERVICES
MANUFACTURING ENGINEERS SERVICE ENGINEERSDESIGN ENGINEERS
Technician Electrical
Technician Mechanical
Draftsmen Operators/fabricators
MAJOR SUPPLY PARTNERSMAJOR SUPPLY PARTNERS
• BRANDNER ENGINEERING-GERMANYBRANDNER ENGINEERING-GERMANY• EXOR INDIA LTDEXOR INDIA LTD• RENU ELECTRONICSRENU ELECTRONICS• SYS-BASE KOREASYS-BASE KOREA• ABB-SWEDENABB-SWEDEN• TEKNO ROBOTS-ITALYTEKNO ROBOTS-ITALY• .. MANY MORE.. MANY MORE
PARTIAL Client list
• SPEL Semiconductors ,Maraimalai nagar• CARTA MISR Paper Mills,Egypt• Motherson Automotive Ltd,chennai• TAFE,sembiam, Chennai• TAFE Gears, Kelambakkam,chennai• BSIL, Pondicherry • KPMG-INDIA• INPAC-Delta Packaging co,Chennai• PRIMO Automations,Chennai• Bimetal Bearings,Thoraipakkam.• Necco tools• Vinay Automotives• Mercury Precision Gears,• Club Mahindra, Chennai• Zest Beach Resort ,Pondicherry• Mahindra Back water Retreat,Ashtamudi• Bharat Starch Industries Limited,,Pondy• Rane Engine valves,chennai• RANGER Cotton mills, GopichettyPalayam• RR Donnelly Publishing India Ltd,Chennai• Leland Deer Ltd• The HINDU• WIPRO INFRSTRUCTURE LIMITED
CARTA MISR Paper Mills-CAIRO-EGYPTCARTA MISR Paper Mills-CAIRO-EGYPTSPECIFIC ENERGY CONSUMPTION CARTA MISR-PLANT 1
328
58.9 62.7 67.6 65.1 71.8 74.2 83.4 83.8 72.5 82.5
367327350
378418
489
578
504564
3400
0 3279
6
3506
0
2804
9
2806
7
2921
1
2929
4
3668
2
2614
1 2709
0
0
100
200
300
400
500
600
700
Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08
MONTH & YEAR
Ener
gy p
er to
n
20000
22000
24000
26000
28000
30000
32000
34000
36000
38000
Daily
aver
age E
nerg
y co
nsum
ptio
n
Average energy per ton Daily average production Daily average energy consumption
SPECIAL PANELS FOR TEST SPECIAL PANELS FOR TEST EQUIPMENTEQUIPMENT
SPECIAL PANELS FOR TEST SPECIAL PANELS FOR TEST EQUIPMENTSEQUIPMENTS
PLC PANELS INDUSTRIAL PLC PANELS INDUSTRIAL PANELSPANELS• CUSTOMERSPECIFIC PLC PANELSCUSTOMERSPECIFIC PLC PANELS• INDUSTRIAL CONTROL PANELSINDUSTRIAL CONTROL PANELS• PANELS FOR SPECIAL PURPOSE PANELS FOR SPECIAL PURPOSE
MACHINES WITH S7-200 , S7-300MACHINES WITH S7-200 , S7-300• INDUSTRIAL CONTROLS WITH SIEMENS INDUSTRIAL CONTROLS WITH SIEMENS
SWICHGEARSWICHGEAR• PANELS WITH SIEMENS DRIVESPANELS WITH SIEMENS DRIVES• PANELS FOR ALL TYPES OF PANELS FOR ALL TYPES OF
AUTMATION NEEDSAUTMATION NEEDS
Project in Progress for CLUB Mahindra
“let us save energy if feasible”
Name of the Name of the ResortResort
Location Location Number of Number of Air Air
conditionerconditionerss
Total Total InvestmentInvestment
In Rs.In Rs.
Expected Expected annual energy annual energy
saving in saving in Kw/HrKw/Hr
Expected Expected annual annual
cost cost savingsaving
Reduction Reduction of Co2 of Co2
emission emission Tons per Tons per annumannum
Pay back Pay back periodperiod
Zest big beach Zest big beach ResortResort
PondicherrPondicherryy
28**28** 1,98,0161,98,016 5565055650 2,09,2442,09,24441.8 41.8
288 Days288 Days
Mahindra Back Mahindra Back water Retreat water Retreat
AshtamudiAshtamudi 4040 2,96,0002,96,000 5917059170 5,62,1115,62,111 44.444.4 216 Days216 Days
KumbalgarhKumbalgarh Resort,Resort,
RajasthanRajasthan 108108 7,99,2007,99,200 1,67,7541,67,754 9,22,6479,22,647 125.82125.82 316 Day316 Day
Corporate Corporate officeoffice
ChennaiChennai 3535 2,47,5202,47,520 5353053530 3,10,4733,10,473 40.1540.15 271 Days271 Days
**Installed 8 nos AC energy savers out of 28 nos originally planned & Saving verified and found to be 17% post installation.
Project Completed for KPMG INDIA-FEB -2010
“let us save energy if feasible”
KPMG Office KPMG Office Location Location
Number of Number of Air Air
conditionerconditionerss
Total Total InvestmentInvestment
In Rs.In Rs.
Expected Expected annual energy annual energy
saving in saving in Kw/HrKw/Hr
Expected Expected annual annual
cost cost savingsaving
Rs.Rs.
Reduction Reduction of Co2 of Co2
emission emission Tons per Tons per annumannum
Pay back Pay back periodperiod
ChennaiChennai 1313 9665096650 56,60256,602 3,99,0503,99,05042.542.5
84 Days84 Days
HyderabadHyderabad 1515 1,02,7501,02,750 29,24529,245 2,06,1812,06,181 2222 171 Days171 Days
Pune Pune BundgardenBundgarden
1313 89,05089,050 29,92629,926 2,10,9832,10,983 22.522.5 144 Days144 Days
Pune2 Pune2 (Kasarwadi(Kasarwadi
3434 2,32,9002,32,900 62,49262,492 4,40,5744,40,574 4747 180 Days180 Days
The entire project was completed during second & third week of Feb 2010
The post Installation savings was established