principles for managing contaminated sediment risks at hazardous … · 2020. 12. 6. · the 2002...

21
The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites" established at 2 tier system of headquarters consultations to encourage national consistency in making decisions at Superfund and RCRA Corrective Action sediment sites. Tier 1 sites are defined as sites where the proposed sediment action will address more than 10,000 cubic yards or five acres of contaminated sediment. Consultation for Tier 1 sites involves the submission of the draft Proposed Remedy or draft EE/CA and a discussion of how the 11 principles were considered to the Regional Coordinator 30 days prior to the public comment period. Tier 2 sites are a subset of the Tier 1 sites that are large, complex, or controversial and are subject to consultation with the Contaminated Sediments Technical Advisory Group throughout the RI/FS and remedy selection stages. This Tier 1 Tracking list is an EPA OSRTI product, largely developed by the Army Core of Engineers, and is intended to be a resource for contaminated sediment RPM's, headquarters and regional technical staff, and others supporting the remedy decision making process at these sites. The list tracks the Tier 1 sites that have signed a decision document and documents the remedy selected, the estimated and actual costs of the remedy, the contaminants of concern and the associated contaminated media, the Action Levels, the Clean-up Levels (CUL), the Remediation Goals (RG), and the Sediment Remedial Action Objectives (RAO). For those sites where the remedy has been implemented and a Five-year Review (FYR) has been completed, the list also documents whether monitoring was conducted for the FYR, data was presented in the report, and the CULs, RGs, and RAOs were met. A key aspect of this list is that the references for all the data in this spreadsheet are easily located. Each cell containing data is hyperlinked to a PDF with the page, or pages, from the relevant, public document that reports the data. Each PDF includes the cover page of the report with the information necessary to locate the complete document and the data included in the spreadsheet is highlighted in the text of the PDF. All of the information and documents included in this tracing list are publically available documents. THIS VERSION HAS BEEN PUBLISHED TO THE INTERNET WITH ALL OF THE HYPERLINKS REMOVED. WE APOLOGIZ THE INCONVENIENCE. EPA IS CURRENTLY UPDATING ITS WEBSITES AND IS TEMPORARILY UNABLE TO PUBLISH T TIER 1 TRACKING LIST WITH THE HYPERLINKS TO THE CITED DOCUMENTS. THE REMEDIAL ACTION OBJECTIVES A FIVE YEAR REVIEW DATA COLUMNS HAVE BEEN REMOVED FROM THIS VERSION BECAUSE THEY ARE LARGELY NARRATIVE TEXT AND REQUIRE THE CONTEXT PROVIDED BY THE HYPERLINKED DOCUMENTS IN ORDER TO BE PROPERLY UNDERSTOOD. WHEN THE INTERNET UPGRADE IS COMPLETE, THE FULLY CITED VERSION WILL BE PUBLISHED. UNTIL THEN, ANY QUESTIONS REGARDING THIS TIER 1 TRACKING LIST CAN BE DIRECTED TO MATT LAMBERT, EPA OFFICE OF SUPERFUND REMEDIATION AND TECHNOLOGY INNOVATION ([email protected]). The Tier 1 Tracking List includes sites in the Remedial Program where a Proposed Plan and Record of Decision w signed. The sites are organized by EPA Region number and then listed alphabetically by name. Due to the structu the list, columns cannot be filtered or sorted.

Upload: others

Post on 04-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"

The 2002 memo Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sitesestablished at 2 tier system of headquarters consultations to encourage national consistency in makingdecisions at Superfund and RCRA Corrective Action sediment sites Tier 1 sites are defined as sites wherethe proposed sediment action will address more than 10000 cubic yards or five acres of contaminatedsediment Consultation for Tier 1 sites involves the submission of the draft Proposed Remedy or draftEECA and a discussion of how the 11 principles were considered to the Regional Coordinator 30 daysprior to the public comment period Tier 2 sites are a subset of the Tier 1 sites that are large complex orcontroversial and are subject to consultation with the Contaminated Sediments Technical AdvisoryGroup throughout the RIFS and remedy selection stages

This Tier 1 Tracking list is an EPA OSRTI product largely developed by the Army Core of Engineers and isintended to be a resource for contaminated sediment RPMs headquarters and regional technical staffand others supporting the remedy decision making process at these sites The list tracks the Tier 1 sitesthat have signed a decision document and documents the remedy selected theestimated and actual costs of the remedy the contaminants of concern and the associatedcontaminated media the Action Levels the Clean-up Levels (CUL) the Remediation Goals (RG) and theSediment Remedial Action Objectives (RAO) For those sites where the remedy has been implementedand a Five-year Review (FYR) has been completed the list also documents whether monitoring wasconducted for the FYR data was presented in the report and the CULs RGs and RAOs were met A keyaspect of this list is that the references for all the data in this spreadsheet are easily located Each cellcontaining data is hyperlinked to a PDF with the page or pages from the relevant public document thatreports the data Each PDF includes the cover page of the report with the information necessary tolocate the complete document and the data included in the spreadsheet is highlighted in the text of thePDF All of the information and documents included in this tracing list are publically availabledocuments

THIS VERSION HAS BEEN PUBLISHED TO THE INTERNET WITH ALL OF THE HYPERLINKS REMOVED WE APOLOGIZ THE INCONVENIENCE EPA IS CURRENTLY UPDATING ITS WEBSITES AND IS TEMPORARILY UNABLE TO PUBLISH T TIER 1 TRACKING LIST WITH THE HYPERLINKS TO THE CITED DOCUMENTS THE REMEDIAL ACTION OBJECTIVES A FIVE YEAR REVIEW DATA COLUMNS HAVE BEEN REMOVED FROM THIS VERSION BECAUSE THEY ARE LARGELY NARRATIVE TEXT AND REQUIRE THE CONTEXT PROVIDED BY THE HYPERLINKED DOCUMENTS IN ORDER TO BE PROPERLY UNDERSTOOD WHEN THE INTERNET UPGRADE IS COMPLETE THE FULLY CITED VERSION WILL BE PUBLISHED UNTIL THEN ANY QUESTIONS REGARDING THIS TIER 1 TRACKING LIST CAN BE DIRECTED TO MATT LAMBERT EPA OFFICE OF SUPERFUND REMEDIATION AND TECHNOLOGY INNOVATION (LAMBERTMATTHEWEPAGOV)

The Tier 1 Tracking List includes sites in the Remedial Program where a Proposed Plan and Record of Decision w signed The sites are organized by EPA Region number and then listed alphabetically by name Due to the structu the list columns cannot be filtered or sorted

ZE FOR THE

AND

were ure of

Copper

Lead

Benzo(a)pyrene 00015Dieldrin 00011

Technical Chlordane 013

Aroclor 1254 0037Aroclor 1268 00112378-Tetrachlorodibenzo-p-dioxin

00000022

Total Aroclors 007644-DDD 0006244-DDE 0018

DioxinsFurans TEQ 0000044

Benzo(a)pyrene

Dibenz(ah)anthracene

Dieldrin

Technical Chlordane

Aroclor 1254

Aroclor 1268

Arsenic

2378-Tetrachlorodibenzo-p-dioxinCoplanar PCBs (TEQ)3Total Aroclors

Selenium

Zinc

44-DDD

44-DDE

Aluminum

Barium

VanadiumN-Nitroso-di-n-propylamine

38 (Est) Total PAHs

Total 44-DDTDDDDDE

Allendale Pond and Lyman Mill Pond Sediment

CALLAHAN MINING CORP

Callahan Mine (Region 1 Website)

CENTREDALE MANOR RESTORATION PROJECT

Centredale Manor Restoration Project (Region 1 Website)

LORING AIR FORCE BASE

1

00026

04

3 Ongoing 101 No Sediment

790

39

0000025

710

5100

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork Dates

OU Area Name

1

Dredge (1000 cu yds)

Lyman Mill Stream Sediment

SedimentsCap

Zinc

$21

1

156

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

046

11

221

0031

0000015

8210

134

376

006

In Situ Treatment (acres)

Sample Matrix

0023

165

14

Sediment

35

028

Sediment

Remediation Goal (ppm)

00084

0006

If needed 605

Fish

097

205 Yes 225

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Aroclor 1260

Total Chlordanes

Lead

44-DDD 0018

44-DDE 0013

44-DDT 0013

Aroclor 1242 00022

Aroclor 1260 00022

Heptaclor 000098

Chlordane Alpha 00034

Chlordane Gamma 00034

NEW BEDFORD

Acushnet River North of Wood Street (within Upper Harbor)

1202 - 303 156 (Act) No2002 ESD $317 (for all of OU 1)

Sediment (Upper Harbor) 10

Sediment (Lower Harbor) 50

Sediment intertidal areas with public access or abutting recreational land use

25

Sediment saltmarsh areas with little to no public access (aka Marsh Island)

50

2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000

Anthracene 051

Fluorene 02

Loring Air Force Base (Region 1 Website)

002

1

048

218

051

02

1

Region 1 New Bedford Website

1

1 Yes1997 - 199813 East Branch of Greenlaw Brook 86 (Act)

34 (Est)

Upper and Lower Harbor

900 (throughout OU1)

2004 - Ongoing

Seafood

1

2011 ESD $422-1200 (for all of OU1)

PCBs

NEWPORT NAVAL EDUCATION amp

481

Operation ongoing

Sediment

Fish

Sediment intertidal areas with abutting residential land use

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

PCBs 36

Pyrene 3

Copper 00529

Nickel 00337

NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp

Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1

MERCURY Sediment 10 (EMNR)

MERCURYFish (largemouth bass yellow perch bullhead)

048

PINE STREET CANAL 2002-2004

2004 78 (Act) (GeotextileSand Cap)

PAHs

Region 1 Pine Street Canal Website 82010 - 22011 08

2011 organoclay cap (size not specified)

Metals and Cyanide

SULLIVANS LEDGE 19 (Est)

86 (Act)

52 (Est)

255 (Act)

BATAVIA LANDFILL 25 (Est) PAHs

22001 - 122001 Yes

Unnamed Stream Ponds A and B 1998-2002

Turning Basin Pine Street Canal and Wetlands

Middle Marsh Wetlands 1998-2001

1

Nyanza Chemical Waste DumpRegion 1 Website

Region 1 Sullivans Ledge website

4

1

1

20 uggC

20 uggCPCBs

Sediment

PCBs

2 28Yes

Yes

36

NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals

Visual13 (soil and sediment)

75 (soil and sediment)

LEAD

Sediment

46000 tons (Act)(cyds not provided)

Sudbury River

McAllister Point Landfill (Narrangasett Bay)

ROD Date September 2010

226

Sediment

3

Area not specified 85

00529

44

ER-M Values

1

84

00337

ER-M Values

Porewater

1

EDUCATION amp TRAINING CENTER

NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website

1

4

Sediment1

Yes

Deleted from NPL Act Wetland

upper portion of stream diverted

2 1 Wetland Areas June 2001 - June 2003

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

BRIDGEPORT RENTAL amp OIL SERVICES

PCBs 10

LEAD 1000

Total Petroleum Hydrocarbons None

LEAD 250

PCBs 5

3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment

St Lawrence River 61995 - 111995 13 (Act) 2 (Act)

Turtle CreekTurtle Cove 1004 - 305

23 (Act) (soil and sediments)

01

Raquette River 602 - 503 14 (Act)

GOWANUS CANAL ROD Date Sept 2013588 (Est)

Area not stated (dredgecap remedy)

In-situ stabilization of 3-5 feet of NAPL-containing sediments

PAHs

Holding Tanks for CSO Control

Copper

Lead

Grasse River Superfund Site(aka Alcoa Aggregation Site)

2431 Sediment 1

Yes Area not specified

Region 2 Bridgeport Rental amp Oil Services Website

175 (Est) 106 (Est)

1

Little Timber Creek Swamp

2 Sediment

20

80

94

g

None

125 Sediment

LEAD 11292005

area volume not specified

2

2

BURNT FLY BOG

2Downstream Area and Westerly Wetlands

400049

2

11795 - 1996

gt6000 tons (Act) (soil and sediment)

10

1000

ROD dateSeptember

Sediment

PCBs Sediment

22

1

1

GENERAL MOTORS (CENTRAL FOUNDRY DIVISION)

1

Gowanus Canal (Region 2 Website)

215 01

Canal Sediments

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Grasse River(Region 2 Website) Fish

001-005 (Final Remedial Goal)

026-036(Interim Target Concentrations)

HOOKER (102ND STREET) Sediment 01

(organics)

Deleted from NPL 852004 Sediment 02

(Mercury)

Fish 005

Sediment 3 gm2 (MPA)Sediment 10 gm2 (MPA)Fish 005SedimentFish 005

(change in ESD from dredging to excavation)

981 (Est) ROD 21

85000 Tons (Act) ESD 50-75

2

LOVE CANAL

Deleted from NPL 9302004

2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001

Biological Sampling None

Sediment 100

56 (Est)

Sediment Excavate up to 1 ft

580 (Est)

HUDSON RIVER PCBS

ROD Date April 2014

Upper Hudson River (Section 2)

Grasse River

Hudson River PCBs EPA Website Upper Hudson

River (Section 3) 510 (Est)

None

0001

Not specified

New York State Sediment TBCs

11

PCBs284

$36 - 56

2 109 Yes

Yes2 1 Niagara River Embayment 71996 - 111996 28 (dredge

to 2 feet)

PCBs

1

PAHs METALS CHLORINATED ORGANICS (MULTIPLE)

22502 2

Upper Hudson River (Section 1)

ROD dateFebruary 20 Area not specified

1560 (Est)

Yes

2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001

485 CADMIUM

INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC

Sediment

CADMIUM

Biological Sampling

100

2

MARATHON BATTERY CORP 1

East Foundry Cove Marsh and Constitution Marsh

91993 - 31995

Actual not sp

30 (Est)

Deleted from NPL 10181996 2

East Foundry Cove West Foundry Cove and the Cold Spring Pier Area

91993 - 31995

Yesbentonite clay layer

40

95 Removal 10 mgkg

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

ROD dateJuly 2005

MERCURY and others Sediment 014-2

Operations Ongoing

5LCP Bridge St SiteWest Flume and Wetland AB

June 2005 - July 2007

543 (Est)917 (Act) Yes 96 MERCURY Sediment 02

MERCURY and others Sediment

Mercury Fish 01-03

Sediment Soil (flood plain)

Fish 01 - 03

Raritan Bay Slag

Raritan Bay Slag (Region 2 Website)

52 (Est) PAHs 1086 (Act) PCBs 1

TDBFs 0001

2RICHARDSON HILL ROAD LANDFILLPOND

1South Pond and Herrick Hollow Creek

2004 285 (Act) 139 PCBs Sediment 1

116 (Est) PAHs

240 (Act) Metals

3

River Areas (Blackwater Branch Floodplain amp Maurice River)

2006 - ongoing 626 Yes 11 ARSENIC Sediment 20

4 Union Lake Sediments Remedy not yet initiat Unknown Yes Sediment

Washing 129 ARSENIC Sediment Unknown

2000-2001 11 (Est) LEAD Not specified

METHYL Hg Fish

2

ONONDAGA LAKE

Region 2 Onondaga Lake Website

03

0 400

See Attached

20 exposed 120 submerged

1

Lead 400Sediment787ROD Date May 2013 34 (Est)

425 (Est) 1771 154 (Est)

2

2 Onondaga Lake Bottoms Subsite 2407 (Est)

Geddes Brook NineMile Creek Reach BC CD

ROD DateApril 2009

June 2012 - ongoing

59 (Est)20

24Geddes Brook NineMile Creek Reach AB

414

Combined with Dredge volume

Yes

151

Partial Channel Re-location

June 2012 - 16 (Est) 42 (Est) Yes MERCURY and others

015

54 (Act) Sediment

189

2

REYNOLDS METALS CO

Not on the NPL - Superfund Alternative Site

1 St Lawrence amp Raquett Rivers 412001 - 102001 35

ROEBLING STEEL CO 5 Delaware River and

Crafts Creek Sediment2010-2013 Yes2 11

2 VINELAND CHEMICAL CO INC

120

08

015

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

15 (Act) PCBs

Complete Removal or

1

PCBs

1 Contingent on biological and chemical testing

LEAD Not specified

ATLANTIC WOOD INDUSTRIES INC 6 7 45 to 100

Region 3 Atlantic Wood Industries Website

157 (Est) 100

CADMIUM 60LEAD 1200ZINC 5600CADMIUM 60LEAD 1200

ZINC 5600

CADMIUM 20LEAD 700ZINC 3000

KOPPERS CO INC (NEWPORT PLANT)

ROD dateSeptember 2005

Region 3 Koppers Co Inc Website

Remedy not yet initiated

METAL BANKS RiverMudflat Sediments

METAL BANK (Regional Website)

OU Name SOIL EXCAVCONTAIN

BORONCOPPERLEADZINC

PCB-1260

Sediment

Unknown

Contamination Pathways - Northwestern Wetland

River Water and Sediments

1

PAHs

3

2010-Ongoing

Cedar Creek

Dunham Creek

Christina River

1727

39

37 (Act)

Yes

Yes

Unknown (Act)

Yes

33

Yes

2

50

Contamination Pathways - Western Wetland

126 (Dredging and Disposal)

Sediment

Sediment

2 YORK OIL CO

Sediment

Sediment

tPAHs3 3

12

7 51099 - 9899 11 (Act)

425 South Wetlands 1997 - 12897

95 (Act)

3

3 North Wetlands 1997 - 12897EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL)

Region 3 EI duPont Website

150

47

Sediment 1

Unknown

Sediment

Re-channelize portion of Hershey Run

Sediment

Unknown

PCBs12 (Est)

58 (Est) Unknown3 1

3 1 2008-2010

Wetlands Ponds and Hershey Run

4 1 ROD dateAugust 2006

94 (Est)

38 (Est)Yes

AMERICAN BRASS INC

American Brass Inc (Regional Website) 429

170780

22028

Yes

Sediment

5176

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

AMERICAN CREOSOTE WORKS INC

American Creosote Works Inc(Regional Website)

Arsenic Sediment

Cadmium Sediment

Fish 3 ppt

Sediment

$20 (Total) TOTAL PAH Sediment 100

DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company)

ROD dateSeptember 2008

Unknown

23

Mercury

143 river miles Dioxin

0

PCBs

196

53000 (O3R amp PR)

57000 (CBR)

640 (Ocoee 3 amp Parksville Reservoirs)

680 (Copper Basin Reach)

5

2200 (CBR)

2

4

Lower Roanoke River

4

Sediment

970 (O3R amp PR)

Sediment

Iron Sediment

Sediment

250 (O3R amp PR)

Yes

Sediment

COPPER BASIN MINING DISTRICT SITE

Copper Basin Reach

Ocoee No 3 Reservoir

Parksville Reservoir

ROD date September 2011

Fish

Region 4 Copper Basin Mining District Site website

4 ROD date September 2007 40 (Est)

Copper

Zinc

Area Not Specified (approx 14 river miles)

Railroad Lake and Hughes Creek

Lead

145 (CBR)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website

4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment

0 (Est) 3 (Act)

$045 (ROD)

01 (ESD)

North Marsh Sediments No info 15 (Act)

1000 linear feet 025 acre (Est)1300 linear feet (Act)

SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION

Fish 2

Lake Hartwell (Regional Website) Sediment

TENNESSEE PRODUCTS 142 (Est) $94 (ROD) Visual

107000 tons (Act)Followed by capping

71 (Act)Aquablock $257 (ESD)

Chattanooga Creek NTCRA 1997-1998 229 Yes Visual

TRIANATENNESSEE RIVER

Fish (channel catfish)

Region 4 TrianaTennessee River Website

Fish (smallmouth buffalo)

Fish (largemouth bass)

WARD TRANSFORMER

Reach A (Removal Action) June 2007 - 2009

150000 tons (Est)Approx 400000 tons (Act)

PCB Sediment

Region 4 Website Sediment

Fish 005

PAHs

Arsenic

Region 4 Tennesse Products Website

1

1

4 1

Ashley River 7101 - 12101

South Marsh Sediments

Barge Canal

Region 4 Koppers Co Inc (Charleston Plant)

KOPPERS CO INC (CHARLESTON PLANT)

0001

32 (Est)0 (Act)

0 (Est)32 (Act)

3103 - 6103

SedimentWeight of Evidence Approach

$05 (ROD)3 (ESD)

Lead

42003 ESD selected MNR for the area

19 tons (Act) 15 (Est)2 (Act)

730 (Est)

17

282

23

01

321 PCBs

1

4 2Twelve Mile CreekLake Hartwell

ROD date62894

Chattanooga Creek - Middle Reach

September 2005 - September 2007 PAHs Sediment

4 0

Reach AHuntsville Spring Branch - Indian Creek

4186 - 101487 DDT 5

Rerouted river buried in-place sediments

No sediment CUL

4Reach B C D and lower Brier Creek

13 (soil and sediment) (Est)ROD date

S t b 2008

Yes

No sediment CUL

No sediment CUL

1

1

None

4

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Sediment

Fish 005

BENZO(A)PYRENE 8

BENZO(BampK)FLOURANTHENE 7

BENZO(A)ANTHRACENE 95

INDENO(123-CD)PYRENE 465

ARSENICBERYLLIUMARCHLOR-1016 3ARCHLOR-1242 3ARCHLOR-1254 3ARCHLOR-1248 3ARCHLOR-1260 3BENZO(A)ANTHRACENE

BENZO(A)PYRENE

BENZO(BampK) FLOURANTHENEDI-BENZ(AH) ANTHRACENEINDENO(123-CD)PYRENEARCHLOR-1248ARSENICLEAD

1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 Sediment 1

2 Appleton to Little Rapids

MNR RemedyROD Date 122002 3 (Est) 20 river

miles Sediment

Sediment 1

Fish (Walleye) 005

Sediment 1

Fish (Walleye) 005

MNR RemedyROD Date 62003

Approx 2700 sq miles

1

701(2010 ESD)

5 PCBs

1

CONTINENTAL STEEL

Region 5 Continental Steel Website

FOX RIVER NRDAPCB RELEASES

Proposed to be added to the NPL

Lower Fox River Cleanup Website

4

Sediment

02

04

119

PCBBrier Creek Reservoir Lake Crabtree and Lower Crabtree Creek

September 2008

Remedy not yet initiated

12

~25 river miles

$37 (Total)

4 Markland Avenue Quarry 3252008 - 612010

5

3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est)

08

1

400

Sediment

14

19

1

11

175Yes

297000 cy

SWAC 025

SWAC 028

11

390 (2005 ROD Amendment)

3273 (Est) 136 (Est)

3216 (Est)

227 (Est)

De Pere to Green Bay 2007 - ongoing

Little Rapids to De Pere 42009 - ongoing

Yes

5 Green Bay

05

Sediment

025 (SWAC)

05

16

19084

093

None

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER)

43 (Est) Yes RADIUM 226

Region 5 Kerr-McGee Website 129 (Act) RADIUM 228

LITTLE MISSISSINEWA RIVER

Not on the NPL - Other Cleanup Activity Private Party-Lead Cleanup

Sediment4 (0-1ft) 5 (deeper than 1ft)

Little Mississinewa River

(Region 5 Website)

Fish Unknown

North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below

71992 to 91992 55 (Est) Yes 074

Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below

1991-1992523 (EST)

30 (ACT)131

2010-2012 PCBs 1

PAHs 2

Fish (Sport) 003 - 01

1 (0-1ft)5 (deeper than 1ft)

72 picoCuries per gram (pCig) combined radium

Yes

57 (Est)

100000 tons (Act)

Kress Creek Site

5 0 Little Mississinewa River

Spring 2005 - Fall 2009

5 0 Summer 2005 - 2012

2012-2013 195 (Est)

$719 (Total) Sediment128

PCBs25 miles (Est) 27 20

OUTBOARD MARINE CORP (Region 5 Website)

4 formerly 1

1HarborSlip No 3(2009 ROD Amendment)

Sediment

PCBs

5

OUTBOARD MARINE CORP 1

Yes40 (soil and sediment) (Est)

Unknown

50 (upper harbor)

Sediment

73

OMC Plant 2 North and South DitchROD Date August 2007

2012 ROD Amendment

Yes PCBs349

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

36 (Est)

54 (Act)

53 (ROD)51 (ESD) Sediment 26

51 (ACT)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Sediment 26Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

21 (Est) SedimentNone (88 mass removal of PCB)

21 (Act)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Copper

VELSICOL CHEMICAL CORP (MICHIGAN)

640 (Act) Carp Smallmouth Bass 1708

Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5

Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000

Natural Recovery Areas 122001 - ongoing Area not

specified

North of Dredge Island NA Actual ROD

Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act)

MERCURY

Pine RiverSt Louis Impoundment

05

Sediment

Amendment)

PCBsYes Sediment

Sediment 1

5

SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI)

2 Area 9 -- Lake Embayment 1295 - 0697

SHEBOYGAN HARBOR amp RIVER

1

Lower River and Inner Harbor Completed in 2012

Region 5 Sheboygan River and Harbor Superfund Site Website

Middle River

Remedy not yet startedAOC dateFebruary 2009

02 (SWAC)

05

05

05

Yes (ROD)

7 miles

12

PCBs

Sept 2004 - October 2007

5 DDT

Unknown area

5 Torch Lake 2

Yes

6

$60 (Total)

ALCOA (POINT COMFORT)LAVACA BAY

1PAHs 448 Total

Upper River 31

Surface WatersNPL DeletionFeb 5 2002

ROD DateMarch 311994

5

$30 (as of 2002)2 1999 - 2005

No Action

161

15

Hg 025 Marsh 05 Open Water

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Witco Marsh 12006 - 42006 57

Chlor-Alkali Process Area (Treatability Study)

August 1998 (Phase I)January 1999 (Phase II)

80 (Act) 1952 MERCURY Mass removal

20 (tar and sediment) (Act)

6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995

47 (ROD Est)150 (ESD Est)170 (Act)

Yes 226 PAHs Sediment 1300

MILLTOWN RESERVOIR SEDIMENTS

2600 (Est)

Region 8 Milltown Reservoir Sediments Website

2560 (Act)

ROCKY MOUNTAIN ARSENAL (USARMY) 19 (Est) Yes (Est) ALDRIN 38

DIELDRIN 37

CHLORDANE 12

ROCKY MOUNTAIN ARSENAL (Region 8 Website)

DDE None

DDT 14

ROCKY MOUNTAIN ARSENAL (US Army Website)

MERCURY 82

ARSENIC 270

SHARON STEEL CORP (MIDVALE TAILINGS)

1 436 (Est) ARSENIC 70

Sediment None

PAHs

North Marsh Area Unknown Sediment None

6 (EST)

8 1 Milltown Reservoir Sediments

Remediation completed Dec 2010

Deleted from NPL 10152007

6

BAILEY WASTE DISPOSAL

1 January 1996 - September 1996

Yes

39 Sediment

Channel realignment and construction

ARSENICCADMIUMCOPPERLEADZINC

140

8 3Lake Sediments Remediation Project

June 1999 - Aug 1999

No (Act)33 (Act)

Yes

Area not specified

Aug 1996 - Sept

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

100 (Act) LEAD 500

CADMIUM None

ARSENIC 200 979CADMIUM 20 099

COPPER 1000 316

LEAD 1000 358

ZINC 1000 None

SILVER BOW CREEKBUTTE AREA (MT STATE Website)

Sediment Trap MERCURY 10 018

2008-20011 ARSENIC

COPPERRegion 9 Iron Mountain Mine Website

IRON

MCCORMICK amp BAXTER CREOSOTING CO

88 (Est) DIOXIN 000021 TEQ

Region 9 Website McCormick and Baxter Creosoting

88 (Act) PAHs 333 (OC)

TOTAL PCBs 035TOTAL DDT 00648TOTAL CHLORDANE 0931

CADMIUM 184LEAD 173MERCURY 152SELENIUM 0926SILVER 137ZINC 720

MONTROSE CHEMICAL CORP DDT Sediment

White Croaker 04

Water

Palos Verdes Shelf (Region 9 Website) PCBs Sediment

White Croaker 007

Water

9 300 Area not specifiedPalos Verde Shelf

46 (OC) interim23 (OC) Final

00648

Sediment

(elevation raised above water line)

047

SILVER BOW CREEKBUTTE AREA

1 Streamside Tailing (Silver Bow Creek)

Deleted from NPL 9242004

Marshy Area

1996

Sediment

Channel realignment and construction (176 miles)

July 1999 - Ongoing 73 (ROD Est) Yes None

0000021 TEQ

Yes

Sediment susceptible to erosion dredged to a specific elevation

None186

Sediment

Sediment$44 (ROD)$98 (ESD)

15 area not specified9

IRON MOUNTAIN MINE

5 Spring Creek Arm 200 (Est)

8

ROD dateSeptember 2004

SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website)

9 3 Old Mormon Slough 2006

9

MOFFETT NAVAL AIR STATION

8 Site 27 - Northern Channel completed in 12007

Naval Air Station Moffett Field Website

68

area not specified 35

173152

0064 ngL

Sediment

0931656 (soil and sediment) (Est)

035

333 (OC)

184

0926137720

022 ngL

7 (OC)

8

5 Interim ROD Date September 2009

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

UNITED HECKATHORN CO

Region 9 United Heckathorn Co WebsiteBunker Hill Mining and Metallurgical 3 Arsenic

CadmiumRunker Hill Mining and Metallurgical (Regional Website)

Copper

LeadMercurySilverZinc

COMMENCEMENT BAY NEAR SHORETIDE FLATS

Partial deletion (St Paul Waterway) 1996

1Olympic View Resource Area (NTCRA)

Completed in 102002

11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ

20 (Est) ARSENIC10 (Act) COPPER

LEADZINC

1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13

ARSENIC 160COPPER 1100ARSENIC 97HEX-CB 01HPAHs 32PCBs 045

Occidental Site Removal Action (NTCRA)

completed March 2003 36 (Act) 10 PCE Sediment

CADMIUM 66HPAHs 22LEAD 580MERCURY 077ZINC 490COPPER 470MERCURY 071LPAHs NoneHPAHs None

18 cy (Est) ARSENIC 93 (Dredge) 57 (Cap)

70 (Act) COPPER 390 (Dredge and Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

Sediment

1752

57

000002 TEQ

530

dredge all soft sediments

preponderance of evidence approach

DDT SedimentYes 7 059 (average)Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)

65 (Proj)

10

COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website)

1 Sitcum Waterway completed in 1994 428 (Act)

19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 174 Sediment 390

450410

Sediment 39045 (Act) 4

1

Hylebos Waterway 32003-22005 940 11 20

17450

46

03

0022Sediment 17

05 (Act) 87 (Act)

4 (Est)

57

21 (Est)

Sediment

82 Sediment

125

60

390

22 (Act)

32 (Est)

059

1Thea Foss and Wheeler-Osgood Waterways

2002-2006 423 (Act)

1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes

HARBOR ISLAND

059410

57

390

960 (OC)

067

93

0057

51

ROD Amendment date Aug 201210 Upper Basin Not specified

9 1

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

LEAD 530 (Dredge) 450 (Cap)

LPAHs780(OC) (Dredge) 370(OC) (Cap)

MERCURY 059 (Dredge) 041 (Cap)

PCBs65(OC) (Dredge) 12(OC) (Cap)

ZINC 960 (Dredge) 410 (Cap)

TBT Not available

ARSENIC 93 (Dredge) 57 (Cap)

COPPER 390 (Dredge and Cap)

LEAD 530 (Dredge) 450 (Cap)

MERCURY 059 (Dredge) 041 (Cap)

116 (Est) ZINC 960 (Dredge) 410 (Cap)

220 (Act) LPAHs780(OC) (Dredge) 370(OC) (Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

PCBs65 (OC) (Dredge)12(OC) (Cap)

TBT Not available

MERCURY

PCBs

KETCHIKAN PULP COMPANY

4-METHYL-PHENOL 17

Not on the NPL - Superfund Alternative Sited

AMMONIA 120

Region 10 Ketchikan Pulp Company Web Site

SULFIDE None

PCB

0002

57

370 (OC)

Yes In dredge areas No area given

370 (OC)

041

12 (OC)

$15(ROD) $12(ESD) 20 Sediment

5 (Act)(223235 sq ft)

10

Todd Shipyard Sediments 7604 - 22007

Region 10 Harbor Island (Lead) Web Site

9

5 (Act)12 (Act) In dredge areas

10

(LEAD)

7 Lockheed Sediments 7703 - 2405

East Waterway Sediments NTCRA

11204 - 31605 (removal action)No ROD completed for this OU

206 (Act) - Removal action

13 (Act) In dredge area

$45-$69 21 Sediment

17 16 Sediment

21 (Est) 27(Act) 44Yes 50 (Est)

52 (Act) 31 Sediment

410

10 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est)

87 (Act)

Not Stated Benthic toxicity community structure and chemistry

Not available

390

450

12 (OC)

450

041

12 (OC)

041

410

960 (OC)

not available

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Arsenic

Lead

Copper

Mercury

Carcinogenic PAHs (TEQ)

TBT

DioxinsFurans

Multiple Others

MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT)

ARSENIC

Region 10 McCormick and Baxter Creosoting

DIOXINSFURANS

PAHs

PCP

Arsenic (III)

Chromium (III)

Copper

Zinc

PCP

Acenaphthene

Fluoranthene

10 Sediment

11

7

041 (subtidal)017 (intertidal)

114

see attached

0009

LOCKHEED WEST SEATTLE

Lockheed West Seattle (Region 10 Website)

Lockheed West ROD Date August 2013

116 DredgeE

MNR

284 EMNR only

1 167potential use in shallow areas

yes 477

54 μgL

520 μgL

13 μgL

10

190 μgL

23 12

Water

23 (Act)organoclay

4 72004-92005Sediments

000008

100

Sediment

ORDEQ McCormick amp Baxter Creosoting Co Web Site

15 (Est)

12 μgL

2

12

110 μgL

210 μgL

043 (subtidal)2 (intertidal)

Washington State CSL or SQS

0000002

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Naphthalene

Total cPAHs

Dioxinsfurans

PCBs 004COPPERLEADZINCSILVER2 4-DIMETHYL-PHENOL

PCBs Shellfish (intertidal clams) 0042

50 (Est) LMWPAHs 780(OC)

58 (Act) HMWPAHs 5300(OC)

98 (Act)Capped dredge areas

PCBs

12 (OC) (trigger for sediments to 10 feet depth)

Fish (English sole) 0023 ww

Sediment12 (OC) dredgecap 6 (OC) EMNR

Sediment in state owned adjacent lands

9 (OC) EMNR

MERCURY Sediment3 where PCBs greater than 6 (OC)

ST MARIES CREOSOTE - proposed to be added to the NPL

ROD dateJuly 2007 LPAHs

370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)

St Maries Creosote (Regional Website)

Remediation Ongoing HPAHs

960 (OC) (17 if TOC lt02or gt4)

7-10 (Est)

200 (Est)

10 (Act)

35 (Est)

510

OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA)

1 Clam Bay Sediments 61999 - 102001

15

450

Area not specifiedYes

12 (OC)

46 71Sediment

013390

61

0029

410

10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005

960(OC)49 Sediment

12

PCBs

3 (OC) SWAC12 (OC)) SWAC

10PUGET SOUND NAVAL SHIPYARD COMPLEX

2 OUB Marine 61600 - 3104

225 (Act)

10 0Shoreline Nearshore and Offshore Sediment

29 (Est) Yes

211 9

108 Sediment

5

1x10-5 ngL

031 μgL

620 μgL

370(OC)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

MERCURY (toxicity test opt-out)

LPAHs 780 (OC)

HPAHs 5300 (OC)

MERCURY 059 subtidal

LPAHs 780 (OC) subtidal

HPAHs 5300 (OC) subtidal

MERCURY 059

LPAHs 780 (OC)

HPAHs 12 dw intertidal

MERCURY 5 21059LPAHs

HPAHs 12 dw intertidal

48 (Act)

30(Act)

54 (Act)

Region 10 Wyckoff Eagle Harbor Web Site

East HarborWest Beach Sediments

2007-2008

31997 - 121997 13-92 (Est) Yes

10

WYCKOFF COEAGLE HARBOR

1

East HarborPhase 1 - NTCRA

91993 -31994 (Phase 1)

East HarborIntertidal and Subtidal Sediments

2000-2002

3 West Harbor

117

780 (OC)

23

$6-20

Sediment

Sediment

059 (dw)

5300 (OC)

780 (OC)

5300 (OC)

5300 (OC)

Sediment

059

49 $62 - $16 Sediment12 - 31 (includes EMNR)

see cap

059

780 (OC)

  • READ_FIRST
  • Tier 1 Sites - Remedial
    • READ_FIRST

      The 2002 memo Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sitesestablished at 2 tier system of headquarters consultations to encourage national consistency in makingdecisions at Superfund and RCRA Corrective Action sediment sites Tier 1 sites are defined as sites wherethe proposed sediment action will address more than 10000 cubic yards or five acres of contaminatedsediment Consultation for Tier 1 sites involves the submission of the draft Proposed Remedy or draftEECA and a discussion of how the 11 principles were considered to the Regional Coordinator 30 daysprior to the public comment period Tier 2 sites are a subset of the Tier 1 sites that are large complex orcontroversial and are subject to consultation with the Contaminated Sediments Technical AdvisoryGroup throughout the RIFS and remedy selection stagesThis Tier 1 Tracking list is an EPA OSRTI product largely developed by the Army Core of Engineers and isintended to be a resource for contaminated sediment RPMs headquarters and regional technical staffand others supporting the remedy decision making process at these sites The list tracks the Tier 1 sitesthat have signed a decision document and documents the remedy selected theestimated and actual costs of the remedy the contaminants of concern and the associatedcontaminated media the Action Levels the Clean-up Levels (CUL) the Remediation Goals (RG) and theSediment Remedial Action Objectives (RAO) For those sites where the remedy has been implementedand a Five-year Review (FYR) has been completed the list also documents whether monitoring wasconducted for the FYR data was presented in the report and the CULs RGs and RAOs were met A keyaspect of this list is that the references for all the data in this spreadsheet are easily located Each cellcontaining data is hyperlinked to a PDF with the page or pages from the relevant public document thatreports the data Each PDF includes the cover page of the report with the information necessary tolocate the complete document and the data included in the spreadsheet is highlighted in the text of thePDF All of the information and documents included in this tracing list are publically availabledocumentsThis Version has been published to the internet with all of the hyperlinks removed We apologize for the inconvenience EPA is currently updating its websites and is temporarily unable to publish the Tier 1 Tracking List with the hyperlinks to the Cited Documents The Remedial Action Objectives and Five Year Review data columns have been removed from this version because they are largely narrative text and require the context provided by the hyperlinked documents in order to be properly understood When the Internet upgrade is complete the Fully cited version will be published Until then any questions regarding this Tier 1 Tracking List can be directed to Matt Lambert EPA Office Of Superfund REmediation and Technology Innovation (lambertmatthewepagov)The Tier 1 Tracking List includes sites in the Remedial Program where a Proposed Plan and Record of Decision were signed The sites are organized by EPA Region number and then listed alphabetically by name Due to the structure of the list columns cannot be filtered or sorted

      Tier 1 Sites - Remedial

      264pdf
      Websitehttpcumulisepagovsupercpadcursitescsitinfocfmid=0101431
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100948
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101479
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100744
      216pdf
      1-011pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100743
      Website httpwwwepagovnbhindexhtml
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631F8CFE11E53EFA23C8525691F0063F6E8OpenDocument
      1-009pdf
      260pdf
      702pdf
      Website httpyosemiteepagovr1npl_padnsf31c4fec03a0762d285256bb80076489ca48c071b6a314e1c8525691f0063f6ddOpenDocument
      1-068pdf
      608pdf
      610pdf
      611pdf
      612pdf
      631pdf
      681pdf Soil and sediment not differentiated
      682pdf
      1-057pdf
      692pdf
      695pdf
      700pdf
      703pdforig 1998 estimate
      1-035pdf
      679pdf
      1-005pdf
      636pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      638pdf
      636pdf
      1-010pdf
      1-074pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      1-017pdf
      1-018pdf
      1-020pdf
      215pdf
      694pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-024pdf
      1-023pdf
      1-025pdf
      1-026pdf
      1-027pdf
      1-027pdf
      1-028pdf
      1-025pdf
      1-047pdf
      1-031pdf
      1-033pdf
      1-034pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101074
      1-012pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201766
      738pdfDates are for entire construction not only sediment portion
      356pdf
      2058pdf
      735pdfThis represents cost estimate for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1266pdfThis represents actual cost for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1268pdf
      2083pdf
      1268pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200364
      2203pdf
      372pdf
      739pdf
      740pdf
      371pdfIn-situ treatment with sorptive agents
      371pdf
      1259pdf
      373pdf
      Website httpwwwepagovr02earthsuperfundnpl0200364chtm
      1259pdf
      373pdf
      1259pdf
      373pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200528
      1272pdf
      177pdf
      477pdf
      1261pdf
      2086pdf
      478pdf
      2086pdf
      478pdf
      Northerly wetlands and tar patch area were determined to be more like soil removals as they were not submerged Westerly wetlandds has a surface water stream running through it that is monitored for sediments so it is retained
      1273pdf
      2088pdfMNR doesnt have fieldwork dates but site fieldwork dates are included
      1274pdfNo specific area for MNR provided 21 acres is area of westerly wetlands for which MNR is selected
      2006pdf
      2087pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0201644
      456pdf
      218pdf
      457pdf
      2093pdf
      2094pdf
      178pdf
      2011pdf
      1279pdf
      461pdf
      56pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201706
      463pdf
      2016pdf
      463pdf
      2016pdf
      2091pdf
      2015pdf
      2015pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0202229
      990pdf
      993pdf
      1014pdf
      1299pdf
      2018pdf
      996pdf
      990pdf
      991pdf
      991pdf
      992pdf
      996pdf
      996pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200557
      2019pdf
      997pdf Remedy componentsareas not broken out
      2098pdf
      2096pdfInfo only on Alycon Lake no info on Rabbit Run or Chestnut Branch
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201290
      2033pdf
      764pdf
      2023pdf
      2024pdf
      2024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201491
      2032pdf
      1002pdf
      1001pdf
      2221pdf
      2031pdf
      2032pdf
      2102pdf
      2029pdf
      2028pdf
      2134pdf
      2030pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0203382
      2072pdf
      518pdf
      2228pdf MNR area was not stated Calculation Profundal areas 08= 154 profundal area = 1925 acres - 154 TLC acres = 1771 MNR acres
      518pdf
      2073pdf
      2075pdf
      2079pdf
      2123pdf
      2126pdf
      1005pdfAttachment has 2 sections one from the ROD the other from the FYR
      1006pdf
      2124pdf
      2125pdf
      2070pdf
      2059pdf
      2059pdf
      2059pdf
      2128pdf
      2060pdf
      2061pdf
      2127pdf
      2063pdf
      2063pdf
      2064pdf
      2065pdf
      2066pdf
      2130pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201465
      369pdf
      2133pdf
      2034pdf
      1008pdf
      2131pdf
      183pdf
      2177pdf
      2131pdf
      183pdf
      2131pdf
      183pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201770
      2036pdf
      64pdf
      1009pdfIncludes entire remedy sediment portion is not defined
      2038pdf
      2037pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200439
      2174pdf
      1012pdf
      2042pdf
      2041pdf
      2041pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200209
      2171pdf
      2051pdf
      523pdf
      2046pdf
      2044pdf
      2049pdf
      2162pdf
      2052pdf
      2053pdf
      2047pdf
      2045pdf
      2050pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201202
      69pdf
      2170pdf
      2054pdf
      2120pdf
      2054pdf
      2054pdf
      2118pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0302836
      Website httpcfpubepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0302836
      3006pdf
      497pdf Apparently same area as EMNR
      498pdf Apparently same area as MNR
      496pdf
      3001pdfWeb site COC list is much more extensive then tPAH
      497pdf
      497pdf
      httpwwwepagovreg3hwmdnplVAD990710410htm
      499pdf
      499pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300093
      1605pdf
      224pdf
      1601pdf
      1614pdf
      1606pdf
      1606pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1605pdf
      482pdf
      73pdf
      1615pdf
      656pdf
      1606pdf
      1617pdf
      1617pdf
      1617pdf
      1617pdf
      Website httpwwwepagovreg3hwmdsupersitesDED980555122indexhtm
      1617pdf
      1617pdf
      1605pdf
      483pdf
      74pdf
      484pdf
      657pdf
      1606pdf
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300092
      1622pdf
      1621pdf
      1039pdf
      959pdf
      1040pdf
      958pdf
      1623pdf
      665pdf
      httpwwwepagovreg3hwmdnplDED980552244htm
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300951
      1624pdf
      3008pdf
      961pdf
      960pdf
      3002pdfArea not stated No mention of sediment capping or marine mattress in ROD or ESDs
      962pdf
      1625pdf
      1626pdf
      1627pdf
      1628pdf
      Websitehttpwwwepagovreg3hwmdnplPAD046557096htm
      Website httpcumulisepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0300951Provided to indicate formal OU name
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0406299
      Construction completed but no documents are available
      12pdf
      578pdf
      579pdf
      4001pdf
      4001pdf
      12pdf
      4001pdf
      4001pdf
      4001pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0402260
      No information on websites regarding status of sediment work unclear as of Jan 2014
      21pdf
      4002pdf
      53pdfCost of sediment remedy is not broken out
      4003pdf
      Website hhttpcumulisepagovsupercpadcursitescsitinfocfmid=0403156
      400pdf
      580pdf
      4004pdf
      Website httpwwwepagovregion4superfundsitesnplnorthcarolinawcoplwtpnchtml
      395pdf
      402pdf
      396pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403350
      4008pdf
      4007pdf
      4023pdf
      965pdf
      4020pdfThe ROD and FYR do not directly state the COCs for the sediment remedy and there are not contaminant-specific cleanup levels The contaminants identified here are those with an HQ above 1 for all areas (see attachment) Presented here to indicate prevalent contamination
      4019pdf Excavation depth based on elevation and visual determinations
      4009pdf
      4011pdf
      4010pdfChanged remedy to MNR
      4011pdfChanged remedy to MNR
      4017pdf
      966pdf
      584pdf
      964pdf
      4013pdf
      4018pdf
      4021pdf
      1025pdf
      1026pdf
      4014pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403252
      77pdf
      561pdf
      4022pdf
      558pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0403765
      391pdf
      4030pdf
      4031pdf
      4032pdf
      393pdf
      httpwwwepagovregion04superfundsitesnpltennesseetennprotnhtml
      562pdf
      563pdf
      4031pdf
      4033pdfROD states However if certain excavated sediments appear to be uncontaminated then those sediments shall be subjected to sampling and analyses for the PAHs The action levels for sediment removal will reflect EPAs excess lifetime carcinogenic risk range of 1 x 10 6 to 1 x 10 4 (See Table G - 9) Its unclear whether or which concentrations will be used for an action level but the text and table are addded as a reference
      4034pdfNo remedial action in Reaches B and C See second page of attachment
      570pdf
      1031pdf
      4043pdf
      4044pdf
      4043pdf
      4043pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406082
      592pdf
      592pdfSite soils included in volume
      No Reach A removal action decision documents exist on EPA HQ or region websites
      httpwwwepagovregion4superfundsitesnplnorthcarolinawardtrnchtml
      593pdf
      590pdf
      591pdf
      4040pdf
      4041pdf
      4042pdf
      4041pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0501228
      5070pdf
      15pdf
      20pdfThis value represents Estimated 30-Year Net Present Worth to excavate and consolidate sediment in landfill
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      17pdf
      5170pdf
      5171pdf
      5172pdf
      533pdf
      532pdf
      Website httpwwwepagovregion5sitescontinentalindexhtm
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0507723
      5059pdf
      5173pdf
      5174pdf
      5180pdf
      5175pdf
      5057pdf
      5137pdf
      5093pdf
      5176pdfDeposit DD is located in OU2 but it is considered part of the OU3 response
      5179pdf
      5062pdf
      5181pdf
      5051pdf
      5092pdf
      5177pdf
      213pdf
      5058pdf
      Website httpwwwepagovregion5sitesfoxriverindexhtml
      5092pdf
      5178pdfAlso see Fox River ROD Amendment 2007 pg 14 Table 2 for documentation of the OU 5 dredge volume being included in the OU4
      213pdf
      5217pdf
      5094pdf
      5096pdf
      214pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500760
      33pdf
      5063pdfBackfill stated on second page of attachment
      35pdfIncludes floodplain material
      32pdf
      Website httpwwwepagovR5SupernplillinoisILD980823991htm
      32pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0508120
      5003pdf
      5002pdf
      5005pdf
      5060pdfEstimated from map in 5 year report
      5004pdf
      5004pdf
      5006pdf
      5001pdf
      5168pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500083
      5108pdf
      5222pdf
      5208pdf
      5022pdf
      5131pdf
      5209pdf
      Website httpwwwepagovregion5sitesoutboardmarine
      5205pdf
      514pdf
      515pdf
      5120pdf
      514pdf
      5120pdf
      514pdf
      5212pdf
      5125pdf
      5126pdf
      5127pdf
      5123pdf
      5128pdf
      Website ttpcumulisepagovsupercpadcursitescsitinfocfmid=0501181
      5024pdf
      5160pdfIncludes sediments and soils
      5026pdf
      5025pdf
      5024pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0505188
      5203pdf
      5202pdf
      5146pdf
      5044pdf
      5037pdf
      5045pdf
      5142pdf
      5142pdf
      Website httpwwwepagovregion5sitessheboygan
      5046pdf
      5145pdf
      5043pdf
      5140pdf
      5142pdf
      5142pdf
      5035pdf
      5144pdf
      5042pdf
      5036pdf
      5142pdf
      5142pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0502194
      150pdf
      148pdf
      149pdf
      5157pdf
      147pdf
      147pdfNo update provided in 2012 FYR
      5027pdf
      5156pdf
      Website httpwwwepagovregion5cleanupvelsicolmichiganindexhtml
      5154pdf
      5164pdf
      5164pdf
      5151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0601752
      6001pdf
      986pdf
      6004pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      987pdf
      983pdf
      981pdf
      984pdf
      6014pdf
      6006pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0602911
      1043pdf
      1044pdf
      6008pdf
      6009pdfA list of principal parameters is provided without risk context COCs or risk drivers in sediments are not identified
      1047pdfPossible that visually clean performance standard also applies to marsh sediments
      1045pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0600574
      1049pdf
      153pdf
      1050pdf
      1051pdf
      6010pdfConstruction and disposal only
      6011pdf
      1052pdf
      Wesbite httpcumulisepagovsupercpadcursitescsitinfocfmid=0800445
      8003pdf
      311pdfIncludes Area 1 sediments and 30K cy in area 3
      625pdf
      624pdf
      8002pdf
      Website httpwwwepagovregion8superfundmtmilltown
      8050pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800357
      8018pdf
      8017pdf
      1019pdf
      1018pdf
      8023pdf
      8012pdf
      8013pdf
      8015pdf
      website httpwww2epagovregion8rocky-mountain-arsenal
      8020pdf
      8019pdf
      8012pdf
      8015pdf
      website httpwwwrmaarmymil
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800694
      629pdf
      8024pdf
      630pdf
      8025pdf
      8026pdf
      8027pdfSediment and soil are often used interchangeably in the ROD
      628pdf
      627pdf
      8026pdf
      628pdf
      8026pdf
      8028pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800416
      8037pdf
      1021pdf
      1022pdf
      8043pdf
      1023pdf
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Websitehttpwww2epagovregion8silver-bow-creek-butte-area
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpdeqmtgovREMMWCBConstructionServicesSectionSilverBowCreekdefaultmcpx
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901755
      9015pdf
      596pdf
      1237pdf
      1236pdf
      1235pdf
      1234pdf
      980pdf
      1238pdf
      1234pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDCAD980498612OpenDocument
      1234pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901129
      1245pdf
      9002pdf
      1240pdfThis cost does not include $18M for bank stabilization
      1239pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDcad009106527OpenDocument
      543pdf
      1239pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902734
      1249pdf
      41pdf
      545pdf
      39pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpyosemiteepagovR9SFUNDR9SFDOCWNSF3dec8ba3252368428825742600743733c01ef2be6ec9ab9c8825737f002bf719OpenDocument978
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902440
      1254pdf
      156pdf
      974pdf
      975pdf
      1250pdfDieldrin is also a COC but only has a CUL for surface water
      1252pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfvwsoalphabeticUnited+Heckathorn+CoOpenDocument
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000981
      10-030pdf
      Name in ROD However name on CB website is NSTF Areawide Sediment covered within OU1 ROD was later divided into separate OUs except for removal actions conducted at Olympic View This removal action is summarized here
      1104pdf
      1105pdf
      1105pdf
      1106pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1106pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc923e8d62480494ad483882564f80082a1c0OpenDocument
      10-030pdf(formerly OU6)
      10-100pdf
      1101pdf
      1100pdf
      1099pdf
      1097pdf
      10-002pdf10 acres as of 2009
      1097pdf
      1097pdf
      1097pdf
      10-030pdf
      1071pdf
      1076pdf
      1073pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1072pdf
      10-030pdf
      1066pdf
      1061pdf Quantity does not include Blair Waterway dredging 1993 ESD states that Blair is not part of ROD cleanup and is for navigational purposes
      1062pdf
      1063pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      10-030pdf
      1060pdf
      1059pdf
      1059pdf
      1059pdf
      1067pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1070pdf
      1111pdf
      1112pdf
      1115pdf
      1113pdf
      10-030pdf
      10-098pdf
      1121pdf
      1079pdf
      1094pdf
      1094pdf
      1078pdf
      1122pdfThis is strictly a construction cost that appears to include construction of CDF and pile removal as well as dredging and capping
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 25
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 089
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      10-030pdf
      10-008pdf
      1081pdf
      1082pdf
      10-009pdf
      1084pdf
      1085pdf
      1087pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000020OU 8 is not included because OU was reommended for no further action in 2003 ROD
      1123pdf
      10-022pdf
      1134pdfCapping took place after dredging to in part maintain original depths
      1138pdf
      433pdfROD estimated remedy would cost $15M but 2002 ESD estimated it as $12M
      1133pdf
      1130pdf
      949pdf
      1135pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc9235a64831b6521f46b8825650200836f1cOpenDocument
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      1136pdf
      1124pdf
      10-023pdf
      1128pdf
      10-028pdf
      434pdf
      1125pdf
      1130pdf
      10-024pdf
      1126pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-025pdf
      1142pdf
      10-095pdf
      1144pdf
      1141pdf
      1143pdf
      1146pdf
      1146pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1000020
      1152pdf
      162pdf
      1148pdf
      314pdf
      633pdf
      1149pdf
      1153pdf
      431pdf
      1150pdf
      431pdf
      1151pdf
      Website httpyosemiteepagovR10CLEANUPNSF7d19cd587dff1eee8825685f007d56b72dd5ab7462e4f004882567b30057eb7bOpenDocument
      431pdf
      1151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000339
      166pdf
      49pdf
      1158pdf
      1159pdf
      1157pdf
      1157pdf
      Website httpwwwdeqstateoruslqcunwrmccormickbaxter
      1290pdf
      1157pdf
      1157pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1001134
      1291pdf
      1163pdf
      1164pdf
      1292pdf
      1293pdfAlthough not called MNR remedy is to monitor contaminant levels until the goal is achieved which is MNR
      10-061pdf
      1165pdfThis cost includes capping of the upland landfill A breakout for just the sediment portion was not provided
      1166pdfThis cost includes the fire training area and upland landfill cover A breakout of just the sediment remediation was not provided
      1167pdf
      1169pdfconsidered at conceptual target for sediment
      1292pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1169pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000611
      1177pdf
      10-031pdf
      10-031pdf
      1179pdf
      1178pdf
      1173pdf
      1181pdf
      1176pdf
      1174pdf
      1173pdf
      1181pdf
      1176pdf
      1173pdf
      1181pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1001107
      1182pdf
      10-040pdf
      1242pdf
      1244pdf
      1243pdf
      1188pdf
      1189pdf
      1187pdf
      1183pdf
      1185pdf
      10-041pdf
      10-042pdf
      1189pdf
      1185pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1002095
      46pdfIncludes soil excavation quantity in total volume
      10-039pdf
      408pdfIncludes cost for excavating nearshore soil
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate that sediment is not toxic
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate sediment that is not toxic
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000612
      10-066pdf
      1216pdf
      10-044pdf
      10-071pdf
      10-068pdf
      10-068pdf
      Website httpyosemiteepagovR10CLEANUPNSFsitesWyckoff
      10-068pdf
      10-075pdf
      10-113pdf
      409pdf
      1218pdf
      202pdf
      202pdf
      202pdf
      10-064pdf
      10-072pdf
      1219pdf
      1214pdf
      1214pdf
      1214pdf
      1215pdfRequirement for intertidal sediments
      423pdf
      10-047pdf
      10-046pdf
      1209pdf
      1208pdf
      1207pdf
      1203pdf
      1202pdf5 mgkg criteria for areas requiring dredging21 mgkg criteria for areas requiring a 1-meter thick cap 059 for thin layer capping
      1203pdf
      1204pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      2195pdf
      2136pdfCleanup goals for biological endpoints were not provided
      2136pdfCleanup goals for biological endpoints were not provided
      2127pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0900993
      Website httpwwwepagovregion9superfundpvshelf
      9003pdf
      9004pdf
      9005pdf
      9005pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      613pdf
      1-030pdf
      1-064pdf
      683pdf
      475pdf
      2085pdfHowever see RAO of 50 ppm
      2085pdf
      2085pdf
      1-102pdf
      1278pdf
      1279pdf
      1278pdf
      2092pdf
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      2097pdf
      763pdf
      1003pdf
      2030pdfIts unclear the extent to which 10 mgkg is considered the cleanup level ROD language and FYR note is attached The closest to being definitive is on p 34 of attachment the cleanup goal of about 10 mgkg
      2123pdf
      2062pdf
      2129pdf
      186pdf
      2117pdf
      2043pdf
      2043pdf
      963pdf Attachment incl language from ROD and ESD
      11pdf
      11pdf
      11pdf
      11pdf
      11pdf
      23pdf
      396pdf
      4019pdf
      597pdf
      4045pdf
      4045pdf
      4045pdf
      586pdf
      585pdf
      4057pdfSediment concentration associated with protective fish tissue concentration is lt10ppb
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      5137pdf
      5050pdf
      5050pdf
      34pdf
      5001pdf
      5109pdfAction level or cleanup level of North Ditch remediation never stated in ROD ROD amendment five year reviews or construction completion report
      277pdf
      5122pdf
      526pdf
      5045pdf
      5139pdf
      5141pdf
      5155pdf
      982pdf
      6003pdf
      8002pdfNo sediment cleanup levels cleanup levels pertain to groundwater or surface water
      1024pdf
      979pdf
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      9006pdf
      9006pdf
      9006pdf
      9006pdf
      1251pdf
      1106pdf
      1103pdf
      1103pdf
      1103pdf
      1103pdf
      1072pdf
      1065pdf
      1065pdf
      1069pdf
      1069pdf
      1069pdf
      1070pdf
      1116pdf
      1091pdf
      1091pdf
      1091pdf
      1091pdf
      1114pdfTable 13 in the ROD lists Zinc SQO as 059 This appears to be an error Table 12 of the ROD lists 059 for mercury and 410 for zinc
      1074pdf
      1074pdf
      1089pdf
      1089pdf
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1136pdfConfirmational number of 76 mgkg (OC) established for TBT
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-025pdf76 ppm (OC) 1335 ppb (dw)TBT is a confirmational number See attachment
      10-096pdf
      10-096pdf
      164pdf
      312pdf
      164pdf
      164pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      1181pdf
      1181pdf
      1181pdf
      1187pdf
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (041 ppm) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (970 ppm [OC]) is considered a conceptual target
      9006pdf
      9006pdf
      6018pdf
      6018pdf
      5184pdfCalled residual cover here
      5185pdfTermed post-dredge residual sand cover
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406638
      4048pdf
      4049pdf
      4050pdf
      4051pdf
      4051pdf
      4051pdf
      4051pdf
      httpepagovregion4superfundsitesnpltennesseecopbastnhtml
      4051pdf
      4051pdf
      4051pdf
      1-045pdf
      1-045pdf
      1-030pdf
      1-046augmentedreplaced sand cap in 2011
      1-047pdf
      httpwwwepagovregion02superfundnplonondagalakeindexhtml
      Ley Creek subsite not included because the volume removedmanaged was less than 10K cy
      2179pdf
      2165pdf
      2167pdf
      2166pdf
      2054pdf
      2054pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      1300pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      5186pdf
      3007pdfSame factsheet as of Jan 2014
      httpepagovregion4superfundsitesnplalabamaamerbrasalhtml
      httpepagovregion4superfundsitesnplmississippiamercrewkmshtml
      httpyosemiteepagovr10cleanupnsf22f04d62fa63974288256da6005f9868cabb84db584c955f8825697f00049beeOpenDocument
      10-056pdf
      10-058pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0503034
      5187pdf
      5188pdf
      5189pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinasangschtml
      5195pdf
      5194pdf
      6023pdf
      10-060pdfROD amendment did not specify the volume of instream sediments vs floodplain material
      10-062pdf
      10-063pdf
      10-064pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      10-069pdf
      10-069pdf
      10-083pdf
      1203pdf
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (370 ppm [OC]) is considered a conceptual target
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      Website httpyosemiteepagovr10cleanupnsfsitesmccormick_baxter
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-087pdf
      10-097pdf
      10-101pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      1246pdfCap placed in areas exceeding CUL
      1246pdfCap placed in areas exceeding CUL
      9014pdf
      8044pdf
      8046pdf
      8051pdf
      6026pdf
      6026pdf
      6026pdf
      6026pdf
      6027pdf
      5196pdf
      5197pdf
      5203pdf
      5204pdf
      5206pdf
      5207pdf
      5210pdf
      5022pdf
      httpwwwepagovregion5cleanupmississinewaindexhtml
      5213pdf
      5214pdf
      5215pdf
      5216pdfAmended cost for OU 2-5 does not include Phase 1 in OU4
      4056pdf
      4061pdf
      4062pdf
      4063pdf
      4065pdfBackfill in at least portions of site N of 38th St area unclear
      4066pdf
      4075pdf
      4075pdf
      4076pdf
      4051pdf
      69pdf
      2053pdf
      2181pdf -- most recent factsheet as of 2014-Jan
      2181pdf -- most recent factsheet as of 2014-Aug
      ROD also describes NYSDEC-regulated action removing channel sediment (4200 cy) and floodplain sedimentsoil (63000 cy)
      2185pdf
      2196pdf
      2197pdf Remedy componentsareas not broken out
      httpwwwepagovhudson
      2198pdf
      1-058pdf
      1-059pdf Soil and sediment not differentiated
      2205pdf
      2204pdf
      1-065pdf
      613pdf
      1-067pdf
      1-071pdf
      1-072pdf
      1-013pdf
      1-073pdf
      698pdf
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93d01550369a32b31bb8525691f0063f6d6OpenDocument
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101028
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8584c38df37ade1998525764f005a96d3OpenDocumentampHighlight=0callahan
      1-076pdf
      1-075pdf
      1-078pdf
      1-078pdf
      1-078pdf
      1-078pdfNote that the dredging and subaqueous disposal of sediments was changed from OU1 to OU3 in the 2013 ESD
      1-078pdf
      1-078pdf
      1-080pdfAs of 2014-Jan
      1-077pdf
      1-081pdf only dredge operation
      httpwwwepagovregion02superfundnplraritanbayslag
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206276
      1-082pdf
      1-083pdf
      1-083pdf level specified on p 3 of 4
      1-083pdf 1-083pdf level specified on p 3 of 4
      1-086pdf
      1-085pdf
      1-087pdf Total cost ROD does not specify cost of sediment portion
      2206pdf
      2206pdf
      2206pdf
      2207pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201690
      2208pdf
      2210pdf
      2211pdf
      2212pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206222
      httpwwwepagovregion2superfundnplgowanus
      2213pdf
      2214pdf
      2214pdf
      2215pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1002655
      httpyosemiteepagovr10cleanupnsf32e58b284950a4fc882578480000fdcc9458199e8119eba3882572910069d808OpenDocument
      10-102pdf
      10-104pdf
      10-105pdf
      10-105pdf
      10-106pdf
      10-107pdf
      10-108pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driverf
      10-110pdf
      10-111pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-093pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8bbe0100a535e8840852576e90053b186OpenDocument
      1-090pdf - soilsediment volumes not differentiated
      1-090pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-089pdf
      1-091pdf
      1-092pdf
      Fish tissue remedial goal appears to only apply to the Allendale and Lyman Mill Pond areas not lyman mill stream sediment
      1-096pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-098pdf
      1-099pdf
      1-099pdf
      2218pdf
      2219pdf
      2219pdf
      2220pdf
      2222pdf
      2123pdf
      2225pdf
      2173pdf
      2116pdf
      5109pdf
      5223pdf
      10-125pdf
      10-125pdf
      10-125pdf
      1-100pdfFloodplain vs sediments not differentiated
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93de720462345729a4f8525691f0063f6e1OpenDocument
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631E704D6C17F74EA678525697B0008CCAAOpenDocument
      1-101pdf
      httpwwwepagovregion02superfundnplaluminumcompany
      2200pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinakopchschtml
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0405546
      httpwwwepagovregion4superfundsitesnplalabamatriatenvalhtml
      877pdf
      877pdf
      877pdf
      877pdf
      6024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000195
      httpyosemiteepagovr10cleanupnsfsitesbh
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101388
      Reg Site OU Area Name Fieldwork Dates Dredge (1000 cu yds) Excavate (1000 cu yds) Back-fill (Residual Cap) Cap (acre) MNR (acre) EMNR Thin Cover (acre) In Situ Treatment (acres) Other Estimated Cost (in millions) Actual Cost (in millions) COC Sample Matrix Action Level (ppm) Cleanup Level (ppm) Remediation Goal (ppm)
      1 CALLAHAN MINING CORP 3 SedimentsCap Ongoing 101 No $21 Copper Sediment 790
      Lead 710
      Callahan Mine (Region 1 Website) Zinc 5100
      1 CENTREDALE MANOR RESTORATION PROJECT 1 Allendale Pond and Lyman Mill Pond Sediment 156 If needed 605 Benzo(a)pyrene Fish 00015
      Dieldrin 00011
      Technical Chlordane 013
      Aroclor 1254 0037
      Aroclor 1268 0011
      2378-Tetrachlorodibenzo-p-dioxin 00000022
      Total Aroclors 0076
      44-DDD 00062
      44-DDE 0018
      DioxinsFurans TEQ 0000044
      Benzo(a)pyrene Sediment 14
      Dibenz(ah)anthracene 097
      Dieldrin 00026
      Technical Chlordane 04
      Aroclor 1254 0031
      Aroclor 1268 0023
      Arsenic 39
      Centredale Manor Restoration Project (Region 1 Website) 2378-Tetrachlorodibenzo-p-dioxin 0000015
      Lyman Mill Stream Sediment 205 Yes 225 165 Coplanar PCBs (TEQ)3 0000025
      Total Aroclors 006
      Selenium 11
      Zinc 221
      44-DDD 00084
      44-DDE 0006
      Aluminum 8210
      Barium 134
      Vanadium 376
      N-Nitroso-di-n-propylamine 046
      1 LORING AIR FORCE BASE 13 East Branch of Greenlaw Brook 1997 - 1998 38 (Est) Yes 481 Total PAHs Sediment 35
      86 (Act) Total 44-DDTDDDDDE 028
      Loring Air Force Base (Region 1 Website) Aroclor 1260 1
      Total Chlordanes 048
      Lead 218
      44-DDD Fish 0018
      44-DDE 0013
      44-DDT 0013
      Aroclor 1242 00022
      Aroclor 1260 00022
      Heptaclor 000098
      Chlordane Alpha 00034
      Chlordane Gamma 00034
      1 NEW BEDFORD 1 Acushnet River North of Wood Street (within Upper Harbor) 1202 - 303 900 (throughout OU1) 156 (Act) No 2002 ESD $317 (for all of OU 1) Operation ongoing PCBs Sediment (Upper Harbor) 10
      Region 1 New Bedford Website Upper and Lower Harbor 2004 - Ongoing 2011 ESD $422-1200 (for all of OU1) Sediment (Lower Harbor) 50
      Sediment intertidal areas with public access or abutting recreational land use 25
      Sediment saltmarsh areas with little to no public access (aka Marsh Island) 50
      Sediment intertidal areas with abutting residential land use 1
      Seafood 002
      2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000
      1 NEWPORT NAVAL EDUCATION amp TRAINING CENTER 4 McAllister Point Landfill (Narrangasett Bay) 22001 - 122001 34 (Est) Yes 226 Anthracene Sediment 051 051
      Fluorene 02 02
      46000 tons (Act)(cyds not provided) PCBs 36 36
      NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website Pyrene 3 3
      Copper Porewater 00529 00529
      Nickel 00337 00337
      1 NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1 1
      Nyanza Chemical Waste DumpRegion 1 Website 4 Sudbury River ROD Date September 2010 Area not specified 84 85 MERCURY Sediment 10 (EMNR)
      MERCURY Fish (largemouth bass yellow perch bullhead) 048
      1 PINE STREET CANAL 1 Turning Basin Pine Street Canal and Wetlands 2002-2004 2004 78 (Act) (GeotextileSand Cap) 44 PAHs Sediment ER-M Values
      Region 1 Pine Street Canal Website 82010 - 22011 08 2011 organoclay cap (size not specified) Metals and Cyanide ER-M Values
      1 SULLIVANS LEDGE 1 Unnamed Stream Ponds A and B 1998-2002 19 (Est) Yes upper portion of stream diverted PCBs Sediment 20 uggC
      Region 1 Sullivans Ledge website 86 (Act)
      2 Middle Marsh Wetlands 1998-2001 52 (Est) Yes 28 PCBs 20 uggC
      255 (Act)
      2 BATAVIA LANDFILL 1 Wetland Areas June 2001 - June 2003 25 (Est) Yes 13 (soil and sediment) 75 (soil and sediment) PAHs Sediment Visual NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals
      Deleted from NPL 11292005 Act Wetland area volume not specified LEAD
      2 BRIDGEPORT RENTAL amp OIL SERVICES 2 Little Timber Creek Swamp ROD dateSeptember 2006Remedial Action 2009-2011 175 (Est) Yes Area not specified 106 (Est) 125 PCBs Sediment 10 10
      Region 2 Bridgeport Rental amp Oil Services Website LEAD 1000 1000
      Total Petroleum Hydrocarbons None None
      2 BURNT FLY BOG 2 Downstream Area and Westerly Wetlands 11795 - 1996 gt6000 tons (Act) (soil and sediment) 22 LEAD Sediment 250
      PCBs 5
      3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment 400049
      2 GENERAL MOTORS (CENTRAL FOUNDRY DIVISION) 1 St Lawrence River 61995 - 111995 13 (Act) 2 (Act) 215 PCBs Sediment 1
      Turtle CreekTurtle Cove 1004 - 305 23 (Act) (soil and sediments) 01 01
      Raquette River 602 - 503 14 (Act) 1
      2 GOWANUS CANAL 1 Canal Sediments ROD Date Sept 2013 588 (Est) Area not stated (dredgecap remedy) In-situ stabilization of 3-5 feet of NAPL-containing sediments PAHs Sediment 20
      Gowanus Canal (Region 2 Website) Holding Tanks for CSO Control Copper 80
      Lead 94
      2 Grasse River Superfund Site(aka Alcoa Aggregation Site) Grasse River ROD Date April 2014 109 Yes 284 2431 PCBs Sediment 1
      Grasse River(Region 2 Website) Fish 001-005 (Final Remedial Goal)026-036(Interim Target Concentrations)
      2 HOOKER (102ND STREET) 1 Niagara River Embayment 71996 - 111996 28 (dredge to 2 feet) Yes $36 - 56 PAHs METALS CHLORINATED ORGANICS (MULTIPLE) Sediment 01(organics) New York State Sediment TBCs
      Deleted from NPL 852004 Sediment 02(Mercury)
      2 HUDSON RIVER PCBS 2 Upper Hudson River (Section 1) ROD dateFebruary 2002 Field work 2009-ongoing 1560 (Est) Yes Area not specified 2250 PCBs Fish 005
      Sediment 3 gm2 (MPA) 1
      Hudson River PCBs EPA Website Upper Hudson River (Section 2) 580 (Est) Sediment 10 gm2 (MPA) 1
      Fish 005
      Upper Hudson River (Section 3) 510 (Est) Sediment 1
      Fish 005
      2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001 (change in ESD from dredging to excavation) 981 (Est) ROD 21 INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC Sediment Not specified
      85000 Tons (Act) ESD 50-75
      2 LOVE CANALDeleted from NPL 9302004 2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001 0001
      2 MARATHON BATTERY CORP 1 East Foundry Cove Marsh and Constitution Marsh 91993 - 31995 30 (Est) Yesbentonite clay layer 40 CADMIUM Biological Sampling None
      Sediment 100 100
      Deleted from NPL 10181996 2 East Foundry Cove West Foundry Cove and the Cold Spring Pier Area 91993 - 31995 56 (Est) 485 CADMIUM Biological Sampling None
      Actual not specified by area
      Sediment Excavate up to 1 ft 95 Removal 10 mgkg
      2 ONONDAGA LAKE 2 Onondaga Lake Bottoms Subsite ROD dateJuly 2005 2407 (Est) 425 (Est) 1771 154 (Est) 414 MERCURY and others Sediment 08 014-2
      Operations Ongoing METHYL Hg Fish 03
      5 LCP Bridge St SiteWest Flume and Wetland AB June 2005 - July 2007 543 (Est)917 (Act) Yes 96 MERCURY Sediment 02
      20 Geddes Brook NineMile Creek Reach BC CD ROD DateApril 2009June 2012 - ongoing 59 (Est) Combined with Dredge volume Yes Partial Channel Re-location 189 MERCURY and others Sediment 015
      Region 2 Onondaga Lake Website Mercury Fish 01-03
      24 Geddes Brook NineMile Creek Reach AB June 2012 - 16 (Est) 42 (Est) Yes 151 MERCURY and others Sediment Soil (flood plain) 015
      Fish 01 - 03
      2 Raritan Bay Slag 0 ROD Date May 2013 34 (Est) 787 Lead Sediment 400 400
      Raritan Bay Slag (Region 2 Website)
      2 REYNOLDS METALS CONot on the NPL - Superfund Alternative Site 1 St Lawrence amp Raquett Rivers 412001 - 102001 52 (Est) 54 (Act) 35 PAHs Sediment 10
      86 (Act) PCBs 1
      TDBFs 0001
      2 RICHARDSON HILL ROAD LANDFILLPOND 1 South Pond and Herrick Hollow Creek 2004 285 (Act) 139 PCBs Sediment 1 1
      2 ROEBLING STEEL CO 5 Delaware River and Crafts Creek 2010-2013 116 (Est) Yes 11 PAHs Sediment See Attached
      240 (Act) Metals
      2 VINELAND CHEMICAL CO INC 3 River Areas (Blackwater Branch Floodplain amp Maurice River) 2006 - ongoing 626 Yes 11 ARSENIC Sediment 20 20 exposed 120 submerged
      4 Union Lake Sediments Remedy not yet initiated Unknown Yes Sediment Washing 129 ARSENIC Sediment Unknown 120
      2 YORK OIL CO 2 Contamination Pathways - Western Wetland 2000-2001 11 (Est) Yes 33 LEAD Sediment Not specified
      15 (Act) PCBs Complete Removal or 1
      Contamination Pathways - Northwestern Wetland 50 PCBs Sediment 1 Contingent on biological and chemical testing
      LEAD Not specified
      3 ATLANTIC WOOD INDUSTRIES INC 3 River Water and Sediments 2010-Ongoing 6 7 126 (Dredging and Disposal) tPAHs Sediment 45 to 100
      Region 3 Atlantic Wood Industries Website 157 (Est) 100
      3 EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL) 3 North Wetlands 1997 - 12897 95 (Act) Yes 12 3 CADMIUM Sediment 60
      LEAD 1200
      ZINC 5600
      5 South Wetlands 1997 - 12897 37 (Act) Yes 42 Unknown CADMIUM Sediment 60
      LEAD 1200
      Region 3 EI duPont Website ZINC 5600
      7 Christina River 51099 - 9899 11 (Act) Yes 47 Unknown CADMIUM Sediment 20
      LEAD 700
      ZINC 3000
      3 KOPPERS CO INC (NEWPORT PLANT) 1 Wetlands Ponds and Hershey Run ROD dateSeptember 2005 58 (Est) Unknown Re-channelize portion of Hershey Run 5176 PAHs Sediment 150
      Region 3 Koppers Co Inc Website Remedy not yet initiated
      3 METAL BANKS 1 RiverMudflat Sediments 2008-2010 12 (Est) Yes Unknown (Act) 1727 Unknown PCBs Sediment 1 1
      METAL BANK (Regional Website) OU Name SOIL EXCAVCONTAIN
      4 AMERICAN BRASS INC 1 Cedar Creek ROD dateAugust 2006 94 (Est) Yes 39 BORON Sediment 28
      COPPER 220
      Dunham Creek 38 (Est) LEAD 170
      American Brass Inc (Regional Website) ZINC 780
      PCB-1260 429
      4 AMERICAN CREOSOTE WORKS INC 0 Railroad Lake and Hughes Creek ROD date September 2007 40 (Est) Yes $20 (Total) TOTAL PAH Sediment 100
      American Creosote Works Inc(Regional Website)
      4 COPPER BASIN MINING DISTRICT SITE 5 Copper Basin ReachOcoee No 3 ReservoirParksville Reservoir ROD date September 2011 Area Not Specified (approx 14 river miles) 23 PCBs Sediment
      Arsenic Sediment
      Cadmium Sediment
      Copper Sediment 680 (Copper Basin Reach)
      640 (Ocoee 3 amp Parksville Reservoirs)
      Region 4 Copper Basin Mining District Site website Iron Sediment 57000 (CBR)
      53000 (O3R amp PR)
      Lead Sediment 145 (CBR)
      250 (O3R amp PR)
      Mercury Fish
      Zinc Sediment 2200 (CBR)
      970 (O3R amp PR)
      4 DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company) 2 Lower Roanoke River ROD dateSeptember 2008 143 river miles 196 Dioxin Fish 3 ppt
      Sediment Unknown
      Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website 4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment 0001
      4 KOPPERS CO INC (CHARLESTON PLANT) 1 Ashley River 7101 - 12101 0 (Est) $05 (ROD)3 (ESD) 282 PAHs Sediment Weight of Evidence Approach None
      3 (Act)
      Barge Canal 42003 ESD selected MNR for the area 32 (Est)0 (Act) 0 (Est)32 (Act) $045 (ROD) 01
      01 (ESD) Arsenic
      Region 4 Koppers Co Inc (Charleston Plant) North Marsh Sediments No info 15 (Act) 1000 linear feet 025 acre (Est)1300 linear feet (Act) 17 23
      South Marsh Sediments 3103 - 6103 19 tons (Act) 15 (Est)2 (Act) Lead
      4 SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION 2 Twelve Mile CreekLake Hartwell ROD date62894 730 (Est) 321 PCBs Fish 2
      Lake Hartwell (Regional Website) Sediment 1
      4 TENNESSEE PRODUCTS 1 Chattanooga Creek - Middle Reach September 2005 - September 2007 142 (Est) $94 (ROD) PAHs Sediment Visual
      Region 4 Tennesse Products Website 107000 tons (Act)Followed by capping 71 (Act)Aquablock $257 (ESD)
      Chattanooga Creek NTCRA 1997-1998 229 Yes Visual
      4 TRIANATENNESSEE RIVER 0 Reach AHuntsville Spring Branch - Indian Creek 4186 - 101487 Rerouted river buried in-place sediments DDT Fish (channel catfish) No sediment CUL 5
      Region 4 TrianaTennessee River Website Fish (smallmouth buffalo) No sediment CUL
      Fish (largemouth bass) No sediment CUL
      4 WARD TRANSFORMER Reach A (Removal Action) June 2007 - 2009 150000 tons (Est)Approx 400000 tons (Act) PCB Sediment 1
      Region 4 Website 1 Reach B C D and lower Brier Creek ROD dateSeptember 2008Remedy not yet initiated 13 (soil and sediment) (Est) Yes $37 (Total) PCB Sediment 1
      Fish 005
      Brier Creek Reservoir Lake Crabtree and Lower Crabtree Creek ~25 river miles Sediment None
      Fish 005
      5 CONTINENTAL STEEL 3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est) 12 BENZO(A)PYRENE Sediment 8 16
      BENZO(BampK)FLOURANTHENE 7 14
      BENZO(A)ANTHRACENE 95 19
      INDENO(123-CD)PYRENE 465 093
      ARSENIC 19
      BERYLLIUM 084
      ARCHLOR-1016 3 1
      ARCHLOR-1242 3 1
      ARCHLOR-1254 3 1
      ARCHLOR-1248 3 1
      ARCHLOR-1260 3 1
      Region 5 Continental Steel Website 4 Markland Avenue Quarry 3252008 - 612010 175 Yes297000 cy 11 BENZO(A)ANTHRACENE Sediment 05
      BENZO(A)PYRENE 05
      BENZO(BampK) FLOURANTHENE 08
      DI-BENZ(AH) ANTHRACENE 02
      INDENO(123-CD)PYRENE 04
      ARCHLOR-1248 1
      ARSENIC 19
      LEAD 400
      5 FOX RIVER NRDAPCB RELEASESProposed to be added to the NPL 1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 PCBs Sediment 1 025 (SWAC)
      2 Appleton to Little Rapids MNR RemedyROD Date 122002 3 (Est) Yes 273 (Est) 20 river miles 136 (Est) 390 (2005 ROD Amendment) Sediment
      3 Little Rapids to De Pere 42009 - ongoing 227 (Est) Sediment 1 SWAC 028
      Fish (Walleye) 005
      Lower Fox River Cleanup Website 4 De Pere to Green Bay 2007 - ongoing 3216 (Est) Sediment 1 SWAC 025
      Fish (Walleye) 005
      5 Green Bay MNR RemedyROD Date 62003 Approx 2700 sq miles Sediment 1
      701(2010 ESD)
      5 KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER) 0 Kress Creek Site Summer 2005 - 2012 43 (Est) Yes $719 (Total) 128 RADIUM 226 Sediment 72 picoCuries per gram (pCig) combined radium
      Region 5 Kerr-McGee Website 129 (Act) RADIUM 228
      5 LITTLE MISSISSINEWA RIVERNot on the NPL - Other Cleanup Activity Private Party-Lead Cleanup 0 Little Mississinewa River Spring 2005 - Fall 2009 57 (Est)100000 tons (Act) Yes 25 miles (Est) 27 20 PCBs Sediment 4 (0-1ft) 5 (deeper than 1ft) 1 (0-1ft)5 (deeper than 1ft)
      Little Mississinewa River(Region 5 Website) Fish Unknown
      5 OUTBOARD MARINE CORP 1 North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below 71992 to 91992 55 (Est) Yes 074 PCBs Sediment Unknown
      Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below 1991-1992 523 (EST)30 (ACT) 131 50 (upper harbor)
      OUTBOARD MARINE CORP (Region 5 Website) 4 formerly 1 OMC Plant 2 North and South DitchROD Date August 20072012 ROD Amendment 2010-2012 40 (soil and sediment) (Est) Yes 73 PCBs Sediment 1
      PAHs 2
      1 HarborSlip No 3(2009 ROD Amendment) 2012-2013 195 (Est) Yes 349 PCBs Fish (Sport) 003 - 01
      Sediment 1 02 (SWAC)
      5 SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI) 2 Area 9 -- Lake Embayment 1295 - 0697 36 (Est) Yes PCBs Sediment 05
      54 (Act)
      5 SHEBOYGAN HARBOR amp RIVER 1 Lower River and Inner Harbor Completed in 2012 53 (ROD)51 (ESD) Yes (ROD) 12 PCBs Sediment 26 05
      51 (ACT) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Region 5 Sheboygan River and Harbor Superfund Site Website Middle River Remedy not yet startedAOC dateFebruary 2009 7 miles 2 Sediment 26 05
      Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Upper River Sept 2004 - October 2007 21 (Est) 31 Sediment None (88 mass removal of PCB) 05
      21 (Act) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      5 Torch Lake 2 Surface Waters ROD DateMarch 311994 No Action Copper
      NPL DeletionFeb 5 2002
      5 VELSICOL CHEMICAL CORP (MICHIGAN) 2 Pine RiverSt Louis Impoundment 1999 - 2005 640 (Act) Yes Unknown area(2 ft compacted clay) $60 (Total) $30 (as of 2002) DDT Carp Smallmouth Bass 1708
      Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5 15
      Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000
      6 ALCOA (POINT COMFORT)LAVACA BAY 1 Natural Recovery Areas 122001 - ongoing Area not specified 161 MERCURY Sediment Hg 025 Marsh 05 Open Water
      North of Dredge Island NA Actual ROD PAHs 448 Total
      Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act) PAHs
      Witco Marsh 12006 - 42006 57
      Chlor-Alkali Process Area (Treatability Study) August 1998 (Phase I)January 1999 (Phase II) 80 (Act) 1952 MERCURY Mass removal
      6 BAILEY WASTE DISPOSAL 1 North Marsh Area January 1996 - September 1996 6 (EST) Unknown Sediment None
      20 (tar and sediment) (Act)
      Deleted from NPL 10152007
      6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995 47 (ROD Est)150 (ESD Est)170 (Act) Yes 226 PAHs Sediment 1300
      8 MILLTOWN RESERVOIR SEDIMENTS 1 Milltown Reservoir Sediments Remediation completed Dec 2010 2600 (Est) Yes Channel realignment and construction 140 ARSENICCADMIUMCOPPERLEADZINC Sediment None
      Region 8 Milltown Reservoir Sediments Website 2560 (Act)
      8 ROCKY MOUNTAIN ARSENAL (USARMY) 3 Lake Sediments Remediation Project June 1999 - Aug 1999 19 (Est) Yes (Est) Area not specified 39 ALDRIN Sediment 38
      33 (Act) No (Act) DIELDRIN 37
      CHLORDANE 12
      ROCKY MOUNTAIN ARSENAL (Region 8 Website) DDE None
      DDT 14
      ROCKY MOUNTAIN ARSENAL (US Army Website) MERCURY 82
      ARSENIC 270
      8 SHARON STEEL CORP (MIDVALE TAILINGS) 1 Marshy Area Aug 1996 - Sept 1996 436 (Est) Yes (elevation raised above water line) 047 ARSENIC Sediment 70
      Deleted from NPL 9242004 100 (Act) LEAD 500
      CADMIUM None
      8 SILVER BOW CREEKBUTTE AREA 1 Streamside Tailing (Silver Bow Creek) July 1999 - Ongoing 73 (ROD Est) Yes Channel realignment and construction (176 miles) $44 (ROD)$98 (ESD) ARSENIC Sediment None 200 979
      CADMIUM 20 099
      COPPER 1000 316
      SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website) LEAD 1000 358
      ZINC 1000 None
      SILVER BOW CREEKBUTTE AREA (MT STATE Website) Sediment Trap MERCURY 10 018
      9 IRON MOUNTAIN MINE 5 Spring Creek Arm 2008-20011 200 (Est) 15 area not specified 186 ARSENIC Sediment Sediment susceptible to erosion dredged to a specific elevation None
      ROD dateSeptember 2004 COPPER
      Region 9 Iron Mountain Mine Website IRON
      9 MCCORMICK amp BAXTER CREOSOTING CO 3 Old Mormon Slough 2006 88 (Est) area not specified 35 DIOXIN Sediment 000021 TEQ 0000021 TEQ
      Region 9 Website McCormick and Baxter Creosoting 88 (Act) PAHs 333 (OC) 333 (OC)
      9 MOFFETT NAVAL AIR STATION 8 Site 27 - Northern Channel completed in 12007 656 (soil and sediment) (Est) Yes 68 TOTAL PCBs Sediment 035 035
      TOTAL DDT 00648 00648
      TOTAL CHLORDANE 0931 0931
      CADMIUM 184 184
      Naval Air Station Moffett Field Website LEAD 173 173
      MERCURY 152 152
      SELENIUM 0926 0926
      SILVER 137 137
      ZINC 720 720
      9 MONTROSE CHEMICAL CORP 5 Palos Verde Shelf Interim ROD Date September 2009 300 Area not specified DDT Sediment 46 (OC) interim23 (OC) Final
      White Croaker 04
      Water 022 ngL
      Palos Verdes Shelf (Region 9 Website) PCBs Sediment 7 (OC)
      White Croaker 007
      Water 0064 ngL
      9 UNITED HECKATHORN CO 1 Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)65 (Proj) Yes 7 DDT Sediment dredge all soft sediments 059 (average)
      Region 9 United Heckathorn Co Website
      10 Bunker Hill Mining and Metallurgical 3 Upper Basin ROD Amendment date Aug 2012 Not specified Arsenic Sediment
      Cadmium
      Runker Hill Mining and Metallurgical (Regional Website) Copper
      Lead 530
      Mercury
      Silver
      Zinc
      10 COMMENCEMENT BAY NEAR SHORETIDE FLATSPartial deletion (St Paul Waterway) 1996 1 Olympic View Resource Area (NTCRA) Completed in 102002 11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ 000002 TEQ
      COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website) 19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 20 (Est) 174 ARSENIC Sediment preponderance of evidence approach 93
      10 (Act) COPPER 390
      LEAD 450
      ZINC 410
      1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13 067
      1 Sitcum Waterway completed in 1994 428 (Act) 45 (Act) 4 ARSENIC Sediment 160 57
      COPPER 1100 390
      1 Hylebos Waterway 32003-22005 940 11 20 46 ARSENIC Sediment 97 57
      HEX-CB 01 0022
      HPAHs 32 17
      PCBs 045 03
      Occidental Site Removal Action (NTCRA) completed March 2003 36 (Act) 10 PCE Sediment 0057
      1 Thea Foss and Wheeler-Osgood Waterways 2002-2006 423 (Act) 32 (Est) 21 (Est) 4 (Est) 60 82 CADMIUM Sediment 66 51
      HPAHs 22 17
      LEAD 580 450
      MERCURY 077 059
      ZINC 490 410
      1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes 22 (Act) 05 (Act) 87 (Act) 125 COPPER Sediment 470 390
      MERCURY 071 059
      LPAHs None 52
      HPAHs None 17
      10 HARBOR ISLAND (LEAD) 7 Lockheed Sediments 7703 - 2405 18 cy (Est) 5 (Act) 12 (Act) In dredge areas $15(ROD) $12(ESD) 20 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      70 (Act) COPPER 390 (Dredge and Cap) 390
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      LEAD 530 (Dredge) 450 (Cap) 450
      LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      MERCURY 059 (Dredge) 041 (Cap) 041
      Region 10 Harbor Island (Lead) Web Site PCBs 65(OC) (Dredge) 12(OC) (Cap) 12 (OC)
      ZINC 960 (Dredge) 410 (Cap) 410
      TBT Not available Not available
      9 Todd Shipyard Sediments 7604 - 22007 5 (Act)(223235 sq ft) Yes In dredge areas No area given $45-$69 21 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      COPPER 390 (Dredge and Cap) 390
      LEAD 530 (Dredge) 450 (Cap) 450
      MERCURY 059 (Dredge) 041 (Cap) 041
      116 (Est) ZINC 960 (Dredge) 410 (Cap) 410
      220 (Act) LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      PCBs 65 (OC) (Dredge)12(OC) (Cap) 12 (OC)
      TBT Not available not available
      10 East Waterway Sediments NTCRA 11204 - 31605 (removal action)No ROD completed for this OU 206 (Act) - Removal action 13 (Act) In dredge area 17 16 MERCURY Sediment 041
      PCBs 12 (OC)
      10 KETCHIKAN PULP COMPANY 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est) 87 (Act) Yes 50 (Est) 52 (Act) 21 (Est) 27(Act) 44 31 4-METHYL-PHENOL Sediment 17 Not Stated Benthic toxicity community structure and chemistry
      Not on the NPL - Superfund Alternative Sited AMMONIA 120
      Region 10 Ketchikan Pulp Company Web Site SULFIDE None
      10 LOCKHEED WEST SEATTLE 1 Lockheed West ROD Date August 2013 167 potential use in shallow areas yes 116 DredgeEMNR 477 PCB Sediment Washington State CSL or SQS 0002
      Arsenic 7
      Lead 11
      Copper 114
      Lockheed West Seattle (Region 10 Website) Mercury 041 (subtidal)017 (intertidal)
      284 EMNR only Carcinogenic PAHs (TEQ) 0009
      TBT 043 (subtidal)2 (intertidal)
      DioxinsFurans 0000002
      Multiple Others see attached
      10 MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT) 4 Sediments 72004-92005 23 (Act)organoclay 23 12 ARSENIC Sediment 12
      Region 10 McCormick and Baxter Creosoting DIOXINSFURANS 000008
      ORDEQ McCormick amp Baxter Creosoting Co Web Site 15 (Est) PAHs 2
      PCP 100
      Arsenic (III) Water 190 μgL
      Chromium (III) 210 μgL
      Copper 12 μgL
      Zinc 110 μgL
      PCP 13 μgL
      Acenaphthene 520 μgL
      Fluoranthene 54 μgL
      Naphthalene 620 μgL
      Total cPAHs 031 μgL
      Dioxinsfurans 1x10-5 ngL
      10 OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA) 1 Clam Bay Sediments 61999 - 102001 7-10 (Est) Yes Area not specified 5 46 71 PCBs Sediment 013 004
      COPPER 390
      LEAD 450
      ZINC 410
      10 (Act) SILVER 61
      2 4-DIMETHYL-PHENOL 0029
      PCBs Shellfish (intertidal clams) 0042
      10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005 35 (Est) 50 (Est) 49 15 LMWPAHs Sediment 780(OC) 370(OC)
      58 (Act) HMWPAHs 5300(OC) 960(OC)
      98 (Act) Capped dredge areas PCBs 12 (OC) (trigger for sediments to 10 feet depth) 12 (OC)
      10 PUGET SOUND NAVAL SHIPYARD COMPLEX 2 OUB Marine 61600 - 3104 200 (Est) 5 211 9 12 PCBs Fish (English sole) 0023 ww
      Sediment 12 (OC) dredgecap 6 (OC) EMNR 3 (OC) SWAC12 (OC)) SWAC
      225 (Act) Sediment in state owned adjacent lands 9 (OC) EMNR
      MERCURY Sediment 3 where PCBs greater than 6 (OC)
      10 ST MARIES CREOSOTE - proposed to be added to the NPL 0 Shoreline Nearshore and Offshore Sediment ROD dateJuly 2007 29 (Est) Yes 108 LPAHs Sediment 370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)
      St Maries Creosote (Regional Website) Remediation Ongoing HPAHs 960 (OC) (17 if TOC lt02or gt4)
      10 WYCKOFF COEAGLE HARBOR 1 East HarborPhase 1 - NTCRA 91993 -31994 (Phase 1) 54 (Act) 117 MERCURY Sediment (toxicity test opt-out)
      LPAHs 780 (OC)
      Region 10 Wyckoff Eagle Harbor Web Site HPAHs 5300 (OC)
      East HarborWest Beach Sediments 2007-2008 48 (Act) 23 MERCURY Sediment 059 subtidal 059
      LPAHs 780 (OC) subtidal 780 (OC)
      HPAHs 5300 (OC) subtidal 5300 (OC)
      East HarborIntertidal and Subtidal Sediments 2000-2002 30(Act) $6-20 MERCURY Sediment 059 059
      LPAHs 780 (OC) 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      3 West Harbor 31997 - 121997 13-92 (Est) Yes 12 - 31 (includes EMNR) 49 see cap $62 - $16 MERCURY Sediment 5 21059 059 (dw)
      LPAHs 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      71
Page 2: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"

ZE FOR THE

AND

were ure of

Copper

Lead

Benzo(a)pyrene 00015Dieldrin 00011

Technical Chlordane 013

Aroclor 1254 0037Aroclor 1268 00112378-Tetrachlorodibenzo-p-dioxin

00000022

Total Aroclors 007644-DDD 0006244-DDE 0018

DioxinsFurans TEQ 0000044

Benzo(a)pyrene

Dibenz(ah)anthracene

Dieldrin

Technical Chlordane

Aroclor 1254

Aroclor 1268

Arsenic

2378-Tetrachlorodibenzo-p-dioxinCoplanar PCBs (TEQ)3Total Aroclors

Selenium

Zinc

44-DDD

44-DDE

Aluminum

Barium

VanadiumN-Nitroso-di-n-propylamine

38 (Est) Total PAHs

Total 44-DDTDDDDDE

Allendale Pond and Lyman Mill Pond Sediment

CALLAHAN MINING CORP

Callahan Mine (Region 1 Website)

CENTREDALE MANOR RESTORATION PROJECT

Centredale Manor Restoration Project (Region 1 Website)

LORING AIR FORCE BASE

1

00026

04

3 Ongoing 101 No Sediment

790

39

0000025

710

5100

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork Dates

OU Area Name

1

Dredge (1000 cu yds)

Lyman Mill Stream Sediment

SedimentsCap

Zinc

$21

1

156

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

046

11

221

0031

0000015

8210

134

376

006

In Situ Treatment (acres)

Sample Matrix

0023

165

14

Sediment

35

028

Sediment

Remediation Goal (ppm)

00084

0006

If needed 605

Fish

097

205 Yes 225

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Aroclor 1260

Total Chlordanes

Lead

44-DDD 0018

44-DDE 0013

44-DDT 0013

Aroclor 1242 00022

Aroclor 1260 00022

Heptaclor 000098

Chlordane Alpha 00034

Chlordane Gamma 00034

NEW BEDFORD

Acushnet River North of Wood Street (within Upper Harbor)

1202 - 303 156 (Act) No2002 ESD $317 (for all of OU 1)

Sediment (Upper Harbor) 10

Sediment (Lower Harbor) 50

Sediment intertidal areas with public access or abutting recreational land use

25

Sediment saltmarsh areas with little to no public access (aka Marsh Island)

50

2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000

Anthracene 051

Fluorene 02

Loring Air Force Base (Region 1 Website)

002

1

048

218

051

02

1

Region 1 New Bedford Website

1

1 Yes1997 - 199813 East Branch of Greenlaw Brook 86 (Act)

34 (Est)

Upper and Lower Harbor

900 (throughout OU1)

2004 - Ongoing

Seafood

1

2011 ESD $422-1200 (for all of OU1)

PCBs

NEWPORT NAVAL EDUCATION amp

481

Operation ongoing

Sediment

Fish

Sediment intertidal areas with abutting residential land use

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

PCBs 36

Pyrene 3

Copper 00529

Nickel 00337

NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp

Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1

MERCURY Sediment 10 (EMNR)

MERCURYFish (largemouth bass yellow perch bullhead)

048

PINE STREET CANAL 2002-2004

2004 78 (Act) (GeotextileSand Cap)

PAHs

Region 1 Pine Street Canal Website 82010 - 22011 08

2011 organoclay cap (size not specified)

Metals and Cyanide

SULLIVANS LEDGE 19 (Est)

86 (Act)

52 (Est)

255 (Act)

BATAVIA LANDFILL 25 (Est) PAHs

22001 - 122001 Yes

Unnamed Stream Ponds A and B 1998-2002

Turning Basin Pine Street Canal and Wetlands

Middle Marsh Wetlands 1998-2001

1

Nyanza Chemical Waste DumpRegion 1 Website

Region 1 Sullivans Ledge website

4

1

1

20 uggC

20 uggCPCBs

Sediment

PCBs

2 28Yes

Yes

36

NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals

Visual13 (soil and sediment)

75 (soil and sediment)

LEAD

Sediment

46000 tons (Act)(cyds not provided)

Sudbury River

McAllister Point Landfill (Narrangasett Bay)

ROD Date September 2010

226

Sediment

3

Area not specified 85

00529

44

ER-M Values

1

84

00337

ER-M Values

Porewater

1

EDUCATION amp TRAINING CENTER

NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website

1

4

Sediment1

Yes

Deleted from NPL Act Wetland

upper portion of stream diverted

2 1 Wetland Areas June 2001 - June 2003

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

BRIDGEPORT RENTAL amp OIL SERVICES

PCBs 10

LEAD 1000

Total Petroleum Hydrocarbons None

LEAD 250

PCBs 5

3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment

St Lawrence River 61995 - 111995 13 (Act) 2 (Act)

Turtle CreekTurtle Cove 1004 - 305

23 (Act) (soil and sediments)

01

Raquette River 602 - 503 14 (Act)

GOWANUS CANAL ROD Date Sept 2013588 (Est)

Area not stated (dredgecap remedy)

In-situ stabilization of 3-5 feet of NAPL-containing sediments

PAHs

Holding Tanks for CSO Control

Copper

Lead

Grasse River Superfund Site(aka Alcoa Aggregation Site)

2431 Sediment 1

Yes Area not specified

Region 2 Bridgeport Rental amp Oil Services Website

175 (Est) 106 (Est)

1

Little Timber Creek Swamp

2 Sediment

20

80

94

g

None

125 Sediment

LEAD 11292005

area volume not specified

2

2

BURNT FLY BOG

2Downstream Area and Westerly Wetlands

400049

2

11795 - 1996

gt6000 tons (Act) (soil and sediment)

10

1000

ROD dateSeptember

Sediment

PCBs Sediment

22

1

1

GENERAL MOTORS (CENTRAL FOUNDRY DIVISION)

1

Gowanus Canal (Region 2 Website)

215 01

Canal Sediments

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Grasse River(Region 2 Website) Fish

001-005 (Final Remedial Goal)

026-036(Interim Target Concentrations)

HOOKER (102ND STREET) Sediment 01

(organics)

Deleted from NPL 852004 Sediment 02

(Mercury)

Fish 005

Sediment 3 gm2 (MPA)Sediment 10 gm2 (MPA)Fish 005SedimentFish 005

(change in ESD from dredging to excavation)

981 (Est) ROD 21

85000 Tons (Act) ESD 50-75

2

LOVE CANAL

Deleted from NPL 9302004

2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001

Biological Sampling None

Sediment 100

56 (Est)

Sediment Excavate up to 1 ft

580 (Est)

HUDSON RIVER PCBS

ROD Date April 2014

Upper Hudson River (Section 2)

Grasse River

Hudson River PCBs EPA Website Upper Hudson

River (Section 3) 510 (Est)

None

0001

Not specified

New York State Sediment TBCs

11

PCBs284

$36 - 56

2 109 Yes

Yes2 1 Niagara River Embayment 71996 - 111996 28 (dredge

to 2 feet)

PCBs

1

PAHs METALS CHLORINATED ORGANICS (MULTIPLE)

22502 2

Upper Hudson River (Section 1)

ROD dateFebruary 20 Area not specified

1560 (Est)

Yes

2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001

485 CADMIUM

INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC

Sediment

CADMIUM

Biological Sampling

100

2

MARATHON BATTERY CORP 1

East Foundry Cove Marsh and Constitution Marsh

91993 - 31995

Actual not sp

30 (Est)

Deleted from NPL 10181996 2

East Foundry Cove West Foundry Cove and the Cold Spring Pier Area

91993 - 31995

Yesbentonite clay layer

40

95 Removal 10 mgkg

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

ROD dateJuly 2005

MERCURY and others Sediment 014-2

Operations Ongoing

5LCP Bridge St SiteWest Flume and Wetland AB

June 2005 - July 2007

543 (Est)917 (Act) Yes 96 MERCURY Sediment 02

MERCURY and others Sediment

Mercury Fish 01-03

Sediment Soil (flood plain)

Fish 01 - 03

Raritan Bay Slag

Raritan Bay Slag (Region 2 Website)

52 (Est) PAHs 1086 (Act) PCBs 1

TDBFs 0001

2RICHARDSON HILL ROAD LANDFILLPOND

1South Pond and Herrick Hollow Creek

2004 285 (Act) 139 PCBs Sediment 1

116 (Est) PAHs

240 (Act) Metals

3

River Areas (Blackwater Branch Floodplain amp Maurice River)

2006 - ongoing 626 Yes 11 ARSENIC Sediment 20

4 Union Lake Sediments Remedy not yet initiat Unknown Yes Sediment

Washing 129 ARSENIC Sediment Unknown

2000-2001 11 (Est) LEAD Not specified

METHYL Hg Fish

2

ONONDAGA LAKE

Region 2 Onondaga Lake Website

03

0 400

See Attached

20 exposed 120 submerged

1

Lead 400Sediment787ROD Date May 2013 34 (Est)

425 (Est) 1771 154 (Est)

2

2 Onondaga Lake Bottoms Subsite 2407 (Est)

Geddes Brook NineMile Creek Reach BC CD

ROD DateApril 2009

June 2012 - ongoing

59 (Est)20

24Geddes Brook NineMile Creek Reach AB

414

Combined with Dredge volume

Yes

151

Partial Channel Re-location

June 2012 - 16 (Est) 42 (Est) Yes MERCURY and others

015

54 (Act) Sediment

189

2

REYNOLDS METALS CO

Not on the NPL - Superfund Alternative Site

1 St Lawrence amp Raquett Rivers 412001 - 102001 35

ROEBLING STEEL CO 5 Delaware River and

Crafts Creek Sediment2010-2013 Yes2 11

2 VINELAND CHEMICAL CO INC

120

08

015

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

15 (Act) PCBs

Complete Removal or

1

PCBs

1 Contingent on biological and chemical testing

LEAD Not specified

ATLANTIC WOOD INDUSTRIES INC 6 7 45 to 100

Region 3 Atlantic Wood Industries Website

157 (Est) 100

CADMIUM 60LEAD 1200ZINC 5600CADMIUM 60LEAD 1200

ZINC 5600

CADMIUM 20LEAD 700ZINC 3000

KOPPERS CO INC (NEWPORT PLANT)

ROD dateSeptember 2005

Region 3 Koppers Co Inc Website

Remedy not yet initiated

METAL BANKS RiverMudflat Sediments

METAL BANK (Regional Website)

OU Name SOIL EXCAVCONTAIN

BORONCOPPERLEADZINC

PCB-1260

Sediment

Unknown

Contamination Pathways - Northwestern Wetland

River Water and Sediments

1

PAHs

3

2010-Ongoing

Cedar Creek

Dunham Creek

Christina River

1727

39

37 (Act)

Yes

Yes

Unknown (Act)

Yes

33

Yes

2

50

Contamination Pathways - Western Wetland

126 (Dredging and Disposal)

Sediment

Sediment

2 YORK OIL CO

Sediment

Sediment

tPAHs3 3

12

7 51099 - 9899 11 (Act)

425 South Wetlands 1997 - 12897

95 (Act)

3

3 North Wetlands 1997 - 12897EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL)

Region 3 EI duPont Website

150

47

Sediment 1

Unknown

Sediment

Re-channelize portion of Hershey Run

Sediment

Unknown

PCBs12 (Est)

58 (Est) Unknown3 1

3 1 2008-2010

Wetlands Ponds and Hershey Run

4 1 ROD dateAugust 2006

94 (Est)

38 (Est)Yes

AMERICAN BRASS INC

American Brass Inc (Regional Website) 429

170780

22028

Yes

Sediment

5176

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

AMERICAN CREOSOTE WORKS INC

American Creosote Works Inc(Regional Website)

Arsenic Sediment

Cadmium Sediment

Fish 3 ppt

Sediment

$20 (Total) TOTAL PAH Sediment 100

DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company)

ROD dateSeptember 2008

Unknown

23

Mercury

143 river miles Dioxin

0

PCBs

196

53000 (O3R amp PR)

57000 (CBR)

640 (Ocoee 3 amp Parksville Reservoirs)

680 (Copper Basin Reach)

5

2200 (CBR)

2

4

Lower Roanoke River

4

Sediment

970 (O3R amp PR)

Sediment

Iron Sediment

Sediment

250 (O3R amp PR)

Yes

Sediment

COPPER BASIN MINING DISTRICT SITE

Copper Basin Reach

Ocoee No 3 Reservoir

Parksville Reservoir

ROD date September 2011

Fish

Region 4 Copper Basin Mining District Site website

4 ROD date September 2007 40 (Est)

Copper

Zinc

Area Not Specified (approx 14 river miles)

Railroad Lake and Hughes Creek

Lead

145 (CBR)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website

4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment

0 (Est) 3 (Act)

$045 (ROD)

01 (ESD)

North Marsh Sediments No info 15 (Act)

1000 linear feet 025 acre (Est)1300 linear feet (Act)

SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION

Fish 2

Lake Hartwell (Regional Website) Sediment

TENNESSEE PRODUCTS 142 (Est) $94 (ROD) Visual

107000 tons (Act)Followed by capping

71 (Act)Aquablock $257 (ESD)

Chattanooga Creek NTCRA 1997-1998 229 Yes Visual

TRIANATENNESSEE RIVER

Fish (channel catfish)

Region 4 TrianaTennessee River Website

Fish (smallmouth buffalo)

Fish (largemouth bass)

WARD TRANSFORMER

Reach A (Removal Action) June 2007 - 2009

150000 tons (Est)Approx 400000 tons (Act)

PCB Sediment

Region 4 Website Sediment

Fish 005

PAHs

Arsenic

Region 4 Tennesse Products Website

1

1

4 1

Ashley River 7101 - 12101

South Marsh Sediments

Barge Canal

Region 4 Koppers Co Inc (Charleston Plant)

KOPPERS CO INC (CHARLESTON PLANT)

0001

32 (Est)0 (Act)

0 (Est)32 (Act)

3103 - 6103

SedimentWeight of Evidence Approach

$05 (ROD)3 (ESD)

Lead

42003 ESD selected MNR for the area

19 tons (Act) 15 (Est)2 (Act)

730 (Est)

17

282

23

01

321 PCBs

1

4 2Twelve Mile CreekLake Hartwell

ROD date62894

Chattanooga Creek - Middle Reach

September 2005 - September 2007 PAHs Sediment

4 0

Reach AHuntsville Spring Branch - Indian Creek

4186 - 101487 DDT 5

Rerouted river buried in-place sediments

No sediment CUL

4Reach B C D and lower Brier Creek

13 (soil and sediment) (Est)ROD date

S t b 2008

Yes

No sediment CUL

No sediment CUL

1

1

None

4

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Sediment

Fish 005

BENZO(A)PYRENE 8

BENZO(BampK)FLOURANTHENE 7

BENZO(A)ANTHRACENE 95

INDENO(123-CD)PYRENE 465

ARSENICBERYLLIUMARCHLOR-1016 3ARCHLOR-1242 3ARCHLOR-1254 3ARCHLOR-1248 3ARCHLOR-1260 3BENZO(A)ANTHRACENE

BENZO(A)PYRENE

BENZO(BampK) FLOURANTHENEDI-BENZ(AH) ANTHRACENEINDENO(123-CD)PYRENEARCHLOR-1248ARSENICLEAD

1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 Sediment 1

2 Appleton to Little Rapids

MNR RemedyROD Date 122002 3 (Est) 20 river

miles Sediment

Sediment 1

Fish (Walleye) 005

Sediment 1

Fish (Walleye) 005

MNR RemedyROD Date 62003

Approx 2700 sq miles

1

701(2010 ESD)

5 PCBs

1

CONTINENTAL STEEL

Region 5 Continental Steel Website

FOX RIVER NRDAPCB RELEASES

Proposed to be added to the NPL

Lower Fox River Cleanup Website

4

Sediment

02

04

119

PCBBrier Creek Reservoir Lake Crabtree and Lower Crabtree Creek

September 2008

Remedy not yet initiated

12

~25 river miles

$37 (Total)

4 Markland Avenue Quarry 3252008 - 612010

5

3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est)

08

1

400

Sediment

14

19

1

11

175Yes

297000 cy

SWAC 025

SWAC 028

11

390 (2005 ROD Amendment)

3273 (Est) 136 (Est)

3216 (Est)

227 (Est)

De Pere to Green Bay 2007 - ongoing

Little Rapids to De Pere 42009 - ongoing

Yes

5 Green Bay

05

Sediment

025 (SWAC)

05

16

19084

093

None

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER)

43 (Est) Yes RADIUM 226

Region 5 Kerr-McGee Website 129 (Act) RADIUM 228

LITTLE MISSISSINEWA RIVER

Not on the NPL - Other Cleanup Activity Private Party-Lead Cleanup

Sediment4 (0-1ft) 5 (deeper than 1ft)

Little Mississinewa River

(Region 5 Website)

Fish Unknown

North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below

71992 to 91992 55 (Est) Yes 074

Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below

1991-1992523 (EST)

30 (ACT)131

2010-2012 PCBs 1

PAHs 2

Fish (Sport) 003 - 01

1 (0-1ft)5 (deeper than 1ft)

72 picoCuries per gram (pCig) combined radium

Yes

57 (Est)

100000 tons (Act)

Kress Creek Site

5 0 Little Mississinewa River

Spring 2005 - Fall 2009

5 0 Summer 2005 - 2012

2012-2013 195 (Est)

$719 (Total) Sediment128

PCBs25 miles (Est) 27 20

OUTBOARD MARINE CORP (Region 5 Website)

4 formerly 1

1HarborSlip No 3(2009 ROD Amendment)

Sediment

PCBs

5

OUTBOARD MARINE CORP 1

Yes40 (soil and sediment) (Est)

Unknown

50 (upper harbor)

Sediment

73

OMC Plant 2 North and South DitchROD Date August 2007

2012 ROD Amendment

Yes PCBs349

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

36 (Est)

54 (Act)

53 (ROD)51 (ESD) Sediment 26

51 (ACT)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Sediment 26Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

21 (Est) SedimentNone (88 mass removal of PCB)

21 (Act)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Copper

VELSICOL CHEMICAL CORP (MICHIGAN)

640 (Act) Carp Smallmouth Bass 1708

Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5

Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000

Natural Recovery Areas 122001 - ongoing Area not

specified

North of Dredge Island NA Actual ROD

Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act)

MERCURY

Pine RiverSt Louis Impoundment

05

Sediment

Amendment)

PCBsYes Sediment

Sediment 1

5

SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI)

2 Area 9 -- Lake Embayment 1295 - 0697

SHEBOYGAN HARBOR amp RIVER

1

Lower River and Inner Harbor Completed in 2012

Region 5 Sheboygan River and Harbor Superfund Site Website

Middle River

Remedy not yet startedAOC dateFebruary 2009

02 (SWAC)

05

05

05

Yes (ROD)

7 miles

12

PCBs

Sept 2004 - October 2007

5 DDT

Unknown area

5 Torch Lake 2

Yes

6

$60 (Total)

ALCOA (POINT COMFORT)LAVACA BAY

1PAHs 448 Total

Upper River 31

Surface WatersNPL DeletionFeb 5 2002

ROD DateMarch 311994

5

$30 (as of 2002)2 1999 - 2005

No Action

161

15

Hg 025 Marsh 05 Open Water

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Witco Marsh 12006 - 42006 57

Chlor-Alkali Process Area (Treatability Study)

August 1998 (Phase I)January 1999 (Phase II)

80 (Act) 1952 MERCURY Mass removal

20 (tar and sediment) (Act)

6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995

47 (ROD Est)150 (ESD Est)170 (Act)

Yes 226 PAHs Sediment 1300

MILLTOWN RESERVOIR SEDIMENTS

2600 (Est)

Region 8 Milltown Reservoir Sediments Website

2560 (Act)

ROCKY MOUNTAIN ARSENAL (USARMY) 19 (Est) Yes (Est) ALDRIN 38

DIELDRIN 37

CHLORDANE 12

ROCKY MOUNTAIN ARSENAL (Region 8 Website)

DDE None

DDT 14

ROCKY MOUNTAIN ARSENAL (US Army Website)

MERCURY 82

ARSENIC 270

SHARON STEEL CORP (MIDVALE TAILINGS)

1 436 (Est) ARSENIC 70

Sediment None

PAHs

North Marsh Area Unknown Sediment None

6 (EST)

8 1 Milltown Reservoir Sediments

Remediation completed Dec 2010

Deleted from NPL 10152007

6

BAILEY WASTE DISPOSAL

1 January 1996 - September 1996

Yes

39 Sediment

Channel realignment and construction

ARSENICCADMIUMCOPPERLEADZINC

140

8 3Lake Sediments Remediation Project

June 1999 - Aug 1999

No (Act)33 (Act)

Yes

Area not specified

Aug 1996 - Sept

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

100 (Act) LEAD 500

CADMIUM None

ARSENIC 200 979CADMIUM 20 099

COPPER 1000 316

LEAD 1000 358

ZINC 1000 None

SILVER BOW CREEKBUTTE AREA (MT STATE Website)

Sediment Trap MERCURY 10 018

2008-20011 ARSENIC

COPPERRegion 9 Iron Mountain Mine Website

IRON

MCCORMICK amp BAXTER CREOSOTING CO

88 (Est) DIOXIN 000021 TEQ

Region 9 Website McCormick and Baxter Creosoting

88 (Act) PAHs 333 (OC)

TOTAL PCBs 035TOTAL DDT 00648TOTAL CHLORDANE 0931

CADMIUM 184LEAD 173MERCURY 152SELENIUM 0926SILVER 137ZINC 720

MONTROSE CHEMICAL CORP DDT Sediment

White Croaker 04

Water

Palos Verdes Shelf (Region 9 Website) PCBs Sediment

White Croaker 007

Water

9 300 Area not specifiedPalos Verde Shelf

46 (OC) interim23 (OC) Final

00648

Sediment

(elevation raised above water line)

047

SILVER BOW CREEKBUTTE AREA

1 Streamside Tailing (Silver Bow Creek)

Deleted from NPL 9242004

Marshy Area

1996

Sediment

Channel realignment and construction (176 miles)

July 1999 - Ongoing 73 (ROD Est) Yes None

0000021 TEQ

Yes

Sediment susceptible to erosion dredged to a specific elevation

None186

Sediment

Sediment$44 (ROD)$98 (ESD)

15 area not specified9

IRON MOUNTAIN MINE

5 Spring Creek Arm 200 (Est)

8

ROD dateSeptember 2004

SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website)

9 3 Old Mormon Slough 2006

9

MOFFETT NAVAL AIR STATION

8 Site 27 - Northern Channel completed in 12007

Naval Air Station Moffett Field Website

68

area not specified 35

173152

0064 ngL

Sediment

0931656 (soil and sediment) (Est)

035

333 (OC)

184

0926137720

022 ngL

7 (OC)

8

5 Interim ROD Date September 2009

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

UNITED HECKATHORN CO

Region 9 United Heckathorn Co WebsiteBunker Hill Mining and Metallurgical 3 Arsenic

CadmiumRunker Hill Mining and Metallurgical (Regional Website)

Copper

LeadMercurySilverZinc

COMMENCEMENT BAY NEAR SHORETIDE FLATS

Partial deletion (St Paul Waterway) 1996

1Olympic View Resource Area (NTCRA)

Completed in 102002

11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ

20 (Est) ARSENIC10 (Act) COPPER

LEADZINC

1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13

ARSENIC 160COPPER 1100ARSENIC 97HEX-CB 01HPAHs 32PCBs 045

Occidental Site Removal Action (NTCRA)

completed March 2003 36 (Act) 10 PCE Sediment

CADMIUM 66HPAHs 22LEAD 580MERCURY 077ZINC 490COPPER 470MERCURY 071LPAHs NoneHPAHs None

18 cy (Est) ARSENIC 93 (Dredge) 57 (Cap)

70 (Act) COPPER 390 (Dredge and Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

Sediment

1752

57

000002 TEQ

530

dredge all soft sediments

preponderance of evidence approach

DDT SedimentYes 7 059 (average)Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)

65 (Proj)

10

COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website)

1 Sitcum Waterway completed in 1994 428 (Act)

19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 174 Sediment 390

450410

Sediment 39045 (Act) 4

1

Hylebos Waterway 32003-22005 940 11 20

17450

46

03

0022Sediment 17

05 (Act) 87 (Act)

4 (Est)

57

21 (Est)

Sediment

82 Sediment

125

60

390

22 (Act)

32 (Est)

059

1Thea Foss and Wheeler-Osgood Waterways

2002-2006 423 (Act)

1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes

HARBOR ISLAND

059410

57

390

960 (OC)

067

93

0057

51

ROD Amendment date Aug 201210 Upper Basin Not specified

9 1

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

LEAD 530 (Dredge) 450 (Cap)

LPAHs780(OC) (Dredge) 370(OC) (Cap)

MERCURY 059 (Dredge) 041 (Cap)

PCBs65(OC) (Dredge) 12(OC) (Cap)

ZINC 960 (Dredge) 410 (Cap)

TBT Not available

ARSENIC 93 (Dredge) 57 (Cap)

COPPER 390 (Dredge and Cap)

LEAD 530 (Dredge) 450 (Cap)

MERCURY 059 (Dredge) 041 (Cap)

116 (Est) ZINC 960 (Dredge) 410 (Cap)

220 (Act) LPAHs780(OC) (Dredge) 370(OC) (Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

PCBs65 (OC) (Dredge)12(OC) (Cap)

TBT Not available

MERCURY

PCBs

KETCHIKAN PULP COMPANY

4-METHYL-PHENOL 17

Not on the NPL - Superfund Alternative Sited

AMMONIA 120

Region 10 Ketchikan Pulp Company Web Site

SULFIDE None

PCB

0002

57

370 (OC)

Yes In dredge areas No area given

370 (OC)

041

12 (OC)

$15(ROD) $12(ESD) 20 Sediment

5 (Act)(223235 sq ft)

10

Todd Shipyard Sediments 7604 - 22007

Region 10 Harbor Island (Lead) Web Site

9

5 (Act)12 (Act) In dredge areas

10

(LEAD)

7 Lockheed Sediments 7703 - 2405

East Waterway Sediments NTCRA

11204 - 31605 (removal action)No ROD completed for this OU

206 (Act) - Removal action

13 (Act) In dredge area

$45-$69 21 Sediment

17 16 Sediment

21 (Est) 27(Act) 44Yes 50 (Est)

52 (Act) 31 Sediment

410

10 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est)

87 (Act)

Not Stated Benthic toxicity community structure and chemistry

Not available

390

450

12 (OC)

450

041

12 (OC)

041

410

960 (OC)

not available

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Arsenic

Lead

Copper

Mercury

Carcinogenic PAHs (TEQ)

TBT

DioxinsFurans

Multiple Others

MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT)

ARSENIC

Region 10 McCormick and Baxter Creosoting

DIOXINSFURANS

PAHs

PCP

Arsenic (III)

Chromium (III)

Copper

Zinc

PCP

Acenaphthene

Fluoranthene

10 Sediment

11

7

041 (subtidal)017 (intertidal)

114

see attached

0009

LOCKHEED WEST SEATTLE

Lockheed West Seattle (Region 10 Website)

Lockheed West ROD Date August 2013

116 DredgeE

MNR

284 EMNR only

1 167potential use in shallow areas

yes 477

54 μgL

520 μgL

13 μgL

10

190 μgL

23 12

Water

23 (Act)organoclay

4 72004-92005Sediments

000008

100

Sediment

ORDEQ McCormick amp Baxter Creosoting Co Web Site

15 (Est)

12 μgL

2

12

110 μgL

210 μgL

043 (subtidal)2 (intertidal)

Washington State CSL or SQS

0000002

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Naphthalene

Total cPAHs

Dioxinsfurans

PCBs 004COPPERLEADZINCSILVER2 4-DIMETHYL-PHENOL

PCBs Shellfish (intertidal clams) 0042

50 (Est) LMWPAHs 780(OC)

58 (Act) HMWPAHs 5300(OC)

98 (Act)Capped dredge areas

PCBs

12 (OC) (trigger for sediments to 10 feet depth)

Fish (English sole) 0023 ww

Sediment12 (OC) dredgecap 6 (OC) EMNR

Sediment in state owned adjacent lands

9 (OC) EMNR

MERCURY Sediment3 where PCBs greater than 6 (OC)

ST MARIES CREOSOTE - proposed to be added to the NPL

ROD dateJuly 2007 LPAHs

370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)

St Maries Creosote (Regional Website)

Remediation Ongoing HPAHs

960 (OC) (17 if TOC lt02or gt4)

7-10 (Est)

200 (Est)

10 (Act)

35 (Est)

510

OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA)

1 Clam Bay Sediments 61999 - 102001

15

450

Area not specifiedYes

12 (OC)

46 71Sediment

013390

61

0029

410

10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005

960(OC)49 Sediment

12

PCBs

3 (OC) SWAC12 (OC)) SWAC

10PUGET SOUND NAVAL SHIPYARD COMPLEX

2 OUB Marine 61600 - 3104

225 (Act)

10 0Shoreline Nearshore and Offshore Sediment

29 (Est) Yes

211 9

108 Sediment

5

1x10-5 ngL

031 μgL

620 μgL

370(OC)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

MERCURY (toxicity test opt-out)

LPAHs 780 (OC)

HPAHs 5300 (OC)

MERCURY 059 subtidal

LPAHs 780 (OC) subtidal

HPAHs 5300 (OC) subtidal

MERCURY 059

LPAHs 780 (OC)

HPAHs 12 dw intertidal

MERCURY 5 21059LPAHs

HPAHs 12 dw intertidal

48 (Act)

30(Act)

54 (Act)

Region 10 Wyckoff Eagle Harbor Web Site

East HarborWest Beach Sediments

2007-2008

31997 - 121997 13-92 (Est) Yes

10

WYCKOFF COEAGLE HARBOR

1

East HarborPhase 1 - NTCRA

91993 -31994 (Phase 1)

East HarborIntertidal and Subtidal Sediments

2000-2002

3 West Harbor

117

780 (OC)

23

$6-20

Sediment

Sediment

059 (dw)

5300 (OC)

780 (OC)

5300 (OC)

5300 (OC)

Sediment

059

49 $62 - $16 Sediment12 - 31 (includes EMNR)

see cap

059

780 (OC)

  • READ_FIRST
  • Tier 1 Sites - Remedial
    • READ_FIRST

      The 2002 memo Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sitesestablished at 2 tier system of headquarters consultations to encourage national consistency in makingdecisions at Superfund and RCRA Corrective Action sediment sites Tier 1 sites are defined as sites wherethe proposed sediment action will address more than 10000 cubic yards or five acres of contaminatedsediment Consultation for Tier 1 sites involves the submission of the draft Proposed Remedy or draftEECA and a discussion of how the 11 principles were considered to the Regional Coordinator 30 daysprior to the public comment period Tier 2 sites are a subset of the Tier 1 sites that are large complex orcontroversial and are subject to consultation with the Contaminated Sediments Technical AdvisoryGroup throughout the RIFS and remedy selection stagesThis Tier 1 Tracking list is an EPA OSRTI product largely developed by the Army Core of Engineers and isintended to be a resource for contaminated sediment RPMs headquarters and regional technical staffand others supporting the remedy decision making process at these sites The list tracks the Tier 1 sitesthat have signed a decision document and documents the remedy selected theestimated and actual costs of the remedy the contaminants of concern and the associatedcontaminated media the Action Levels the Clean-up Levels (CUL) the Remediation Goals (RG) and theSediment Remedial Action Objectives (RAO) For those sites where the remedy has been implementedand a Five-year Review (FYR) has been completed the list also documents whether monitoring wasconducted for the FYR data was presented in the report and the CULs RGs and RAOs were met A keyaspect of this list is that the references for all the data in this spreadsheet are easily located Each cellcontaining data is hyperlinked to a PDF with the page or pages from the relevant public document thatreports the data Each PDF includes the cover page of the report with the information necessary tolocate the complete document and the data included in the spreadsheet is highlighted in the text of thePDF All of the information and documents included in this tracing list are publically availabledocumentsThis Version has been published to the internet with all of the hyperlinks removed We apologize for the inconvenience EPA is currently updating its websites and is temporarily unable to publish the Tier 1 Tracking List with the hyperlinks to the Cited Documents The Remedial Action Objectives and Five Year Review data columns have been removed from this version because they are largely narrative text and require the context provided by the hyperlinked documents in order to be properly understood When the Internet upgrade is complete the Fully cited version will be published Until then any questions regarding this Tier 1 Tracking List can be directed to Matt Lambert EPA Office Of Superfund REmediation and Technology Innovation (lambertmatthewepagov)The Tier 1 Tracking List includes sites in the Remedial Program where a Proposed Plan and Record of Decision were signed The sites are organized by EPA Region number and then listed alphabetically by name Due to the structure of the list columns cannot be filtered or sorted

      Tier 1 Sites - Remedial

      264pdf
      Websitehttpcumulisepagovsupercpadcursitescsitinfocfmid=0101431
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100948
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101479
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100744
      216pdf
      1-011pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100743
      Website httpwwwepagovnbhindexhtml
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631F8CFE11E53EFA23C8525691F0063F6E8OpenDocument
      1-009pdf
      260pdf
      702pdf
      Website httpyosemiteepagovr1npl_padnsf31c4fec03a0762d285256bb80076489ca48c071b6a314e1c8525691f0063f6ddOpenDocument
      1-068pdf
      608pdf
      610pdf
      611pdf
      612pdf
      631pdf
      681pdf Soil and sediment not differentiated
      682pdf
      1-057pdf
      692pdf
      695pdf
      700pdf
      703pdforig 1998 estimate
      1-035pdf
      679pdf
      1-005pdf
      636pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      638pdf
      636pdf
      1-010pdf
      1-074pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      1-017pdf
      1-018pdf
      1-020pdf
      215pdf
      694pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-024pdf
      1-023pdf
      1-025pdf
      1-026pdf
      1-027pdf
      1-027pdf
      1-028pdf
      1-025pdf
      1-047pdf
      1-031pdf
      1-033pdf
      1-034pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101074
      1-012pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201766
      738pdfDates are for entire construction not only sediment portion
      356pdf
      2058pdf
      735pdfThis represents cost estimate for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1266pdfThis represents actual cost for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1268pdf
      2083pdf
      1268pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200364
      2203pdf
      372pdf
      739pdf
      740pdf
      371pdfIn-situ treatment with sorptive agents
      371pdf
      1259pdf
      373pdf
      Website httpwwwepagovr02earthsuperfundnpl0200364chtm
      1259pdf
      373pdf
      1259pdf
      373pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200528
      1272pdf
      177pdf
      477pdf
      1261pdf
      2086pdf
      478pdf
      2086pdf
      478pdf
      Northerly wetlands and tar patch area were determined to be more like soil removals as they were not submerged Westerly wetlandds has a surface water stream running through it that is monitored for sediments so it is retained
      1273pdf
      2088pdfMNR doesnt have fieldwork dates but site fieldwork dates are included
      1274pdfNo specific area for MNR provided 21 acres is area of westerly wetlands for which MNR is selected
      2006pdf
      2087pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0201644
      456pdf
      218pdf
      457pdf
      2093pdf
      2094pdf
      178pdf
      2011pdf
      1279pdf
      461pdf
      56pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201706
      463pdf
      2016pdf
      463pdf
      2016pdf
      2091pdf
      2015pdf
      2015pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0202229
      990pdf
      993pdf
      1014pdf
      1299pdf
      2018pdf
      996pdf
      990pdf
      991pdf
      991pdf
      992pdf
      996pdf
      996pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200557
      2019pdf
      997pdf Remedy componentsareas not broken out
      2098pdf
      2096pdfInfo only on Alycon Lake no info on Rabbit Run or Chestnut Branch
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201290
      2033pdf
      764pdf
      2023pdf
      2024pdf
      2024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201491
      2032pdf
      1002pdf
      1001pdf
      2221pdf
      2031pdf
      2032pdf
      2102pdf
      2029pdf
      2028pdf
      2134pdf
      2030pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0203382
      2072pdf
      518pdf
      2228pdf MNR area was not stated Calculation Profundal areas 08= 154 profundal area = 1925 acres - 154 TLC acres = 1771 MNR acres
      518pdf
      2073pdf
      2075pdf
      2079pdf
      2123pdf
      2126pdf
      1005pdfAttachment has 2 sections one from the ROD the other from the FYR
      1006pdf
      2124pdf
      2125pdf
      2070pdf
      2059pdf
      2059pdf
      2059pdf
      2128pdf
      2060pdf
      2061pdf
      2127pdf
      2063pdf
      2063pdf
      2064pdf
      2065pdf
      2066pdf
      2130pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201465
      369pdf
      2133pdf
      2034pdf
      1008pdf
      2131pdf
      183pdf
      2177pdf
      2131pdf
      183pdf
      2131pdf
      183pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201770
      2036pdf
      64pdf
      1009pdfIncludes entire remedy sediment portion is not defined
      2038pdf
      2037pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200439
      2174pdf
      1012pdf
      2042pdf
      2041pdf
      2041pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200209
      2171pdf
      2051pdf
      523pdf
      2046pdf
      2044pdf
      2049pdf
      2162pdf
      2052pdf
      2053pdf
      2047pdf
      2045pdf
      2050pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201202
      69pdf
      2170pdf
      2054pdf
      2120pdf
      2054pdf
      2054pdf
      2118pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0302836
      Website httpcfpubepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0302836
      3006pdf
      497pdf Apparently same area as EMNR
      498pdf Apparently same area as MNR
      496pdf
      3001pdfWeb site COC list is much more extensive then tPAH
      497pdf
      497pdf
      httpwwwepagovreg3hwmdnplVAD990710410htm
      499pdf
      499pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300093
      1605pdf
      224pdf
      1601pdf
      1614pdf
      1606pdf
      1606pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1605pdf
      482pdf
      73pdf
      1615pdf
      656pdf
      1606pdf
      1617pdf
      1617pdf
      1617pdf
      1617pdf
      Website httpwwwepagovreg3hwmdsupersitesDED980555122indexhtm
      1617pdf
      1617pdf
      1605pdf
      483pdf
      74pdf
      484pdf
      657pdf
      1606pdf
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300092
      1622pdf
      1621pdf
      1039pdf
      959pdf
      1040pdf
      958pdf
      1623pdf
      665pdf
      httpwwwepagovreg3hwmdnplDED980552244htm
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300951
      1624pdf
      3008pdf
      961pdf
      960pdf
      3002pdfArea not stated No mention of sediment capping or marine mattress in ROD or ESDs
      962pdf
      1625pdf
      1626pdf
      1627pdf
      1628pdf
      Websitehttpwwwepagovreg3hwmdnplPAD046557096htm
      Website httpcumulisepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0300951Provided to indicate formal OU name
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0406299
      Construction completed but no documents are available
      12pdf
      578pdf
      579pdf
      4001pdf
      4001pdf
      12pdf
      4001pdf
      4001pdf
      4001pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0402260
      No information on websites regarding status of sediment work unclear as of Jan 2014
      21pdf
      4002pdf
      53pdfCost of sediment remedy is not broken out
      4003pdf
      Website hhttpcumulisepagovsupercpadcursitescsitinfocfmid=0403156
      400pdf
      580pdf
      4004pdf
      Website httpwwwepagovregion4superfundsitesnplnorthcarolinawcoplwtpnchtml
      395pdf
      402pdf
      396pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403350
      4008pdf
      4007pdf
      4023pdf
      965pdf
      4020pdfThe ROD and FYR do not directly state the COCs for the sediment remedy and there are not contaminant-specific cleanup levels The contaminants identified here are those with an HQ above 1 for all areas (see attachment) Presented here to indicate prevalent contamination
      4019pdf Excavation depth based on elevation and visual determinations
      4009pdf
      4011pdf
      4010pdfChanged remedy to MNR
      4011pdfChanged remedy to MNR
      4017pdf
      966pdf
      584pdf
      964pdf
      4013pdf
      4018pdf
      4021pdf
      1025pdf
      1026pdf
      4014pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403252
      77pdf
      561pdf
      4022pdf
      558pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0403765
      391pdf
      4030pdf
      4031pdf
      4032pdf
      393pdf
      httpwwwepagovregion04superfundsitesnpltennesseetennprotnhtml
      562pdf
      563pdf
      4031pdf
      4033pdfROD states However if certain excavated sediments appear to be uncontaminated then those sediments shall be subjected to sampling and analyses for the PAHs The action levels for sediment removal will reflect EPAs excess lifetime carcinogenic risk range of 1 x 10 6 to 1 x 10 4 (See Table G - 9) Its unclear whether or which concentrations will be used for an action level but the text and table are addded as a reference
      4034pdfNo remedial action in Reaches B and C See second page of attachment
      570pdf
      1031pdf
      4043pdf
      4044pdf
      4043pdf
      4043pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406082
      592pdf
      592pdfSite soils included in volume
      No Reach A removal action decision documents exist on EPA HQ or region websites
      httpwwwepagovregion4superfundsitesnplnorthcarolinawardtrnchtml
      593pdf
      590pdf
      591pdf
      4040pdf
      4041pdf
      4042pdf
      4041pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0501228
      5070pdf
      15pdf
      20pdfThis value represents Estimated 30-Year Net Present Worth to excavate and consolidate sediment in landfill
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      17pdf
      5170pdf
      5171pdf
      5172pdf
      533pdf
      532pdf
      Website httpwwwepagovregion5sitescontinentalindexhtm
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0507723
      5059pdf
      5173pdf
      5174pdf
      5180pdf
      5175pdf
      5057pdf
      5137pdf
      5093pdf
      5176pdfDeposit DD is located in OU2 but it is considered part of the OU3 response
      5179pdf
      5062pdf
      5181pdf
      5051pdf
      5092pdf
      5177pdf
      213pdf
      5058pdf
      Website httpwwwepagovregion5sitesfoxriverindexhtml
      5092pdf
      5178pdfAlso see Fox River ROD Amendment 2007 pg 14 Table 2 for documentation of the OU 5 dredge volume being included in the OU4
      213pdf
      5217pdf
      5094pdf
      5096pdf
      214pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500760
      33pdf
      5063pdfBackfill stated on second page of attachment
      35pdfIncludes floodplain material
      32pdf
      Website httpwwwepagovR5SupernplillinoisILD980823991htm
      32pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0508120
      5003pdf
      5002pdf
      5005pdf
      5060pdfEstimated from map in 5 year report
      5004pdf
      5004pdf
      5006pdf
      5001pdf
      5168pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500083
      5108pdf
      5222pdf
      5208pdf
      5022pdf
      5131pdf
      5209pdf
      Website httpwwwepagovregion5sitesoutboardmarine
      5205pdf
      514pdf
      515pdf
      5120pdf
      514pdf
      5120pdf
      514pdf
      5212pdf
      5125pdf
      5126pdf
      5127pdf
      5123pdf
      5128pdf
      Website ttpcumulisepagovsupercpadcursitescsitinfocfmid=0501181
      5024pdf
      5160pdfIncludes sediments and soils
      5026pdf
      5025pdf
      5024pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0505188
      5203pdf
      5202pdf
      5146pdf
      5044pdf
      5037pdf
      5045pdf
      5142pdf
      5142pdf
      Website httpwwwepagovregion5sitessheboygan
      5046pdf
      5145pdf
      5043pdf
      5140pdf
      5142pdf
      5142pdf
      5035pdf
      5144pdf
      5042pdf
      5036pdf
      5142pdf
      5142pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0502194
      150pdf
      148pdf
      149pdf
      5157pdf
      147pdf
      147pdfNo update provided in 2012 FYR
      5027pdf
      5156pdf
      Website httpwwwepagovregion5cleanupvelsicolmichiganindexhtml
      5154pdf
      5164pdf
      5164pdf
      5151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0601752
      6001pdf
      986pdf
      6004pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      987pdf
      983pdf
      981pdf
      984pdf
      6014pdf
      6006pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0602911
      1043pdf
      1044pdf
      6008pdf
      6009pdfA list of principal parameters is provided without risk context COCs or risk drivers in sediments are not identified
      1047pdfPossible that visually clean performance standard also applies to marsh sediments
      1045pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0600574
      1049pdf
      153pdf
      1050pdf
      1051pdf
      6010pdfConstruction and disposal only
      6011pdf
      1052pdf
      Wesbite httpcumulisepagovsupercpadcursitescsitinfocfmid=0800445
      8003pdf
      311pdfIncludes Area 1 sediments and 30K cy in area 3
      625pdf
      624pdf
      8002pdf
      Website httpwwwepagovregion8superfundmtmilltown
      8050pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800357
      8018pdf
      8017pdf
      1019pdf
      1018pdf
      8023pdf
      8012pdf
      8013pdf
      8015pdf
      website httpwww2epagovregion8rocky-mountain-arsenal
      8020pdf
      8019pdf
      8012pdf
      8015pdf
      website httpwwwrmaarmymil
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800694
      629pdf
      8024pdf
      630pdf
      8025pdf
      8026pdf
      8027pdfSediment and soil are often used interchangeably in the ROD
      628pdf
      627pdf
      8026pdf
      628pdf
      8026pdf
      8028pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800416
      8037pdf
      1021pdf
      1022pdf
      8043pdf
      1023pdf
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Websitehttpwww2epagovregion8silver-bow-creek-butte-area
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpdeqmtgovREMMWCBConstructionServicesSectionSilverBowCreekdefaultmcpx
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901755
      9015pdf
      596pdf
      1237pdf
      1236pdf
      1235pdf
      1234pdf
      980pdf
      1238pdf
      1234pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDCAD980498612OpenDocument
      1234pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901129
      1245pdf
      9002pdf
      1240pdfThis cost does not include $18M for bank stabilization
      1239pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDcad009106527OpenDocument
      543pdf
      1239pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902734
      1249pdf
      41pdf
      545pdf
      39pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpyosemiteepagovR9SFUNDR9SFDOCWNSF3dec8ba3252368428825742600743733c01ef2be6ec9ab9c8825737f002bf719OpenDocument978
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902440
      1254pdf
      156pdf
      974pdf
      975pdf
      1250pdfDieldrin is also a COC but only has a CUL for surface water
      1252pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfvwsoalphabeticUnited+Heckathorn+CoOpenDocument
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000981
      10-030pdf
      Name in ROD However name on CB website is NSTF Areawide Sediment covered within OU1 ROD was later divided into separate OUs except for removal actions conducted at Olympic View This removal action is summarized here
      1104pdf
      1105pdf
      1105pdf
      1106pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1106pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc923e8d62480494ad483882564f80082a1c0OpenDocument
      10-030pdf(formerly OU6)
      10-100pdf
      1101pdf
      1100pdf
      1099pdf
      1097pdf
      10-002pdf10 acres as of 2009
      1097pdf
      1097pdf
      1097pdf
      10-030pdf
      1071pdf
      1076pdf
      1073pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1072pdf
      10-030pdf
      1066pdf
      1061pdf Quantity does not include Blair Waterway dredging 1993 ESD states that Blair is not part of ROD cleanup and is for navigational purposes
      1062pdf
      1063pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      10-030pdf
      1060pdf
      1059pdf
      1059pdf
      1059pdf
      1067pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1070pdf
      1111pdf
      1112pdf
      1115pdf
      1113pdf
      10-030pdf
      10-098pdf
      1121pdf
      1079pdf
      1094pdf
      1094pdf
      1078pdf
      1122pdfThis is strictly a construction cost that appears to include construction of CDF and pile removal as well as dredging and capping
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 25
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 089
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      10-030pdf
      10-008pdf
      1081pdf
      1082pdf
      10-009pdf
      1084pdf
      1085pdf
      1087pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000020OU 8 is not included because OU was reommended for no further action in 2003 ROD
      1123pdf
      10-022pdf
      1134pdfCapping took place after dredging to in part maintain original depths
      1138pdf
      433pdfROD estimated remedy would cost $15M but 2002 ESD estimated it as $12M
      1133pdf
      1130pdf
      949pdf
      1135pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc9235a64831b6521f46b8825650200836f1cOpenDocument
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      1136pdf
      1124pdf
      10-023pdf
      1128pdf
      10-028pdf
      434pdf
      1125pdf
      1130pdf
      10-024pdf
      1126pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-025pdf
      1142pdf
      10-095pdf
      1144pdf
      1141pdf
      1143pdf
      1146pdf
      1146pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1000020
      1152pdf
      162pdf
      1148pdf
      314pdf
      633pdf
      1149pdf
      1153pdf
      431pdf
      1150pdf
      431pdf
      1151pdf
      Website httpyosemiteepagovR10CLEANUPNSF7d19cd587dff1eee8825685f007d56b72dd5ab7462e4f004882567b30057eb7bOpenDocument
      431pdf
      1151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000339
      166pdf
      49pdf
      1158pdf
      1159pdf
      1157pdf
      1157pdf
      Website httpwwwdeqstateoruslqcunwrmccormickbaxter
      1290pdf
      1157pdf
      1157pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1001134
      1291pdf
      1163pdf
      1164pdf
      1292pdf
      1293pdfAlthough not called MNR remedy is to monitor contaminant levels until the goal is achieved which is MNR
      10-061pdf
      1165pdfThis cost includes capping of the upland landfill A breakout for just the sediment portion was not provided
      1166pdfThis cost includes the fire training area and upland landfill cover A breakout of just the sediment remediation was not provided
      1167pdf
      1169pdfconsidered at conceptual target for sediment
      1292pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1169pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000611
      1177pdf
      10-031pdf
      10-031pdf
      1179pdf
      1178pdf
      1173pdf
      1181pdf
      1176pdf
      1174pdf
      1173pdf
      1181pdf
      1176pdf
      1173pdf
      1181pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1001107
      1182pdf
      10-040pdf
      1242pdf
      1244pdf
      1243pdf
      1188pdf
      1189pdf
      1187pdf
      1183pdf
      1185pdf
      10-041pdf
      10-042pdf
      1189pdf
      1185pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1002095
      46pdfIncludes soil excavation quantity in total volume
      10-039pdf
      408pdfIncludes cost for excavating nearshore soil
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate that sediment is not toxic
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate sediment that is not toxic
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000612
      10-066pdf
      1216pdf
      10-044pdf
      10-071pdf
      10-068pdf
      10-068pdf
      Website httpyosemiteepagovR10CLEANUPNSFsitesWyckoff
      10-068pdf
      10-075pdf
      10-113pdf
      409pdf
      1218pdf
      202pdf
      202pdf
      202pdf
      10-064pdf
      10-072pdf
      1219pdf
      1214pdf
      1214pdf
      1214pdf
      1215pdfRequirement for intertidal sediments
      423pdf
      10-047pdf
      10-046pdf
      1209pdf
      1208pdf
      1207pdf
      1203pdf
      1202pdf5 mgkg criteria for areas requiring dredging21 mgkg criteria for areas requiring a 1-meter thick cap 059 for thin layer capping
      1203pdf
      1204pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      2195pdf
      2136pdfCleanup goals for biological endpoints were not provided
      2136pdfCleanup goals for biological endpoints were not provided
      2127pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0900993
      Website httpwwwepagovregion9superfundpvshelf
      9003pdf
      9004pdf
      9005pdf
      9005pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      613pdf
      1-030pdf
      1-064pdf
      683pdf
      475pdf
      2085pdfHowever see RAO of 50 ppm
      2085pdf
      2085pdf
      1-102pdf
      1278pdf
      1279pdf
      1278pdf
      2092pdf
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      2097pdf
      763pdf
      1003pdf
      2030pdfIts unclear the extent to which 10 mgkg is considered the cleanup level ROD language and FYR note is attached The closest to being definitive is on p 34 of attachment the cleanup goal of about 10 mgkg
      2123pdf
      2062pdf
      2129pdf
      186pdf
      2117pdf
      2043pdf
      2043pdf
      963pdf Attachment incl language from ROD and ESD
      11pdf
      11pdf
      11pdf
      11pdf
      11pdf
      23pdf
      396pdf
      4019pdf
      597pdf
      4045pdf
      4045pdf
      4045pdf
      586pdf
      585pdf
      4057pdfSediment concentration associated with protective fish tissue concentration is lt10ppb
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      5137pdf
      5050pdf
      5050pdf
      34pdf
      5001pdf
      5109pdfAction level or cleanup level of North Ditch remediation never stated in ROD ROD amendment five year reviews or construction completion report
      277pdf
      5122pdf
      526pdf
      5045pdf
      5139pdf
      5141pdf
      5155pdf
      982pdf
      6003pdf
      8002pdfNo sediment cleanup levels cleanup levels pertain to groundwater or surface water
      1024pdf
      979pdf
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      9006pdf
      9006pdf
      9006pdf
      9006pdf
      1251pdf
      1106pdf
      1103pdf
      1103pdf
      1103pdf
      1103pdf
      1072pdf
      1065pdf
      1065pdf
      1069pdf
      1069pdf
      1069pdf
      1070pdf
      1116pdf
      1091pdf
      1091pdf
      1091pdf
      1091pdf
      1114pdfTable 13 in the ROD lists Zinc SQO as 059 This appears to be an error Table 12 of the ROD lists 059 for mercury and 410 for zinc
      1074pdf
      1074pdf
      1089pdf
      1089pdf
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1136pdfConfirmational number of 76 mgkg (OC) established for TBT
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-025pdf76 ppm (OC) 1335 ppb (dw)TBT is a confirmational number See attachment
      10-096pdf
      10-096pdf
      164pdf
      312pdf
      164pdf
      164pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      1181pdf
      1181pdf
      1181pdf
      1187pdf
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (041 ppm) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (970 ppm [OC]) is considered a conceptual target
      9006pdf
      9006pdf
      6018pdf
      6018pdf
      5184pdfCalled residual cover here
      5185pdfTermed post-dredge residual sand cover
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406638
      4048pdf
      4049pdf
      4050pdf
      4051pdf
      4051pdf
      4051pdf
      4051pdf
      httpepagovregion4superfundsitesnpltennesseecopbastnhtml
      4051pdf
      4051pdf
      4051pdf
      1-045pdf
      1-045pdf
      1-030pdf
      1-046augmentedreplaced sand cap in 2011
      1-047pdf
      httpwwwepagovregion02superfundnplonondagalakeindexhtml
      Ley Creek subsite not included because the volume removedmanaged was less than 10K cy
      2179pdf
      2165pdf
      2167pdf
      2166pdf
      2054pdf
      2054pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      1300pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      5186pdf
      3007pdfSame factsheet as of Jan 2014
      httpepagovregion4superfundsitesnplalabamaamerbrasalhtml
      httpepagovregion4superfundsitesnplmississippiamercrewkmshtml
      httpyosemiteepagovr10cleanupnsf22f04d62fa63974288256da6005f9868cabb84db584c955f8825697f00049beeOpenDocument
      10-056pdf
      10-058pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0503034
      5187pdf
      5188pdf
      5189pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinasangschtml
      5195pdf
      5194pdf
      6023pdf
      10-060pdfROD amendment did not specify the volume of instream sediments vs floodplain material
      10-062pdf
      10-063pdf
      10-064pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      10-069pdf
      10-069pdf
      10-083pdf
      1203pdf
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (370 ppm [OC]) is considered a conceptual target
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      Website httpyosemiteepagovr10cleanupnsfsitesmccormick_baxter
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-087pdf
      10-097pdf
      10-101pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      1246pdfCap placed in areas exceeding CUL
      1246pdfCap placed in areas exceeding CUL
      9014pdf
      8044pdf
      8046pdf
      8051pdf
      6026pdf
      6026pdf
      6026pdf
      6026pdf
      6027pdf
      5196pdf
      5197pdf
      5203pdf
      5204pdf
      5206pdf
      5207pdf
      5210pdf
      5022pdf
      httpwwwepagovregion5cleanupmississinewaindexhtml
      5213pdf
      5214pdf
      5215pdf
      5216pdfAmended cost for OU 2-5 does not include Phase 1 in OU4
      4056pdf
      4061pdf
      4062pdf
      4063pdf
      4065pdfBackfill in at least portions of site N of 38th St area unclear
      4066pdf
      4075pdf
      4075pdf
      4076pdf
      4051pdf
      69pdf
      2053pdf
      2181pdf -- most recent factsheet as of 2014-Jan
      2181pdf -- most recent factsheet as of 2014-Aug
      ROD also describes NYSDEC-regulated action removing channel sediment (4200 cy) and floodplain sedimentsoil (63000 cy)
      2185pdf
      2196pdf
      2197pdf Remedy componentsareas not broken out
      httpwwwepagovhudson
      2198pdf
      1-058pdf
      1-059pdf Soil and sediment not differentiated
      2205pdf
      2204pdf
      1-065pdf
      613pdf
      1-067pdf
      1-071pdf
      1-072pdf
      1-013pdf
      1-073pdf
      698pdf
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93d01550369a32b31bb8525691f0063f6d6OpenDocument
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101028
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8584c38df37ade1998525764f005a96d3OpenDocumentampHighlight=0callahan
      1-076pdf
      1-075pdf
      1-078pdf
      1-078pdf
      1-078pdf
      1-078pdfNote that the dredging and subaqueous disposal of sediments was changed from OU1 to OU3 in the 2013 ESD
      1-078pdf
      1-078pdf
      1-080pdfAs of 2014-Jan
      1-077pdf
      1-081pdf only dredge operation
      httpwwwepagovregion02superfundnplraritanbayslag
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206276
      1-082pdf
      1-083pdf
      1-083pdf level specified on p 3 of 4
      1-083pdf 1-083pdf level specified on p 3 of 4
      1-086pdf
      1-085pdf
      1-087pdf Total cost ROD does not specify cost of sediment portion
      2206pdf
      2206pdf
      2206pdf
      2207pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201690
      2208pdf
      2210pdf
      2211pdf
      2212pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206222
      httpwwwepagovregion2superfundnplgowanus
      2213pdf
      2214pdf
      2214pdf
      2215pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1002655
      httpyosemiteepagovr10cleanupnsf32e58b284950a4fc882578480000fdcc9458199e8119eba3882572910069d808OpenDocument
      10-102pdf
      10-104pdf
      10-105pdf
      10-105pdf
      10-106pdf
      10-107pdf
      10-108pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driverf
      10-110pdf
      10-111pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-093pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8bbe0100a535e8840852576e90053b186OpenDocument
      1-090pdf - soilsediment volumes not differentiated
      1-090pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-089pdf
      1-091pdf
      1-092pdf
      Fish tissue remedial goal appears to only apply to the Allendale and Lyman Mill Pond areas not lyman mill stream sediment
      1-096pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-098pdf
      1-099pdf
      1-099pdf
      2218pdf
      2219pdf
      2219pdf
      2220pdf
      2222pdf
      2123pdf
      2225pdf
      2173pdf
      2116pdf
      5109pdf
      5223pdf
      10-125pdf
      10-125pdf
      10-125pdf
      1-100pdfFloodplain vs sediments not differentiated
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93de720462345729a4f8525691f0063f6e1OpenDocument
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631E704D6C17F74EA678525697B0008CCAAOpenDocument
      1-101pdf
      httpwwwepagovregion02superfundnplaluminumcompany
      2200pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinakopchschtml
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0405546
      httpwwwepagovregion4superfundsitesnplalabamatriatenvalhtml
      877pdf
      877pdf
      877pdf
      877pdf
      6024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000195
      httpyosemiteepagovr10cleanupnsfsitesbh
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101388
      Reg Site OU Area Name Fieldwork Dates Dredge (1000 cu yds) Excavate (1000 cu yds) Back-fill (Residual Cap) Cap (acre) MNR (acre) EMNR Thin Cover (acre) In Situ Treatment (acres) Other Estimated Cost (in millions) Actual Cost (in millions) COC Sample Matrix Action Level (ppm) Cleanup Level (ppm) Remediation Goal (ppm)
      1 CALLAHAN MINING CORP 3 SedimentsCap Ongoing 101 No $21 Copper Sediment 790
      Lead 710
      Callahan Mine (Region 1 Website) Zinc 5100
      1 CENTREDALE MANOR RESTORATION PROJECT 1 Allendale Pond and Lyman Mill Pond Sediment 156 If needed 605 Benzo(a)pyrene Fish 00015
      Dieldrin 00011
      Technical Chlordane 013
      Aroclor 1254 0037
      Aroclor 1268 0011
      2378-Tetrachlorodibenzo-p-dioxin 00000022
      Total Aroclors 0076
      44-DDD 00062
      44-DDE 0018
      DioxinsFurans TEQ 0000044
      Benzo(a)pyrene Sediment 14
      Dibenz(ah)anthracene 097
      Dieldrin 00026
      Technical Chlordane 04
      Aroclor 1254 0031
      Aroclor 1268 0023
      Arsenic 39
      Centredale Manor Restoration Project (Region 1 Website) 2378-Tetrachlorodibenzo-p-dioxin 0000015
      Lyman Mill Stream Sediment 205 Yes 225 165 Coplanar PCBs (TEQ)3 0000025
      Total Aroclors 006
      Selenium 11
      Zinc 221
      44-DDD 00084
      44-DDE 0006
      Aluminum 8210
      Barium 134
      Vanadium 376
      N-Nitroso-di-n-propylamine 046
      1 LORING AIR FORCE BASE 13 East Branch of Greenlaw Brook 1997 - 1998 38 (Est) Yes 481 Total PAHs Sediment 35
      86 (Act) Total 44-DDTDDDDDE 028
      Loring Air Force Base (Region 1 Website) Aroclor 1260 1
      Total Chlordanes 048
      Lead 218
      44-DDD Fish 0018
      44-DDE 0013
      44-DDT 0013
      Aroclor 1242 00022
      Aroclor 1260 00022
      Heptaclor 000098
      Chlordane Alpha 00034
      Chlordane Gamma 00034
      1 NEW BEDFORD 1 Acushnet River North of Wood Street (within Upper Harbor) 1202 - 303 900 (throughout OU1) 156 (Act) No 2002 ESD $317 (for all of OU 1) Operation ongoing PCBs Sediment (Upper Harbor) 10
      Region 1 New Bedford Website Upper and Lower Harbor 2004 - Ongoing 2011 ESD $422-1200 (for all of OU1) Sediment (Lower Harbor) 50
      Sediment intertidal areas with public access or abutting recreational land use 25
      Sediment saltmarsh areas with little to no public access (aka Marsh Island) 50
      Sediment intertidal areas with abutting residential land use 1
      Seafood 002
      2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000
      1 NEWPORT NAVAL EDUCATION amp TRAINING CENTER 4 McAllister Point Landfill (Narrangasett Bay) 22001 - 122001 34 (Est) Yes 226 Anthracene Sediment 051 051
      Fluorene 02 02
      46000 tons (Act)(cyds not provided) PCBs 36 36
      NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website Pyrene 3 3
      Copper Porewater 00529 00529
      Nickel 00337 00337
      1 NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1 1
      Nyanza Chemical Waste DumpRegion 1 Website 4 Sudbury River ROD Date September 2010 Area not specified 84 85 MERCURY Sediment 10 (EMNR)
      MERCURY Fish (largemouth bass yellow perch bullhead) 048
      1 PINE STREET CANAL 1 Turning Basin Pine Street Canal and Wetlands 2002-2004 2004 78 (Act) (GeotextileSand Cap) 44 PAHs Sediment ER-M Values
      Region 1 Pine Street Canal Website 82010 - 22011 08 2011 organoclay cap (size not specified) Metals and Cyanide ER-M Values
      1 SULLIVANS LEDGE 1 Unnamed Stream Ponds A and B 1998-2002 19 (Est) Yes upper portion of stream diverted PCBs Sediment 20 uggC
      Region 1 Sullivans Ledge website 86 (Act)
      2 Middle Marsh Wetlands 1998-2001 52 (Est) Yes 28 PCBs 20 uggC
      255 (Act)
      2 BATAVIA LANDFILL 1 Wetland Areas June 2001 - June 2003 25 (Est) Yes 13 (soil and sediment) 75 (soil and sediment) PAHs Sediment Visual NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals
      Deleted from NPL 11292005 Act Wetland area volume not specified LEAD
      2 BRIDGEPORT RENTAL amp OIL SERVICES 2 Little Timber Creek Swamp ROD dateSeptember 2006Remedial Action 2009-2011 175 (Est) Yes Area not specified 106 (Est) 125 PCBs Sediment 10 10
      Region 2 Bridgeport Rental amp Oil Services Website LEAD 1000 1000
      Total Petroleum Hydrocarbons None None
      2 BURNT FLY BOG 2 Downstream Area and Westerly Wetlands 11795 - 1996 gt6000 tons (Act) (soil and sediment) 22 LEAD Sediment 250
      PCBs 5
      3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment 400049
      2 GENERAL MOTORS (CENTRAL FOUNDRY DIVISION) 1 St Lawrence River 61995 - 111995 13 (Act) 2 (Act) 215 PCBs Sediment 1
      Turtle CreekTurtle Cove 1004 - 305 23 (Act) (soil and sediments) 01 01
      Raquette River 602 - 503 14 (Act) 1
      2 GOWANUS CANAL 1 Canal Sediments ROD Date Sept 2013 588 (Est) Area not stated (dredgecap remedy) In-situ stabilization of 3-5 feet of NAPL-containing sediments PAHs Sediment 20
      Gowanus Canal (Region 2 Website) Holding Tanks for CSO Control Copper 80
      Lead 94
      2 Grasse River Superfund Site(aka Alcoa Aggregation Site) Grasse River ROD Date April 2014 109 Yes 284 2431 PCBs Sediment 1
      Grasse River(Region 2 Website) Fish 001-005 (Final Remedial Goal)026-036(Interim Target Concentrations)
      2 HOOKER (102ND STREET) 1 Niagara River Embayment 71996 - 111996 28 (dredge to 2 feet) Yes $36 - 56 PAHs METALS CHLORINATED ORGANICS (MULTIPLE) Sediment 01(organics) New York State Sediment TBCs
      Deleted from NPL 852004 Sediment 02(Mercury)
      2 HUDSON RIVER PCBS 2 Upper Hudson River (Section 1) ROD dateFebruary 2002 Field work 2009-ongoing 1560 (Est) Yes Area not specified 2250 PCBs Fish 005
      Sediment 3 gm2 (MPA) 1
      Hudson River PCBs EPA Website Upper Hudson River (Section 2) 580 (Est) Sediment 10 gm2 (MPA) 1
      Fish 005
      Upper Hudson River (Section 3) 510 (Est) Sediment 1
      Fish 005
      2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001 (change in ESD from dredging to excavation) 981 (Est) ROD 21 INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC Sediment Not specified
      85000 Tons (Act) ESD 50-75
      2 LOVE CANALDeleted from NPL 9302004 2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001 0001
      2 MARATHON BATTERY CORP 1 East Foundry Cove Marsh and Constitution Marsh 91993 - 31995 30 (Est) Yesbentonite clay layer 40 CADMIUM Biological Sampling None
      Sediment 100 100
      Deleted from NPL 10181996 2 East Foundry Cove West Foundry Cove and the Cold Spring Pier Area 91993 - 31995 56 (Est) 485 CADMIUM Biological Sampling None
      Actual not specified by area
      Sediment Excavate up to 1 ft 95 Removal 10 mgkg
      2 ONONDAGA LAKE 2 Onondaga Lake Bottoms Subsite ROD dateJuly 2005 2407 (Est) 425 (Est) 1771 154 (Est) 414 MERCURY and others Sediment 08 014-2
      Operations Ongoing METHYL Hg Fish 03
      5 LCP Bridge St SiteWest Flume and Wetland AB June 2005 - July 2007 543 (Est)917 (Act) Yes 96 MERCURY Sediment 02
      20 Geddes Brook NineMile Creek Reach BC CD ROD DateApril 2009June 2012 - ongoing 59 (Est) Combined with Dredge volume Yes Partial Channel Re-location 189 MERCURY and others Sediment 015
      Region 2 Onondaga Lake Website Mercury Fish 01-03
      24 Geddes Brook NineMile Creek Reach AB June 2012 - 16 (Est) 42 (Est) Yes 151 MERCURY and others Sediment Soil (flood plain) 015
      Fish 01 - 03
      2 Raritan Bay Slag 0 ROD Date May 2013 34 (Est) 787 Lead Sediment 400 400
      Raritan Bay Slag (Region 2 Website)
      2 REYNOLDS METALS CONot on the NPL - Superfund Alternative Site 1 St Lawrence amp Raquett Rivers 412001 - 102001 52 (Est) 54 (Act) 35 PAHs Sediment 10
      86 (Act) PCBs 1
      TDBFs 0001
      2 RICHARDSON HILL ROAD LANDFILLPOND 1 South Pond and Herrick Hollow Creek 2004 285 (Act) 139 PCBs Sediment 1 1
      2 ROEBLING STEEL CO 5 Delaware River and Crafts Creek 2010-2013 116 (Est) Yes 11 PAHs Sediment See Attached
      240 (Act) Metals
      2 VINELAND CHEMICAL CO INC 3 River Areas (Blackwater Branch Floodplain amp Maurice River) 2006 - ongoing 626 Yes 11 ARSENIC Sediment 20 20 exposed 120 submerged
      4 Union Lake Sediments Remedy not yet initiated Unknown Yes Sediment Washing 129 ARSENIC Sediment Unknown 120
      2 YORK OIL CO 2 Contamination Pathways - Western Wetland 2000-2001 11 (Est) Yes 33 LEAD Sediment Not specified
      15 (Act) PCBs Complete Removal or 1
      Contamination Pathways - Northwestern Wetland 50 PCBs Sediment 1 Contingent on biological and chemical testing
      LEAD Not specified
      3 ATLANTIC WOOD INDUSTRIES INC 3 River Water and Sediments 2010-Ongoing 6 7 126 (Dredging and Disposal) tPAHs Sediment 45 to 100
      Region 3 Atlantic Wood Industries Website 157 (Est) 100
      3 EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL) 3 North Wetlands 1997 - 12897 95 (Act) Yes 12 3 CADMIUM Sediment 60
      LEAD 1200
      ZINC 5600
      5 South Wetlands 1997 - 12897 37 (Act) Yes 42 Unknown CADMIUM Sediment 60
      LEAD 1200
      Region 3 EI duPont Website ZINC 5600
      7 Christina River 51099 - 9899 11 (Act) Yes 47 Unknown CADMIUM Sediment 20
      LEAD 700
      ZINC 3000
      3 KOPPERS CO INC (NEWPORT PLANT) 1 Wetlands Ponds and Hershey Run ROD dateSeptember 2005 58 (Est) Unknown Re-channelize portion of Hershey Run 5176 PAHs Sediment 150
      Region 3 Koppers Co Inc Website Remedy not yet initiated
      3 METAL BANKS 1 RiverMudflat Sediments 2008-2010 12 (Est) Yes Unknown (Act) 1727 Unknown PCBs Sediment 1 1
      METAL BANK (Regional Website) OU Name SOIL EXCAVCONTAIN
      4 AMERICAN BRASS INC 1 Cedar Creek ROD dateAugust 2006 94 (Est) Yes 39 BORON Sediment 28
      COPPER 220
      Dunham Creek 38 (Est) LEAD 170
      American Brass Inc (Regional Website) ZINC 780
      PCB-1260 429
      4 AMERICAN CREOSOTE WORKS INC 0 Railroad Lake and Hughes Creek ROD date September 2007 40 (Est) Yes $20 (Total) TOTAL PAH Sediment 100
      American Creosote Works Inc(Regional Website)
      4 COPPER BASIN MINING DISTRICT SITE 5 Copper Basin ReachOcoee No 3 ReservoirParksville Reservoir ROD date September 2011 Area Not Specified (approx 14 river miles) 23 PCBs Sediment
      Arsenic Sediment
      Cadmium Sediment
      Copper Sediment 680 (Copper Basin Reach)
      640 (Ocoee 3 amp Parksville Reservoirs)
      Region 4 Copper Basin Mining District Site website Iron Sediment 57000 (CBR)
      53000 (O3R amp PR)
      Lead Sediment 145 (CBR)
      250 (O3R amp PR)
      Mercury Fish
      Zinc Sediment 2200 (CBR)
      970 (O3R amp PR)
      4 DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company) 2 Lower Roanoke River ROD dateSeptember 2008 143 river miles 196 Dioxin Fish 3 ppt
      Sediment Unknown
      Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website 4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment 0001
      4 KOPPERS CO INC (CHARLESTON PLANT) 1 Ashley River 7101 - 12101 0 (Est) $05 (ROD)3 (ESD) 282 PAHs Sediment Weight of Evidence Approach None
      3 (Act)
      Barge Canal 42003 ESD selected MNR for the area 32 (Est)0 (Act) 0 (Est)32 (Act) $045 (ROD) 01
      01 (ESD) Arsenic
      Region 4 Koppers Co Inc (Charleston Plant) North Marsh Sediments No info 15 (Act) 1000 linear feet 025 acre (Est)1300 linear feet (Act) 17 23
      South Marsh Sediments 3103 - 6103 19 tons (Act) 15 (Est)2 (Act) Lead
      4 SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION 2 Twelve Mile CreekLake Hartwell ROD date62894 730 (Est) 321 PCBs Fish 2
      Lake Hartwell (Regional Website) Sediment 1
      4 TENNESSEE PRODUCTS 1 Chattanooga Creek - Middle Reach September 2005 - September 2007 142 (Est) $94 (ROD) PAHs Sediment Visual
      Region 4 Tennesse Products Website 107000 tons (Act)Followed by capping 71 (Act)Aquablock $257 (ESD)
      Chattanooga Creek NTCRA 1997-1998 229 Yes Visual
      4 TRIANATENNESSEE RIVER 0 Reach AHuntsville Spring Branch - Indian Creek 4186 - 101487 Rerouted river buried in-place sediments DDT Fish (channel catfish) No sediment CUL 5
      Region 4 TrianaTennessee River Website Fish (smallmouth buffalo) No sediment CUL
      Fish (largemouth bass) No sediment CUL
      4 WARD TRANSFORMER Reach A (Removal Action) June 2007 - 2009 150000 tons (Est)Approx 400000 tons (Act) PCB Sediment 1
      Region 4 Website 1 Reach B C D and lower Brier Creek ROD dateSeptember 2008Remedy not yet initiated 13 (soil and sediment) (Est) Yes $37 (Total) PCB Sediment 1
      Fish 005
      Brier Creek Reservoir Lake Crabtree and Lower Crabtree Creek ~25 river miles Sediment None
      Fish 005
      5 CONTINENTAL STEEL 3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est) 12 BENZO(A)PYRENE Sediment 8 16
      BENZO(BampK)FLOURANTHENE 7 14
      BENZO(A)ANTHRACENE 95 19
      INDENO(123-CD)PYRENE 465 093
      ARSENIC 19
      BERYLLIUM 084
      ARCHLOR-1016 3 1
      ARCHLOR-1242 3 1
      ARCHLOR-1254 3 1
      ARCHLOR-1248 3 1
      ARCHLOR-1260 3 1
      Region 5 Continental Steel Website 4 Markland Avenue Quarry 3252008 - 612010 175 Yes297000 cy 11 BENZO(A)ANTHRACENE Sediment 05
      BENZO(A)PYRENE 05
      BENZO(BampK) FLOURANTHENE 08
      DI-BENZ(AH) ANTHRACENE 02
      INDENO(123-CD)PYRENE 04
      ARCHLOR-1248 1
      ARSENIC 19
      LEAD 400
      5 FOX RIVER NRDAPCB RELEASESProposed to be added to the NPL 1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 PCBs Sediment 1 025 (SWAC)
      2 Appleton to Little Rapids MNR RemedyROD Date 122002 3 (Est) Yes 273 (Est) 20 river miles 136 (Est) 390 (2005 ROD Amendment) Sediment
      3 Little Rapids to De Pere 42009 - ongoing 227 (Est) Sediment 1 SWAC 028
      Fish (Walleye) 005
      Lower Fox River Cleanup Website 4 De Pere to Green Bay 2007 - ongoing 3216 (Est) Sediment 1 SWAC 025
      Fish (Walleye) 005
      5 Green Bay MNR RemedyROD Date 62003 Approx 2700 sq miles Sediment 1
      701(2010 ESD)
      5 KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER) 0 Kress Creek Site Summer 2005 - 2012 43 (Est) Yes $719 (Total) 128 RADIUM 226 Sediment 72 picoCuries per gram (pCig) combined radium
      Region 5 Kerr-McGee Website 129 (Act) RADIUM 228
      5 LITTLE MISSISSINEWA RIVERNot on the NPL - Other Cleanup Activity Private Party-Lead Cleanup 0 Little Mississinewa River Spring 2005 - Fall 2009 57 (Est)100000 tons (Act) Yes 25 miles (Est) 27 20 PCBs Sediment 4 (0-1ft) 5 (deeper than 1ft) 1 (0-1ft)5 (deeper than 1ft)
      Little Mississinewa River(Region 5 Website) Fish Unknown
      5 OUTBOARD MARINE CORP 1 North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below 71992 to 91992 55 (Est) Yes 074 PCBs Sediment Unknown
      Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below 1991-1992 523 (EST)30 (ACT) 131 50 (upper harbor)
      OUTBOARD MARINE CORP (Region 5 Website) 4 formerly 1 OMC Plant 2 North and South DitchROD Date August 20072012 ROD Amendment 2010-2012 40 (soil and sediment) (Est) Yes 73 PCBs Sediment 1
      PAHs 2
      1 HarborSlip No 3(2009 ROD Amendment) 2012-2013 195 (Est) Yes 349 PCBs Fish (Sport) 003 - 01
      Sediment 1 02 (SWAC)
      5 SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI) 2 Area 9 -- Lake Embayment 1295 - 0697 36 (Est) Yes PCBs Sediment 05
      54 (Act)
      5 SHEBOYGAN HARBOR amp RIVER 1 Lower River and Inner Harbor Completed in 2012 53 (ROD)51 (ESD) Yes (ROD) 12 PCBs Sediment 26 05
      51 (ACT) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Region 5 Sheboygan River and Harbor Superfund Site Website Middle River Remedy not yet startedAOC dateFebruary 2009 7 miles 2 Sediment 26 05
      Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Upper River Sept 2004 - October 2007 21 (Est) 31 Sediment None (88 mass removal of PCB) 05
      21 (Act) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      5 Torch Lake 2 Surface Waters ROD DateMarch 311994 No Action Copper
      NPL DeletionFeb 5 2002
      5 VELSICOL CHEMICAL CORP (MICHIGAN) 2 Pine RiverSt Louis Impoundment 1999 - 2005 640 (Act) Yes Unknown area(2 ft compacted clay) $60 (Total) $30 (as of 2002) DDT Carp Smallmouth Bass 1708
      Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5 15
      Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000
      6 ALCOA (POINT COMFORT)LAVACA BAY 1 Natural Recovery Areas 122001 - ongoing Area not specified 161 MERCURY Sediment Hg 025 Marsh 05 Open Water
      North of Dredge Island NA Actual ROD PAHs 448 Total
      Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act) PAHs
      Witco Marsh 12006 - 42006 57
      Chlor-Alkali Process Area (Treatability Study) August 1998 (Phase I)January 1999 (Phase II) 80 (Act) 1952 MERCURY Mass removal
      6 BAILEY WASTE DISPOSAL 1 North Marsh Area January 1996 - September 1996 6 (EST) Unknown Sediment None
      20 (tar and sediment) (Act)
      Deleted from NPL 10152007
      6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995 47 (ROD Est)150 (ESD Est)170 (Act) Yes 226 PAHs Sediment 1300
      8 MILLTOWN RESERVOIR SEDIMENTS 1 Milltown Reservoir Sediments Remediation completed Dec 2010 2600 (Est) Yes Channel realignment and construction 140 ARSENICCADMIUMCOPPERLEADZINC Sediment None
      Region 8 Milltown Reservoir Sediments Website 2560 (Act)
      8 ROCKY MOUNTAIN ARSENAL (USARMY) 3 Lake Sediments Remediation Project June 1999 - Aug 1999 19 (Est) Yes (Est) Area not specified 39 ALDRIN Sediment 38
      33 (Act) No (Act) DIELDRIN 37
      CHLORDANE 12
      ROCKY MOUNTAIN ARSENAL (Region 8 Website) DDE None
      DDT 14
      ROCKY MOUNTAIN ARSENAL (US Army Website) MERCURY 82
      ARSENIC 270
      8 SHARON STEEL CORP (MIDVALE TAILINGS) 1 Marshy Area Aug 1996 - Sept 1996 436 (Est) Yes (elevation raised above water line) 047 ARSENIC Sediment 70
      Deleted from NPL 9242004 100 (Act) LEAD 500
      CADMIUM None
      8 SILVER BOW CREEKBUTTE AREA 1 Streamside Tailing (Silver Bow Creek) July 1999 - Ongoing 73 (ROD Est) Yes Channel realignment and construction (176 miles) $44 (ROD)$98 (ESD) ARSENIC Sediment None 200 979
      CADMIUM 20 099
      COPPER 1000 316
      SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website) LEAD 1000 358
      ZINC 1000 None
      SILVER BOW CREEKBUTTE AREA (MT STATE Website) Sediment Trap MERCURY 10 018
      9 IRON MOUNTAIN MINE 5 Spring Creek Arm 2008-20011 200 (Est) 15 area not specified 186 ARSENIC Sediment Sediment susceptible to erosion dredged to a specific elevation None
      ROD dateSeptember 2004 COPPER
      Region 9 Iron Mountain Mine Website IRON
      9 MCCORMICK amp BAXTER CREOSOTING CO 3 Old Mormon Slough 2006 88 (Est) area not specified 35 DIOXIN Sediment 000021 TEQ 0000021 TEQ
      Region 9 Website McCormick and Baxter Creosoting 88 (Act) PAHs 333 (OC) 333 (OC)
      9 MOFFETT NAVAL AIR STATION 8 Site 27 - Northern Channel completed in 12007 656 (soil and sediment) (Est) Yes 68 TOTAL PCBs Sediment 035 035
      TOTAL DDT 00648 00648
      TOTAL CHLORDANE 0931 0931
      CADMIUM 184 184
      Naval Air Station Moffett Field Website LEAD 173 173
      MERCURY 152 152
      SELENIUM 0926 0926
      SILVER 137 137
      ZINC 720 720
      9 MONTROSE CHEMICAL CORP 5 Palos Verde Shelf Interim ROD Date September 2009 300 Area not specified DDT Sediment 46 (OC) interim23 (OC) Final
      White Croaker 04
      Water 022 ngL
      Palos Verdes Shelf (Region 9 Website) PCBs Sediment 7 (OC)
      White Croaker 007
      Water 0064 ngL
      9 UNITED HECKATHORN CO 1 Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)65 (Proj) Yes 7 DDT Sediment dredge all soft sediments 059 (average)
      Region 9 United Heckathorn Co Website
      10 Bunker Hill Mining and Metallurgical 3 Upper Basin ROD Amendment date Aug 2012 Not specified Arsenic Sediment
      Cadmium
      Runker Hill Mining and Metallurgical (Regional Website) Copper
      Lead 530
      Mercury
      Silver
      Zinc
      10 COMMENCEMENT BAY NEAR SHORETIDE FLATSPartial deletion (St Paul Waterway) 1996 1 Olympic View Resource Area (NTCRA) Completed in 102002 11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ 000002 TEQ
      COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website) 19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 20 (Est) 174 ARSENIC Sediment preponderance of evidence approach 93
      10 (Act) COPPER 390
      LEAD 450
      ZINC 410
      1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13 067
      1 Sitcum Waterway completed in 1994 428 (Act) 45 (Act) 4 ARSENIC Sediment 160 57
      COPPER 1100 390
      1 Hylebos Waterway 32003-22005 940 11 20 46 ARSENIC Sediment 97 57
      HEX-CB 01 0022
      HPAHs 32 17
      PCBs 045 03
      Occidental Site Removal Action (NTCRA) completed March 2003 36 (Act) 10 PCE Sediment 0057
      1 Thea Foss and Wheeler-Osgood Waterways 2002-2006 423 (Act) 32 (Est) 21 (Est) 4 (Est) 60 82 CADMIUM Sediment 66 51
      HPAHs 22 17
      LEAD 580 450
      MERCURY 077 059
      ZINC 490 410
      1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes 22 (Act) 05 (Act) 87 (Act) 125 COPPER Sediment 470 390
      MERCURY 071 059
      LPAHs None 52
      HPAHs None 17
      10 HARBOR ISLAND (LEAD) 7 Lockheed Sediments 7703 - 2405 18 cy (Est) 5 (Act) 12 (Act) In dredge areas $15(ROD) $12(ESD) 20 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      70 (Act) COPPER 390 (Dredge and Cap) 390
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      LEAD 530 (Dredge) 450 (Cap) 450
      LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      MERCURY 059 (Dredge) 041 (Cap) 041
      Region 10 Harbor Island (Lead) Web Site PCBs 65(OC) (Dredge) 12(OC) (Cap) 12 (OC)
      ZINC 960 (Dredge) 410 (Cap) 410
      TBT Not available Not available
      9 Todd Shipyard Sediments 7604 - 22007 5 (Act)(223235 sq ft) Yes In dredge areas No area given $45-$69 21 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      COPPER 390 (Dredge and Cap) 390
      LEAD 530 (Dredge) 450 (Cap) 450
      MERCURY 059 (Dredge) 041 (Cap) 041
      116 (Est) ZINC 960 (Dredge) 410 (Cap) 410
      220 (Act) LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      PCBs 65 (OC) (Dredge)12(OC) (Cap) 12 (OC)
      TBT Not available not available
      10 East Waterway Sediments NTCRA 11204 - 31605 (removal action)No ROD completed for this OU 206 (Act) - Removal action 13 (Act) In dredge area 17 16 MERCURY Sediment 041
      PCBs 12 (OC)
      10 KETCHIKAN PULP COMPANY 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est) 87 (Act) Yes 50 (Est) 52 (Act) 21 (Est) 27(Act) 44 31 4-METHYL-PHENOL Sediment 17 Not Stated Benthic toxicity community structure and chemistry
      Not on the NPL - Superfund Alternative Sited AMMONIA 120
      Region 10 Ketchikan Pulp Company Web Site SULFIDE None
      10 LOCKHEED WEST SEATTLE 1 Lockheed West ROD Date August 2013 167 potential use in shallow areas yes 116 DredgeEMNR 477 PCB Sediment Washington State CSL or SQS 0002
      Arsenic 7
      Lead 11
      Copper 114
      Lockheed West Seattle (Region 10 Website) Mercury 041 (subtidal)017 (intertidal)
      284 EMNR only Carcinogenic PAHs (TEQ) 0009
      TBT 043 (subtidal)2 (intertidal)
      DioxinsFurans 0000002
      Multiple Others see attached
      10 MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT) 4 Sediments 72004-92005 23 (Act)organoclay 23 12 ARSENIC Sediment 12
      Region 10 McCormick and Baxter Creosoting DIOXINSFURANS 000008
      ORDEQ McCormick amp Baxter Creosoting Co Web Site 15 (Est) PAHs 2
      PCP 100
      Arsenic (III) Water 190 μgL
      Chromium (III) 210 μgL
      Copper 12 μgL
      Zinc 110 μgL
      PCP 13 μgL
      Acenaphthene 520 μgL
      Fluoranthene 54 μgL
      Naphthalene 620 μgL
      Total cPAHs 031 μgL
      Dioxinsfurans 1x10-5 ngL
      10 OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA) 1 Clam Bay Sediments 61999 - 102001 7-10 (Est) Yes Area not specified 5 46 71 PCBs Sediment 013 004
      COPPER 390
      LEAD 450
      ZINC 410
      10 (Act) SILVER 61
      2 4-DIMETHYL-PHENOL 0029
      PCBs Shellfish (intertidal clams) 0042
      10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005 35 (Est) 50 (Est) 49 15 LMWPAHs Sediment 780(OC) 370(OC)
      58 (Act) HMWPAHs 5300(OC) 960(OC)
      98 (Act) Capped dredge areas PCBs 12 (OC) (trigger for sediments to 10 feet depth) 12 (OC)
      10 PUGET SOUND NAVAL SHIPYARD COMPLEX 2 OUB Marine 61600 - 3104 200 (Est) 5 211 9 12 PCBs Fish (English sole) 0023 ww
      Sediment 12 (OC) dredgecap 6 (OC) EMNR 3 (OC) SWAC12 (OC)) SWAC
      225 (Act) Sediment in state owned adjacent lands 9 (OC) EMNR
      MERCURY Sediment 3 where PCBs greater than 6 (OC)
      10 ST MARIES CREOSOTE - proposed to be added to the NPL 0 Shoreline Nearshore and Offshore Sediment ROD dateJuly 2007 29 (Est) Yes 108 LPAHs Sediment 370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)
      St Maries Creosote (Regional Website) Remediation Ongoing HPAHs 960 (OC) (17 if TOC lt02or gt4)
      10 WYCKOFF COEAGLE HARBOR 1 East HarborPhase 1 - NTCRA 91993 -31994 (Phase 1) 54 (Act) 117 MERCURY Sediment (toxicity test opt-out)
      LPAHs 780 (OC)
      Region 10 Wyckoff Eagle Harbor Web Site HPAHs 5300 (OC)
      East HarborWest Beach Sediments 2007-2008 48 (Act) 23 MERCURY Sediment 059 subtidal 059
      LPAHs 780 (OC) subtidal 780 (OC)
      HPAHs 5300 (OC) subtidal 5300 (OC)
      East HarborIntertidal and Subtidal Sediments 2000-2002 30(Act) $6-20 MERCURY Sediment 059 059
      LPAHs 780 (OC) 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      3 West Harbor 31997 - 121997 13-92 (Est) Yes 12 - 31 (includes EMNR) 49 see cap $62 - $16 MERCURY Sediment 5 21059 059 (dw)
      LPAHs 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      71
Page 3: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"

Copper

Lead

Benzo(a)pyrene 00015Dieldrin 00011

Technical Chlordane 013

Aroclor 1254 0037Aroclor 1268 00112378-Tetrachlorodibenzo-p-dioxin

00000022

Total Aroclors 007644-DDD 0006244-DDE 0018

DioxinsFurans TEQ 0000044

Benzo(a)pyrene

Dibenz(ah)anthracene

Dieldrin

Technical Chlordane

Aroclor 1254

Aroclor 1268

Arsenic

2378-Tetrachlorodibenzo-p-dioxinCoplanar PCBs (TEQ)3Total Aroclors

Selenium

Zinc

44-DDD

44-DDE

Aluminum

Barium

VanadiumN-Nitroso-di-n-propylamine

38 (Est) Total PAHs

Total 44-DDTDDDDDE

Allendale Pond and Lyman Mill Pond Sediment

CALLAHAN MINING CORP

Callahan Mine (Region 1 Website)

CENTREDALE MANOR RESTORATION PROJECT

Centredale Manor Restoration Project (Region 1 Website)

LORING AIR FORCE BASE

1

00026

04

3 Ongoing 101 No Sediment

790

39

0000025

710

5100

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork Dates

OU Area Name

1

Dredge (1000 cu yds)

Lyman Mill Stream Sediment

SedimentsCap

Zinc

$21

1

156

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

046

11

221

0031

0000015

8210

134

376

006

In Situ Treatment (acres)

Sample Matrix

0023

165

14

Sediment

35

028

Sediment

Remediation Goal (ppm)

00084

0006

If needed 605

Fish

097

205 Yes 225

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Aroclor 1260

Total Chlordanes

Lead

44-DDD 0018

44-DDE 0013

44-DDT 0013

Aroclor 1242 00022

Aroclor 1260 00022

Heptaclor 000098

Chlordane Alpha 00034

Chlordane Gamma 00034

NEW BEDFORD

Acushnet River North of Wood Street (within Upper Harbor)

1202 - 303 156 (Act) No2002 ESD $317 (for all of OU 1)

Sediment (Upper Harbor) 10

Sediment (Lower Harbor) 50

Sediment intertidal areas with public access or abutting recreational land use

25

Sediment saltmarsh areas with little to no public access (aka Marsh Island)

50

2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000

Anthracene 051

Fluorene 02

Loring Air Force Base (Region 1 Website)

002

1

048

218

051

02

1

Region 1 New Bedford Website

1

1 Yes1997 - 199813 East Branch of Greenlaw Brook 86 (Act)

34 (Est)

Upper and Lower Harbor

900 (throughout OU1)

2004 - Ongoing

Seafood

1

2011 ESD $422-1200 (for all of OU1)

PCBs

NEWPORT NAVAL EDUCATION amp

481

Operation ongoing

Sediment

Fish

Sediment intertidal areas with abutting residential land use

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

PCBs 36

Pyrene 3

Copper 00529

Nickel 00337

NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp

Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1

MERCURY Sediment 10 (EMNR)

MERCURYFish (largemouth bass yellow perch bullhead)

048

PINE STREET CANAL 2002-2004

2004 78 (Act) (GeotextileSand Cap)

PAHs

Region 1 Pine Street Canal Website 82010 - 22011 08

2011 organoclay cap (size not specified)

Metals and Cyanide

SULLIVANS LEDGE 19 (Est)

86 (Act)

52 (Est)

255 (Act)

BATAVIA LANDFILL 25 (Est) PAHs

22001 - 122001 Yes

Unnamed Stream Ponds A and B 1998-2002

Turning Basin Pine Street Canal and Wetlands

Middle Marsh Wetlands 1998-2001

1

Nyanza Chemical Waste DumpRegion 1 Website

Region 1 Sullivans Ledge website

4

1

1

20 uggC

20 uggCPCBs

Sediment

PCBs

2 28Yes

Yes

36

NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals

Visual13 (soil and sediment)

75 (soil and sediment)

LEAD

Sediment

46000 tons (Act)(cyds not provided)

Sudbury River

McAllister Point Landfill (Narrangasett Bay)

ROD Date September 2010

226

Sediment

3

Area not specified 85

00529

44

ER-M Values

1

84

00337

ER-M Values

Porewater

1

EDUCATION amp TRAINING CENTER

NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website

1

4

Sediment1

Yes

Deleted from NPL Act Wetland

upper portion of stream diverted

2 1 Wetland Areas June 2001 - June 2003

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

BRIDGEPORT RENTAL amp OIL SERVICES

PCBs 10

LEAD 1000

Total Petroleum Hydrocarbons None

LEAD 250

PCBs 5

3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment

St Lawrence River 61995 - 111995 13 (Act) 2 (Act)

Turtle CreekTurtle Cove 1004 - 305

23 (Act) (soil and sediments)

01

Raquette River 602 - 503 14 (Act)

GOWANUS CANAL ROD Date Sept 2013588 (Est)

Area not stated (dredgecap remedy)

In-situ stabilization of 3-5 feet of NAPL-containing sediments

PAHs

Holding Tanks for CSO Control

Copper

Lead

Grasse River Superfund Site(aka Alcoa Aggregation Site)

2431 Sediment 1

Yes Area not specified

Region 2 Bridgeport Rental amp Oil Services Website

175 (Est) 106 (Est)

1

Little Timber Creek Swamp

2 Sediment

20

80

94

g

None

125 Sediment

LEAD 11292005

area volume not specified

2

2

BURNT FLY BOG

2Downstream Area and Westerly Wetlands

400049

2

11795 - 1996

gt6000 tons (Act) (soil and sediment)

10

1000

ROD dateSeptember

Sediment

PCBs Sediment

22

1

1

GENERAL MOTORS (CENTRAL FOUNDRY DIVISION)

1

Gowanus Canal (Region 2 Website)

215 01

Canal Sediments

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Grasse River(Region 2 Website) Fish

001-005 (Final Remedial Goal)

026-036(Interim Target Concentrations)

HOOKER (102ND STREET) Sediment 01

(organics)

Deleted from NPL 852004 Sediment 02

(Mercury)

Fish 005

Sediment 3 gm2 (MPA)Sediment 10 gm2 (MPA)Fish 005SedimentFish 005

(change in ESD from dredging to excavation)

981 (Est) ROD 21

85000 Tons (Act) ESD 50-75

2

LOVE CANAL

Deleted from NPL 9302004

2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001

Biological Sampling None

Sediment 100

56 (Est)

Sediment Excavate up to 1 ft

580 (Est)

HUDSON RIVER PCBS

ROD Date April 2014

Upper Hudson River (Section 2)

Grasse River

Hudson River PCBs EPA Website Upper Hudson

River (Section 3) 510 (Est)

None

0001

Not specified

New York State Sediment TBCs

11

PCBs284

$36 - 56

2 109 Yes

Yes2 1 Niagara River Embayment 71996 - 111996 28 (dredge

to 2 feet)

PCBs

1

PAHs METALS CHLORINATED ORGANICS (MULTIPLE)

22502 2

Upper Hudson River (Section 1)

ROD dateFebruary 20 Area not specified

1560 (Est)

Yes

2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001

485 CADMIUM

INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC

Sediment

CADMIUM

Biological Sampling

100

2

MARATHON BATTERY CORP 1

East Foundry Cove Marsh and Constitution Marsh

91993 - 31995

Actual not sp

30 (Est)

Deleted from NPL 10181996 2

East Foundry Cove West Foundry Cove and the Cold Spring Pier Area

91993 - 31995

Yesbentonite clay layer

40

95 Removal 10 mgkg

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

ROD dateJuly 2005

MERCURY and others Sediment 014-2

Operations Ongoing

5LCP Bridge St SiteWest Flume and Wetland AB

June 2005 - July 2007

543 (Est)917 (Act) Yes 96 MERCURY Sediment 02

MERCURY and others Sediment

Mercury Fish 01-03

Sediment Soil (flood plain)

Fish 01 - 03

Raritan Bay Slag

Raritan Bay Slag (Region 2 Website)

52 (Est) PAHs 1086 (Act) PCBs 1

TDBFs 0001

2RICHARDSON HILL ROAD LANDFILLPOND

1South Pond and Herrick Hollow Creek

2004 285 (Act) 139 PCBs Sediment 1

116 (Est) PAHs

240 (Act) Metals

3

River Areas (Blackwater Branch Floodplain amp Maurice River)

2006 - ongoing 626 Yes 11 ARSENIC Sediment 20

4 Union Lake Sediments Remedy not yet initiat Unknown Yes Sediment

Washing 129 ARSENIC Sediment Unknown

2000-2001 11 (Est) LEAD Not specified

METHYL Hg Fish

2

ONONDAGA LAKE

Region 2 Onondaga Lake Website

03

0 400

See Attached

20 exposed 120 submerged

1

Lead 400Sediment787ROD Date May 2013 34 (Est)

425 (Est) 1771 154 (Est)

2

2 Onondaga Lake Bottoms Subsite 2407 (Est)

Geddes Brook NineMile Creek Reach BC CD

ROD DateApril 2009

June 2012 - ongoing

59 (Est)20

24Geddes Brook NineMile Creek Reach AB

414

Combined with Dredge volume

Yes

151

Partial Channel Re-location

June 2012 - 16 (Est) 42 (Est) Yes MERCURY and others

015

54 (Act) Sediment

189

2

REYNOLDS METALS CO

Not on the NPL - Superfund Alternative Site

1 St Lawrence amp Raquett Rivers 412001 - 102001 35

ROEBLING STEEL CO 5 Delaware River and

Crafts Creek Sediment2010-2013 Yes2 11

2 VINELAND CHEMICAL CO INC

120

08

015

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

15 (Act) PCBs

Complete Removal or

1

PCBs

1 Contingent on biological and chemical testing

LEAD Not specified

ATLANTIC WOOD INDUSTRIES INC 6 7 45 to 100

Region 3 Atlantic Wood Industries Website

157 (Est) 100

CADMIUM 60LEAD 1200ZINC 5600CADMIUM 60LEAD 1200

ZINC 5600

CADMIUM 20LEAD 700ZINC 3000

KOPPERS CO INC (NEWPORT PLANT)

ROD dateSeptember 2005

Region 3 Koppers Co Inc Website

Remedy not yet initiated

METAL BANKS RiverMudflat Sediments

METAL BANK (Regional Website)

OU Name SOIL EXCAVCONTAIN

BORONCOPPERLEADZINC

PCB-1260

Sediment

Unknown

Contamination Pathways - Northwestern Wetland

River Water and Sediments

1

PAHs

3

2010-Ongoing

Cedar Creek

Dunham Creek

Christina River

1727

39

37 (Act)

Yes

Yes

Unknown (Act)

Yes

33

Yes

2

50

Contamination Pathways - Western Wetland

126 (Dredging and Disposal)

Sediment

Sediment

2 YORK OIL CO

Sediment

Sediment

tPAHs3 3

12

7 51099 - 9899 11 (Act)

425 South Wetlands 1997 - 12897

95 (Act)

3

3 North Wetlands 1997 - 12897EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL)

Region 3 EI duPont Website

150

47

Sediment 1

Unknown

Sediment

Re-channelize portion of Hershey Run

Sediment

Unknown

PCBs12 (Est)

58 (Est) Unknown3 1

3 1 2008-2010

Wetlands Ponds and Hershey Run

4 1 ROD dateAugust 2006

94 (Est)

38 (Est)Yes

AMERICAN BRASS INC

American Brass Inc (Regional Website) 429

170780

22028

Yes

Sediment

5176

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

AMERICAN CREOSOTE WORKS INC

American Creosote Works Inc(Regional Website)

Arsenic Sediment

Cadmium Sediment

Fish 3 ppt

Sediment

$20 (Total) TOTAL PAH Sediment 100

DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company)

ROD dateSeptember 2008

Unknown

23

Mercury

143 river miles Dioxin

0

PCBs

196

53000 (O3R amp PR)

57000 (CBR)

640 (Ocoee 3 amp Parksville Reservoirs)

680 (Copper Basin Reach)

5

2200 (CBR)

2

4

Lower Roanoke River

4

Sediment

970 (O3R amp PR)

Sediment

Iron Sediment

Sediment

250 (O3R amp PR)

Yes

Sediment

COPPER BASIN MINING DISTRICT SITE

Copper Basin Reach

Ocoee No 3 Reservoir

Parksville Reservoir

ROD date September 2011

Fish

Region 4 Copper Basin Mining District Site website

4 ROD date September 2007 40 (Est)

Copper

Zinc

Area Not Specified (approx 14 river miles)

Railroad Lake and Hughes Creek

Lead

145 (CBR)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website

4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment

0 (Est) 3 (Act)

$045 (ROD)

01 (ESD)

North Marsh Sediments No info 15 (Act)

1000 linear feet 025 acre (Est)1300 linear feet (Act)

SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION

Fish 2

Lake Hartwell (Regional Website) Sediment

TENNESSEE PRODUCTS 142 (Est) $94 (ROD) Visual

107000 tons (Act)Followed by capping

71 (Act)Aquablock $257 (ESD)

Chattanooga Creek NTCRA 1997-1998 229 Yes Visual

TRIANATENNESSEE RIVER

Fish (channel catfish)

Region 4 TrianaTennessee River Website

Fish (smallmouth buffalo)

Fish (largemouth bass)

WARD TRANSFORMER

Reach A (Removal Action) June 2007 - 2009

150000 tons (Est)Approx 400000 tons (Act)

PCB Sediment

Region 4 Website Sediment

Fish 005

PAHs

Arsenic

Region 4 Tennesse Products Website

1

1

4 1

Ashley River 7101 - 12101

South Marsh Sediments

Barge Canal

Region 4 Koppers Co Inc (Charleston Plant)

KOPPERS CO INC (CHARLESTON PLANT)

0001

32 (Est)0 (Act)

0 (Est)32 (Act)

3103 - 6103

SedimentWeight of Evidence Approach

$05 (ROD)3 (ESD)

Lead

42003 ESD selected MNR for the area

19 tons (Act) 15 (Est)2 (Act)

730 (Est)

17

282

23

01

321 PCBs

1

4 2Twelve Mile CreekLake Hartwell

ROD date62894

Chattanooga Creek - Middle Reach

September 2005 - September 2007 PAHs Sediment

4 0

Reach AHuntsville Spring Branch - Indian Creek

4186 - 101487 DDT 5

Rerouted river buried in-place sediments

No sediment CUL

4Reach B C D and lower Brier Creek

13 (soil and sediment) (Est)ROD date

S t b 2008

Yes

No sediment CUL

No sediment CUL

1

1

None

4

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Sediment

Fish 005

BENZO(A)PYRENE 8

BENZO(BampK)FLOURANTHENE 7

BENZO(A)ANTHRACENE 95

INDENO(123-CD)PYRENE 465

ARSENICBERYLLIUMARCHLOR-1016 3ARCHLOR-1242 3ARCHLOR-1254 3ARCHLOR-1248 3ARCHLOR-1260 3BENZO(A)ANTHRACENE

BENZO(A)PYRENE

BENZO(BampK) FLOURANTHENEDI-BENZ(AH) ANTHRACENEINDENO(123-CD)PYRENEARCHLOR-1248ARSENICLEAD

1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 Sediment 1

2 Appleton to Little Rapids

MNR RemedyROD Date 122002 3 (Est) 20 river

miles Sediment

Sediment 1

Fish (Walleye) 005

Sediment 1

Fish (Walleye) 005

MNR RemedyROD Date 62003

Approx 2700 sq miles

1

701(2010 ESD)

5 PCBs

1

CONTINENTAL STEEL

Region 5 Continental Steel Website

FOX RIVER NRDAPCB RELEASES

Proposed to be added to the NPL

Lower Fox River Cleanup Website

4

Sediment

02

04

119

PCBBrier Creek Reservoir Lake Crabtree and Lower Crabtree Creek

September 2008

Remedy not yet initiated

12

~25 river miles

$37 (Total)

4 Markland Avenue Quarry 3252008 - 612010

5

3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est)

08

1

400

Sediment

14

19

1

11

175Yes

297000 cy

SWAC 025

SWAC 028

11

390 (2005 ROD Amendment)

3273 (Est) 136 (Est)

3216 (Est)

227 (Est)

De Pere to Green Bay 2007 - ongoing

Little Rapids to De Pere 42009 - ongoing

Yes

5 Green Bay

05

Sediment

025 (SWAC)

05

16

19084

093

None

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER)

43 (Est) Yes RADIUM 226

Region 5 Kerr-McGee Website 129 (Act) RADIUM 228

LITTLE MISSISSINEWA RIVER

Not on the NPL - Other Cleanup Activity Private Party-Lead Cleanup

Sediment4 (0-1ft) 5 (deeper than 1ft)

Little Mississinewa River

(Region 5 Website)

Fish Unknown

North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below

71992 to 91992 55 (Est) Yes 074

Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below

1991-1992523 (EST)

30 (ACT)131

2010-2012 PCBs 1

PAHs 2

Fish (Sport) 003 - 01

1 (0-1ft)5 (deeper than 1ft)

72 picoCuries per gram (pCig) combined radium

Yes

57 (Est)

100000 tons (Act)

Kress Creek Site

5 0 Little Mississinewa River

Spring 2005 - Fall 2009

5 0 Summer 2005 - 2012

2012-2013 195 (Est)

$719 (Total) Sediment128

PCBs25 miles (Est) 27 20

OUTBOARD MARINE CORP (Region 5 Website)

4 formerly 1

1HarborSlip No 3(2009 ROD Amendment)

Sediment

PCBs

5

OUTBOARD MARINE CORP 1

Yes40 (soil and sediment) (Est)

Unknown

50 (upper harbor)

Sediment

73

OMC Plant 2 North and South DitchROD Date August 2007

2012 ROD Amendment

Yes PCBs349

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

36 (Est)

54 (Act)

53 (ROD)51 (ESD) Sediment 26

51 (ACT)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Sediment 26Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

21 (Est) SedimentNone (88 mass removal of PCB)

21 (Act)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Copper

VELSICOL CHEMICAL CORP (MICHIGAN)

640 (Act) Carp Smallmouth Bass 1708

Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5

Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000

Natural Recovery Areas 122001 - ongoing Area not

specified

North of Dredge Island NA Actual ROD

Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act)

MERCURY

Pine RiverSt Louis Impoundment

05

Sediment

Amendment)

PCBsYes Sediment

Sediment 1

5

SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI)

2 Area 9 -- Lake Embayment 1295 - 0697

SHEBOYGAN HARBOR amp RIVER

1

Lower River and Inner Harbor Completed in 2012

Region 5 Sheboygan River and Harbor Superfund Site Website

Middle River

Remedy not yet startedAOC dateFebruary 2009

02 (SWAC)

05

05

05

Yes (ROD)

7 miles

12

PCBs

Sept 2004 - October 2007

5 DDT

Unknown area

5 Torch Lake 2

Yes

6

$60 (Total)

ALCOA (POINT COMFORT)LAVACA BAY

1PAHs 448 Total

Upper River 31

Surface WatersNPL DeletionFeb 5 2002

ROD DateMarch 311994

5

$30 (as of 2002)2 1999 - 2005

No Action

161

15

Hg 025 Marsh 05 Open Water

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Witco Marsh 12006 - 42006 57

Chlor-Alkali Process Area (Treatability Study)

August 1998 (Phase I)January 1999 (Phase II)

80 (Act) 1952 MERCURY Mass removal

20 (tar and sediment) (Act)

6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995

47 (ROD Est)150 (ESD Est)170 (Act)

Yes 226 PAHs Sediment 1300

MILLTOWN RESERVOIR SEDIMENTS

2600 (Est)

Region 8 Milltown Reservoir Sediments Website

2560 (Act)

ROCKY MOUNTAIN ARSENAL (USARMY) 19 (Est) Yes (Est) ALDRIN 38

DIELDRIN 37

CHLORDANE 12

ROCKY MOUNTAIN ARSENAL (Region 8 Website)

DDE None

DDT 14

ROCKY MOUNTAIN ARSENAL (US Army Website)

MERCURY 82

ARSENIC 270

SHARON STEEL CORP (MIDVALE TAILINGS)

1 436 (Est) ARSENIC 70

Sediment None

PAHs

North Marsh Area Unknown Sediment None

6 (EST)

8 1 Milltown Reservoir Sediments

Remediation completed Dec 2010

Deleted from NPL 10152007

6

BAILEY WASTE DISPOSAL

1 January 1996 - September 1996

Yes

39 Sediment

Channel realignment and construction

ARSENICCADMIUMCOPPERLEADZINC

140

8 3Lake Sediments Remediation Project

June 1999 - Aug 1999

No (Act)33 (Act)

Yes

Area not specified

Aug 1996 - Sept

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

100 (Act) LEAD 500

CADMIUM None

ARSENIC 200 979CADMIUM 20 099

COPPER 1000 316

LEAD 1000 358

ZINC 1000 None

SILVER BOW CREEKBUTTE AREA (MT STATE Website)

Sediment Trap MERCURY 10 018

2008-20011 ARSENIC

COPPERRegion 9 Iron Mountain Mine Website

IRON

MCCORMICK amp BAXTER CREOSOTING CO

88 (Est) DIOXIN 000021 TEQ

Region 9 Website McCormick and Baxter Creosoting

88 (Act) PAHs 333 (OC)

TOTAL PCBs 035TOTAL DDT 00648TOTAL CHLORDANE 0931

CADMIUM 184LEAD 173MERCURY 152SELENIUM 0926SILVER 137ZINC 720

MONTROSE CHEMICAL CORP DDT Sediment

White Croaker 04

Water

Palos Verdes Shelf (Region 9 Website) PCBs Sediment

White Croaker 007

Water

9 300 Area not specifiedPalos Verde Shelf

46 (OC) interim23 (OC) Final

00648

Sediment

(elevation raised above water line)

047

SILVER BOW CREEKBUTTE AREA

1 Streamside Tailing (Silver Bow Creek)

Deleted from NPL 9242004

Marshy Area

1996

Sediment

Channel realignment and construction (176 miles)

July 1999 - Ongoing 73 (ROD Est) Yes None

0000021 TEQ

Yes

Sediment susceptible to erosion dredged to a specific elevation

None186

Sediment

Sediment$44 (ROD)$98 (ESD)

15 area not specified9

IRON MOUNTAIN MINE

5 Spring Creek Arm 200 (Est)

8

ROD dateSeptember 2004

SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website)

9 3 Old Mormon Slough 2006

9

MOFFETT NAVAL AIR STATION

8 Site 27 - Northern Channel completed in 12007

Naval Air Station Moffett Field Website

68

area not specified 35

173152

0064 ngL

Sediment

0931656 (soil and sediment) (Est)

035

333 (OC)

184

0926137720

022 ngL

7 (OC)

8

5 Interim ROD Date September 2009

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

UNITED HECKATHORN CO

Region 9 United Heckathorn Co WebsiteBunker Hill Mining and Metallurgical 3 Arsenic

CadmiumRunker Hill Mining and Metallurgical (Regional Website)

Copper

LeadMercurySilverZinc

COMMENCEMENT BAY NEAR SHORETIDE FLATS

Partial deletion (St Paul Waterway) 1996

1Olympic View Resource Area (NTCRA)

Completed in 102002

11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ

20 (Est) ARSENIC10 (Act) COPPER

LEADZINC

1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13

ARSENIC 160COPPER 1100ARSENIC 97HEX-CB 01HPAHs 32PCBs 045

Occidental Site Removal Action (NTCRA)

completed March 2003 36 (Act) 10 PCE Sediment

CADMIUM 66HPAHs 22LEAD 580MERCURY 077ZINC 490COPPER 470MERCURY 071LPAHs NoneHPAHs None

18 cy (Est) ARSENIC 93 (Dredge) 57 (Cap)

70 (Act) COPPER 390 (Dredge and Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

Sediment

1752

57

000002 TEQ

530

dredge all soft sediments

preponderance of evidence approach

DDT SedimentYes 7 059 (average)Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)

65 (Proj)

10

COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website)

1 Sitcum Waterway completed in 1994 428 (Act)

19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 174 Sediment 390

450410

Sediment 39045 (Act) 4

1

Hylebos Waterway 32003-22005 940 11 20

17450

46

03

0022Sediment 17

05 (Act) 87 (Act)

4 (Est)

57

21 (Est)

Sediment

82 Sediment

125

60

390

22 (Act)

32 (Est)

059

1Thea Foss and Wheeler-Osgood Waterways

2002-2006 423 (Act)

1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes

HARBOR ISLAND

059410

57

390

960 (OC)

067

93

0057

51

ROD Amendment date Aug 201210 Upper Basin Not specified

9 1

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

LEAD 530 (Dredge) 450 (Cap)

LPAHs780(OC) (Dredge) 370(OC) (Cap)

MERCURY 059 (Dredge) 041 (Cap)

PCBs65(OC) (Dredge) 12(OC) (Cap)

ZINC 960 (Dredge) 410 (Cap)

TBT Not available

ARSENIC 93 (Dredge) 57 (Cap)

COPPER 390 (Dredge and Cap)

LEAD 530 (Dredge) 450 (Cap)

MERCURY 059 (Dredge) 041 (Cap)

116 (Est) ZINC 960 (Dredge) 410 (Cap)

220 (Act) LPAHs780(OC) (Dredge) 370(OC) (Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

PCBs65 (OC) (Dredge)12(OC) (Cap)

TBT Not available

MERCURY

PCBs

KETCHIKAN PULP COMPANY

4-METHYL-PHENOL 17

Not on the NPL - Superfund Alternative Sited

AMMONIA 120

Region 10 Ketchikan Pulp Company Web Site

SULFIDE None

PCB

0002

57

370 (OC)

Yes In dredge areas No area given

370 (OC)

041

12 (OC)

$15(ROD) $12(ESD) 20 Sediment

5 (Act)(223235 sq ft)

10

Todd Shipyard Sediments 7604 - 22007

Region 10 Harbor Island (Lead) Web Site

9

5 (Act)12 (Act) In dredge areas

10

(LEAD)

7 Lockheed Sediments 7703 - 2405

East Waterway Sediments NTCRA

11204 - 31605 (removal action)No ROD completed for this OU

206 (Act) - Removal action

13 (Act) In dredge area

$45-$69 21 Sediment

17 16 Sediment

21 (Est) 27(Act) 44Yes 50 (Est)

52 (Act) 31 Sediment

410

10 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est)

87 (Act)

Not Stated Benthic toxicity community structure and chemistry

Not available

390

450

12 (OC)

450

041

12 (OC)

041

410

960 (OC)

not available

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Arsenic

Lead

Copper

Mercury

Carcinogenic PAHs (TEQ)

TBT

DioxinsFurans

Multiple Others

MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT)

ARSENIC

Region 10 McCormick and Baxter Creosoting

DIOXINSFURANS

PAHs

PCP

Arsenic (III)

Chromium (III)

Copper

Zinc

PCP

Acenaphthene

Fluoranthene

10 Sediment

11

7

041 (subtidal)017 (intertidal)

114

see attached

0009

LOCKHEED WEST SEATTLE

Lockheed West Seattle (Region 10 Website)

Lockheed West ROD Date August 2013

116 DredgeE

MNR

284 EMNR only

1 167potential use in shallow areas

yes 477

54 μgL

520 μgL

13 μgL

10

190 μgL

23 12

Water

23 (Act)organoclay

4 72004-92005Sediments

000008

100

Sediment

ORDEQ McCormick amp Baxter Creosoting Co Web Site

15 (Est)

12 μgL

2

12

110 μgL

210 μgL

043 (subtidal)2 (intertidal)

Washington State CSL or SQS

0000002

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Naphthalene

Total cPAHs

Dioxinsfurans

PCBs 004COPPERLEADZINCSILVER2 4-DIMETHYL-PHENOL

PCBs Shellfish (intertidal clams) 0042

50 (Est) LMWPAHs 780(OC)

58 (Act) HMWPAHs 5300(OC)

98 (Act)Capped dredge areas

PCBs

12 (OC) (trigger for sediments to 10 feet depth)

Fish (English sole) 0023 ww

Sediment12 (OC) dredgecap 6 (OC) EMNR

Sediment in state owned adjacent lands

9 (OC) EMNR

MERCURY Sediment3 where PCBs greater than 6 (OC)

ST MARIES CREOSOTE - proposed to be added to the NPL

ROD dateJuly 2007 LPAHs

370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)

St Maries Creosote (Regional Website)

Remediation Ongoing HPAHs

960 (OC) (17 if TOC lt02or gt4)

7-10 (Est)

200 (Est)

10 (Act)

35 (Est)

510

OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA)

1 Clam Bay Sediments 61999 - 102001

15

450

Area not specifiedYes

12 (OC)

46 71Sediment

013390

61

0029

410

10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005

960(OC)49 Sediment

12

PCBs

3 (OC) SWAC12 (OC)) SWAC

10PUGET SOUND NAVAL SHIPYARD COMPLEX

2 OUB Marine 61600 - 3104

225 (Act)

10 0Shoreline Nearshore and Offshore Sediment

29 (Est) Yes

211 9

108 Sediment

5

1x10-5 ngL

031 μgL

620 μgL

370(OC)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

MERCURY (toxicity test opt-out)

LPAHs 780 (OC)

HPAHs 5300 (OC)

MERCURY 059 subtidal

LPAHs 780 (OC) subtidal

HPAHs 5300 (OC) subtidal

MERCURY 059

LPAHs 780 (OC)

HPAHs 12 dw intertidal

MERCURY 5 21059LPAHs

HPAHs 12 dw intertidal

48 (Act)

30(Act)

54 (Act)

Region 10 Wyckoff Eagle Harbor Web Site

East HarborWest Beach Sediments

2007-2008

31997 - 121997 13-92 (Est) Yes

10

WYCKOFF COEAGLE HARBOR

1

East HarborPhase 1 - NTCRA

91993 -31994 (Phase 1)

East HarborIntertidal and Subtidal Sediments

2000-2002

3 West Harbor

117

780 (OC)

23

$6-20

Sediment

Sediment

059 (dw)

5300 (OC)

780 (OC)

5300 (OC)

5300 (OC)

Sediment

059

49 $62 - $16 Sediment12 - 31 (includes EMNR)

see cap

059

780 (OC)

  • READ_FIRST
  • Tier 1 Sites - Remedial
    • READ_FIRST

      The 2002 memo Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sitesestablished at 2 tier system of headquarters consultations to encourage national consistency in makingdecisions at Superfund and RCRA Corrective Action sediment sites Tier 1 sites are defined as sites wherethe proposed sediment action will address more than 10000 cubic yards or five acres of contaminatedsediment Consultation for Tier 1 sites involves the submission of the draft Proposed Remedy or draftEECA and a discussion of how the 11 principles were considered to the Regional Coordinator 30 daysprior to the public comment period Tier 2 sites are a subset of the Tier 1 sites that are large complex orcontroversial and are subject to consultation with the Contaminated Sediments Technical AdvisoryGroup throughout the RIFS and remedy selection stagesThis Tier 1 Tracking list is an EPA OSRTI product largely developed by the Army Core of Engineers and isintended to be a resource for contaminated sediment RPMs headquarters and regional technical staffand others supporting the remedy decision making process at these sites The list tracks the Tier 1 sitesthat have signed a decision document and documents the remedy selected theestimated and actual costs of the remedy the contaminants of concern and the associatedcontaminated media the Action Levels the Clean-up Levels (CUL) the Remediation Goals (RG) and theSediment Remedial Action Objectives (RAO) For those sites where the remedy has been implementedand a Five-year Review (FYR) has been completed the list also documents whether monitoring wasconducted for the FYR data was presented in the report and the CULs RGs and RAOs were met A keyaspect of this list is that the references for all the data in this spreadsheet are easily located Each cellcontaining data is hyperlinked to a PDF with the page or pages from the relevant public document thatreports the data Each PDF includes the cover page of the report with the information necessary tolocate the complete document and the data included in the spreadsheet is highlighted in the text of thePDF All of the information and documents included in this tracing list are publically availabledocumentsThis Version has been published to the internet with all of the hyperlinks removed We apologize for the inconvenience EPA is currently updating its websites and is temporarily unable to publish the Tier 1 Tracking List with the hyperlinks to the Cited Documents The Remedial Action Objectives and Five Year Review data columns have been removed from this version because they are largely narrative text and require the context provided by the hyperlinked documents in order to be properly understood When the Internet upgrade is complete the Fully cited version will be published Until then any questions regarding this Tier 1 Tracking List can be directed to Matt Lambert EPA Office Of Superfund REmediation and Technology Innovation (lambertmatthewepagov)The Tier 1 Tracking List includes sites in the Remedial Program where a Proposed Plan and Record of Decision were signed The sites are organized by EPA Region number and then listed alphabetically by name Due to the structure of the list columns cannot be filtered or sorted

      Tier 1 Sites - Remedial

      264pdf
      Websitehttpcumulisepagovsupercpadcursitescsitinfocfmid=0101431
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100948
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101479
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100744
      216pdf
      1-011pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100743
      Website httpwwwepagovnbhindexhtml
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631F8CFE11E53EFA23C8525691F0063F6E8OpenDocument
      1-009pdf
      260pdf
      702pdf
      Website httpyosemiteepagovr1npl_padnsf31c4fec03a0762d285256bb80076489ca48c071b6a314e1c8525691f0063f6ddOpenDocument
      1-068pdf
      608pdf
      610pdf
      611pdf
      612pdf
      631pdf
      681pdf Soil and sediment not differentiated
      682pdf
      1-057pdf
      692pdf
      695pdf
      700pdf
      703pdforig 1998 estimate
      1-035pdf
      679pdf
      1-005pdf
      636pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      638pdf
      636pdf
      1-010pdf
      1-074pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      1-017pdf
      1-018pdf
      1-020pdf
      215pdf
      694pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-024pdf
      1-023pdf
      1-025pdf
      1-026pdf
      1-027pdf
      1-027pdf
      1-028pdf
      1-025pdf
      1-047pdf
      1-031pdf
      1-033pdf
      1-034pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101074
      1-012pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201766
      738pdfDates are for entire construction not only sediment portion
      356pdf
      2058pdf
      735pdfThis represents cost estimate for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1266pdfThis represents actual cost for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1268pdf
      2083pdf
      1268pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200364
      2203pdf
      372pdf
      739pdf
      740pdf
      371pdfIn-situ treatment with sorptive agents
      371pdf
      1259pdf
      373pdf
      Website httpwwwepagovr02earthsuperfundnpl0200364chtm
      1259pdf
      373pdf
      1259pdf
      373pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200528
      1272pdf
      177pdf
      477pdf
      1261pdf
      2086pdf
      478pdf
      2086pdf
      478pdf
      Northerly wetlands and tar patch area were determined to be more like soil removals as they were not submerged Westerly wetlandds has a surface water stream running through it that is monitored for sediments so it is retained
      1273pdf
      2088pdfMNR doesnt have fieldwork dates but site fieldwork dates are included
      1274pdfNo specific area for MNR provided 21 acres is area of westerly wetlands for which MNR is selected
      2006pdf
      2087pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0201644
      456pdf
      218pdf
      457pdf
      2093pdf
      2094pdf
      178pdf
      2011pdf
      1279pdf
      461pdf
      56pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201706
      463pdf
      2016pdf
      463pdf
      2016pdf
      2091pdf
      2015pdf
      2015pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0202229
      990pdf
      993pdf
      1014pdf
      1299pdf
      2018pdf
      996pdf
      990pdf
      991pdf
      991pdf
      992pdf
      996pdf
      996pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200557
      2019pdf
      997pdf Remedy componentsareas not broken out
      2098pdf
      2096pdfInfo only on Alycon Lake no info on Rabbit Run or Chestnut Branch
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201290
      2033pdf
      764pdf
      2023pdf
      2024pdf
      2024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201491
      2032pdf
      1002pdf
      1001pdf
      2221pdf
      2031pdf
      2032pdf
      2102pdf
      2029pdf
      2028pdf
      2134pdf
      2030pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0203382
      2072pdf
      518pdf
      2228pdf MNR area was not stated Calculation Profundal areas 08= 154 profundal area = 1925 acres - 154 TLC acres = 1771 MNR acres
      518pdf
      2073pdf
      2075pdf
      2079pdf
      2123pdf
      2126pdf
      1005pdfAttachment has 2 sections one from the ROD the other from the FYR
      1006pdf
      2124pdf
      2125pdf
      2070pdf
      2059pdf
      2059pdf
      2059pdf
      2128pdf
      2060pdf
      2061pdf
      2127pdf
      2063pdf
      2063pdf
      2064pdf
      2065pdf
      2066pdf
      2130pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201465
      369pdf
      2133pdf
      2034pdf
      1008pdf
      2131pdf
      183pdf
      2177pdf
      2131pdf
      183pdf
      2131pdf
      183pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201770
      2036pdf
      64pdf
      1009pdfIncludes entire remedy sediment portion is not defined
      2038pdf
      2037pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200439
      2174pdf
      1012pdf
      2042pdf
      2041pdf
      2041pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200209
      2171pdf
      2051pdf
      523pdf
      2046pdf
      2044pdf
      2049pdf
      2162pdf
      2052pdf
      2053pdf
      2047pdf
      2045pdf
      2050pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201202
      69pdf
      2170pdf
      2054pdf
      2120pdf
      2054pdf
      2054pdf
      2118pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0302836
      Website httpcfpubepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0302836
      3006pdf
      497pdf Apparently same area as EMNR
      498pdf Apparently same area as MNR
      496pdf
      3001pdfWeb site COC list is much more extensive then tPAH
      497pdf
      497pdf
      httpwwwepagovreg3hwmdnplVAD990710410htm
      499pdf
      499pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300093
      1605pdf
      224pdf
      1601pdf
      1614pdf
      1606pdf
      1606pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1605pdf
      482pdf
      73pdf
      1615pdf
      656pdf
      1606pdf
      1617pdf
      1617pdf
      1617pdf
      1617pdf
      Website httpwwwepagovreg3hwmdsupersitesDED980555122indexhtm
      1617pdf
      1617pdf
      1605pdf
      483pdf
      74pdf
      484pdf
      657pdf
      1606pdf
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300092
      1622pdf
      1621pdf
      1039pdf
      959pdf
      1040pdf
      958pdf
      1623pdf
      665pdf
      httpwwwepagovreg3hwmdnplDED980552244htm
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300951
      1624pdf
      3008pdf
      961pdf
      960pdf
      3002pdfArea not stated No mention of sediment capping or marine mattress in ROD or ESDs
      962pdf
      1625pdf
      1626pdf
      1627pdf
      1628pdf
      Websitehttpwwwepagovreg3hwmdnplPAD046557096htm
      Website httpcumulisepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0300951Provided to indicate formal OU name
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0406299
      Construction completed but no documents are available
      12pdf
      578pdf
      579pdf
      4001pdf
      4001pdf
      12pdf
      4001pdf
      4001pdf
      4001pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0402260
      No information on websites regarding status of sediment work unclear as of Jan 2014
      21pdf
      4002pdf
      53pdfCost of sediment remedy is not broken out
      4003pdf
      Website hhttpcumulisepagovsupercpadcursitescsitinfocfmid=0403156
      400pdf
      580pdf
      4004pdf
      Website httpwwwepagovregion4superfundsitesnplnorthcarolinawcoplwtpnchtml
      395pdf
      402pdf
      396pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403350
      4008pdf
      4007pdf
      4023pdf
      965pdf
      4020pdfThe ROD and FYR do not directly state the COCs for the sediment remedy and there are not contaminant-specific cleanup levels The contaminants identified here are those with an HQ above 1 for all areas (see attachment) Presented here to indicate prevalent contamination
      4019pdf Excavation depth based on elevation and visual determinations
      4009pdf
      4011pdf
      4010pdfChanged remedy to MNR
      4011pdfChanged remedy to MNR
      4017pdf
      966pdf
      584pdf
      964pdf
      4013pdf
      4018pdf
      4021pdf
      1025pdf
      1026pdf
      4014pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403252
      77pdf
      561pdf
      4022pdf
      558pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0403765
      391pdf
      4030pdf
      4031pdf
      4032pdf
      393pdf
      httpwwwepagovregion04superfundsitesnpltennesseetennprotnhtml
      562pdf
      563pdf
      4031pdf
      4033pdfROD states However if certain excavated sediments appear to be uncontaminated then those sediments shall be subjected to sampling and analyses for the PAHs The action levels for sediment removal will reflect EPAs excess lifetime carcinogenic risk range of 1 x 10 6 to 1 x 10 4 (See Table G - 9) Its unclear whether or which concentrations will be used for an action level but the text and table are addded as a reference
      4034pdfNo remedial action in Reaches B and C See second page of attachment
      570pdf
      1031pdf
      4043pdf
      4044pdf
      4043pdf
      4043pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406082
      592pdf
      592pdfSite soils included in volume
      No Reach A removal action decision documents exist on EPA HQ or region websites
      httpwwwepagovregion4superfundsitesnplnorthcarolinawardtrnchtml
      593pdf
      590pdf
      591pdf
      4040pdf
      4041pdf
      4042pdf
      4041pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0501228
      5070pdf
      15pdf
      20pdfThis value represents Estimated 30-Year Net Present Worth to excavate and consolidate sediment in landfill
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      17pdf
      5170pdf
      5171pdf
      5172pdf
      533pdf
      532pdf
      Website httpwwwepagovregion5sitescontinentalindexhtm
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0507723
      5059pdf
      5173pdf
      5174pdf
      5180pdf
      5175pdf
      5057pdf
      5137pdf
      5093pdf
      5176pdfDeposit DD is located in OU2 but it is considered part of the OU3 response
      5179pdf
      5062pdf
      5181pdf
      5051pdf
      5092pdf
      5177pdf
      213pdf
      5058pdf
      Website httpwwwepagovregion5sitesfoxriverindexhtml
      5092pdf
      5178pdfAlso see Fox River ROD Amendment 2007 pg 14 Table 2 for documentation of the OU 5 dredge volume being included in the OU4
      213pdf
      5217pdf
      5094pdf
      5096pdf
      214pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500760
      33pdf
      5063pdfBackfill stated on second page of attachment
      35pdfIncludes floodplain material
      32pdf
      Website httpwwwepagovR5SupernplillinoisILD980823991htm
      32pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0508120
      5003pdf
      5002pdf
      5005pdf
      5060pdfEstimated from map in 5 year report
      5004pdf
      5004pdf
      5006pdf
      5001pdf
      5168pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500083
      5108pdf
      5222pdf
      5208pdf
      5022pdf
      5131pdf
      5209pdf
      Website httpwwwepagovregion5sitesoutboardmarine
      5205pdf
      514pdf
      515pdf
      5120pdf
      514pdf
      5120pdf
      514pdf
      5212pdf
      5125pdf
      5126pdf
      5127pdf
      5123pdf
      5128pdf
      Website ttpcumulisepagovsupercpadcursitescsitinfocfmid=0501181
      5024pdf
      5160pdfIncludes sediments and soils
      5026pdf
      5025pdf
      5024pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0505188
      5203pdf
      5202pdf
      5146pdf
      5044pdf
      5037pdf
      5045pdf
      5142pdf
      5142pdf
      Website httpwwwepagovregion5sitessheboygan
      5046pdf
      5145pdf
      5043pdf
      5140pdf
      5142pdf
      5142pdf
      5035pdf
      5144pdf
      5042pdf
      5036pdf
      5142pdf
      5142pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0502194
      150pdf
      148pdf
      149pdf
      5157pdf
      147pdf
      147pdfNo update provided in 2012 FYR
      5027pdf
      5156pdf
      Website httpwwwepagovregion5cleanupvelsicolmichiganindexhtml
      5154pdf
      5164pdf
      5164pdf
      5151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0601752
      6001pdf
      986pdf
      6004pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      987pdf
      983pdf
      981pdf
      984pdf
      6014pdf
      6006pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0602911
      1043pdf
      1044pdf
      6008pdf
      6009pdfA list of principal parameters is provided without risk context COCs or risk drivers in sediments are not identified
      1047pdfPossible that visually clean performance standard also applies to marsh sediments
      1045pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0600574
      1049pdf
      153pdf
      1050pdf
      1051pdf
      6010pdfConstruction and disposal only
      6011pdf
      1052pdf
      Wesbite httpcumulisepagovsupercpadcursitescsitinfocfmid=0800445
      8003pdf
      311pdfIncludes Area 1 sediments and 30K cy in area 3
      625pdf
      624pdf
      8002pdf
      Website httpwwwepagovregion8superfundmtmilltown
      8050pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800357
      8018pdf
      8017pdf
      1019pdf
      1018pdf
      8023pdf
      8012pdf
      8013pdf
      8015pdf
      website httpwww2epagovregion8rocky-mountain-arsenal
      8020pdf
      8019pdf
      8012pdf
      8015pdf
      website httpwwwrmaarmymil
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800694
      629pdf
      8024pdf
      630pdf
      8025pdf
      8026pdf
      8027pdfSediment and soil are often used interchangeably in the ROD
      628pdf
      627pdf
      8026pdf
      628pdf
      8026pdf
      8028pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800416
      8037pdf
      1021pdf
      1022pdf
      8043pdf
      1023pdf
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Websitehttpwww2epagovregion8silver-bow-creek-butte-area
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpdeqmtgovREMMWCBConstructionServicesSectionSilverBowCreekdefaultmcpx
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901755
      9015pdf
      596pdf
      1237pdf
      1236pdf
      1235pdf
      1234pdf
      980pdf
      1238pdf
      1234pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDCAD980498612OpenDocument
      1234pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901129
      1245pdf
      9002pdf
      1240pdfThis cost does not include $18M for bank stabilization
      1239pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDcad009106527OpenDocument
      543pdf
      1239pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902734
      1249pdf
      41pdf
      545pdf
      39pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpyosemiteepagovR9SFUNDR9SFDOCWNSF3dec8ba3252368428825742600743733c01ef2be6ec9ab9c8825737f002bf719OpenDocument978
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902440
      1254pdf
      156pdf
      974pdf
      975pdf
      1250pdfDieldrin is also a COC but only has a CUL for surface water
      1252pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfvwsoalphabeticUnited+Heckathorn+CoOpenDocument
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000981
      10-030pdf
      Name in ROD However name on CB website is NSTF Areawide Sediment covered within OU1 ROD was later divided into separate OUs except for removal actions conducted at Olympic View This removal action is summarized here
      1104pdf
      1105pdf
      1105pdf
      1106pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1106pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc923e8d62480494ad483882564f80082a1c0OpenDocument
      10-030pdf(formerly OU6)
      10-100pdf
      1101pdf
      1100pdf
      1099pdf
      1097pdf
      10-002pdf10 acres as of 2009
      1097pdf
      1097pdf
      1097pdf
      10-030pdf
      1071pdf
      1076pdf
      1073pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1072pdf
      10-030pdf
      1066pdf
      1061pdf Quantity does not include Blair Waterway dredging 1993 ESD states that Blair is not part of ROD cleanup and is for navigational purposes
      1062pdf
      1063pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      10-030pdf
      1060pdf
      1059pdf
      1059pdf
      1059pdf
      1067pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1070pdf
      1111pdf
      1112pdf
      1115pdf
      1113pdf
      10-030pdf
      10-098pdf
      1121pdf
      1079pdf
      1094pdf
      1094pdf
      1078pdf
      1122pdfThis is strictly a construction cost that appears to include construction of CDF and pile removal as well as dredging and capping
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 25
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 089
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      10-030pdf
      10-008pdf
      1081pdf
      1082pdf
      10-009pdf
      1084pdf
      1085pdf
      1087pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000020OU 8 is not included because OU was reommended for no further action in 2003 ROD
      1123pdf
      10-022pdf
      1134pdfCapping took place after dredging to in part maintain original depths
      1138pdf
      433pdfROD estimated remedy would cost $15M but 2002 ESD estimated it as $12M
      1133pdf
      1130pdf
      949pdf
      1135pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc9235a64831b6521f46b8825650200836f1cOpenDocument
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      1136pdf
      1124pdf
      10-023pdf
      1128pdf
      10-028pdf
      434pdf
      1125pdf
      1130pdf
      10-024pdf
      1126pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-025pdf
      1142pdf
      10-095pdf
      1144pdf
      1141pdf
      1143pdf
      1146pdf
      1146pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1000020
      1152pdf
      162pdf
      1148pdf
      314pdf
      633pdf
      1149pdf
      1153pdf
      431pdf
      1150pdf
      431pdf
      1151pdf
      Website httpyosemiteepagovR10CLEANUPNSF7d19cd587dff1eee8825685f007d56b72dd5ab7462e4f004882567b30057eb7bOpenDocument
      431pdf
      1151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000339
      166pdf
      49pdf
      1158pdf
      1159pdf
      1157pdf
      1157pdf
      Website httpwwwdeqstateoruslqcunwrmccormickbaxter
      1290pdf
      1157pdf
      1157pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1001134
      1291pdf
      1163pdf
      1164pdf
      1292pdf
      1293pdfAlthough not called MNR remedy is to monitor contaminant levels until the goal is achieved which is MNR
      10-061pdf
      1165pdfThis cost includes capping of the upland landfill A breakout for just the sediment portion was not provided
      1166pdfThis cost includes the fire training area and upland landfill cover A breakout of just the sediment remediation was not provided
      1167pdf
      1169pdfconsidered at conceptual target for sediment
      1292pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1169pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000611
      1177pdf
      10-031pdf
      10-031pdf
      1179pdf
      1178pdf
      1173pdf
      1181pdf
      1176pdf
      1174pdf
      1173pdf
      1181pdf
      1176pdf
      1173pdf
      1181pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1001107
      1182pdf
      10-040pdf
      1242pdf
      1244pdf
      1243pdf
      1188pdf
      1189pdf
      1187pdf
      1183pdf
      1185pdf
      10-041pdf
      10-042pdf
      1189pdf
      1185pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1002095
      46pdfIncludes soil excavation quantity in total volume
      10-039pdf
      408pdfIncludes cost for excavating nearshore soil
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate that sediment is not toxic
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate sediment that is not toxic
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000612
      10-066pdf
      1216pdf
      10-044pdf
      10-071pdf
      10-068pdf
      10-068pdf
      Website httpyosemiteepagovR10CLEANUPNSFsitesWyckoff
      10-068pdf
      10-075pdf
      10-113pdf
      409pdf
      1218pdf
      202pdf
      202pdf
      202pdf
      10-064pdf
      10-072pdf
      1219pdf
      1214pdf
      1214pdf
      1214pdf
      1215pdfRequirement for intertidal sediments
      423pdf
      10-047pdf
      10-046pdf
      1209pdf
      1208pdf
      1207pdf
      1203pdf
      1202pdf5 mgkg criteria for areas requiring dredging21 mgkg criteria for areas requiring a 1-meter thick cap 059 for thin layer capping
      1203pdf
      1204pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      2195pdf
      2136pdfCleanup goals for biological endpoints were not provided
      2136pdfCleanup goals for biological endpoints were not provided
      2127pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0900993
      Website httpwwwepagovregion9superfundpvshelf
      9003pdf
      9004pdf
      9005pdf
      9005pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      613pdf
      1-030pdf
      1-064pdf
      683pdf
      475pdf
      2085pdfHowever see RAO of 50 ppm
      2085pdf
      2085pdf
      1-102pdf
      1278pdf
      1279pdf
      1278pdf
      2092pdf
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      2097pdf
      763pdf
      1003pdf
      2030pdfIts unclear the extent to which 10 mgkg is considered the cleanup level ROD language and FYR note is attached The closest to being definitive is on p 34 of attachment the cleanup goal of about 10 mgkg
      2123pdf
      2062pdf
      2129pdf
      186pdf
      2117pdf
      2043pdf
      2043pdf
      963pdf Attachment incl language from ROD and ESD
      11pdf
      11pdf
      11pdf
      11pdf
      11pdf
      23pdf
      396pdf
      4019pdf
      597pdf
      4045pdf
      4045pdf
      4045pdf
      586pdf
      585pdf
      4057pdfSediment concentration associated with protective fish tissue concentration is lt10ppb
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      5137pdf
      5050pdf
      5050pdf
      34pdf
      5001pdf
      5109pdfAction level or cleanup level of North Ditch remediation never stated in ROD ROD amendment five year reviews or construction completion report
      277pdf
      5122pdf
      526pdf
      5045pdf
      5139pdf
      5141pdf
      5155pdf
      982pdf
      6003pdf
      8002pdfNo sediment cleanup levels cleanup levels pertain to groundwater or surface water
      1024pdf
      979pdf
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      9006pdf
      9006pdf
      9006pdf
      9006pdf
      1251pdf
      1106pdf
      1103pdf
      1103pdf
      1103pdf
      1103pdf
      1072pdf
      1065pdf
      1065pdf
      1069pdf
      1069pdf
      1069pdf
      1070pdf
      1116pdf
      1091pdf
      1091pdf
      1091pdf
      1091pdf
      1114pdfTable 13 in the ROD lists Zinc SQO as 059 This appears to be an error Table 12 of the ROD lists 059 for mercury and 410 for zinc
      1074pdf
      1074pdf
      1089pdf
      1089pdf
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1136pdfConfirmational number of 76 mgkg (OC) established for TBT
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-025pdf76 ppm (OC) 1335 ppb (dw)TBT is a confirmational number See attachment
      10-096pdf
      10-096pdf
      164pdf
      312pdf
      164pdf
      164pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      1181pdf
      1181pdf
      1181pdf
      1187pdf
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (041 ppm) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (970 ppm [OC]) is considered a conceptual target
      9006pdf
      9006pdf
      6018pdf
      6018pdf
      5184pdfCalled residual cover here
      5185pdfTermed post-dredge residual sand cover
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406638
      4048pdf
      4049pdf
      4050pdf
      4051pdf
      4051pdf
      4051pdf
      4051pdf
      httpepagovregion4superfundsitesnpltennesseecopbastnhtml
      4051pdf
      4051pdf
      4051pdf
      1-045pdf
      1-045pdf
      1-030pdf
      1-046augmentedreplaced sand cap in 2011
      1-047pdf
      httpwwwepagovregion02superfundnplonondagalakeindexhtml
      Ley Creek subsite not included because the volume removedmanaged was less than 10K cy
      2179pdf
      2165pdf
      2167pdf
      2166pdf
      2054pdf
      2054pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      1300pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      5186pdf
      3007pdfSame factsheet as of Jan 2014
      httpepagovregion4superfundsitesnplalabamaamerbrasalhtml
      httpepagovregion4superfundsitesnplmississippiamercrewkmshtml
      httpyosemiteepagovr10cleanupnsf22f04d62fa63974288256da6005f9868cabb84db584c955f8825697f00049beeOpenDocument
      10-056pdf
      10-058pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0503034
      5187pdf
      5188pdf
      5189pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinasangschtml
      5195pdf
      5194pdf
      6023pdf
      10-060pdfROD amendment did not specify the volume of instream sediments vs floodplain material
      10-062pdf
      10-063pdf
      10-064pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      10-069pdf
      10-069pdf
      10-083pdf
      1203pdf
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (370 ppm [OC]) is considered a conceptual target
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      Website httpyosemiteepagovr10cleanupnsfsitesmccormick_baxter
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-087pdf
      10-097pdf
      10-101pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      1246pdfCap placed in areas exceeding CUL
      1246pdfCap placed in areas exceeding CUL
      9014pdf
      8044pdf
      8046pdf
      8051pdf
      6026pdf
      6026pdf
      6026pdf
      6026pdf
      6027pdf
      5196pdf
      5197pdf
      5203pdf
      5204pdf
      5206pdf
      5207pdf
      5210pdf
      5022pdf
      httpwwwepagovregion5cleanupmississinewaindexhtml
      5213pdf
      5214pdf
      5215pdf
      5216pdfAmended cost for OU 2-5 does not include Phase 1 in OU4
      4056pdf
      4061pdf
      4062pdf
      4063pdf
      4065pdfBackfill in at least portions of site N of 38th St area unclear
      4066pdf
      4075pdf
      4075pdf
      4076pdf
      4051pdf
      69pdf
      2053pdf
      2181pdf -- most recent factsheet as of 2014-Jan
      2181pdf -- most recent factsheet as of 2014-Aug
      ROD also describes NYSDEC-regulated action removing channel sediment (4200 cy) and floodplain sedimentsoil (63000 cy)
      2185pdf
      2196pdf
      2197pdf Remedy componentsareas not broken out
      httpwwwepagovhudson
      2198pdf
      1-058pdf
      1-059pdf Soil and sediment not differentiated
      2205pdf
      2204pdf
      1-065pdf
      613pdf
      1-067pdf
      1-071pdf
      1-072pdf
      1-013pdf
      1-073pdf
      698pdf
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93d01550369a32b31bb8525691f0063f6d6OpenDocument
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101028
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8584c38df37ade1998525764f005a96d3OpenDocumentampHighlight=0callahan
      1-076pdf
      1-075pdf
      1-078pdf
      1-078pdf
      1-078pdf
      1-078pdfNote that the dredging and subaqueous disposal of sediments was changed from OU1 to OU3 in the 2013 ESD
      1-078pdf
      1-078pdf
      1-080pdfAs of 2014-Jan
      1-077pdf
      1-081pdf only dredge operation
      httpwwwepagovregion02superfundnplraritanbayslag
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206276
      1-082pdf
      1-083pdf
      1-083pdf level specified on p 3 of 4
      1-083pdf 1-083pdf level specified on p 3 of 4
      1-086pdf
      1-085pdf
      1-087pdf Total cost ROD does not specify cost of sediment portion
      2206pdf
      2206pdf
      2206pdf
      2207pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201690
      2208pdf
      2210pdf
      2211pdf
      2212pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206222
      httpwwwepagovregion2superfundnplgowanus
      2213pdf
      2214pdf
      2214pdf
      2215pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1002655
      httpyosemiteepagovr10cleanupnsf32e58b284950a4fc882578480000fdcc9458199e8119eba3882572910069d808OpenDocument
      10-102pdf
      10-104pdf
      10-105pdf
      10-105pdf
      10-106pdf
      10-107pdf
      10-108pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driverf
      10-110pdf
      10-111pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-093pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8bbe0100a535e8840852576e90053b186OpenDocument
      1-090pdf - soilsediment volumes not differentiated
      1-090pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-089pdf
      1-091pdf
      1-092pdf
      Fish tissue remedial goal appears to only apply to the Allendale and Lyman Mill Pond areas not lyman mill stream sediment
      1-096pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-098pdf
      1-099pdf
      1-099pdf
      2218pdf
      2219pdf
      2219pdf
      2220pdf
      2222pdf
      2123pdf
      2225pdf
      2173pdf
      2116pdf
      5109pdf
      5223pdf
      10-125pdf
      10-125pdf
      10-125pdf
      1-100pdfFloodplain vs sediments not differentiated
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93de720462345729a4f8525691f0063f6e1OpenDocument
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631E704D6C17F74EA678525697B0008CCAAOpenDocument
      1-101pdf
      httpwwwepagovregion02superfundnplaluminumcompany
      2200pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinakopchschtml
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0405546
      httpwwwepagovregion4superfundsitesnplalabamatriatenvalhtml
      877pdf
      877pdf
      877pdf
      877pdf
      6024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000195
      httpyosemiteepagovr10cleanupnsfsitesbh
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101388
      Reg Site OU Area Name Fieldwork Dates Dredge (1000 cu yds) Excavate (1000 cu yds) Back-fill (Residual Cap) Cap (acre) MNR (acre) EMNR Thin Cover (acre) In Situ Treatment (acres) Other Estimated Cost (in millions) Actual Cost (in millions) COC Sample Matrix Action Level (ppm) Cleanup Level (ppm) Remediation Goal (ppm)
      1 CALLAHAN MINING CORP 3 SedimentsCap Ongoing 101 No $21 Copper Sediment 790
      Lead 710
      Callahan Mine (Region 1 Website) Zinc 5100
      1 CENTREDALE MANOR RESTORATION PROJECT 1 Allendale Pond and Lyman Mill Pond Sediment 156 If needed 605 Benzo(a)pyrene Fish 00015
      Dieldrin 00011
      Technical Chlordane 013
      Aroclor 1254 0037
      Aroclor 1268 0011
      2378-Tetrachlorodibenzo-p-dioxin 00000022
      Total Aroclors 0076
      44-DDD 00062
      44-DDE 0018
      DioxinsFurans TEQ 0000044
      Benzo(a)pyrene Sediment 14
      Dibenz(ah)anthracene 097
      Dieldrin 00026
      Technical Chlordane 04
      Aroclor 1254 0031
      Aroclor 1268 0023
      Arsenic 39
      Centredale Manor Restoration Project (Region 1 Website) 2378-Tetrachlorodibenzo-p-dioxin 0000015
      Lyman Mill Stream Sediment 205 Yes 225 165 Coplanar PCBs (TEQ)3 0000025
      Total Aroclors 006
      Selenium 11
      Zinc 221
      44-DDD 00084
      44-DDE 0006
      Aluminum 8210
      Barium 134
      Vanadium 376
      N-Nitroso-di-n-propylamine 046
      1 LORING AIR FORCE BASE 13 East Branch of Greenlaw Brook 1997 - 1998 38 (Est) Yes 481 Total PAHs Sediment 35
      86 (Act) Total 44-DDTDDDDDE 028
      Loring Air Force Base (Region 1 Website) Aroclor 1260 1
      Total Chlordanes 048
      Lead 218
      44-DDD Fish 0018
      44-DDE 0013
      44-DDT 0013
      Aroclor 1242 00022
      Aroclor 1260 00022
      Heptaclor 000098
      Chlordane Alpha 00034
      Chlordane Gamma 00034
      1 NEW BEDFORD 1 Acushnet River North of Wood Street (within Upper Harbor) 1202 - 303 900 (throughout OU1) 156 (Act) No 2002 ESD $317 (for all of OU 1) Operation ongoing PCBs Sediment (Upper Harbor) 10
      Region 1 New Bedford Website Upper and Lower Harbor 2004 - Ongoing 2011 ESD $422-1200 (for all of OU1) Sediment (Lower Harbor) 50
      Sediment intertidal areas with public access or abutting recreational land use 25
      Sediment saltmarsh areas with little to no public access (aka Marsh Island) 50
      Sediment intertidal areas with abutting residential land use 1
      Seafood 002
      2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000
      1 NEWPORT NAVAL EDUCATION amp TRAINING CENTER 4 McAllister Point Landfill (Narrangasett Bay) 22001 - 122001 34 (Est) Yes 226 Anthracene Sediment 051 051
      Fluorene 02 02
      46000 tons (Act)(cyds not provided) PCBs 36 36
      NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website Pyrene 3 3
      Copper Porewater 00529 00529
      Nickel 00337 00337
      1 NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1 1
      Nyanza Chemical Waste DumpRegion 1 Website 4 Sudbury River ROD Date September 2010 Area not specified 84 85 MERCURY Sediment 10 (EMNR)
      MERCURY Fish (largemouth bass yellow perch bullhead) 048
      1 PINE STREET CANAL 1 Turning Basin Pine Street Canal and Wetlands 2002-2004 2004 78 (Act) (GeotextileSand Cap) 44 PAHs Sediment ER-M Values
      Region 1 Pine Street Canal Website 82010 - 22011 08 2011 organoclay cap (size not specified) Metals and Cyanide ER-M Values
      1 SULLIVANS LEDGE 1 Unnamed Stream Ponds A and B 1998-2002 19 (Est) Yes upper portion of stream diverted PCBs Sediment 20 uggC
      Region 1 Sullivans Ledge website 86 (Act)
      2 Middle Marsh Wetlands 1998-2001 52 (Est) Yes 28 PCBs 20 uggC
      255 (Act)
      2 BATAVIA LANDFILL 1 Wetland Areas June 2001 - June 2003 25 (Est) Yes 13 (soil and sediment) 75 (soil and sediment) PAHs Sediment Visual NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals
      Deleted from NPL 11292005 Act Wetland area volume not specified LEAD
      2 BRIDGEPORT RENTAL amp OIL SERVICES 2 Little Timber Creek Swamp ROD dateSeptember 2006Remedial Action 2009-2011 175 (Est) Yes Area not specified 106 (Est) 125 PCBs Sediment 10 10
      Region 2 Bridgeport Rental amp Oil Services Website LEAD 1000 1000
      Total Petroleum Hydrocarbons None None
      2 BURNT FLY BOG 2 Downstream Area and Westerly Wetlands 11795 - 1996 gt6000 tons (Act) (soil and sediment) 22 LEAD Sediment 250
      PCBs 5
      3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment 400049
      2 GENERAL MOTORS (CENTRAL FOUNDRY DIVISION) 1 St Lawrence River 61995 - 111995 13 (Act) 2 (Act) 215 PCBs Sediment 1
      Turtle CreekTurtle Cove 1004 - 305 23 (Act) (soil and sediments) 01 01
      Raquette River 602 - 503 14 (Act) 1
      2 GOWANUS CANAL 1 Canal Sediments ROD Date Sept 2013 588 (Est) Area not stated (dredgecap remedy) In-situ stabilization of 3-5 feet of NAPL-containing sediments PAHs Sediment 20
      Gowanus Canal (Region 2 Website) Holding Tanks for CSO Control Copper 80
      Lead 94
      2 Grasse River Superfund Site(aka Alcoa Aggregation Site) Grasse River ROD Date April 2014 109 Yes 284 2431 PCBs Sediment 1
      Grasse River(Region 2 Website) Fish 001-005 (Final Remedial Goal)026-036(Interim Target Concentrations)
      2 HOOKER (102ND STREET) 1 Niagara River Embayment 71996 - 111996 28 (dredge to 2 feet) Yes $36 - 56 PAHs METALS CHLORINATED ORGANICS (MULTIPLE) Sediment 01(organics) New York State Sediment TBCs
      Deleted from NPL 852004 Sediment 02(Mercury)
      2 HUDSON RIVER PCBS 2 Upper Hudson River (Section 1) ROD dateFebruary 2002 Field work 2009-ongoing 1560 (Est) Yes Area not specified 2250 PCBs Fish 005
      Sediment 3 gm2 (MPA) 1
      Hudson River PCBs EPA Website Upper Hudson River (Section 2) 580 (Est) Sediment 10 gm2 (MPA) 1
      Fish 005
      Upper Hudson River (Section 3) 510 (Est) Sediment 1
      Fish 005
      2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001 (change in ESD from dredging to excavation) 981 (Est) ROD 21 INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC Sediment Not specified
      85000 Tons (Act) ESD 50-75
      2 LOVE CANALDeleted from NPL 9302004 2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001 0001
      2 MARATHON BATTERY CORP 1 East Foundry Cove Marsh and Constitution Marsh 91993 - 31995 30 (Est) Yesbentonite clay layer 40 CADMIUM Biological Sampling None
      Sediment 100 100
      Deleted from NPL 10181996 2 East Foundry Cove West Foundry Cove and the Cold Spring Pier Area 91993 - 31995 56 (Est) 485 CADMIUM Biological Sampling None
      Actual not specified by area
      Sediment Excavate up to 1 ft 95 Removal 10 mgkg
      2 ONONDAGA LAKE 2 Onondaga Lake Bottoms Subsite ROD dateJuly 2005 2407 (Est) 425 (Est) 1771 154 (Est) 414 MERCURY and others Sediment 08 014-2
      Operations Ongoing METHYL Hg Fish 03
      5 LCP Bridge St SiteWest Flume and Wetland AB June 2005 - July 2007 543 (Est)917 (Act) Yes 96 MERCURY Sediment 02
      20 Geddes Brook NineMile Creek Reach BC CD ROD DateApril 2009June 2012 - ongoing 59 (Est) Combined with Dredge volume Yes Partial Channel Re-location 189 MERCURY and others Sediment 015
      Region 2 Onondaga Lake Website Mercury Fish 01-03
      24 Geddes Brook NineMile Creek Reach AB June 2012 - 16 (Est) 42 (Est) Yes 151 MERCURY and others Sediment Soil (flood plain) 015
      Fish 01 - 03
      2 Raritan Bay Slag 0 ROD Date May 2013 34 (Est) 787 Lead Sediment 400 400
      Raritan Bay Slag (Region 2 Website)
      2 REYNOLDS METALS CONot on the NPL - Superfund Alternative Site 1 St Lawrence amp Raquett Rivers 412001 - 102001 52 (Est) 54 (Act) 35 PAHs Sediment 10
      86 (Act) PCBs 1
      TDBFs 0001
      2 RICHARDSON HILL ROAD LANDFILLPOND 1 South Pond and Herrick Hollow Creek 2004 285 (Act) 139 PCBs Sediment 1 1
      2 ROEBLING STEEL CO 5 Delaware River and Crafts Creek 2010-2013 116 (Est) Yes 11 PAHs Sediment See Attached
      240 (Act) Metals
      2 VINELAND CHEMICAL CO INC 3 River Areas (Blackwater Branch Floodplain amp Maurice River) 2006 - ongoing 626 Yes 11 ARSENIC Sediment 20 20 exposed 120 submerged
      4 Union Lake Sediments Remedy not yet initiated Unknown Yes Sediment Washing 129 ARSENIC Sediment Unknown 120
      2 YORK OIL CO 2 Contamination Pathways - Western Wetland 2000-2001 11 (Est) Yes 33 LEAD Sediment Not specified
      15 (Act) PCBs Complete Removal or 1
      Contamination Pathways - Northwestern Wetland 50 PCBs Sediment 1 Contingent on biological and chemical testing
      LEAD Not specified
      3 ATLANTIC WOOD INDUSTRIES INC 3 River Water and Sediments 2010-Ongoing 6 7 126 (Dredging and Disposal) tPAHs Sediment 45 to 100
      Region 3 Atlantic Wood Industries Website 157 (Est) 100
      3 EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL) 3 North Wetlands 1997 - 12897 95 (Act) Yes 12 3 CADMIUM Sediment 60
      LEAD 1200
      ZINC 5600
      5 South Wetlands 1997 - 12897 37 (Act) Yes 42 Unknown CADMIUM Sediment 60
      LEAD 1200
      Region 3 EI duPont Website ZINC 5600
      7 Christina River 51099 - 9899 11 (Act) Yes 47 Unknown CADMIUM Sediment 20
      LEAD 700
      ZINC 3000
      3 KOPPERS CO INC (NEWPORT PLANT) 1 Wetlands Ponds and Hershey Run ROD dateSeptember 2005 58 (Est) Unknown Re-channelize portion of Hershey Run 5176 PAHs Sediment 150
      Region 3 Koppers Co Inc Website Remedy not yet initiated
      3 METAL BANKS 1 RiverMudflat Sediments 2008-2010 12 (Est) Yes Unknown (Act) 1727 Unknown PCBs Sediment 1 1
      METAL BANK (Regional Website) OU Name SOIL EXCAVCONTAIN
      4 AMERICAN BRASS INC 1 Cedar Creek ROD dateAugust 2006 94 (Est) Yes 39 BORON Sediment 28
      COPPER 220
      Dunham Creek 38 (Est) LEAD 170
      American Brass Inc (Regional Website) ZINC 780
      PCB-1260 429
      4 AMERICAN CREOSOTE WORKS INC 0 Railroad Lake and Hughes Creek ROD date September 2007 40 (Est) Yes $20 (Total) TOTAL PAH Sediment 100
      American Creosote Works Inc(Regional Website)
      4 COPPER BASIN MINING DISTRICT SITE 5 Copper Basin ReachOcoee No 3 ReservoirParksville Reservoir ROD date September 2011 Area Not Specified (approx 14 river miles) 23 PCBs Sediment
      Arsenic Sediment
      Cadmium Sediment
      Copper Sediment 680 (Copper Basin Reach)
      640 (Ocoee 3 amp Parksville Reservoirs)
      Region 4 Copper Basin Mining District Site website Iron Sediment 57000 (CBR)
      53000 (O3R amp PR)
      Lead Sediment 145 (CBR)
      250 (O3R amp PR)
      Mercury Fish
      Zinc Sediment 2200 (CBR)
      970 (O3R amp PR)
      4 DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company) 2 Lower Roanoke River ROD dateSeptember 2008 143 river miles 196 Dioxin Fish 3 ppt
      Sediment Unknown
      Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website 4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment 0001
      4 KOPPERS CO INC (CHARLESTON PLANT) 1 Ashley River 7101 - 12101 0 (Est) $05 (ROD)3 (ESD) 282 PAHs Sediment Weight of Evidence Approach None
      3 (Act)
      Barge Canal 42003 ESD selected MNR for the area 32 (Est)0 (Act) 0 (Est)32 (Act) $045 (ROD) 01
      01 (ESD) Arsenic
      Region 4 Koppers Co Inc (Charleston Plant) North Marsh Sediments No info 15 (Act) 1000 linear feet 025 acre (Est)1300 linear feet (Act) 17 23
      South Marsh Sediments 3103 - 6103 19 tons (Act) 15 (Est)2 (Act) Lead
      4 SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION 2 Twelve Mile CreekLake Hartwell ROD date62894 730 (Est) 321 PCBs Fish 2
      Lake Hartwell (Regional Website) Sediment 1
      4 TENNESSEE PRODUCTS 1 Chattanooga Creek - Middle Reach September 2005 - September 2007 142 (Est) $94 (ROD) PAHs Sediment Visual
      Region 4 Tennesse Products Website 107000 tons (Act)Followed by capping 71 (Act)Aquablock $257 (ESD)
      Chattanooga Creek NTCRA 1997-1998 229 Yes Visual
      4 TRIANATENNESSEE RIVER 0 Reach AHuntsville Spring Branch - Indian Creek 4186 - 101487 Rerouted river buried in-place sediments DDT Fish (channel catfish) No sediment CUL 5
      Region 4 TrianaTennessee River Website Fish (smallmouth buffalo) No sediment CUL
      Fish (largemouth bass) No sediment CUL
      4 WARD TRANSFORMER Reach A (Removal Action) June 2007 - 2009 150000 tons (Est)Approx 400000 tons (Act) PCB Sediment 1
      Region 4 Website 1 Reach B C D and lower Brier Creek ROD dateSeptember 2008Remedy not yet initiated 13 (soil and sediment) (Est) Yes $37 (Total) PCB Sediment 1
      Fish 005
      Brier Creek Reservoir Lake Crabtree and Lower Crabtree Creek ~25 river miles Sediment None
      Fish 005
      5 CONTINENTAL STEEL 3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est) 12 BENZO(A)PYRENE Sediment 8 16
      BENZO(BampK)FLOURANTHENE 7 14
      BENZO(A)ANTHRACENE 95 19
      INDENO(123-CD)PYRENE 465 093
      ARSENIC 19
      BERYLLIUM 084
      ARCHLOR-1016 3 1
      ARCHLOR-1242 3 1
      ARCHLOR-1254 3 1
      ARCHLOR-1248 3 1
      ARCHLOR-1260 3 1
      Region 5 Continental Steel Website 4 Markland Avenue Quarry 3252008 - 612010 175 Yes297000 cy 11 BENZO(A)ANTHRACENE Sediment 05
      BENZO(A)PYRENE 05
      BENZO(BampK) FLOURANTHENE 08
      DI-BENZ(AH) ANTHRACENE 02
      INDENO(123-CD)PYRENE 04
      ARCHLOR-1248 1
      ARSENIC 19
      LEAD 400
      5 FOX RIVER NRDAPCB RELEASESProposed to be added to the NPL 1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 PCBs Sediment 1 025 (SWAC)
      2 Appleton to Little Rapids MNR RemedyROD Date 122002 3 (Est) Yes 273 (Est) 20 river miles 136 (Est) 390 (2005 ROD Amendment) Sediment
      3 Little Rapids to De Pere 42009 - ongoing 227 (Est) Sediment 1 SWAC 028
      Fish (Walleye) 005
      Lower Fox River Cleanup Website 4 De Pere to Green Bay 2007 - ongoing 3216 (Est) Sediment 1 SWAC 025
      Fish (Walleye) 005
      5 Green Bay MNR RemedyROD Date 62003 Approx 2700 sq miles Sediment 1
      701(2010 ESD)
      5 KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER) 0 Kress Creek Site Summer 2005 - 2012 43 (Est) Yes $719 (Total) 128 RADIUM 226 Sediment 72 picoCuries per gram (pCig) combined radium
      Region 5 Kerr-McGee Website 129 (Act) RADIUM 228
      5 LITTLE MISSISSINEWA RIVERNot on the NPL - Other Cleanup Activity Private Party-Lead Cleanup 0 Little Mississinewa River Spring 2005 - Fall 2009 57 (Est)100000 tons (Act) Yes 25 miles (Est) 27 20 PCBs Sediment 4 (0-1ft) 5 (deeper than 1ft) 1 (0-1ft)5 (deeper than 1ft)
      Little Mississinewa River(Region 5 Website) Fish Unknown
      5 OUTBOARD MARINE CORP 1 North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below 71992 to 91992 55 (Est) Yes 074 PCBs Sediment Unknown
      Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below 1991-1992 523 (EST)30 (ACT) 131 50 (upper harbor)
      OUTBOARD MARINE CORP (Region 5 Website) 4 formerly 1 OMC Plant 2 North and South DitchROD Date August 20072012 ROD Amendment 2010-2012 40 (soil and sediment) (Est) Yes 73 PCBs Sediment 1
      PAHs 2
      1 HarborSlip No 3(2009 ROD Amendment) 2012-2013 195 (Est) Yes 349 PCBs Fish (Sport) 003 - 01
      Sediment 1 02 (SWAC)
      5 SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI) 2 Area 9 -- Lake Embayment 1295 - 0697 36 (Est) Yes PCBs Sediment 05
      54 (Act)
      5 SHEBOYGAN HARBOR amp RIVER 1 Lower River and Inner Harbor Completed in 2012 53 (ROD)51 (ESD) Yes (ROD) 12 PCBs Sediment 26 05
      51 (ACT) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Region 5 Sheboygan River and Harbor Superfund Site Website Middle River Remedy not yet startedAOC dateFebruary 2009 7 miles 2 Sediment 26 05
      Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Upper River Sept 2004 - October 2007 21 (Est) 31 Sediment None (88 mass removal of PCB) 05
      21 (Act) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      5 Torch Lake 2 Surface Waters ROD DateMarch 311994 No Action Copper
      NPL DeletionFeb 5 2002
      5 VELSICOL CHEMICAL CORP (MICHIGAN) 2 Pine RiverSt Louis Impoundment 1999 - 2005 640 (Act) Yes Unknown area(2 ft compacted clay) $60 (Total) $30 (as of 2002) DDT Carp Smallmouth Bass 1708
      Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5 15
      Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000
      6 ALCOA (POINT COMFORT)LAVACA BAY 1 Natural Recovery Areas 122001 - ongoing Area not specified 161 MERCURY Sediment Hg 025 Marsh 05 Open Water
      North of Dredge Island NA Actual ROD PAHs 448 Total
      Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act) PAHs
      Witco Marsh 12006 - 42006 57
      Chlor-Alkali Process Area (Treatability Study) August 1998 (Phase I)January 1999 (Phase II) 80 (Act) 1952 MERCURY Mass removal
      6 BAILEY WASTE DISPOSAL 1 North Marsh Area January 1996 - September 1996 6 (EST) Unknown Sediment None
      20 (tar and sediment) (Act)
      Deleted from NPL 10152007
      6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995 47 (ROD Est)150 (ESD Est)170 (Act) Yes 226 PAHs Sediment 1300
      8 MILLTOWN RESERVOIR SEDIMENTS 1 Milltown Reservoir Sediments Remediation completed Dec 2010 2600 (Est) Yes Channel realignment and construction 140 ARSENICCADMIUMCOPPERLEADZINC Sediment None
      Region 8 Milltown Reservoir Sediments Website 2560 (Act)
      8 ROCKY MOUNTAIN ARSENAL (USARMY) 3 Lake Sediments Remediation Project June 1999 - Aug 1999 19 (Est) Yes (Est) Area not specified 39 ALDRIN Sediment 38
      33 (Act) No (Act) DIELDRIN 37
      CHLORDANE 12
      ROCKY MOUNTAIN ARSENAL (Region 8 Website) DDE None
      DDT 14
      ROCKY MOUNTAIN ARSENAL (US Army Website) MERCURY 82
      ARSENIC 270
      8 SHARON STEEL CORP (MIDVALE TAILINGS) 1 Marshy Area Aug 1996 - Sept 1996 436 (Est) Yes (elevation raised above water line) 047 ARSENIC Sediment 70
      Deleted from NPL 9242004 100 (Act) LEAD 500
      CADMIUM None
      8 SILVER BOW CREEKBUTTE AREA 1 Streamside Tailing (Silver Bow Creek) July 1999 - Ongoing 73 (ROD Est) Yes Channel realignment and construction (176 miles) $44 (ROD)$98 (ESD) ARSENIC Sediment None 200 979
      CADMIUM 20 099
      COPPER 1000 316
      SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website) LEAD 1000 358
      ZINC 1000 None
      SILVER BOW CREEKBUTTE AREA (MT STATE Website) Sediment Trap MERCURY 10 018
      9 IRON MOUNTAIN MINE 5 Spring Creek Arm 2008-20011 200 (Est) 15 area not specified 186 ARSENIC Sediment Sediment susceptible to erosion dredged to a specific elevation None
      ROD dateSeptember 2004 COPPER
      Region 9 Iron Mountain Mine Website IRON
      9 MCCORMICK amp BAXTER CREOSOTING CO 3 Old Mormon Slough 2006 88 (Est) area not specified 35 DIOXIN Sediment 000021 TEQ 0000021 TEQ
      Region 9 Website McCormick and Baxter Creosoting 88 (Act) PAHs 333 (OC) 333 (OC)
      9 MOFFETT NAVAL AIR STATION 8 Site 27 - Northern Channel completed in 12007 656 (soil and sediment) (Est) Yes 68 TOTAL PCBs Sediment 035 035
      TOTAL DDT 00648 00648
      TOTAL CHLORDANE 0931 0931
      CADMIUM 184 184
      Naval Air Station Moffett Field Website LEAD 173 173
      MERCURY 152 152
      SELENIUM 0926 0926
      SILVER 137 137
      ZINC 720 720
      9 MONTROSE CHEMICAL CORP 5 Palos Verde Shelf Interim ROD Date September 2009 300 Area not specified DDT Sediment 46 (OC) interim23 (OC) Final
      White Croaker 04
      Water 022 ngL
      Palos Verdes Shelf (Region 9 Website) PCBs Sediment 7 (OC)
      White Croaker 007
      Water 0064 ngL
      9 UNITED HECKATHORN CO 1 Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)65 (Proj) Yes 7 DDT Sediment dredge all soft sediments 059 (average)
      Region 9 United Heckathorn Co Website
      10 Bunker Hill Mining and Metallurgical 3 Upper Basin ROD Amendment date Aug 2012 Not specified Arsenic Sediment
      Cadmium
      Runker Hill Mining and Metallurgical (Regional Website) Copper
      Lead 530
      Mercury
      Silver
      Zinc
      10 COMMENCEMENT BAY NEAR SHORETIDE FLATSPartial deletion (St Paul Waterway) 1996 1 Olympic View Resource Area (NTCRA) Completed in 102002 11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ 000002 TEQ
      COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website) 19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 20 (Est) 174 ARSENIC Sediment preponderance of evidence approach 93
      10 (Act) COPPER 390
      LEAD 450
      ZINC 410
      1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13 067
      1 Sitcum Waterway completed in 1994 428 (Act) 45 (Act) 4 ARSENIC Sediment 160 57
      COPPER 1100 390
      1 Hylebos Waterway 32003-22005 940 11 20 46 ARSENIC Sediment 97 57
      HEX-CB 01 0022
      HPAHs 32 17
      PCBs 045 03
      Occidental Site Removal Action (NTCRA) completed March 2003 36 (Act) 10 PCE Sediment 0057
      1 Thea Foss and Wheeler-Osgood Waterways 2002-2006 423 (Act) 32 (Est) 21 (Est) 4 (Est) 60 82 CADMIUM Sediment 66 51
      HPAHs 22 17
      LEAD 580 450
      MERCURY 077 059
      ZINC 490 410
      1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes 22 (Act) 05 (Act) 87 (Act) 125 COPPER Sediment 470 390
      MERCURY 071 059
      LPAHs None 52
      HPAHs None 17
      10 HARBOR ISLAND (LEAD) 7 Lockheed Sediments 7703 - 2405 18 cy (Est) 5 (Act) 12 (Act) In dredge areas $15(ROD) $12(ESD) 20 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      70 (Act) COPPER 390 (Dredge and Cap) 390
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      LEAD 530 (Dredge) 450 (Cap) 450
      LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      MERCURY 059 (Dredge) 041 (Cap) 041
      Region 10 Harbor Island (Lead) Web Site PCBs 65(OC) (Dredge) 12(OC) (Cap) 12 (OC)
      ZINC 960 (Dredge) 410 (Cap) 410
      TBT Not available Not available
      9 Todd Shipyard Sediments 7604 - 22007 5 (Act)(223235 sq ft) Yes In dredge areas No area given $45-$69 21 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      COPPER 390 (Dredge and Cap) 390
      LEAD 530 (Dredge) 450 (Cap) 450
      MERCURY 059 (Dredge) 041 (Cap) 041
      116 (Est) ZINC 960 (Dredge) 410 (Cap) 410
      220 (Act) LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      PCBs 65 (OC) (Dredge)12(OC) (Cap) 12 (OC)
      TBT Not available not available
      10 East Waterway Sediments NTCRA 11204 - 31605 (removal action)No ROD completed for this OU 206 (Act) - Removal action 13 (Act) In dredge area 17 16 MERCURY Sediment 041
      PCBs 12 (OC)
      10 KETCHIKAN PULP COMPANY 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est) 87 (Act) Yes 50 (Est) 52 (Act) 21 (Est) 27(Act) 44 31 4-METHYL-PHENOL Sediment 17 Not Stated Benthic toxicity community structure and chemistry
      Not on the NPL - Superfund Alternative Sited AMMONIA 120
      Region 10 Ketchikan Pulp Company Web Site SULFIDE None
      10 LOCKHEED WEST SEATTLE 1 Lockheed West ROD Date August 2013 167 potential use in shallow areas yes 116 DredgeEMNR 477 PCB Sediment Washington State CSL or SQS 0002
      Arsenic 7
      Lead 11
      Copper 114
      Lockheed West Seattle (Region 10 Website) Mercury 041 (subtidal)017 (intertidal)
      284 EMNR only Carcinogenic PAHs (TEQ) 0009
      TBT 043 (subtidal)2 (intertidal)
      DioxinsFurans 0000002
      Multiple Others see attached
      10 MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT) 4 Sediments 72004-92005 23 (Act)organoclay 23 12 ARSENIC Sediment 12
      Region 10 McCormick and Baxter Creosoting DIOXINSFURANS 000008
      ORDEQ McCormick amp Baxter Creosoting Co Web Site 15 (Est) PAHs 2
      PCP 100
      Arsenic (III) Water 190 μgL
      Chromium (III) 210 μgL
      Copper 12 μgL
      Zinc 110 μgL
      PCP 13 μgL
      Acenaphthene 520 μgL
      Fluoranthene 54 μgL
      Naphthalene 620 μgL
      Total cPAHs 031 μgL
      Dioxinsfurans 1x10-5 ngL
      10 OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA) 1 Clam Bay Sediments 61999 - 102001 7-10 (Est) Yes Area not specified 5 46 71 PCBs Sediment 013 004
      COPPER 390
      LEAD 450
      ZINC 410
      10 (Act) SILVER 61
      2 4-DIMETHYL-PHENOL 0029
      PCBs Shellfish (intertidal clams) 0042
      10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005 35 (Est) 50 (Est) 49 15 LMWPAHs Sediment 780(OC) 370(OC)
      58 (Act) HMWPAHs 5300(OC) 960(OC)
      98 (Act) Capped dredge areas PCBs 12 (OC) (trigger for sediments to 10 feet depth) 12 (OC)
      10 PUGET SOUND NAVAL SHIPYARD COMPLEX 2 OUB Marine 61600 - 3104 200 (Est) 5 211 9 12 PCBs Fish (English sole) 0023 ww
      Sediment 12 (OC) dredgecap 6 (OC) EMNR 3 (OC) SWAC12 (OC)) SWAC
      225 (Act) Sediment in state owned adjacent lands 9 (OC) EMNR
      MERCURY Sediment 3 where PCBs greater than 6 (OC)
      10 ST MARIES CREOSOTE - proposed to be added to the NPL 0 Shoreline Nearshore and Offshore Sediment ROD dateJuly 2007 29 (Est) Yes 108 LPAHs Sediment 370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)
      St Maries Creosote (Regional Website) Remediation Ongoing HPAHs 960 (OC) (17 if TOC lt02or gt4)
      10 WYCKOFF COEAGLE HARBOR 1 East HarborPhase 1 - NTCRA 91993 -31994 (Phase 1) 54 (Act) 117 MERCURY Sediment (toxicity test opt-out)
      LPAHs 780 (OC)
      Region 10 Wyckoff Eagle Harbor Web Site HPAHs 5300 (OC)
      East HarborWest Beach Sediments 2007-2008 48 (Act) 23 MERCURY Sediment 059 subtidal 059
      LPAHs 780 (OC) subtidal 780 (OC)
      HPAHs 5300 (OC) subtidal 5300 (OC)
      East HarborIntertidal and Subtidal Sediments 2000-2002 30(Act) $6-20 MERCURY Sediment 059 059
      LPAHs 780 (OC) 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      3 West Harbor 31997 - 121997 13-92 (Est) Yes 12 - 31 (includes EMNR) 49 see cap $62 - $16 MERCURY Sediment 5 21059 059 (dw)
      LPAHs 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      71
Page 4: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Aroclor 1260

Total Chlordanes

Lead

44-DDD 0018

44-DDE 0013

44-DDT 0013

Aroclor 1242 00022

Aroclor 1260 00022

Heptaclor 000098

Chlordane Alpha 00034

Chlordane Gamma 00034

NEW BEDFORD

Acushnet River North of Wood Street (within Upper Harbor)

1202 - 303 156 (Act) No2002 ESD $317 (for all of OU 1)

Sediment (Upper Harbor) 10

Sediment (Lower Harbor) 50

Sediment intertidal areas with public access or abutting recreational land use

25

Sediment saltmarsh areas with little to no public access (aka Marsh Island)

50

2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000

Anthracene 051

Fluorene 02

Loring Air Force Base (Region 1 Website)

002

1

048

218

051

02

1

Region 1 New Bedford Website

1

1 Yes1997 - 199813 East Branch of Greenlaw Brook 86 (Act)

34 (Est)

Upper and Lower Harbor

900 (throughout OU1)

2004 - Ongoing

Seafood

1

2011 ESD $422-1200 (for all of OU1)

PCBs

NEWPORT NAVAL EDUCATION amp

481

Operation ongoing

Sediment

Fish

Sediment intertidal areas with abutting residential land use

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

PCBs 36

Pyrene 3

Copper 00529

Nickel 00337

NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp

Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1

MERCURY Sediment 10 (EMNR)

MERCURYFish (largemouth bass yellow perch bullhead)

048

PINE STREET CANAL 2002-2004

2004 78 (Act) (GeotextileSand Cap)

PAHs

Region 1 Pine Street Canal Website 82010 - 22011 08

2011 organoclay cap (size not specified)

Metals and Cyanide

SULLIVANS LEDGE 19 (Est)

86 (Act)

52 (Est)

255 (Act)

BATAVIA LANDFILL 25 (Est) PAHs

22001 - 122001 Yes

Unnamed Stream Ponds A and B 1998-2002

Turning Basin Pine Street Canal and Wetlands

Middle Marsh Wetlands 1998-2001

1

Nyanza Chemical Waste DumpRegion 1 Website

Region 1 Sullivans Ledge website

4

1

1

20 uggC

20 uggCPCBs

Sediment

PCBs

2 28Yes

Yes

36

NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals

Visual13 (soil and sediment)

75 (soil and sediment)

LEAD

Sediment

46000 tons (Act)(cyds not provided)

Sudbury River

McAllister Point Landfill (Narrangasett Bay)

ROD Date September 2010

226

Sediment

3

Area not specified 85

00529

44

ER-M Values

1

84

00337

ER-M Values

Porewater

1

EDUCATION amp TRAINING CENTER

NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website

1

4

Sediment1

Yes

Deleted from NPL Act Wetland

upper portion of stream diverted

2 1 Wetland Areas June 2001 - June 2003

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

BRIDGEPORT RENTAL amp OIL SERVICES

PCBs 10

LEAD 1000

Total Petroleum Hydrocarbons None

LEAD 250

PCBs 5

3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment

St Lawrence River 61995 - 111995 13 (Act) 2 (Act)

Turtle CreekTurtle Cove 1004 - 305

23 (Act) (soil and sediments)

01

Raquette River 602 - 503 14 (Act)

GOWANUS CANAL ROD Date Sept 2013588 (Est)

Area not stated (dredgecap remedy)

In-situ stabilization of 3-5 feet of NAPL-containing sediments

PAHs

Holding Tanks for CSO Control

Copper

Lead

Grasse River Superfund Site(aka Alcoa Aggregation Site)

2431 Sediment 1

Yes Area not specified

Region 2 Bridgeport Rental amp Oil Services Website

175 (Est) 106 (Est)

1

Little Timber Creek Swamp

2 Sediment

20

80

94

g

None

125 Sediment

LEAD 11292005

area volume not specified

2

2

BURNT FLY BOG

2Downstream Area and Westerly Wetlands

400049

2

11795 - 1996

gt6000 tons (Act) (soil and sediment)

10

1000

ROD dateSeptember

Sediment

PCBs Sediment

22

1

1

GENERAL MOTORS (CENTRAL FOUNDRY DIVISION)

1

Gowanus Canal (Region 2 Website)

215 01

Canal Sediments

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Grasse River(Region 2 Website) Fish

001-005 (Final Remedial Goal)

026-036(Interim Target Concentrations)

HOOKER (102ND STREET) Sediment 01

(organics)

Deleted from NPL 852004 Sediment 02

(Mercury)

Fish 005

Sediment 3 gm2 (MPA)Sediment 10 gm2 (MPA)Fish 005SedimentFish 005

(change in ESD from dredging to excavation)

981 (Est) ROD 21

85000 Tons (Act) ESD 50-75

2

LOVE CANAL

Deleted from NPL 9302004

2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001

Biological Sampling None

Sediment 100

56 (Est)

Sediment Excavate up to 1 ft

580 (Est)

HUDSON RIVER PCBS

ROD Date April 2014

Upper Hudson River (Section 2)

Grasse River

Hudson River PCBs EPA Website Upper Hudson

River (Section 3) 510 (Est)

None

0001

Not specified

New York State Sediment TBCs

11

PCBs284

$36 - 56

2 109 Yes

Yes2 1 Niagara River Embayment 71996 - 111996 28 (dredge

to 2 feet)

PCBs

1

PAHs METALS CHLORINATED ORGANICS (MULTIPLE)

22502 2

Upper Hudson River (Section 1)

ROD dateFebruary 20 Area not specified

1560 (Est)

Yes

2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001

485 CADMIUM

INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC

Sediment

CADMIUM

Biological Sampling

100

2

MARATHON BATTERY CORP 1

East Foundry Cove Marsh and Constitution Marsh

91993 - 31995

Actual not sp

30 (Est)

Deleted from NPL 10181996 2

East Foundry Cove West Foundry Cove and the Cold Spring Pier Area

91993 - 31995

Yesbentonite clay layer

40

95 Removal 10 mgkg

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

ROD dateJuly 2005

MERCURY and others Sediment 014-2

Operations Ongoing

5LCP Bridge St SiteWest Flume and Wetland AB

June 2005 - July 2007

543 (Est)917 (Act) Yes 96 MERCURY Sediment 02

MERCURY and others Sediment

Mercury Fish 01-03

Sediment Soil (flood plain)

Fish 01 - 03

Raritan Bay Slag

Raritan Bay Slag (Region 2 Website)

52 (Est) PAHs 1086 (Act) PCBs 1

TDBFs 0001

2RICHARDSON HILL ROAD LANDFILLPOND

1South Pond and Herrick Hollow Creek

2004 285 (Act) 139 PCBs Sediment 1

116 (Est) PAHs

240 (Act) Metals

3

River Areas (Blackwater Branch Floodplain amp Maurice River)

2006 - ongoing 626 Yes 11 ARSENIC Sediment 20

4 Union Lake Sediments Remedy not yet initiat Unknown Yes Sediment

Washing 129 ARSENIC Sediment Unknown

2000-2001 11 (Est) LEAD Not specified

METHYL Hg Fish

2

ONONDAGA LAKE

Region 2 Onondaga Lake Website

03

0 400

See Attached

20 exposed 120 submerged

1

Lead 400Sediment787ROD Date May 2013 34 (Est)

425 (Est) 1771 154 (Est)

2

2 Onondaga Lake Bottoms Subsite 2407 (Est)

Geddes Brook NineMile Creek Reach BC CD

ROD DateApril 2009

June 2012 - ongoing

59 (Est)20

24Geddes Brook NineMile Creek Reach AB

414

Combined with Dredge volume

Yes

151

Partial Channel Re-location

June 2012 - 16 (Est) 42 (Est) Yes MERCURY and others

015

54 (Act) Sediment

189

2

REYNOLDS METALS CO

Not on the NPL - Superfund Alternative Site

1 St Lawrence amp Raquett Rivers 412001 - 102001 35

ROEBLING STEEL CO 5 Delaware River and

Crafts Creek Sediment2010-2013 Yes2 11

2 VINELAND CHEMICAL CO INC

120

08

015

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

15 (Act) PCBs

Complete Removal or

1

PCBs

1 Contingent on biological and chemical testing

LEAD Not specified

ATLANTIC WOOD INDUSTRIES INC 6 7 45 to 100

Region 3 Atlantic Wood Industries Website

157 (Est) 100

CADMIUM 60LEAD 1200ZINC 5600CADMIUM 60LEAD 1200

ZINC 5600

CADMIUM 20LEAD 700ZINC 3000

KOPPERS CO INC (NEWPORT PLANT)

ROD dateSeptember 2005

Region 3 Koppers Co Inc Website

Remedy not yet initiated

METAL BANKS RiverMudflat Sediments

METAL BANK (Regional Website)

OU Name SOIL EXCAVCONTAIN

BORONCOPPERLEADZINC

PCB-1260

Sediment

Unknown

Contamination Pathways - Northwestern Wetland

River Water and Sediments

1

PAHs

3

2010-Ongoing

Cedar Creek

Dunham Creek

Christina River

1727

39

37 (Act)

Yes

Yes

Unknown (Act)

Yes

33

Yes

2

50

Contamination Pathways - Western Wetland

126 (Dredging and Disposal)

Sediment

Sediment

2 YORK OIL CO

Sediment

Sediment

tPAHs3 3

12

7 51099 - 9899 11 (Act)

425 South Wetlands 1997 - 12897

95 (Act)

3

3 North Wetlands 1997 - 12897EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL)

Region 3 EI duPont Website

150

47

Sediment 1

Unknown

Sediment

Re-channelize portion of Hershey Run

Sediment

Unknown

PCBs12 (Est)

58 (Est) Unknown3 1

3 1 2008-2010

Wetlands Ponds and Hershey Run

4 1 ROD dateAugust 2006

94 (Est)

38 (Est)Yes

AMERICAN BRASS INC

American Brass Inc (Regional Website) 429

170780

22028

Yes

Sediment

5176

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

AMERICAN CREOSOTE WORKS INC

American Creosote Works Inc(Regional Website)

Arsenic Sediment

Cadmium Sediment

Fish 3 ppt

Sediment

$20 (Total) TOTAL PAH Sediment 100

DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company)

ROD dateSeptember 2008

Unknown

23

Mercury

143 river miles Dioxin

0

PCBs

196

53000 (O3R amp PR)

57000 (CBR)

640 (Ocoee 3 amp Parksville Reservoirs)

680 (Copper Basin Reach)

5

2200 (CBR)

2

4

Lower Roanoke River

4

Sediment

970 (O3R amp PR)

Sediment

Iron Sediment

Sediment

250 (O3R amp PR)

Yes

Sediment

COPPER BASIN MINING DISTRICT SITE

Copper Basin Reach

Ocoee No 3 Reservoir

Parksville Reservoir

ROD date September 2011

Fish

Region 4 Copper Basin Mining District Site website

4 ROD date September 2007 40 (Est)

Copper

Zinc

Area Not Specified (approx 14 river miles)

Railroad Lake and Hughes Creek

Lead

145 (CBR)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website

4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment

0 (Est) 3 (Act)

$045 (ROD)

01 (ESD)

North Marsh Sediments No info 15 (Act)

1000 linear feet 025 acre (Est)1300 linear feet (Act)

SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION

Fish 2

Lake Hartwell (Regional Website) Sediment

TENNESSEE PRODUCTS 142 (Est) $94 (ROD) Visual

107000 tons (Act)Followed by capping

71 (Act)Aquablock $257 (ESD)

Chattanooga Creek NTCRA 1997-1998 229 Yes Visual

TRIANATENNESSEE RIVER

Fish (channel catfish)

Region 4 TrianaTennessee River Website

Fish (smallmouth buffalo)

Fish (largemouth bass)

WARD TRANSFORMER

Reach A (Removal Action) June 2007 - 2009

150000 tons (Est)Approx 400000 tons (Act)

PCB Sediment

Region 4 Website Sediment

Fish 005

PAHs

Arsenic

Region 4 Tennesse Products Website

1

1

4 1

Ashley River 7101 - 12101

South Marsh Sediments

Barge Canal

Region 4 Koppers Co Inc (Charleston Plant)

KOPPERS CO INC (CHARLESTON PLANT)

0001

32 (Est)0 (Act)

0 (Est)32 (Act)

3103 - 6103

SedimentWeight of Evidence Approach

$05 (ROD)3 (ESD)

Lead

42003 ESD selected MNR for the area

19 tons (Act) 15 (Est)2 (Act)

730 (Est)

17

282

23

01

321 PCBs

1

4 2Twelve Mile CreekLake Hartwell

ROD date62894

Chattanooga Creek - Middle Reach

September 2005 - September 2007 PAHs Sediment

4 0

Reach AHuntsville Spring Branch - Indian Creek

4186 - 101487 DDT 5

Rerouted river buried in-place sediments

No sediment CUL

4Reach B C D and lower Brier Creek

13 (soil and sediment) (Est)ROD date

S t b 2008

Yes

No sediment CUL

No sediment CUL

1

1

None

4

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Sediment

Fish 005

BENZO(A)PYRENE 8

BENZO(BampK)FLOURANTHENE 7

BENZO(A)ANTHRACENE 95

INDENO(123-CD)PYRENE 465

ARSENICBERYLLIUMARCHLOR-1016 3ARCHLOR-1242 3ARCHLOR-1254 3ARCHLOR-1248 3ARCHLOR-1260 3BENZO(A)ANTHRACENE

BENZO(A)PYRENE

BENZO(BampK) FLOURANTHENEDI-BENZ(AH) ANTHRACENEINDENO(123-CD)PYRENEARCHLOR-1248ARSENICLEAD

1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 Sediment 1

2 Appleton to Little Rapids

MNR RemedyROD Date 122002 3 (Est) 20 river

miles Sediment

Sediment 1

Fish (Walleye) 005

Sediment 1

Fish (Walleye) 005

MNR RemedyROD Date 62003

Approx 2700 sq miles

1

701(2010 ESD)

5 PCBs

1

CONTINENTAL STEEL

Region 5 Continental Steel Website

FOX RIVER NRDAPCB RELEASES

Proposed to be added to the NPL

Lower Fox River Cleanup Website

4

Sediment

02

04

119

PCBBrier Creek Reservoir Lake Crabtree and Lower Crabtree Creek

September 2008

Remedy not yet initiated

12

~25 river miles

$37 (Total)

4 Markland Avenue Quarry 3252008 - 612010

5

3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est)

08

1

400

Sediment

14

19

1

11

175Yes

297000 cy

SWAC 025

SWAC 028

11

390 (2005 ROD Amendment)

3273 (Est) 136 (Est)

3216 (Est)

227 (Est)

De Pere to Green Bay 2007 - ongoing

Little Rapids to De Pere 42009 - ongoing

Yes

5 Green Bay

05

Sediment

025 (SWAC)

05

16

19084

093

None

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER)

43 (Est) Yes RADIUM 226

Region 5 Kerr-McGee Website 129 (Act) RADIUM 228

LITTLE MISSISSINEWA RIVER

Not on the NPL - Other Cleanup Activity Private Party-Lead Cleanup

Sediment4 (0-1ft) 5 (deeper than 1ft)

Little Mississinewa River

(Region 5 Website)

Fish Unknown

North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below

71992 to 91992 55 (Est) Yes 074

Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below

1991-1992523 (EST)

30 (ACT)131

2010-2012 PCBs 1

PAHs 2

Fish (Sport) 003 - 01

1 (0-1ft)5 (deeper than 1ft)

72 picoCuries per gram (pCig) combined radium

Yes

57 (Est)

100000 tons (Act)

Kress Creek Site

5 0 Little Mississinewa River

Spring 2005 - Fall 2009

5 0 Summer 2005 - 2012

2012-2013 195 (Est)

$719 (Total) Sediment128

PCBs25 miles (Est) 27 20

OUTBOARD MARINE CORP (Region 5 Website)

4 formerly 1

1HarborSlip No 3(2009 ROD Amendment)

Sediment

PCBs

5

OUTBOARD MARINE CORP 1

Yes40 (soil and sediment) (Est)

Unknown

50 (upper harbor)

Sediment

73

OMC Plant 2 North and South DitchROD Date August 2007

2012 ROD Amendment

Yes PCBs349

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

36 (Est)

54 (Act)

53 (ROD)51 (ESD) Sediment 26

51 (ACT)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Sediment 26Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

21 (Est) SedimentNone (88 mass removal of PCB)

21 (Act)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Copper

VELSICOL CHEMICAL CORP (MICHIGAN)

640 (Act) Carp Smallmouth Bass 1708

Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5

Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000

Natural Recovery Areas 122001 - ongoing Area not

specified

North of Dredge Island NA Actual ROD

Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act)

MERCURY

Pine RiverSt Louis Impoundment

05

Sediment

Amendment)

PCBsYes Sediment

Sediment 1

5

SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI)

2 Area 9 -- Lake Embayment 1295 - 0697

SHEBOYGAN HARBOR amp RIVER

1

Lower River and Inner Harbor Completed in 2012

Region 5 Sheboygan River and Harbor Superfund Site Website

Middle River

Remedy not yet startedAOC dateFebruary 2009

02 (SWAC)

05

05

05

Yes (ROD)

7 miles

12

PCBs

Sept 2004 - October 2007

5 DDT

Unknown area

5 Torch Lake 2

Yes

6

$60 (Total)

ALCOA (POINT COMFORT)LAVACA BAY

1PAHs 448 Total

Upper River 31

Surface WatersNPL DeletionFeb 5 2002

ROD DateMarch 311994

5

$30 (as of 2002)2 1999 - 2005

No Action

161

15

Hg 025 Marsh 05 Open Water

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Witco Marsh 12006 - 42006 57

Chlor-Alkali Process Area (Treatability Study)

August 1998 (Phase I)January 1999 (Phase II)

80 (Act) 1952 MERCURY Mass removal

20 (tar and sediment) (Act)

6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995

47 (ROD Est)150 (ESD Est)170 (Act)

Yes 226 PAHs Sediment 1300

MILLTOWN RESERVOIR SEDIMENTS

2600 (Est)

Region 8 Milltown Reservoir Sediments Website

2560 (Act)

ROCKY MOUNTAIN ARSENAL (USARMY) 19 (Est) Yes (Est) ALDRIN 38

DIELDRIN 37

CHLORDANE 12

ROCKY MOUNTAIN ARSENAL (Region 8 Website)

DDE None

DDT 14

ROCKY MOUNTAIN ARSENAL (US Army Website)

MERCURY 82

ARSENIC 270

SHARON STEEL CORP (MIDVALE TAILINGS)

1 436 (Est) ARSENIC 70

Sediment None

PAHs

North Marsh Area Unknown Sediment None

6 (EST)

8 1 Milltown Reservoir Sediments

Remediation completed Dec 2010

Deleted from NPL 10152007

6

BAILEY WASTE DISPOSAL

1 January 1996 - September 1996

Yes

39 Sediment

Channel realignment and construction

ARSENICCADMIUMCOPPERLEADZINC

140

8 3Lake Sediments Remediation Project

June 1999 - Aug 1999

No (Act)33 (Act)

Yes

Area not specified

Aug 1996 - Sept

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

100 (Act) LEAD 500

CADMIUM None

ARSENIC 200 979CADMIUM 20 099

COPPER 1000 316

LEAD 1000 358

ZINC 1000 None

SILVER BOW CREEKBUTTE AREA (MT STATE Website)

Sediment Trap MERCURY 10 018

2008-20011 ARSENIC

COPPERRegion 9 Iron Mountain Mine Website

IRON

MCCORMICK amp BAXTER CREOSOTING CO

88 (Est) DIOXIN 000021 TEQ

Region 9 Website McCormick and Baxter Creosoting

88 (Act) PAHs 333 (OC)

TOTAL PCBs 035TOTAL DDT 00648TOTAL CHLORDANE 0931

CADMIUM 184LEAD 173MERCURY 152SELENIUM 0926SILVER 137ZINC 720

MONTROSE CHEMICAL CORP DDT Sediment

White Croaker 04

Water

Palos Verdes Shelf (Region 9 Website) PCBs Sediment

White Croaker 007

Water

9 300 Area not specifiedPalos Verde Shelf

46 (OC) interim23 (OC) Final

00648

Sediment

(elevation raised above water line)

047

SILVER BOW CREEKBUTTE AREA

1 Streamside Tailing (Silver Bow Creek)

Deleted from NPL 9242004

Marshy Area

1996

Sediment

Channel realignment and construction (176 miles)

July 1999 - Ongoing 73 (ROD Est) Yes None

0000021 TEQ

Yes

Sediment susceptible to erosion dredged to a specific elevation

None186

Sediment

Sediment$44 (ROD)$98 (ESD)

15 area not specified9

IRON MOUNTAIN MINE

5 Spring Creek Arm 200 (Est)

8

ROD dateSeptember 2004

SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website)

9 3 Old Mormon Slough 2006

9

MOFFETT NAVAL AIR STATION

8 Site 27 - Northern Channel completed in 12007

Naval Air Station Moffett Field Website

68

area not specified 35

173152

0064 ngL

Sediment

0931656 (soil and sediment) (Est)

035

333 (OC)

184

0926137720

022 ngL

7 (OC)

8

5 Interim ROD Date September 2009

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

UNITED HECKATHORN CO

Region 9 United Heckathorn Co WebsiteBunker Hill Mining and Metallurgical 3 Arsenic

CadmiumRunker Hill Mining and Metallurgical (Regional Website)

Copper

LeadMercurySilverZinc

COMMENCEMENT BAY NEAR SHORETIDE FLATS

Partial deletion (St Paul Waterway) 1996

1Olympic View Resource Area (NTCRA)

Completed in 102002

11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ

20 (Est) ARSENIC10 (Act) COPPER

LEADZINC

1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13

ARSENIC 160COPPER 1100ARSENIC 97HEX-CB 01HPAHs 32PCBs 045

Occidental Site Removal Action (NTCRA)

completed March 2003 36 (Act) 10 PCE Sediment

CADMIUM 66HPAHs 22LEAD 580MERCURY 077ZINC 490COPPER 470MERCURY 071LPAHs NoneHPAHs None

18 cy (Est) ARSENIC 93 (Dredge) 57 (Cap)

70 (Act) COPPER 390 (Dredge and Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

Sediment

1752

57

000002 TEQ

530

dredge all soft sediments

preponderance of evidence approach

DDT SedimentYes 7 059 (average)Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)

65 (Proj)

10

COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website)

1 Sitcum Waterway completed in 1994 428 (Act)

19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 174 Sediment 390

450410

Sediment 39045 (Act) 4

1

Hylebos Waterway 32003-22005 940 11 20

17450

46

03

0022Sediment 17

05 (Act) 87 (Act)

4 (Est)

57

21 (Est)

Sediment

82 Sediment

125

60

390

22 (Act)

32 (Est)

059

1Thea Foss and Wheeler-Osgood Waterways

2002-2006 423 (Act)

1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes

HARBOR ISLAND

059410

57

390

960 (OC)

067

93

0057

51

ROD Amendment date Aug 201210 Upper Basin Not specified

9 1

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

LEAD 530 (Dredge) 450 (Cap)

LPAHs780(OC) (Dredge) 370(OC) (Cap)

MERCURY 059 (Dredge) 041 (Cap)

PCBs65(OC) (Dredge) 12(OC) (Cap)

ZINC 960 (Dredge) 410 (Cap)

TBT Not available

ARSENIC 93 (Dredge) 57 (Cap)

COPPER 390 (Dredge and Cap)

LEAD 530 (Dredge) 450 (Cap)

MERCURY 059 (Dredge) 041 (Cap)

116 (Est) ZINC 960 (Dredge) 410 (Cap)

220 (Act) LPAHs780(OC) (Dredge) 370(OC) (Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

PCBs65 (OC) (Dredge)12(OC) (Cap)

TBT Not available

MERCURY

PCBs

KETCHIKAN PULP COMPANY

4-METHYL-PHENOL 17

Not on the NPL - Superfund Alternative Sited

AMMONIA 120

Region 10 Ketchikan Pulp Company Web Site

SULFIDE None

PCB

0002

57

370 (OC)

Yes In dredge areas No area given

370 (OC)

041

12 (OC)

$15(ROD) $12(ESD) 20 Sediment

5 (Act)(223235 sq ft)

10

Todd Shipyard Sediments 7604 - 22007

Region 10 Harbor Island (Lead) Web Site

9

5 (Act)12 (Act) In dredge areas

10

(LEAD)

7 Lockheed Sediments 7703 - 2405

East Waterway Sediments NTCRA

11204 - 31605 (removal action)No ROD completed for this OU

206 (Act) - Removal action

13 (Act) In dredge area

$45-$69 21 Sediment

17 16 Sediment

21 (Est) 27(Act) 44Yes 50 (Est)

52 (Act) 31 Sediment

410

10 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est)

87 (Act)

Not Stated Benthic toxicity community structure and chemistry

Not available

390

450

12 (OC)

450

041

12 (OC)

041

410

960 (OC)

not available

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Arsenic

Lead

Copper

Mercury

Carcinogenic PAHs (TEQ)

TBT

DioxinsFurans

Multiple Others

MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT)

ARSENIC

Region 10 McCormick and Baxter Creosoting

DIOXINSFURANS

PAHs

PCP

Arsenic (III)

Chromium (III)

Copper

Zinc

PCP

Acenaphthene

Fluoranthene

10 Sediment

11

7

041 (subtidal)017 (intertidal)

114

see attached

0009

LOCKHEED WEST SEATTLE

Lockheed West Seattle (Region 10 Website)

Lockheed West ROD Date August 2013

116 DredgeE

MNR

284 EMNR only

1 167potential use in shallow areas

yes 477

54 μgL

520 μgL

13 μgL

10

190 μgL

23 12

Water

23 (Act)organoclay

4 72004-92005Sediments

000008

100

Sediment

ORDEQ McCormick amp Baxter Creosoting Co Web Site

15 (Est)

12 μgL

2

12

110 μgL

210 μgL

043 (subtidal)2 (intertidal)

Washington State CSL or SQS

0000002

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Naphthalene

Total cPAHs

Dioxinsfurans

PCBs 004COPPERLEADZINCSILVER2 4-DIMETHYL-PHENOL

PCBs Shellfish (intertidal clams) 0042

50 (Est) LMWPAHs 780(OC)

58 (Act) HMWPAHs 5300(OC)

98 (Act)Capped dredge areas

PCBs

12 (OC) (trigger for sediments to 10 feet depth)

Fish (English sole) 0023 ww

Sediment12 (OC) dredgecap 6 (OC) EMNR

Sediment in state owned adjacent lands

9 (OC) EMNR

MERCURY Sediment3 where PCBs greater than 6 (OC)

ST MARIES CREOSOTE - proposed to be added to the NPL

ROD dateJuly 2007 LPAHs

370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)

St Maries Creosote (Regional Website)

Remediation Ongoing HPAHs

960 (OC) (17 if TOC lt02or gt4)

7-10 (Est)

200 (Est)

10 (Act)

35 (Est)

510

OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA)

1 Clam Bay Sediments 61999 - 102001

15

450

Area not specifiedYes

12 (OC)

46 71Sediment

013390

61

0029

410

10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005

960(OC)49 Sediment

12

PCBs

3 (OC) SWAC12 (OC)) SWAC

10PUGET SOUND NAVAL SHIPYARD COMPLEX

2 OUB Marine 61600 - 3104

225 (Act)

10 0Shoreline Nearshore and Offshore Sediment

29 (Est) Yes

211 9

108 Sediment

5

1x10-5 ngL

031 μgL

620 μgL

370(OC)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

MERCURY (toxicity test opt-out)

LPAHs 780 (OC)

HPAHs 5300 (OC)

MERCURY 059 subtidal

LPAHs 780 (OC) subtidal

HPAHs 5300 (OC) subtidal

MERCURY 059

LPAHs 780 (OC)

HPAHs 12 dw intertidal

MERCURY 5 21059LPAHs

HPAHs 12 dw intertidal

48 (Act)

30(Act)

54 (Act)

Region 10 Wyckoff Eagle Harbor Web Site

East HarborWest Beach Sediments

2007-2008

31997 - 121997 13-92 (Est) Yes

10

WYCKOFF COEAGLE HARBOR

1

East HarborPhase 1 - NTCRA

91993 -31994 (Phase 1)

East HarborIntertidal and Subtidal Sediments

2000-2002

3 West Harbor

117

780 (OC)

23

$6-20

Sediment

Sediment

059 (dw)

5300 (OC)

780 (OC)

5300 (OC)

5300 (OC)

Sediment

059

49 $62 - $16 Sediment12 - 31 (includes EMNR)

see cap

059

780 (OC)

  • READ_FIRST
  • Tier 1 Sites - Remedial
    • READ_FIRST

      The 2002 memo Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sitesestablished at 2 tier system of headquarters consultations to encourage national consistency in makingdecisions at Superfund and RCRA Corrective Action sediment sites Tier 1 sites are defined as sites wherethe proposed sediment action will address more than 10000 cubic yards or five acres of contaminatedsediment Consultation for Tier 1 sites involves the submission of the draft Proposed Remedy or draftEECA and a discussion of how the 11 principles were considered to the Regional Coordinator 30 daysprior to the public comment period Tier 2 sites are a subset of the Tier 1 sites that are large complex orcontroversial and are subject to consultation with the Contaminated Sediments Technical AdvisoryGroup throughout the RIFS and remedy selection stagesThis Tier 1 Tracking list is an EPA OSRTI product largely developed by the Army Core of Engineers and isintended to be a resource for contaminated sediment RPMs headquarters and regional technical staffand others supporting the remedy decision making process at these sites The list tracks the Tier 1 sitesthat have signed a decision document and documents the remedy selected theestimated and actual costs of the remedy the contaminants of concern and the associatedcontaminated media the Action Levels the Clean-up Levels (CUL) the Remediation Goals (RG) and theSediment Remedial Action Objectives (RAO) For those sites where the remedy has been implementedand a Five-year Review (FYR) has been completed the list also documents whether monitoring wasconducted for the FYR data was presented in the report and the CULs RGs and RAOs were met A keyaspect of this list is that the references for all the data in this spreadsheet are easily located Each cellcontaining data is hyperlinked to a PDF with the page or pages from the relevant public document thatreports the data Each PDF includes the cover page of the report with the information necessary tolocate the complete document and the data included in the spreadsheet is highlighted in the text of thePDF All of the information and documents included in this tracing list are publically availabledocumentsThis Version has been published to the internet with all of the hyperlinks removed We apologize for the inconvenience EPA is currently updating its websites and is temporarily unable to publish the Tier 1 Tracking List with the hyperlinks to the Cited Documents The Remedial Action Objectives and Five Year Review data columns have been removed from this version because they are largely narrative text and require the context provided by the hyperlinked documents in order to be properly understood When the Internet upgrade is complete the Fully cited version will be published Until then any questions regarding this Tier 1 Tracking List can be directed to Matt Lambert EPA Office Of Superfund REmediation and Technology Innovation (lambertmatthewepagov)The Tier 1 Tracking List includes sites in the Remedial Program where a Proposed Plan and Record of Decision were signed The sites are organized by EPA Region number and then listed alphabetically by name Due to the structure of the list columns cannot be filtered or sorted

      Tier 1 Sites - Remedial

      264pdf
      Websitehttpcumulisepagovsupercpadcursitescsitinfocfmid=0101431
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100948
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101479
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100744
      216pdf
      1-011pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100743
      Website httpwwwepagovnbhindexhtml
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631F8CFE11E53EFA23C8525691F0063F6E8OpenDocument
      1-009pdf
      260pdf
      702pdf
      Website httpyosemiteepagovr1npl_padnsf31c4fec03a0762d285256bb80076489ca48c071b6a314e1c8525691f0063f6ddOpenDocument
      1-068pdf
      608pdf
      610pdf
      611pdf
      612pdf
      631pdf
      681pdf Soil and sediment not differentiated
      682pdf
      1-057pdf
      692pdf
      695pdf
      700pdf
      703pdforig 1998 estimate
      1-035pdf
      679pdf
      1-005pdf
      636pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      638pdf
      636pdf
      1-010pdf
      1-074pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      1-017pdf
      1-018pdf
      1-020pdf
      215pdf
      694pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-024pdf
      1-023pdf
      1-025pdf
      1-026pdf
      1-027pdf
      1-027pdf
      1-028pdf
      1-025pdf
      1-047pdf
      1-031pdf
      1-033pdf
      1-034pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101074
      1-012pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201766
      738pdfDates are for entire construction not only sediment portion
      356pdf
      2058pdf
      735pdfThis represents cost estimate for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1266pdfThis represents actual cost for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1268pdf
      2083pdf
      1268pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200364
      2203pdf
      372pdf
      739pdf
      740pdf
      371pdfIn-situ treatment with sorptive agents
      371pdf
      1259pdf
      373pdf
      Website httpwwwepagovr02earthsuperfundnpl0200364chtm
      1259pdf
      373pdf
      1259pdf
      373pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200528
      1272pdf
      177pdf
      477pdf
      1261pdf
      2086pdf
      478pdf
      2086pdf
      478pdf
      Northerly wetlands and tar patch area were determined to be more like soil removals as they were not submerged Westerly wetlandds has a surface water stream running through it that is monitored for sediments so it is retained
      1273pdf
      2088pdfMNR doesnt have fieldwork dates but site fieldwork dates are included
      1274pdfNo specific area for MNR provided 21 acres is area of westerly wetlands for which MNR is selected
      2006pdf
      2087pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0201644
      456pdf
      218pdf
      457pdf
      2093pdf
      2094pdf
      178pdf
      2011pdf
      1279pdf
      461pdf
      56pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201706
      463pdf
      2016pdf
      463pdf
      2016pdf
      2091pdf
      2015pdf
      2015pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0202229
      990pdf
      993pdf
      1014pdf
      1299pdf
      2018pdf
      996pdf
      990pdf
      991pdf
      991pdf
      992pdf
      996pdf
      996pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200557
      2019pdf
      997pdf Remedy componentsareas not broken out
      2098pdf
      2096pdfInfo only on Alycon Lake no info on Rabbit Run or Chestnut Branch
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201290
      2033pdf
      764pdf
      2023pdf
      2024pdf
      2024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201491
      2032pdf
      1002pdf
      1001pdf
      2221pdf
      2031pdf
      2032pdf
      2102pdf
      2029pdf
      2028pdf
      2134pdf
      2030pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0203382
      2072pdf
      518pdf
      2228pdf MNR area was not stated Calculation Profundal areas 08= 154 profundal area = 1925 acres - 154 TLC acres = 1771 MNR acres
      518pdf
      2073pdf
      2075pdf
      2079pdf
      2123pdf
      2126pdf
      1005pdfAttachment has 2 sections one from the ROD the other from the FYR
      1006pdf
      2124pdf
      2125pdf
      2070pdf
      2059pdf
      2059pdf
      2059pdf
      2128pdf
      2060pdf
      2061pdf
      2127pdf
      2063pdf
      2063pdf
      2064pdf
      2065pdf
      2066pdf
      2130pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201465
      369pdf
      2133pdf
      2034pdf
      1008pdf
      2131pdf
      183pdf
      2177pdf
      2131pdf
      183pdf
      2131pdf
      183pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201770
      2036pdf
      64pdf
      1009pdfIncludes entire remedy sediment portion is not defined
      2038pdf
      2037pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200439
      2174pdf
      1012pdf
      2042pdf
      2041pdf
      2041pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200209
      2171pdf
      2051pdf
      523pdf
      2046pdf
      2044pdf
      2049pdf
      2162pdf
      2052pdf
      2053pdf
      2047pdf
      2045pdf
      2050pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201202
      69pdf
      2170pdf
      2054pdf
      2120pdf
      2054pdf
      2054pdf
      2118pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0302836
      Website httpcfpubepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0302836
      3006pdf
      497pdf Apparently same area as EMNR
      498pdf Apparently same area as MNR
      496pdf
      3001pdfWeb site COC list is much more extensive then tPAH
      497pdf
      497pdf
      httpwwwepagovreg3hwmdnplVAD990710410htm
      499pdf
      499pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300093
      1605pdf
      224pdf
      1601pdf
      1614pdf
      1606pdf
      1606pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1605pdf
      482pdf
      73pdf
      1615pdf
      656pdf
      1606pdf
      1617pdf
      1617pdf
      1617pdf
      1617pdf
      Website httpwwwepagovreg3hwmdsupersitesDED980555122indexhtm
      1617pdf
      1617pdf
      1605pdf
      483pdf
      74pdf
      484pdf
      657pdf
      1606pdf
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300092
      1622pdf
      1621pdf
      1039pdf
      959pdf
      1040pdf
      958pdf
      1623pdf
      665pdf
      httpwwwepagovreg3hwmdnplDED980552244htm
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300951
      1624pdf
      3008pdf
      961pdf
      960pdf
      3002pdfArea not stated No mention of sediment capping or marine mattress in ROD or ESDs
      962pdf
      1625pdf
      1626pdf
      1627pdf
      1628pdf
      Websitehttpwwwepagovreg3hwmdnplPAD046557096htm
      Website httpcumulisepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0300951Provided to indicate formal OU name
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0406299
      Construction completed but no documents are available
      12pdf
      578pdf
      579pdf
      4001pdf
      4001pdf
      12pdf
      4001pdf
      4001pdf
      4001pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0402260
      No information on websites regarding status of sediment work unclear as of Jan 2014
      21pdf
      4002pdf
      53pdfCost of sediment remedy is not broken out
      4003pdf
      Website hhttpcumulisepagovsupercpadcursitescsitinfocfmid=0403156
      400pdf
      580pdf
      4004pdf
      Website httpwwwepagovregion4superfundsitesnplnorthcarolinawcoplwtpnchtml
      395pdf
      402pdf
      396pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403350
      4008pdf
      4007pdf
      4023pdf
      965pdf
      4020pdfThe ROD and FYR do not directly state the COCs for the sediment remedy and there are not contaminant-specific cleanup levels The contaminants identified here are those with an HQ above 1 for all areas (see attachment) Presented here to indicate prevalent contamination
      4019pdf Excavation depth based on elevation and visual determinations
      4009pdf
      4011pdf
      4010pdfChanged remedy to MNR
      4011pdfChanged remedy to MNR
      4017pdf
      966pdf
      584pdf
      964pdf
      4013pdf
      4018pdf
      4021pdf
      1025pdf
      1026pdf
      4014pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403252
      77pdf
      561pdf
      4022pdf
      558pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0403765
      391pdf
      4030pdf
      4031pdf
      4032pdf
      393pdf
      httpwwwepagovregion04superfundsitesnpltennesseetennprotnhtml
      562pdf
      563pdf
      4031pdf
      4033pdfROD states However if certain excavated sediments appear to be uncontaminated then those sediments shall be subjected to sampling and analyses for the PAHs The action levels for sediment removal will reflect EPAs excess lifetime carcinogenic risk range of 1 x 10 6 to 1 x 10 4 (See Table G - 9) Its unclear whether or which concentrations will be used for an action level but the text and table are addded as a reference
      4034pdfNo remedial action in Reaches B and C See second page of attachment
      570pdf
      1031pdf
      4043pdf
      4044pdf
      4043pdf
      4043pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406082
      592pdf
      592pdfSite soils included in volume
      No Reach A removal action decision documents exist on EPA HQ or region websites
      httpwwwepagovregion4superfundsitesnplnorthcarolinawardtrnchtml
      593pdf
      590pdf
      591pdf
      4040pdf
      4041pdf
      4042pdf
      4041pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0501228
      5070pdf
      15pdf
      20pdfThis value represents Estimated 30-Year Net Present Worth to excavate and consolidate sediment in landfill
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      17pdf
      5170pdf
      5171pdf
      5172pdf
      533pdf
      532pdf
      Website httpwwwepagovregion5sitescontinentalindexhtm
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0507723
      5059pdf
      5173pdf
      5174pdf
      5180pdf
      5175pdf
      5057pdf
      5137pdf
      5093pdf
      5176pdfDeposit DD is located in OU2 but it is considered part of the OU3 response
      5179pdf
      5062pdf
      5181pdf
      5051pdf
      5092pdf
      5177pdf
      213pdf
      5058pdf
      Website httpwwwepagovregion5sitesfoxriverindexhtml
      5092pdf
      5178pdfAlso see Fox River ROD Amendment 2007 pg 14 Table 2 for documentation of the OU 5 dredge volume being included in the OU4
      213pdf
      5217pdf
      5094pdf
      5096pdf
      214pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500760
      33pdf
      5063pdfBackfill stated on second page of attachment
      35pdfIncludes floodplain material
      32pdf
      Website httpwwwepagovR5SupernplillinoisILD980823991htm
      32pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0508120
      5003pdf
      5002pdf
      5005pdf
      5060pdfEstimated from map in 5 year report
      5004pdf
      5004pdf
      5006pdf
      5001pdf
      5168pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500083
      5108pdf
      5222pdf
      5208pdf
      5022pdf
      5131pdf
      5209pdf
      Website httpwwwepagovregion5sitesoutboardmarine
      5205pdf
      514pdf
      515pdf
      5120pdf
      514pdf
      5120pdf
      514pdf
      5212pdf
      5125pdf
      5126pdf
      5127pdf
      5123pdf
      5128pdf
      Website ttpcumulisepagovsupercpadcursitescsitinfocfmid=0501181
      5024pdf
      5160pdfIncludes sediments and soils
      5026pdf
      5025pdf
      5024pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0505188
      5203pdf
      5202pdf
      5146pdf
      5044pdf
      5037pdf
      5045pdf
      5142pdf
      5142pdf
      Website httpwwwepagovregion5sitessheboygan
      5046pdf
      5145pdf
      5043pdf
      5140pdf
      5142pdf
      5142pdf
      5035pdf
      5144pdf
      5042pdf
      5036pdf
      5142pdf
      5142pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0502194
      150pdf
      148pdf
      149pdf
      5157pdf
      147pdf
      147pdfNo update provided in 2012 FYR
      5027pdf
      5156pdf
      Website httpwwwepagovregion5cleanupvelsicolmichiganindexhtml
      5154pdf
      5164pdf
      5164pdf
      5151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0601752
      6001pdf
      986pdf
      6004pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      987pdf
      983pdf
      981pdf
      984pdf
      6014pdf
      6006pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0602911
      1043pdf
      1044pdf
      6008pdf
      6009pdfA list of principal parameters is provided without risk context COCs or risk drivers in sediments are not identified
      1047pdfPossible that visually clean performance standard also applies to marsh sediments
      1045pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0600574
      1049pdf
      153pdf
      1050pdf
      1051pdf
      6010pdfConstruction and disposal only
      6011pdf
      1052pdf
      Wesbite httpcumulisepagovsupercpadcursitescsitinfocfmid=0800445
      8003pdf
      311pdfIncludes Area 1 sediments and 30K cy in area 3
      625pdf
      624pdf
      8002pdf
      Website httpwwwepagovregion8superfundmtmilltown
      8050pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800357
      8018pdf
      8017pdf
      1019pdf
      1018pdf
      8023pdf
      8012pdf
      8013pdf
      8015pdf
      website httpwww2epagovregion8rocky-mountain-arsenal
      8020pdf
      8019pdf
      8012pdf
      8015pdf
      website httpwwwrmaarmymil
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800694
      629pdf
      8024pdf
      630pdf
      8025pdf
      8026pdf
      8027pdfSediment and soil are often used interchangeably in the ROD
      628pdf
      627pdf
      8026pdf
      628pdf
      8026pdf
      8028pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800416
      8037pdf
      1021pdf
      1022pdf
      8043pdf
      1023pdf
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Websitehttpwww2epagovregion8silver-bow-creek-butte-area
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpdeqmtgovREMMWCBConstructionServicesSectionSilverBowCreekdefaultmcpx
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901755
      9015pdf
      596pdf
      1237pdf
      1236pdf
      1235pdf
      1234pdf
      980pdf
      1238pdf
      1234pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDCAD980498612OpenDocument
      1234pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901129
      1245pdf
      9002pdf
      1240pdfThis cost does not include $18M for bank stabilization
      1239pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDcad009106527OpenDocument
      543pdf
      1239pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902734
      1249pdf
      41pdf
      545pdf
      39pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpyosemiteepagovR9SFUNDR9SFDOCWNSF3dec8ba3252368428825742600743733c01ef2be6ec9ab9c8825737f002bf719OpenDocument978
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902440
      1254pdf
      156pdf
      974pdf
      975pdf
      1250pdfDieldrin is also a COC but only has a CUL for surface water
      1252pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfvwsoalphabeticUnited+Heckathorn+CoOpenDocument
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000981
      10-030pdf
      Name in ROD However name on CB website is NSTF Areawide Sediment covered within OU1 ROD was later divided into separate OUs except for removal actions conducted at Olympic View This removal action is summarized here
      1104pdf
      1105pdf
      1105pdf
      1106pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1106pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc923e8d62480494ad483882564f80082a1c0OpenDocument
      10-030pdf(formerly OU6)
      10-100pdf
      1101pdf
      1100pdf
      1099pdf
      1097pdf
      10-002pdf10 acres as of 2009
      1097pdf
      1097pdf
      1097pdf
      10-030pdf
      1071pdf
      1076pdf
      1073pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1072pdf
      10-030pdf
      1066pdf
      1061pdf Quantity does not include Blair Waterway dredging 1993 ESD states that Blair is not part of ROD cleanup and is for navigational purposes
      1062pdf
      1063pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      10-030pdf
      1060pdf
      1059pdf
      1059pdf
      1059pdf
      1067pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1070pdf
      1111pdf
      1112pdf
      1115pdf
      1113pdf
      10-030pdf
      10-098pdf
      1121pdf
      1079pdf
      1094pdf
      1094pdf
      1078pdf
      1122pdfThis is strictly a construction cost that appears to include construction of CDF and pile removal as well as dredging and capping
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 25
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 089
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      10-030pdf
      10-008pdf
      1081pdf
      1082pdf
      10-009pdf
      1084pdf
      1085pdf
      1087pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000020OU 8 is not included because OU was reommended for no further action in 2003 ROD
      1123pdf
      10-022pdf
      1134pdfCapping took place after dredging to in part maintain original depths
      1138pdf
      433pdfROD estimated remedy would cost $15M but 2002 ESD estimated it as $12M
      1133pdf
      1130pdf
      949pdf
      1135pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc9235a64831b6521f46b8825650200836f1cOpenDocument
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      1136pdf
      1124pdf
      10-023pdf
      1128pdf
      10-028pdf
      434pdf
      1125pdf
      1130pdf
      10-024pdf
      1126pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-025pdf
      1142pdf
      10-095pdf
      1144pdf
      1141pdf
      1143pdf
      1146pdf
      1146pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1000020
      1152pdf
      162pdf
      1148pdf
      314pdf
      633pdf
      1149pdf
      1153pdf
      431pdf
      1150pdf
      431pdf
      1151pdf
      Website httpyosemiteepagovR10CLEANUPNSF7d19cd587dff1eee8825685f007d56b72dd5ab7462e4f004882567b30057eb7bOpenDocument
      431pdf
      1151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000339
      166pdf
      49pdf
      1158pdf
      1159pdf
      1157pdf
      1157pdf
      Website httpwwwdeqstateoruslqcunwrmccormickbaxter
      1290pdf
      1157pdf
      1157pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1001134
      1291pdf
      1163pdf
      1164pdf
      1292pdf
      1293pdfAlthough not called MNR remedy is to monitor contaminant levels until the goal is achieved which is MNR
      10-061pdf
      1165pdfThis cost includes capping of the upland landfill A breakout for just the sediment portion was not provided
      1166pdfThis cost includes the fire training area and upland landfill cover A breakout of just the sediment remediation was not provided
      1167pdf
      1169pdfconsidered at conceptual target for sediment
      1292pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1169pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000611
      1177pdf
      10-031pdf
      10-031pdf
      1179pdf
      1178pdf
      1173pdf
      1181pdf
      1176pdf
      1174pdf
      1173pdf
      1181pdf
      1176pdf
      1173pdf
      1181pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1001107
      1182pdf
      10-040pdf
      1242pdf
      1244pdf
      1243pdf
      1188pdf
      1189pdf
      1187pdf
      1183pdf
      1185pdf
      10-041pdf
      10-042pdf
      1189pdf
      1185pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1002095
      46pdfIncludes soil excavation quantity in total volume
      10-039pdf
      408pdfIncludes cost for excavating nearshore soil
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate that sediment is not toxic
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate sediment that is not toxic
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000612
      10-066pdf
      1216pdf
      10-044pdf
      10-071pdf
      10-068pdf
      10-068pdf
      Website httpyosemiteepagovR10CLEANUPNSFsitesWyckoff
      10-068pdf
      10-075pdf
      10-113pdf
      409pdf
      1218pdf
      202pdf
      202pdf
      202pdf
      10-064pdf
      10-072pdf
      1219pdf
      1214pdf
      1214pdf
      1214pdf
      1215pdfRequirement for intertidal sediments
      423pdf
      10-047pdf
      10-046pdf
      1209pdf
      1208pdf
      1207pdf
      1203pdf
      1202pdf5 mgkg criteria for areas requiring dredging21 mgkg criteria for areas requiring a 1-meter thick cap 059 for thin layer capping
      1203pdf
      1204pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      2195pdf
      2136pdfCleanup goals for biological endpoints were not provided
      2136pdfCleanup goals for biological endpoints were not provided
      2127pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0900993
      Website httpwwwepagovregion9superfundpvshelf
      9003pdf
      9004pdf
      9005pdf
      9005pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      613pdf
      1-030pdf
      1-064pdf
      683pdf
      475pdf
      2085pdfHowever see RAO of 50 ppm
      2085pdf
      2085pdf
      1-102pdf
      1278pdf
      1279pdf
      1278pdf
      2092pdf
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      2097pdf
      763pdf
      1003pdf
      2030pdfIts unclear the extent to which 10 mgkg is considered the cleanup level ROD language and FYR note is attached The closest to being definitive is on p 34 of attachment the cleanup goal of about 10 mgkg
      2123pdf
      2062pdf
      2129pdf
      186pdf
      2117pdf
      2043pdf
      2043pdf
      963pdf Attachment incl language from ROD and ESD
      11pdf
      11pdf
      11pdf
      11pdf
      11pdf
      23pdf
      396pdf
      4019pdf
      597pdf
      4045pdf
      4045pdf
      4045pdf
      586pdf
      585pdf
      4057pdfSediment concentration associated with protective fish tissue concentration is lt10ppb
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      5137pdf
      5050pdf
      5050pdf
      34pdf
      5001pdf
      5109pdfAction level or cleanup level of North Ditch remediation never stated in ROD ROD amendment five year reviews or construction completion report
      277pdf
      5122pdf
      526pdf
      5045pdf
      5139pdf
      5141pdf
      5155pdf
      982pdf
      6003pdf
      8002pdfNo sediment cleanup levels cleanup levels pertain to groundwater or surface water
      1024pdf
      979pdf
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      9006pdf
      9006pdf
      9006pdf
      9006pdf
      1251pdf
      1106pdf
      1103pdf
      1103pdf
      1103pdf
      1103pdf
      1072pdf
      1065pdf
      1065pdf
      1069pdf
      1069pdf
      1069pdf
      1070pdf
      1116pdf
      1091pdf
      1091pdf
      1091pdf
      1091pdf
      1114pdfTable 13 in the ROD lists Zinc SQO as 059 This appears to be an error Table 12 of the ROD lists 059 for mercury and 410 for zinc
      1074pdf
      1074pdf
      1089pdf
      1089pdf
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1136pdfConfirmational number of 76 mgkg (OC) established for TBT
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-025pdf76 ppm (OC) 1335 ppb (dw)TBT is a confirmational number See attachment
      10-096pdf
      10-096pdf
      164pdf
      312pdf
      164pdf
      164pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      1181pdf
      1181pdf
      1181pdf
      1187pdf
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (041 ppm) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (970 ppm [OC]) is considered a conceptual target
      9006pdf
      9006pdf
      6018pdf
      6018pdf
      5184pdfCalled residual cover here
      5185pdfTermed post-dredge residual sand cover
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406638
      4048pdf
      4049pdf
      4050pdf
      4051pdf
      4051pdf
      4051pdf
      4051pdf
      httpepagovregion4superfundsitesnpltennesseecopbastnhtml
      4051pdf
      4051pdf
      4051pdf
      1-045pdf
      1-045pdf
      1-030pdf
      1-046augmentedreplaced sand cap in 2011
      1-047pdf
      httpwwwepagovregion02superfundnplonondagalakeindexhtml
      Ley Creek subsite not included because the volume removedmanaged was less than 10K cy
      2179pdf
      2165pdf
      2167pdf
      2166pdf
      2054pdf
      2054pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      1300pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      5186pdf
      3007pdfSame factsheet as of Jan 2014
      httpepagovregion4superfundsitesnplalabamaamerbrasalhtml
      httpepagovregion4superfundsitesnplmississippiamercrewkmshtml
      httpyosemiteepagovr10cleanupnsf22f04d62fa63974288256da6005f9868cabb84db584c955f8825697f00049beeOpenDocument
      10-056pdf
      10-058pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0503034
      5187pdf
      5188pdf
      5189pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinasangschtml
      5195pdf
      5194pdf
      6023pdf
      10-060pdfROD amendment did not specify the volume of instream sediments vs floodplain material
      10-062pdf
      10-063pdf
      10-064pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      10-069pdf
      10-069pdf
      10-083pdf
      1203pdf
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (370 ppm [OC]) is considered a conceptual target
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      Website httpyosemiteepagovr10cleanupnsfsitesmccormick_baxter
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-087pdf
      10-097pdf
      10-101pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      1246pdfCap placed in areas exceeding CUL
      1246pdfCap placed in areas exceeding CUL
      9014pdf
      8044pdf
      8046pdf
      8051pdf
      6026pdf
      6026pdf
      6026pdf
      6026pdf
      6027pdf
      5196pdf
      5197pdf
      5203pdf
      5204pdf
      5206pdf
      5207pdf
      5210pdf
      5022pdf
      httpwwwepagovregion5cleanupmississinewaindexhtml
      5213pdf
      5214pdf
      5215pdf
      5216pdfAmended cost for OU 2-5 does not include Phase 1 in OU4
      4056pdf
      4061pdf
      4062pdf
      4063pdf
      4065pdfBackfill in at least portions of site N of 38th St area unclear
      4066pdf
      4075pdf
      4075pdf
      4076pdf
      4051pdf
      69pdf
      2053pdf
      2181pdf -- most recent factsheet as of 2014-Jan
      2181pdf -- most recent factsheet as of 2014-Aug
      ROD also describes NYSDEC-regulated action removing channel sediment (4200 cy) and floodplain sedimentsoil (63000 cy)
      2185pdf
      2196pdf
      2197pdf Remedy componentsareas not broken out
      httpwwwepagovhudson
      2198pdf
      1-058pdf
      1-059pdf Soil and sediment not differentiated
      2205pdf
      2204pdf
      1-065pdf
      613pdf
      1-067pdf
      1-071pdf
      1-072pdf
      1-013pdf
      1-073pdf
      698pdf
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93d01550369a32b31bb8525691f0063f6d6OpenDocument
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101028
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8584c38df37ade1998525764f005a96d3OpenDocumentampHighlight=0callahan
      1-076pdf
      1-075pdf
      1-078pdf
      1-078pdf
      1-078pdf
      1-078pdfNote that the dredging and subaqueous disposal of sediments was changed from OU1 to OU3 in the 2013 ESD
      1-078pdf
      1-078pdf
      1-080pdfAs of 2014-Jan
      1-077pdf
      1-081pdf only dredge operation
      httpwwwepagovregion02superfundnplraritanbayslag
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206276
      1-082pdf
      1-083pdf
      1-083pdf level specified on p 3 of 4
      1-083pdf 1-083pdf level specified on p 3 of 4
      1-086pdf
      1-085pdf
      1-087pdf Total cost ROD does not specify cost of sediment portion
      2206pdf
      2206pdf
      2206pdf
      2207pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201690
      2208pdf
      2210pdf
      2211pdf
      2212pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206222
      httpwwwepagovregion2superfundnplgowanus
      2213pdf
      2214pdf
      2214pdf
      2215pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1002655
      httpyosemiteepagovr10cleanupnsf32e58b284950a4fc882578480000fdcc9458199e8119eba3882572910069d808OpenDocument
      10-102pdf
      10-104pdf
      10-105pdf
      10-105pdf
      10-106pdf
      10-107pdf
      10-108pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driverf
      10-110pdf
      10-111pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-093pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8bbe0100a535e8840852576e90053b186OpenDocument
      1-090pdf - soilsediment volumes not differentiated
      1-090pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-089pdf
      1-091pdf
      1-092pdf
      Fish tissue remedial goal appears to only apply to the Allendale and Lyman Mill Pond areas not lyman mill stream sediment
      1-096pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-098pdf
      1-099pdf
      1-099pdf
      2218pdf
      2219pdf
      2219pdf
      2220pdf
      2222pdf
      2123pdf
      2225pdf
      2173pdf
      2116pdf
      5109pdf
      5223pdf
      10-125pdf
      10-125pdf
      10-125pdf
      1-100pdfFloodplain vs sediments not differentiated
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93de720462345729a4f8525691f0063f6e1OpenDocument
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631E704D6C17F74EA678525697B0008CCAAOpenDocument
      1-101pdf
      httpwwwepagovregion02superfundnplaluminumcompany
      2200pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinakopchschtml
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0405546
      httpwwwepagovregion4superfundsitesnplalabamatriatenvalhtml
      877pdf
      877pdf
      877pdf
      877pdf
      6024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000195
      httpyosemiteepagovr10cleanupnsfsitesbh
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101388
      Reg Site OU Area Name Fieldwork Dates Dredge (1000 cu yds) Excavate (1000 cu yds) Back-fill (Residual Cap) Cap (acre) MNR (acre) EMNR Thin Cover (acre) In Situ Treatment (acres) Other Estimated Cost (in millions) Actual Cost (in millions) COC Sample Matrix Action Level (ppm) Cleanup Level (ppm) Remediation Goal (ppm)
      1 CALLAHAN MINING CORP 3 SedimentsCap Ongoing 101 No $21 Copper Sediment 790
      Lead 710
      Callahan Mine (Region 1 Website) Zinc 5100
      1 CENTREDALE MANOR RESTORATION PROJECT 1 Allendale Pond and Lyman Mill Pond Sediment 156 If needed 605 Benzo(a)pyrene Fish 00015
      Dieldrin 00011
      Technical Chlordane 013
      Aroclor 1254 0037
      Aroclor 1268 0011
      2378-Tetrachlorodibenzo-p-dioxin 00000022
      Total Aroclors 0076
      44-DDD 00062
      44-DDE 0018
      DioxinsFurans TEQ 0000044
      Benzo(a)pyrene Sediment 14
      Dibenz(ah)anthracene 097
      Dieldrin 00026
      Technical Chlordane 04
      Aroclor 1254 0031
      Aroclor 1268 0023
      Arsenic 39
      Centredale Manor Restoration Project (Region 1 Website) 2378-Tetrachlorodibenzo-p-dioxin 0000015
      Lyman Mill Stream Sediment 205 Yes 225 165 Coplanar PCBs (TEQ)3 0000025
      Total Aroclors 006
      Selenium 11
      Zinc 221
      44-DDD 00084
      44-DDE 0006
      Aluminum 8210
      Barium 134
      Vanadium 376
      N-Nitroso-di-n-propylamine 046
      1 LORING AIR FORCE BASE 13 East Branch of Greenlaw Brook 1997 - 1998 38 (Est) Yes 481 Total PAHs Sediment 35
      86 (Act) Total 44-DDTDDDDDE 028
      Loring Air Force Base (Region 1 Website) Aroclor 1260 1
      Total Chlordanes 048
      Lead 218
      44-DDD Fish 0018
      44-DDE 0013
      44-DDT 0013
      Aroclor 1242 00022
      Aroclor 1260 00022
      Heptaclor 000098
      Chlordane Alpha 00034
      Chlordane Gamma 00034
      1 NEW BEDFORD 1 Acushnet River North of Wood Street (within Upper Harbor) 1202 - 303 900 (throughout OU1) 156 (Act) No 2002 ESD $317 (for all of OU 1) Operation ongoing PCBs Sediment (Upper Harbor) 10
      Region 1 New Bedford Website Upper and Lower Harbor 2004 - Ongoing 2011 ESD $422-1200 (for all of OU1) Sediment (Lower Harbor) 50
      Sediment intertidal areas with public access or abutting recreational land use 25
      Sediment saltmarsh areas with little to no public access (aka Marsh Island) 50
      Sediment intertidal areas with abutting residential land use 1
      Seafood 002
      2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000
      1 NEWPORT NAVAL EDUCATION amp TRAINING CENTER 4 McAllister Point Landfill (Narrangasett Bay) 22001 - 122001 34 (Est) Yes 226 Anthracene Sediment 051 051
      Fluorene 02 02
      46000 tons (Act)(cyds not provided) PCBs 36 36
      NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website Pyrene 3 3
      Copper Porewater 00529 00529
      Nickel 00337 00337
      1 NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1 1
      Nyanza Chemical Waste DumpRegion 1 Website 4 Sudbury River ROD Date September 2010 Area not specified 84 85 MERCURY Sediment 10 (EMNR)
      MERCURY Fish (largemouth bass yellow perch bullhead) 048
      1 PINE STREET CANAL 1 Turning Basin Pine Street Canal and Wetlands 2002-2004 2004 78 (Act) (GeotextileSand Cap) 44 PAHs Sediment ER-M Values
      Region 1 Pine Street Canal Website 82010 - 22011 08 2011 organoclay cap (size not specified) Metals and Cyanide ER-M Values
      1 SULLIVANS LEDGE 1 Unnamed Stream Ponds A and B 1998-2002 19 (Est) Yes upper portion of stream diverted PCBs Sediment 20 uggC
      Region 1 Sullivans Ledge website 86 (Act)
      2 Middle Marsh Wetlands 1998-2001 52 (Est) Yes 28 PCBs 20 uggC
      255 (Act)
      2 BATAVIA LANDFILL 1 Wetland Areas June 2001 - June 2003 25 (Est) Yes 13 (soil and sediment) 75 (soil and sediment) PAHs Sediment Visual NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals
      Deleted from NPL 11292005 Act Wetland area volume not specified LEAD
      2 BRIDGEPORT RENTAL amp OIL SERVICES 2 Little Timber Creek Swamp ROD dateSeptember 2006Remedial Action 2009-2011 175 (Est) Yes Area not specified 106 (Est) 125 PCBs Sediment 10 10
      Region 2 Bridgeport Rental amp Oil Services Website LEAD 1000 1000
      Total Petroleum Hydrocarbons None None
      2 BURNT FLY BOG 2 Downstream Area and Westerly Wetlands 11795 - 1996 gt6000 tons (Act) (soil and sediment) 22 LEAD Sediment 250
      PCBs 5
      3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment 400049
      2 GENERAL MOTORS (CENTRAL FOUNDRY DIVISION) 1 St Lawrence River 61995 - 111995 13 (Act) 2 (Act) 215 PCBs Sediment 1
      Turtle CreekTurtle Cove 1004 - 305 23 (Act) (soil and sediments) 01 01
      Raquette River 602 - 503 14 (Act) 1
      2 GOWANUS CANAL 1 Canal Sediments ROD Date Sept 2013 588 (Est) Area not stated (dredgecap remedy) In-situ stabilization of 3-5 feet of NAPL-containing sediments PAHs Sediment 20
      Gowanus Canal (Region 2 Website) Holding Tanks for CSO Control Copper 80
      Lead 94
      2 Grasse River Superfund Site(aka Alcoa Aggregation Site) Grasse River ROD Date April 2014 109 Yes 284 2431 PCBs Sediment 1
      Grasse River(Region 2 Website) Fish 001-005 (Final Remedial Goal)026-036(Interim Target Concentrations)
      2 HOOKER (102ND STREET) 1 Niagara River Embayment 71996 - 111996 28 (dredge to 2 feet) Yes $36 - 56 PAHs METALS CHLORINATED ORGANICS (MULTIPLE) Sediment 01(organics) New York State Sediment TBCs
      Deleted from NPL 852004 Sediment 02(Mercury)
      2 HUDSON RIVER PCBS 2 Upper Hudson River (Section 1) ROD dateFebruary 2002 Field work 2009-ongoing 1560 (Est) Yes Area not specified 2250 PCBs Fish 005
      Sediment 3 gm2 (MPA) 1
      Hudson River PCBs EPA Website Upper Hudson River (Section 2) 580 (Est) Sediment 10 gm2 (MPA) 1
      Fish 005
      Upper Hudson River (Section 3) 510 (Est) Sediment 1
      Fish 005
      2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001 (change in ESD from dredging to excavation) 981 (Est) ROD 21 INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC Sediment Not specified
      85000 Tons (Act) ESD 50-75
      2 LOVE CANALDeleted from NPL 9302004 2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001 0001
      2 MARATHON BATTERY CORP 1 East Foundry Cove Marsh and Constitution Marsh 91993 - 31995 30 (Est) Yesbentonite clay layer 40 CADMIUM Biological Sampling None
      Sediment 100 100
      Deleted from NPL 10181996 2 East Foundry Cove West Foundry Cove and the Cold Spring Pier Area 91993 - 31995 56 (Est) 485 CADMIUM Biological Sampling None
      Actual not specified by area
      Sediment Excavate up to 1 ft 95 Removal 10 mgkg
      2 ONONDAGA LAKE 2 Onondaga Lake Bottoms Subsite ROD dateJuly 2005 2407 (Est) 425 (Est) 1771 154 (Est) 414 MERCURY and others Sediment 08 014-2
      Operations Ongoing METHYL Hg Fish 03
      5 LCP Bridge St SiteWest Flume and Wetland AB June 2005 - July 2007 543 (Est)917 (Act) Yes 96 MERCURY Sediment 02
      20 Geddes Brook NineMile Creek Reach BC CD ROD DateApril 2009June 2012 - ongoing 59 (Est) Combined with Dredge volume Yes Partial Channel Re-location 189 MERCURY and others Sediment 015
      Region 2 Onondaga Lake Website Mercury Fish 01-03
      24 Geddes Brook NineMile Creek Reach AB June 2012 - 16 (Est) 42 (Est) Yes 151 MERCURY and others Sediment Soil (flood plain) 015
      Fish 01 - 03
      2 Raritan Bay Slag 0 ROD Date May 2013 34 (Est) 787 Lead Sediment 400 400
      Raritan Bay Slag (Region 2 Website)
      2 REYNOLDS METALS CONot on the NPL - Superfund Alternative Site 1 St Lawrence amp Raquett Rivers 412001 - 102001 52 (Est) 54 (Act) 35 PAHs Sediment 10
      86 (Act) PCBs 1
      TDBFs 0001
      2 RICHARDSON HILL ROAD LANDFILLPOND 1 South Pond and Herrick Hollow Creek 2004 285 (Act) 139 PCBs Sediment 1 1
      2 ROEBLING STEEL CO 5 Delaware River and Crafts Creek 2010-2013 116 (Est) Yes 11 PAHs Sediment See Attached
      240 (Act) Metals
      2 VINELAND CHEMICAL CO INC 3 River Areas (Blackwater Branch Floodplain amp Maurice River) 2006 - ongoing 626 Yes 11 ARSENIC Sediment 20 20 exposed 120 submerged
      4 Union Lake Sediments Remedy not yet initiated Unknown Yes Sediment Washing 129 ARSENIC Sediment Unknown 120
      2 YORK OIL CO 2 Contamination Pathways - Western Wetland 2000-2001 11 (Est) Yes 33 LEAD Sediment Not specified
      15 (Act) PCBs Complete Removal or 1
      Contamination Pathways - Northwestern Wetland 50 PCBs Sediment 1 Contingent on biological and chemical testing
      LEAD Not specified
      3 ATLANTIC WOOD INDUSTRIES INC 3 River Water and Sediments 2010-Ongoing 6 7 126 (Dredging and Disposal) tPAHs Sediment 45 to 100
      Region 3 Atlantic Wood Industries Website 157 (Est) 100
      3 EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL) 3 North Wetlands 1997 - 12897 95 (Act) Yes 12 3 CADMIUM Sediment 60
      LEAD 1200
      ZINC 5600
      5 South Wetlands 1997 - 12897 37 (Act) Yes 42 Unknown CADMIUM Sediment 60
      LEAD 1200
      Region 3 EI duPont Website ZINC 5600
      7 Christina River 51099 - 9899 11 (Act) Yes 47 Unknown CADMIUM Sediment 20
      LEAD 700
      ZINC 3000
      3 KOPPERS CO INC (NEWPORT PLANT) 1 Wetlands Ponds and Hershey Run ROD dateSeptember 2005 58 (Est) Unknown Re-channelize portion of Hershey Run 5176 PAHs Sediment 150
      Region 3 Koppers Co Inc Website Remedy not yet initiated
      3 METAL BANKS 1 RiverMudflat Sediments 2008-2010 12 (Est) Yes Unknown (Act) 1727 Unknown PCBs Sediment 1 1
      METAL BANK (Regional Website) OU Name SOIL EXCAVCONTAIN
      4 AMERICAN BRASS INC 1 Cedar Creek ROD dateAugust 2006 94 (Est) Yes 39 BORON Sediment 28
      COPPER 220
      Dunham Creek 38 (Est) LEAD 170
      American Brass Inc (Regional Website) ZINC 780
      PCB-1260 429
      4 AMERICAN CREOSOTE WORKS INC 0 Railroad Lake and Hughes Creek ROD date September 2007 40 (Est) Yes $20 (Total) TOTAL PAH Sediment 100
      American Creosote Works Inc(Regional Website)
      4 COPPER BASIN MINING DISTRICT SITE 5 Copper Basin ReachOcoee No 3 ReservoirParksville Reservoir ROD date September 2011 Area Not Specified (approx 14 river miles) 23 PCBs Sediment
      Arsenic Sediment
      Cadmium Sediment
      Copper Sediment 680 (Copper Basin Reach)
      640 (Ocoee 3 amp Parksville Reservoirs)
      Region 4 Copper Basin Mining District Site website Iron Sediment 57000 (CBR)
      53000 (O3R amp PR)
      Lead Sediment 145 (CBR)
      250 (O3R amp PR)
      Mercury Fish
      Zinc Sediment 2200 (CBR)
      970 (O3R amp PR)
      4 DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company) 2 Lower Roanoke River ROD dateSeptember 2008 143 river miles 196 Dioxin Fish 3 ppt
      Sediment Unknown
      Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website 4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment 0001
      4 KOPPERS CO INC (CHARLESTON PLANT) 1 Ashley River 7101 - 12101 0 (Est) $05 (ROD)3 (ESD) 282 PAHs Sediment Weight of Evidence Approach None
      3 (Act)
      Barge Canal 42003 ESD selected MNR for the area 32 (Est)0 (Act) 0 (Est)32 (Act) $045 (ROD) 01
      01 (ESD) Arsenic
      Region 4 Koppers Co Inc (Charleston Plant) North Marsh Sediments No info 15 (Act) 1000 linear feet 025 acre (Est)1300 linear feet (Act) 17 23
      South Marsh Sediments 3103 - 6103 19 tons (Act) 15 (Est)2 (Act) Lead
      4 SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION 2 Twelve Mile CreekLake Hartwell ROD date62894 730 (Est) 321 PCBs Fish 2
      Lake Hartwell (Regional Website) Sediment 1
      4 TENNESSEE PRODUCTS 1 Chattanooga Creek - Middle Reach September 2005 - September 2007 142 (Est) $94 (ROD) PAHs Sediment Visual
      Region 4 Tennesse Products Website 107000 tons (Act)Followed by capping 71 (Act)Aquablock $257 (ESD)
      Chattanooga Creek NTCRA 1997-1998 229 Yes Visual
      4 TRIANATENNESSEE RIVER 0 Reach AHuntsville Spring Branch - Indian Creek 4186 - 101487 Rerouted river buried in-place sediments DDT Fish (channel catfish) No sediment CUL 5
      Region 4 TrianaTennessee River Website Fish (smallmouth buffalo) No sediment CUL
      Fish (largemouth bass) No sediment CUL
      4 WARD TRANSFORMER Reach A (Removal Action) June 2007 - 2009 150000 tons (Est)Approx 400000 tons (Act) PCB Sediment 1
      Region 4 Website 1 Reach B C D and lower Brier Creek ROD dateSeptember 2008Remedy not yet initiated 13 (soil and sediment) (Est) Yes $37 (Total) PCB Sediment 1
      Fish 005
      Brier Creek Reservoir Lake Crabtree and Lower Crabtree Creek ~25 river miles Sediment None
      Fish 005
      5 CONTINENTAL STEEL 3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est) 12 BENZO(A)PYRENE Sediment 8 16
      BENZO(BampK)FLOURANTHENE 7 14
      BENZO(A)ANTHRACENE 95 19
      INDENO(123-CD)PYRENE 465 093
      ARSENIC 19
      BERYLLIUM 084
      ARCHLOR-1016 3 1
      ARCHLOR-1242 3 1
      ARCHLOR-1254 3 1
      ARCHLOR-1248 3 1
      ARCHLOR-1260 3 1
      Region 5 Continental Steel Website 4 Markland Avenue Quarry 3252008 - 612010 175 Yes297000 cy 11 BENZO(A)ANTHRACENE Sediment 05
      BENZO(A)PYRENE 05
      BENZO(BampK) FLOURANTHENE 08
      DI-BENZ(AH) ANTHRACENE 02
      INDENO(123-CD)PYRENE 04
      ARCHLOR-1248 1
      ARSENIC 19
      LEAD 400
      5 FOX RIVER NRDAPCB RELEASESProposed to be added to the NPL 1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 PCBs Sediment 1 025 (SWAC)
      2 Appleton to Little Rapids MNR RemedyROD Date 122002 3 (Est) Yes 273 (Est) 20 river miles 136 (Est) 390 (2005 ROD Amendment) Sediment
      3 Little Rapids to De Pere 42009 - ongoing 227 (Est) Sediment 1 SWAC 028
      Fish (Walleye) 005
      Lower Fox River Cleanup Website 4 De Pere to Green Bay 2007 - ongoing 3216 (Est) Sediment 1 SWAC 025
      Fish (Walleye) 005
      5 Green Bay MNR RemedyROD Date 62003 Approx 2700 sq miles Sediment 1
      701(2010 ESD)
      5 KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER) 0 Kress Creek Site Summer 2005 - 2012 43 (Est) Yes $719 (Total) 128 RADIUM 226 Sediment 72 picoCuries per gram (pCig) combined radium
      Region 5 Kerr-McGee Website 129 (Act) RADIUM 228
      5 LITTLE MISSISSINEWA RIVERNot on the NPL - Other Cleanup Activity Private Party-Lead Cleanup 0 Little Mississinewa River Spring 2005 - Fall 2009 57 (Est)100000 tons (Act) Yes 25 miles (Est) 27 20 PCBs Sediment 4 (0-1ft) 5 (deeper than 1ft) 1 (0-1ft)5 (deeper than 1ft)
      Little Mississinewa River(Region 5 Website) Fish Unknown
      5 OUTBOARD MARINE CORP 1 North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below 71992 to 91992 55 (Est) Yes 074 PCBs Sediment Unknown
      Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below 1991-1992 523 (EST)30 (ACT) 131 50 (upper harbor)
      OUTBOARD MARINE CORP (Region 5 Website) 4 formerly 1 OMC Plant 2 North and South DitchROD Date August 20072012 ROD Amendment 2010-2012 40 (soil and sediment) (Est) Yes 73 PCBs Sediment 1
      PAHs 2
      1 HarborSlip No 3(2009 ROD Amendment) 2012-2013 195 (Est) Yes 349 PCBs Fish (Sport) 003 - 01
      Sediment 1 02 (SWAC)
      5 SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI) 2 Area 9 -- Lake Embayment 1295 - 0697 36 (Est) Yes PCBs Sediment 05
      54 (Act)
      5 SHEBOYGAN HARBOR amp RIVER 1 Lower River and Inner Harbor Completed in 2012 53 (ROD)51 (ESD) Yes (ROD) 12 PCBs Sediment 26 05
      51 (ACT) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Region 5 Sheboygan River and Harbor Superfund Site Website Middle River Remedy not yet startedAOC dateFebruary 2009 7 miles 2 Sediment 26 05
      Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Upper River Sept 2004 - October 2007 21 (Est) 31 Sediment None (88 mass removal of PCB) 05
      21 (Act) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      5 Torch Lake 2 Surface Waters ROD DateMarch 311994 No Action Copper
      NPL DeletionFeb 5 2002
      5 VELSICOL CHEMICAL CORP (MICHIGAN) 2 Pine RiverSt Louis Impoundment 1999 - 2005 640 (Act) Yes Unknown area(2 ft compacted clay) $60 (Total) $30 (as of 2002) DDT Carp Smallmouth Bass 1708
      Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5 15
      Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000
      6 ALCOA (POINT COMFORT)LAVACA BAY 1 Natural Recovery Areas 122001 - ongoing Area not specified 161 MERCURY Sediment Hg 025 Marsh 05 Open Water
      North of Dredge Island NA Actual ROD PAHs 448 Total
      Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act) PAHs
      Witco Marsh 12006 - 42006 57
      Chlor-Alkali Process Area (Treatability Study) August 1998 (Phase I)January 1999 (Phase II) 80 (Act) 1952 MERCURY Mass removal
      6 BAILEY WASTE DISPOSAL 1 North Marsh Area January 1996 - September 1996 6 (EST) Unknown Sediment None
      20 (tar and sediment) (Act)
      Deleted from NPL 10152007
      6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995 47 (ROD Est)150 (ESD Est)170 (Act) Yes 226 PAHs Sediment 1300
      8 MILLTOWN RESERVOIR SEDIMENTS 1 Milltown Reservoir Sediments Remediation completed Dec 2010 2600 (Est) Yes Channel realignment and construction 140 ARSENICCADMIUMCOPPERLEADZINC Sediment None
      Region 8 Milltown Reservoir Sediments Website 2560 (Act)
      8 ROCKY MOUNTAIN ARSENAL (USARMY) 3 Lake Sediments Remediation Project June 1999 - Aug 1999 19 (Est) Yes (Est) Area not specified 39 ALDRIN Sediment 38
      33 (Act) No (Act) DIELDRIN 37
      CHLORDANE 12
      ROCKY MOUNTAIN ARSENAL (Region 8 Website) DDE None
      DDT 14
      ROCKY MOUNTAIN ARSENAL (US Army Website) MERCURY 82
      ARSENIC 270
      8 SHARON STEEL CORP (MIDVALE TAILINGS) 1 Marshy Area Aug 1996 - Sept 1996 436 (Est) Yes (elevation raised above water line) 047 ARSENIC Sediment 70
      Deleted from NPL 9242004 100 (Act) LEAD 500
      CADMIUM None
      8 SILVER BOW CREEKBUTTE AREA 1 Streamside Tailing (Silver Bow Creek) July 1999 - Ongoing 73 (ROD Est) Yes Channel realignment and construction (176 miles) $44 (ROD)$98 (ESD) ARSENIC Sediment None 200 979
      CADMIUM 20 099
      COPPER 1000 316
      SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website) LEAD 1000 358
      ZINC 1000 None
      SILVER BOW CREEKBUTTE AREA (MT STATE Website) Sediment Trap MERCURY 10 018
      9 IRON MOUNTAIN MINE 5 Spring Creek Arm 2008-20011 200 (Est) 15 area not specified 186 ARSENIC Sediment Sediment susceptible to erosion dredged to a specific elevation None
      ROD dateSeptember 2004 COPPER
      Region 9 Iron Mountain Mine Website IRON
      9 MCCORMICK amp BAXTER CREOSOTING CO 3 Old Mormon Slough 2006 88 (Est) area not specified 35 DIOXIN Sediment 000021 TEQ 0000021 TEQ
      Region 9 Website McCormick and Baxter Creosoting 88 (Act) PAHs 333 (OC) 333 (OC)
      9 MOFFETT NAVAL AIR STATION 8 Site 27 - Northern Channel completed in 12007 656 (soil and sediment) (Est) Yes 68 TOTAL PCBs Sediment 035 035
      TOTAL DDT 00648 00648
      TOTAL CHLORDANE 0931 0931
      CADMIUM 184 184
      Naval Air Station Moffett Field Website LEAD 173 173
      MERCURY 152 152
      SELENIUM 0926 0926
      SILVER 137 137
      ZINC 720 720
      9 MONTROSE CHEMICAL CORP 5 Palos Verde Shelf Interim ROD Date September 2009 300 Area not specified DDT Sediment 46 (OC) interim23 (OC) Final
      White Croaker 04
      Water 022 ngL
      Palos Verdes Shelf (Region 9 Website) PCBs Sediment 7 (OC)
      White Croaker 007
      Water 0064 ngL
      9 UNITED HECKATHORN CO 1 Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)65 (Proj) Yes 7 DDT Sediment dredge all soft sediments 059 (average)
      Region 9 United Heckathorn Co Website
      10 Bunker Hill Mining and Metallurgical 3 Upper Basin ROD Amendment date Aug 2012 Not specified Arsenic Sediment
      Cadmium
      Runker Hill Mining and Metallurgical (Regional Website) Copper
      Lead 530
      Mercury
      Silver
      Zinc
      10 COMMENCEMENT BAY NEAR SHORETIDE FLATSPartial deletion (St Paul Waterway) 1996 1 Olympic View Resource Area (NTCRA) Completed in 102002 11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ 000002 TEQ
      COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website) 19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 20 (Est) 174 ARSENIC Sediment preponderance of evidence approach 93
      10 (Act) COPPER 390
      LEAD 450
      ZINC 410
      1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13 067
      1 Sitcum Waterway completed in 1994 428 (Act) 45 (Act) 4 ARSENIC Sediment 160 57
      COPPER 1100 390
      1 Hylebos Waterway 32003-22005 940 11 20 46 ARSENIC Sediment 97 57
      HEX-CB 01 0022
      HPAHs 32 17
      PCBs 045 03
      Occidental Site Removal Action (NTCRA) completed March 2003 36 (Act) 10 PCE Sediment 0057
      1 Thea Foss and Wheeler-Osgood Waterways 2002-2006 423 (Act) 32 (Est) 21 (Est) 4 (Est) 60 82 CADMIUM Sediment 66 51
      HPAHs 22 17
      LEAD 580 450
      MERCURY 077 059
      ZINC 490 410
      1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes 22 (Act) 05 (Act) 87 (Act) 125 COPPER Sediment 470 390
      MERCURY 071 059
      LPAHs None 52
      HPAHs None 17
      10 HARBOR ISLAND (LEAD) 7 Lockheed Sediments 7703 - 2405 18 cy (Est) 5 (Act) 12 (Act) In dredge areas $15(ROD) $12(ESD) 20 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      70 (Act) COPPER 390 (Dredge and Cap) 390
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      LEAD 530 (Dredge) 450 (Cap) 450
      LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      MERCURY 059 (Dredge) 041 (Cap) 041
      Region 10 Harbor Island (Lead) Web Site PCBs 65(OC) (Dredge) 12(OC) (Cap) 12 (OC)
      ZINC 960 (Dredge) 410 (Cap) 410
      TBT Not available Not available
      9 Todd Shipyard Sediments 7604 - 22007 5 (Act)(223235 sq ft) Yes In dredge areas No area given $45-$69 21 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      COPPER 390 (Dredge and Cap) 390
      LEAD 530 (Dredge) 450 (Cap) 450
      MERCURY 059 (Dredge) 041 (Cap) 041
      116 (Est) ZINC 960 (Dredge) 410 (Cap) 410
      220 (Act) LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      PCBs 65 (OC) (Dredge)12(OC) (Cap) 12 (OC)
      TBT Not available not available
      10 East Waterway Sediments NTCRA 11204 - 31605 (removal action)No ROD completed for this OU 206 (Act) - Removal action 13 (Act) In dredge area 17 16 MERCURY Sediment 041
      PCBs 12 (OC)
      10 KETCHIKAN PULP COMPANY 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est) 87 (Act) Yes 50 (Est) 52 (Act) 21 (Est) 27(Act) 44 31 4-METHYL-PHENOL Sediment 17 Not Stated Benthic toxicity community structure and chemistry
      Not on the NPL - Superfund Alternative Sited AMMONIA 120
      Region 10 Ketchikan Pulp Company Web Site SULFIDE None
      10 LOCKHEED WEST SEATTLE 1 Lockheed West ROD Date August 2013 167 potential use in shallow areas yes 116 DredgeEMNR 477 PCB Sediment Washington State CSL or SQS 0002
      Arsenic 7
      Lead 11
      Copper 114
      Lockheed West Seattle (Region 10 Website) Mercury 041 (subtidal)017 (intertidal)
      284 EMNR only Carcinogenic PAHs (TEQ) 0009
      TBT 043 (subtidal)2 (intertidal)
      DioxinsFurans 0000002
      Multiple Others see attached
      10 MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT) 4 Sediments 72004-92005 23 (Act)organoclay 23 12 ARSENIC Sediment 12
      Region 10 McCormick and Baxter Creosoting DIOXINSFURANS 000008
      ORDEQ McCormick amp Baxter Creosoting Co Web Site 15 (Est) PAHs 2
      PCP 100
      Arsenic (III) Water 190 μgL
      Chromium (III) 210 μgL
      Copper 12 μgL
      Zinc 110 μgL
      PCP 13 μgL
      Acenaphthene 520 μgL
      Fluoranthene 54 μgL
      Naphthalene 620 μgL
      Total cPAHs 031 μgL
      Dioxinsfurans 1x10-5 ngL
      10 OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA) 1 Clam Bay Sediments 61999 - 102001 7-10 (Est) Yes Area not specified 5 46 71 PCBs Sediment 013 004
      COPPER 390
      LEAD 450
      ZINC 410
      10 (Act) SILVER 61
      2 4-DIMETHYL-PHENOL 0029
      PCBs Shellfish (intertidal clams) 0042
      10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005 35 (Est) 50 (Est) 49 15 LMWPAHs Sediment 780(OC) 370(OC)
      58 (Act) HMWPAHs 5300(OC) 960(OC)
      98 (Act) Capped dredge areas PCBs 12 (OC) (trigger for sediments to 10 feet depth) 12 (OC)
      10 PUGET SOUND NAVAL SHIPYARD COMPLEX 2 OUB Marine 61600 - 3104 200 (Est) 5 211 9 12 PCBs Fish (English sole) 0023 ww
      Sediment 12 (OC) dredgecap 6 (OC) EMNR 3 (OC) SWAC12 (OC)) SWAC
      225 (Act) Sediment in state owned adjacent lands 9 (OC) EMNR
      MERCURY Sediment 3 where PCBs greater than 6 (OC)
      10 ST MARIES CREOSOTE - proposed to be added to the NPL 0 Shoreline Nearshore and Offshore Sediment ROD dateJuly 2007 29 (Est) Yes 108 LPAHs Sediment 370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)
      St Maries Creosote (Regional Website) Remediation Ongoing HPAHs 960 (OC) (17 if TOC lt02or gt4)
      10 WYCKOFF COEAGLE HARBOR 1 East HarborPhase 1 - NTCRA 91993 -31994 (Phase 1) 54 (Act) 117 MERCURY Sediment (toxicity test opt-out)
      LPAHs 780 (OC)
      Region 10 Wyckoff Eagle Harbor Web Site HPAHs 5300 (OC)
      East HarborWest Beach Sediments 2007-2008 48 (Act) 23 MERCURY Sediment 059 subtidal 059
      LPAHs 780 (OC) subtidal 780 (OC)
      HPAHs 5300 (OC) subtidal 5300 (OC)
      East HarborIntertidal and Subtidal Sediments 2000-2002 30(Act) $6-20 MERCURY Sediment 059 059
      LPAHs 780 (OC) 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      3 West Harbor 31997 - 121997 13-92 (Est) Yes 12 - 31 (includes EMNR) 49 see cap $62 - $16 MERCURY Sediment 5 21059 059 (dw)
      LPAHs 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      71
Page 5: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

PCBs 36

Pyrene 3

Copper 00529

Nickel 00337

NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp

Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1

MERCURY Sediment 10 (EMNR)

MERCURYFish (largemouth bass yellow perch bullhead)

048

PINE STREET CANAL 2002-2004

2004 78 (Act) (GeotextileSand Cap)

PAHs

Region 1 Pine Street Canal Website 82010 - 22011 08

2011 organoclay cap (size not specified)

Metals and Cyanide

SULLIVANS LEDGE 19 (Est)

86 (Act)

52 (Est)

255 (Act)

BATAVIA LANDFILL 25 (Est) PAHs

22001 - 122001 Yes

Unnamed Stream Ponds A and B 1998-2002

Turning Basin Pine Street Canal and Wetlands

Middle Marsh Wetlands 1998-2001

1

Nyanza Chemical Waste DumpRegion 1 Website

Region 1 Sullivans Ledge website

4

1

1

20 uggC

20 uggCPCBs

Sediment

PCBs

2 28Yes

Yes

36

NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals

Visual13 (soil and sediment)

75 (soil and sediment)

LEAD

Sediment

46000 tons (Act)(cyds not provided)

Sudbury River

McAllister Point Landfill (Narrangasett Bay)

ROD Date September 2010

226

Sediment

3

Area not specified 85

00529

44

ER-M Values

1

84

00337

ER-M Values

Porewater

1

EDUCATION amp TRAINING CENTER

NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website

1

4

Sediment1

Yes

Deleted from NPL Act Wetland

upper portion of stream diverted

2 1 Wetland Areas June 2001 - June 2003

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

BRIDGEPORT RENTAL amp OIL SERVICES

PCBs 10

LEAD 1000

Total Petroleum Hydrocarbons None

LEAD 250

PCBs 5

3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment

St Lawrence River 61995 - 111995 13 (Act) 2 (Act)

Turtle CreekTurtle Cove 1004 - 305

23 (Act) (soil and sediments)

01

Raquette River 602 - 503 14 (Act)

GOWANUS CANAL ROD Date Sept 2013588 (Est)

Area not stated (dredgecap remedy)

In-situ stabilization of 3-5 feet of NAPL-containing sediments

PAHs

Holding Tanks for CSO Control

Copper

Lead

Grasse River Superfund Site(aka Alcoa Aggregation Site)

2431 Sediment 1

Yes Area not specified

Region 2 Bridgeport Rental amp Oil Services Website

175 (Est) 106 (Est)

1

Little Timber Creek Swamp

2 Sediment

20

80

94

g

None

125 Sediment

LEAD 11292005

area volume not specified

2

2

BURNT FLY BOG

2Downstream Area and Westerly Wetlands

400049

2

11795 - 1996

gt6000 tons (Act) (soil and sediment)

10

1000

ROD dateSeptember

Sediment

PCBs Sediment

22

1

1

GENERAL MOTORS (CENTRAL FOUNDRY DIVISION)

1

Gowanus Canal (Region 2 Website)

215 01

Canal Sediments

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Grasse River(Region 2 Website) Fish

001-005 (Final Remedial Goal)

026-036(Interim Target Concentrations)

HOOKER (102ND STREET) Sediment 01

(organics)

Deleted from NPL 852004 Sediment 02

(Mercury)

Fish 005

Sediment 3 gm2 (MPA)Sediment 10 gm2 (MPA)Fish 005SedimentFish 005

(change in ESD from dredging to excavation)

981 (Est) ROD 21

85000 Tons (Act) ESD 50-75

2

LOVE CANAL

Deleted from NPL 9302004

2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001

Biological Sampling None

Sediment 100

56 (Est)

Sediment Excavate up to 1 ft

580 (Est)

HUDSON RIVER PCBS

ROD Date April 2014

Upper Hudson River (Section 2)

Grasse River

Hudson River PCBs EPA Website Upper Hudson

River (Section 3) 510 (Est)

None

0001

Not specified

New York State Sediment TBCs

11

PCBs284

$36 - 56

2 109 Yes

Yes2 1 Niagara River Embayment 71996 - 111996 28 (dredge

to 2 feet)

PCBs

1

PAHs METALS CHLORINATED ORGANICS (MULTIPLE)

22502 2

Upper Hudson River (Section 1)

ROD dateFebruary 20 Area not specified

1560 (Est)

Yes

2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001

485 CADMIUM

INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC

Sediment

CADMIUM

Biological Sampling

100

2

MARATHON BATTERY CORP 1

East Foundry Cove Marsh and Constitution Marsh

91993 - 31995

Actual not sp

30 (Est)

Deleted from NPL 10181996 2

East Foundry Cove West Foundry Cove and the Cold Spring Pier Area

91993 - 31995

Yesbentonite clay layer

40

95 Removal 10 mgkg

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

ROD dateJuly 2005

MERCURY and others Sediment 014-2

Operations Ongoing

5LCP Bridge St SiteWest Flume and Wetland AB

June 2005 - July 2007

543 (Est)917 (Act) Yes 96 MERCURY Sediment 02

MERCURY and others Sediment

Mercury Fish 01-03

Sediment Soil (flood plain)

Fish 01 - 03

Raritan Bay Slag

Raritan Bay Slag (Region 2 Website)

52 (Est) PAHs 1086 (Act) PCBs 1

TDBFs 0001

2RICHARDSON HILL ROAD LANDFILLPOND

1South Pond and Herrick Hollow Creek

2004 285 (Act) 139 PCBs Sediment 1

116 (Est) PAHs

240 (Act) Metals

3

River Areas (Blackwater Branch Floodplain amp Maurice River)

2006 - ongoing 626 Yes 11 ARSENIC Sediment 20

4 Union Lake Sediments Remedy not yet initiat Unknown Yes Sediment

Washing 129 ARSENIC Sediment Unknown

2000-2001 11 (Est) LEAD Not specified

METHYL Hg Fish

2

ONONDAGA LAKE

Region 2 Onondaga Lake Website

03

0 400

See Attached

20 exposed 120 submerged

1

Lead 400Sediment787ROD Date May 2013 34 (Est)

425 (Est) 1771 154 (Est)

2

2 Onondaga Lake Bottoms Subsite 2407 (Est)

Geddes Brook NineMile Creek Reach BC CD

ROD DateApril 2009

June 2012 - ongoing

59 (Est)20

24Geddes Brook NineMile Creek Reach AB

414

Combined with Dredge volume

Yes

151

Partial Channel Re-location

June 2012 - 16 (Est) 42 (Est) Yes MERCURY and others

015

54 (Act) Sediment

189

2

REYNOLDS METALS CO

Not on the NPL - Superfund Alternative Site

1 St Lawrence amp Raquett Rivers 412001 - 102001 35

ROEBLING STEEL CO 5 Delaware River and

Crafts Creek Sediment2010-2013 Yes2 11

2 VINELAND CHEMICAL CO INC

120

08

015

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

15 (Act) PCBs

Complete Removal or

1

PCBs

1 Contingent on biological and chemical testing

LEAD Not specified

ATLANTIC WOOD INDUSTRIES INC 6 7 45 to 100

Region 3 Atlantic Wood Industries Website

157 (Est) 100

CADMIUM 60LEAD 1200ZINC 5600CADMIUM 60LEAD 1200

ZINC 5600

CADMIUM 20LEAD 700ZINC 3000

KOPPERS CO INC (NEWPORT PLANT)

ROD dateSeptember 2005

Region 3 Koppers Co Inc Website

Remedy not yet initiated

METAL BANKS RiverMudflat Sediments

METAL BANK (Regional Website)

OU Name SOIL EXCAVCONTAIN

BORONCOPPERLEADZINC

PCB-1260

Sediment

Unknown

Contamination Pathways - Northwestern Wetland

River Water and Sediments

1

PAHs

3

2010-Ongoing

Cedar Creek

Dunham Creek

Christina River

1727

39

37 (Act)

Yes

Yes

Unknown (Act)

Yes

33

Yes

2

50

Contamination Pathways - Western Wetland

126 (Dredging and Disposal)

Sediment

Sediment

2 YORK OIL CO

Sediment

Sediment

tPAHs3 3

12

7 51099 - 9899 11 (Act)

425 South Wetlands 1997 - 12897

95 (Act)

3

3 North Wetlands 1997 - 12897EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL)

Region 3 EI duPont Website

150

47

Sediment 1

Unknown

Sediment

Re-channelize portion of Hershey Run

Sediment

Unknown

PCBs12 (Est)

58 (Est) Unknown3 1

3 1 2008-2010

Wetlands Ponds and Hershey Run

4 1 ROD dateAugust 2006

94 (Est)

38 (Est)Yes

AMERICAN BRASS INC

American Brass Inc (Regional Website) 429

170780

22028

Yes

Sediment

5176

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

AMERICAN CREOSOTE WORKS INC

American Creosote Works Inc(Regional Website)

Arsenic Sediment

Cadmium Sediment

Fish 3 ppt

Sediment

$20 (Total) TOTAL PAH Sediment 100

DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company)

ROD dateSeptember 2008

Unknown

23

Mercury

143 river miles Dioxin

0

PCBs

196

53000 (O3R amp PR)

57000 (CBR)

640 (Ocoee 3 amp Parksville Reservoirs)

680 (Copper Basin Reach)

5

2200 (CBR)

2

4

Lower Roanoke River

4

Sediment

970 (O3R amp PR)

Sediment

Iron Sediment

Sediment

250 (O3R amp PR)

Yes

Sediment

COPPER BASIN MINING DISTRICT SITE

Copper Basin Reach

Ocoee No 3 Reservoir

Parksville Reservoir

ROD date September 2011

Fish

Region 4 Copper Basin Mining District Site website

4 ROD date September 2007 40 (Est)

Copper

Zinc

Area Not Specified (approx 14 river miles)

Railroad Lake and Hughes Creek

Lead

145 (CBR)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website

4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment

0 (Est) 3 (Act)

$045 (ROD)

01 (ESD)

North Marsh Sediments No info 15 (Act)

1000 linear feet 025 acre (Est)1300 linear feet (Act)

SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION

Fish 2

Lake Hartwell (Regional Website) Sediment

TENNESSEE PRODUCTS 142 (Est) $94 (ROD) Visual

107000 tons (Act)Followed by capping

71 (Act)Aquablock $257 (ESD)

Chattanooga Creek NTCRA 1997-1998 229 Yes Visual

TRIANATENNESSEE RIVER

Fish (channel catfish)

Region 4 TrianaTennessee River Website

Fish (smallmouth buffalo)

Fish (largemouth bass)

WARD TRANSFORMER

Reach A (Removal Action) June 2007 - 2009

150000 tons (Est)Approx 400000 tons (Act)

PCB Sediment

Region 4 Website Sediment

Fish 005

PAHs

Arsenic

Region 4 Tennesse Products Website

1

1

4 1

Ashley River 7101 - 12101

South Marsh Sediments

Barge Canal

Region 4 Koppers Co Inc (Charleston Plant)

KOPPERS CO INC (CHARLESTON PLANT)

0001

32 (Est)0 (Act)

0 (Est)32 (Act)

3103 - 6103

SedimentWeight of Evidence Approach

$05 (ROD)3 (ESD)

Lead

42003 ESD selected MNR for the area

19 tons (Act) 15 (Est)2 (Act)

730 (Est)

17

282

23

01

321 PCBs

1

4 2Twelve Mile CreekLake Hartwell

ROD date62894

Chattanooga Creek - Middle Reach

September 2005 - September 2007 PAHs Sediment

4 0

Reach AHuntsville Spring Branch - Indian Creek

4186 - 101487 DDT 5

Rerouted river buried in-place sediments

No sediment CUL

4Reach B C D and lower Brier Creek

13 (soil and sediment) (Est)ROD date

S t b 2008

Yes

No sediment CUL

No sediment CUL

1

1

None

4

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Sediment

Fish 005

BENZO(A)PYRENE 8

BENZO(BampK)FLOURANTHENE 7

BENZO(A)ANTHRACENE 95

INDENO(123-CD)PYRENE 465

ARSENICBERYLLIUMARCHLOR-1016 3ARCHLOR-1242 3ARCHLOR-1254 3ARCHLOR-1248 3ARCHLOR-1260 3BENZO(A)ANTHRACENE

BENZO(A)PYRENE

BENZO(BampK) FLOURANTHENEDI-BENZ(AH) ANTHRACENEINDENO(123-CD)PYRENEARCHLOR-1248ARSENICLEAD

1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 Sediment 1

2 Appleton to Little Rapids

MNR RemedyROD Date 122002 3 (Est) 20 river

miles Sediment

Sediment 1

Fish (Walleye) 005

Sediment 1

Fish (Walleye) 005

MNR RemedyROD Date 62003

Approx 2700 sq miles

1

701(2010 ESD)

5 PCBs

1

CONTINENTAL STEEL

Region 5 Continental Steel Website

FOX RIVER NRDAPCB RELEASES

Proposed to be added to the NPL

Lower Fox River Cleanup Website

4

Sediment

02

04

119

PCBBrier Creek Reservoir Lake Crabtree and Lower Crabtree Creek

September 2008

Remedy not yet initiated

12

~25 river miles

$37 (Total)

4 Markland Avenue Quarry 3252008 - 612010

5

3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est)

08

1

400

Sediment

14

19

1

11

175Yes

297000 cy

SWAC 025

SWAC 028

11

390 (2005 ROD Amendment)

3273 (Est) 136 (Est)

3216 (Est)

227 (Est)

De Pere to Green Bay 2007 - ongoing

Little Rapids to De Pere 42009 - ongoing

Yes

5 Green Bay

05

Sediment

025 (SWAC)

05

16

19084

093

None

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER)

43 (Est) Yes RADIUM 226

Region 5 Kerr-McGee Website 129 (Act) RADIUM 228

LITTLE MISSISSINEWA RIVER

Not on the NPL - Other Cleanup Activity Private Party-Lead Cleanup

Sediment4 (0-1ft) 5 (deeper than 1ft)

Little Mississinewa River

(Region 5 Website)

Fish Unknown

North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below

71992 to 91992 55 (Est) Yes 074

Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below

1991-1992523 (EST)

30 (ACT)131

2010-2012 PCBs 1

PAHs 2

Fish (Sport) 003 - 01

1 (0-1ft)5 (deeper than 1ft)

72 picoCuries per gram (pCig) combined radium

Yes

57 (Est)

100000 tons (Act)

Kress Creek Site

5 0 Little Mississinewa River

Spring 2005 - Fall 2009

5 0 Summer 2005 - 2012

2012-2013 195 (Est)

$719 (Total) Sediment128

PCBs25 miles (Est) 27 20

OUTBOARD MARINE CORP (Region 5 Website)

4 formerly 1

1HarborSlip No 3(2009 ROD Amendment)

Sediment

PCBs

5

OUTBOARD MARINE CORP 1

Yes40 (soil and sediment) (Est)

Unknown

50 (upper harbor)

Sediment

73

OMC Plant 2 North and South DitchROD Date August 2007

2012 ROD Amendment

Yes PCBs349

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

36 (Est)

54 (Act)

53 (ROD)51 (ESD) Sediment 26

51 (ACT)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Sediment 26Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

21 (Est) SedimentNone (88 mass removal of PCB)

21 (Act)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Copper

VELSICOL CHEMICAL CORP (MICHIGAN)

640 (Act) Carp Smallmouth Bass 1708

Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5

Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000

Natural Recovery Areas 122001 - ongoing Area not

specified

North of Dredge Island NA Actual ROD

Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act)

MERCURY

Pine RiverSt Louis Impoundment

05

Sediment

Amendment)

PCBsYes Sediment

Sediment 1

5

SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI)

2 Area 9 -- Lake Embayment 1295 - 0697

SHEBOYGAN HARBOR amp RIVER

1

Lower River and Inner Harbor Completed in 2012

Region 5 Sheboygan River and Harbor Superfund Site Website

Middle River

Remedy not yet startedAOC dateFebruary 2009

02 (SWAC)

05

05

05

Yes (ROD)

7 miles

12

PCBs

Sept 2004 - October 2007

5 DDT

Unknown area

5 Torch Lake 2

Yes

6

$60 (Total)

ALCOA (POINT COMFORT)LAVACA BAY

1PAHs 448 Total

Upper River 31

Surface WatersNPL DeletionFeb 5 2002

ROD DateMarch 311994

5

$30 (as of 2002)2 1999 - 2005

No Action

161

15

Hg 025 Marsh 05 Open Water

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Witco Marsh 12006 - 42006 57

Chlor-Alkali Process Area (Treatability Study)

August 1998 (Phase I)January 1999 (Phase II)

80 (Act) 1952 MERCURY Mass removal

20 (tar and sediment) (Act)

6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995

47 (ROD Est)150 (ESD Est)170 (Act)

Yes 226 PAHs Sediment 1300

MILLTOWN RESERVOIR SEDIMENTS

2600 (Est)

Region 8 Milltown Reservoir Sediments Website

2560 (Act)

ROCKY MOUNTAIN ARSENAL (USARMY) 19 (Est) Yes (Est) ALDRIN 38

DIELDRIN 37

CHLORDANE 12

ROCKY MOUNTAIN ARSENAL (Region 8 Website)

DDE None

DDT 14

ROCKY MOUNTAIN ARSENAL (US Army Website)

MERCURY 82

ARSENIC 270

SHARON STEEL CORP (MIDVALE TAILINGS)

1 436 (Est) ARSENIC 70

Sediment None

PAHs

North Marsh Area Unknown Sediment None

6 (EST)

8 1 Milltown Reservoir Sediments

Remediation completed Dec 2010

Deleted from NPL 10152007

6

BAILEY WASTE DISPOSAL

1 January 1996 - September 1996

Yes

39 Sediment

Channel realignment and construction

ARSENICCADMIUMCOPPERLEADZINC

140

8 3Lake Sediments Remediation Project

June 1999 - Aug 1999

No (Act)33 (Act)

Yes

Area not specified

Aug 1996 - Sept

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

100 (Act) LEAD 500

CADMIUM None

ARSENIC 200 979CADMIUM 20 099

COPPER 1000 316

LEAD 1000 358

ZINC 1000 None

SILVER BOW CREEKBUTTE AREA (MT STATE Website)

Sediment Trap MERCURY 10 018

2008-20011 ARSENIC

COPPERRegion 9 Iron Mountain Mine Website

IRON

MCCORMICK amp BAXTER CREOSOTING CO

88 (Est) DIOXIN 000021 TEQ

Region 9 Website McCormick and Baxter Creosoting

88 (Act) PAHs 333 (OC)

TOTAL PCBs 035TOTAL DDT 00648TOTAL CHLORDANE 0931

CADMIUM 184LEAD 173MERCURY 152SELENIUM 0926SILVER 137ZINC 720

MONTROSE CHEMICAL CORP DDT Sediment

White Croaker 04

Water

Palos Verdes Shelf (Region 9 Website) PCBs Sediment

White Croaker 007

Water

9 300 Area not specifiedPalos Verde Shelf

46 (OC) interim23 (OC) Final

00648

Sediment

(elevation raised above water line)

047

SILVER BOW CREEKBUTTE AREA

1 Streamside Tailing (Silver Bow Creek)

Deleted from NPL 9242004

Marshy Area

1996

Sediment

Channel realignment and construction (176 miles)

July 1999 - Ongoing 73 (ROD Est) Yes None

0000021 TEQ

Yes

Sediment susceptible to erosion dredged to a specific elevation

None186

Sediment

Sediment$44 (ROD)$98 (ESD)

15 area not specified9

IRON MOUNTAIN MINE

5 Spring Creek Arm 200 (Est)

8

ROD dateSeptember 2004

SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website)

9 3 Old Mormon Slough 2006

9

MOFFETT NAVAL AIR STATION

8 Site 27 - Northern Channel completed in 12007

Naval Air Station Moffett Field Website

68

area not specified 35

173152

0064 ngL

Sediment

0931656 (soil and sediment) (Est)

035

333 (OC)

184

0926137720

022 ngL

7 (OC)

8

5 Interim ROD Date September 2009

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

UNITED HECKATHORN CO

Region 9 United Heckathorn Co WebsiteBunker Hill Mining and Metallurgical 3 Arsenic

CadmiumRunker Hill Mining and Metallurgical (Regional Website)

Copper

LeadMercurySilverZinc

COMMENCEMENT BAY NEAR SHORETIDE FLATS

Partial deletion (St Paul Waterway) 1996

1Olympic View Resource Area (NTCRA)

Completed in 102002

11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ

20 (Est) ARSENIC10 (Act) COPPER

LEADZINC

1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13

ARSENIC 160COPPER 1100ARSENIC 97HEX-CB 01HPAHs 32PCBs 045

Occidental Site Removal Action (NTCRA)

completed March 2003 36 (Act) 10 PCE Sediment

CADMIUM 66HPAHs 22LEAD 580MERCURY 077ZINC 490COPPER 470MERCURY 071LPAHs NoneHPAHs None

18 cy (Est) ARSENIC 93 (Dredge) 57 (Cap)

70 (Act) COPPER 390 (Dredge and Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

Sediment

1752

57

000002 TEQ

530

dredge all soft sediments

preponderance of evidence approach

DDT SedimentYes 7 059 (average)Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)

65 (Proj)

10

COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website)

1 Sitcum Waterway completed in 1994 428 (Act)

19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 174 Sediment 390

450410

Sediment 39045 (Act) 4

1

Hylebos Waterway 32003-22005 940 11 20

17450

46

03

0022Sediment 17

05 (Act) 87 (Act)

4 (Est)

57

21 (Est)

Sediment

82 Sediment

125

60

390

22 (Act)

32 (Est)

059

1Thea Foss and Wheeler-Osgood Waterways

2002-2006 423 (Act)

1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes

HARBOR ISLAND

059410

57

390

960 (OC)

067

93

0057

51

ROD Amendment date Aug 201210 Upper Basin Not specified

9 1

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

LEAD 530 (Dredge) 450 (Cap)

LPAHs780(OC) (Dredge) 370(OC) (Cap)

MERCURY 059 (Dredge) 041 (Cap)

PCBs65(OC) (Dredge) 12(OC) (Cap)

ZINC 960 (Dredge) 410 (Cap)

TBT Not available

ARSENIC 93 (Dredge) 57 (Cap)

COPPER 390 (Dredge and Cap)

LEAD 530 (Dredge) 450 (Cap)

MERCURY 059 (Dredge) 041 (Cap)

116 (Est) ZINC 960 (Dredge) 410 (Cap)

220 (Act) LPAHs780(OC) (Dredge) 370(OC) (Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

PCBs65 (OC) (Dredge)12(OC) (Cap)

TBT Not available

MERCURY

PCBs

KETCHIKAN PULP COMPANY

4-METHYL-PHENOL 17

Not on the NPL - Superfund Alternative Sited

AMMONIA 120

Region 10 Ketchikan Pulp Company Web Site

SULFIDE None

PCB

0002

57

370 (OC)

Yes In dredge areas No area given

370 (OC)

041

12 (OC)

$15(ROD) $12(ESD) 20 Sediment

5 (Act)(223235 sq ft)

10

Todd Shipyard Sediments 7604 - 22007

Region 10 Harbor Island (Lead) Web Site

9

5 (Act)12 (Act) In dredge areas

10

(LEAD)

7 Lockheed Sediments 7703 - 2405

East Waterway Sediments NTCRA

11204 - 31605 (removal action)No ROD completed for this OU

206 (Act) - Removal action

13 (Act) In dredge area

$45-$69 21 Sediment

17 16 Sediment

21 (Est) 27(Act) 44Yes 50 (Est)

52 (Act) 31 Sediment

410

10 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est)

87 (Act)

Not Stated Benthic toxicity community structure and chemistry

Not available

390

450

12 (OC)

450

041

12 (OC)

041

410

960 (OC)

not available

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Arsenic

Lead

Copper

Mercury

Carcinogenic PAHs (TEQ)

TBT

DioxinsFurans

Multiple Others

MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT)

ARSENIC

Region 10 McCormick and Baxter Creosoting

DIOXINSFURANS

PAHs

PCP

Arsenic (III)

Chromium (III)

Copper

Zinc

PCP

Acenaphthene

Fluoranthene

10 Sediment

11

7

041 (subtidal)017 (intertidal)

114

see attached

0009

LOCKHEED WEST SEATTLE

Lockheed West Seattle (Region 10 Website)

Lockheed West ROD Date August 2013

116 DredgeE

MNR

284 EMNR only

1 167potential use in shallow areas

yes 477

54 μgL

520 μgL

13 μgL

10

190 μgL

23 12

Water

23 (Act)organoclay

4 72004-92005Sediments

000008

100

Sediment

ORDEQ McCormick amp Baxter Creosoting Co Web Site

15 (Est)

12 μgL

2

12

110 μgL

210 μgL

043 (subtidal)2 (intertidal)

Washington State CSL or SQS

0000002

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Naphthalene

Total cPAHs

Dioxinsfurans

PCBs 004COPPERLEADZINCSILVER2 4-DIMETHYL-PHENOL

PCBs Shellfish (intertidal clams) 0042

50 (Est) LMWPAHs 780(OC)

58 (Act) HMWPAHs 5300(OC)

98 (Act)Capped dredge areas

PCBs

12 (OC) (trigger for sediments to 10 feet depth)

Fish (English sole) 0023 ww

Sediment12 (OC) dredgecap 6 (OC) EMNR

Sediment in state owned adjacent lands

9 (OC) EMNR

MERCURY Sediment3 where PCBs greater than 6 (OC)

ST MARIES CREOSOTE - proposed to be added to the NPL

ROD dateJuly 2007 LPAHs

370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)

St Maries Creosote (Regional Website)

Remediation Ongoing HPAHs

960 (OC) (17 if TOC lt02or gt4)

7-10 (Est)

200 (Est)

10 (Act)

35 (Est)

510

OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA)

1 Clam Bay Sediments 61999 - 102001

15

450

Area not specifiedYes

12 (OC)

46 71Sediment

013390

61

0029

410

10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005

960(OC)49 Sediment

12

PCBs

3 (OC) SWAC12 (OC)) SWAC

10PUGET SOUND NAVAL SHIPYARD COMPLEX

2 OUB Marine 61600 - 3104

225 (Act)

10 0Shoreline Nearshore and Offshore Sediment

29 (Est) Yes

211 9

108 Sediment

5

1x10-5 ngL

031 μgL

620 μgL

370(OC)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

MERCURY (toxicity test opt-out)

LPAHs 780 (OC)

HPAHs 5300 (OC)

MERCURY 059 subtidal

LPAHs 780 (OC) subtidal

HPAHs 5300 (OC) subtidal

MERCURY 059

LPAHs 780 (OC)

HPAHs 12 dw intertidal

MERCURY 5 21059LPAHs

HPAHs 12 dw intertidal

48 (Act)

30(Act)

54 (Act)

Region 10 Wyckoff Eagle Harbor Web Site

East HarborWest Beach Sediments

2007-2008

31997 - 121997 13-92 (Est) Yes

10

WYCKOFF COEAGLE HARBOR

1

East HarborPhase 1 - NTCRA

91993 -31994 (Phase 1)

East HarborIntertidal and Subtidal Sediments

2000-2002

3 West Harbor

117

780 (OC)

23

$6-20

Sediment

Sediment

059 (dw)

5300 (OC)

780 (OC)

5300 (OC)

5300 (OC)

Sediment

059

49 $62 - $16 Sediment12 - 31 (includes EMNR)

see cap

059

780 (OC)

  • READ_FIRST
  • Tier 1 Sites - Remedial
    • READ_FIRST

      The 2002 memo Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sitesestablished at 2 tier system of headquarters consultations to encourage national consistency in makingdecisions at Superfund and RCRA Corrective Action sediment sites Tier 1 sites are defined as sites wherethe proposed sediment action will address more than 10000 cubic yards or five acres of contaminatedsediment Consultation for Tier 1 sites involves the submission of the draft Proposed Remedy or draftEECA and a discussion of how the 11 principles were considered to the Regional Coordinator 30 daysprior to the public comment period Tier 2 sites are a subset of the Tier 1 sites that are large complex orcontroversial and are subject to consultation with the Contaminated Sediments Technical AdvisoryGroup throughout the RIFS and remedy selection stagesThis Tier 1 Tracking list is an EPA OSRTI product largely developed by the Army Core of Engineers and isintended to be a resource for contaminated sediment RPMs headquarters and regional technical staffand others supporting the remedy decision making process at these sites The list tracks the Tier 1 sitesthat have signed a decision document and documents the remedy selected theestimated and actual costs of the remedy the contaminants of concern and the associatedcontaminated media the Action Levels the Clean-up Levels (CUL) the Remediation Goals (RG) and theSediment Remedial Action Objectives (RAO) For those sites where the remedy has been implementedand a Five-year Review (FYR) has been completed the list also documents whether monitoring wasconducted for the FYR data was presented in the report and the CULs RGs and RAOs were met A keyaspect of this list is that the references for all the data in this spreadsheet are easily located Each cellcontaining data is hyperlinked to a PDF with the page or pages from the relevant public document thatreports the data Each PDF includes the cover page of the report with the information necessary tolocate the complete document and the data included in the spreadsheet is highlighted in the text of thePDF All of the information and documents included in this tracing list are publically availabledocumentsThis Version has been published to the internet with all of the hyperlinks removed We apologize for the inconvenience EPA is currently updating its websites and is temporarily unable to publish the Tier 1 Tracking List with the hyperlinks to the Cited Documents The Remedial Action Objectives and Five Year Review data columns have been removed from this version because they are largely narrative text and require the context provided by the hyperlinked documents in order to be properly understood When the Internet upgrade is complete the Fully cited version will be published Until then any questions regarding this Tier 1 Tracking List can be directed to Matt Lambert EPA Office Of Superfund REmediation and Technology Innovation (lambertmatthewepagov)The Tier 1 Tracking List includes sites in the Remedial Program where a Proposed Plan and Record of Decision were signed The sites are organized by EPA Region number and then listed alphabetically by name Due to the structure of the list columns cannot be filtered or sorted

      Tier 1 Sites - Remedial

      264pdf
      Websitehttpcumulisepagovsupercpadcursitescsitinfocfmid=0101431
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100948
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101479
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100744
      216pdf
      1-011pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100743
      Website httpwwwepagovnbhindexhtml
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631F8CFE11E53EFA23C8525691F0063F6E8OpenDocument
      1-009pdf
      260pdf
      702pdf
      Website httpyosemiteepagovr1npl_padnsf31c4fec03a0762d285256bb80076489ca48c071b6a314e1c8525691f0063f6ddOpenDocument
      1-068pdf
      608pdf
      610pdf
      611pdf
      612pdf
      631pdf
      681pdf Soil and sediment not differentiated
      682pdf
      1-057pdf
      692pdf
      695pdf
      700pdf
      703pdforig 1998 estimate
      1-035pdf
      679pdf
      1-005pdf
      636pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      638pdf
      636pdf
      1-010pdf
      1-074pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      1-017pdf
      1-018pdf
      1-020pdf
      215pdf
      694pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-024pdf
      1-023pdf
      1-025pdf
      1-026pdf
      1-027pdf
      1-027pdf
      1-028pdf
      1-025pdf
      1-047pdf
      1-031pdf
      1-033pdf
      1-034pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101074
      1-012pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201766
      738pdfDates are for entire construction not only sediment portion
      356pdf
      2058pdf
      735pdfThis represents cost estimate for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1266pdfThis represents actual cost for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1268pdf
      2083pdf
      1268pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200364
      2203pdf
      372pdf
      739pdf
      740pdf
      371pdfIn-situ treatment with sorptive agents
      371pdf
      1259pdf
      373pdf
      Website httpwwwepagovr02earthsuperfundnpl0200364chtm
      1259pdf
      373pdf
      1259pdf
      373pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200528
      1272pdf
      177pdf
      477pdf
      1261pdf
      2086pdf
      478pdf
      2086pdf
      478pdf
      Northerly wetlands and tar patch area were determined to be more like soil removals as they were not submerged Westerly wetlandds has a surface water stream running through it that is monitored for sediments so it is retained
      1273pdf
      2088pdfMNR doesnt have fieldwork dates but site fieldwork dates are included
      1274pdfNo specific area for MNR provided 21 acres is area of westerly wetlands for which MNR is selected
      2006pdf
      2087pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0201644
      456pdf
      218pdf
      457pdf
      2093pdf
      2094pdf
      178pdf
      2011pdf
      1279pdf
      461pdf
      56pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201706
      463pdf
      2016pdf
      463pdf
      2016pdf
      2091pdf
      2015pdf
      2015pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0202229
      990pdf
      993pdf
      1014pdf
      1299pdf
      2018pdf
      996pdf
      990pdf
      991pdf
      991pdf
      992pdf
      996pdf
      996pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200557
      2019pdf
      997pdf Remedy componentsareas not broken out
      2098pdf
      2096pdfInfo only on Alycon Lake no info on Rabbit Run or Chestnut Branch
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201290
      2033pdf
      764pdf
      2023pdf
      2024pdf
      2024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201491
      2032pdf
      1002pdf
      1001pdf
      2221pdf
      2031pdf
      2032pdf
      2102pdf
      2029pdf
      2028pdf
      2134pdf
      2030pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0203382
      2072pdf
      518pdf
      2228pdf MNR area was not stated Calculation Profundal areas 08= 154 profundal area = 1925 acres - 154 TLC acres = 1771 MNR acres
      518pdf
      2073pdf
      2075pdf
      2079pdf
      2123pdf
      2126pdf
      1005pdfAttachment has 2 sections one from the ROD the other from the FYR
      1006pdf
      2124pdf
      2125pdf
      2070pdf
      2059pdf
      2059pdf
      2059pdf
      2128pdf
      2060pdf
      2061pdf
      2127pdf
      2063pdf
      2063pdf
      2064pdf
      2065pdf
      2066pdf
      2130pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201465
      369pdf
      2133pdf
      2034pdf
      1008pdf
      2131pdf
      183pdf
      2177pdf
      2131pdf
      183pdf
      2131pdf
      183pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201770
      2036pdf
      64pdf
      1009pdfIncludes entire remedy sediment portion is not defined
      2038pdf
      2037pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200439
      2174pdf
      1012pdf
      2042pdf
      2041pdf
      2041pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200209
      2171pdf
      2051pdf
      523pdf
      2046pdf
      2044pdf
      2049pdf
      2162pdf
      2052pdf
      2053pdf
      2047pdf
      2045pdf
      2050pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201202
      69pdf
      2170pdf
      2054pdf
      2120pdf
      2054pdf
      2054pdf
      2118pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0302836
      Website httpcfpubepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0302836
      3006pdf
      497pdf Apparently same area as EMNR
      498pdf Apparently same area as MNR
      496pdf
      3001pdfWeb site COC list is much more extensive then tPAH
      497pdf
      497pdf
      httpwwwepagovreg3hwmdnplVAD990710410htm
      499pdf
      499pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300093
      1605pdf
      224pdf
      1601pdf
      1614pdf
      1606pdf
      1606pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1605pdf
      482pdf
      73pdf
      1615pdf
      656pdf
      1606pdf
      1617pdf
      1617pdf
      1617pdf
      1617pdf
      Website httpwwwepagovreg3hwmdsupersitesDED980555122indexhtm
      1617pdf
      1617pdf
      1605pdf
      483pdf
      74pdf
      484pdf
      657pdf
      1606pdf
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300092
      1622pdf
      1621pdf
      1039pdf
      959pdf
      1040pdf
      958pdf
      1623pdf
      665pdf
      httpwwwepagovreg3hwmdnplDED980552244htm
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300951
      1624pdf
      3008pdf
      961pdf
      960pdf
      3002pdfArea not stated No mention of sediment capping or marine mattress in ROD or ESDs
      962pdf
      1625pdf
      1626pdf
      1627pdf
      1628pdf
      Websitehttpwwwepagovreg3hwmdnplPAD046557096htm
      Website httpcumulisepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0300951Provided to indicate formal OU name
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0406299
      Construction completed but no documents are available
      12pdf
      578pdf
      579pdf
      4001pdf
      4001pdf
      12pdf
      4001pdf
      4001pdf
      4001pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0402260
      No information on websites regarding status of sediment work unclear as of Jan 2014
      21pdf
      4002pdf
      53pdfCost of sediment remedy is not broken out
      4003pdf
      Website hhttpcumulisepagovsupercpadcursitescsitinfocfmid=0403156
      400pdf
      580pdf
      4004pdf
      Website httpwwwepagovregion4superfundsitesnplnorthcarolinawcoplwtpnchtml
      395pdf
      402pdf
      396pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403350
      4008pdf
      4007pdf
      4023pdf
      965pdf
      4020pdfThe ROD and FYR do not directly state the COCs for the sediment remedy and there are not contaminant-specific cleanup levels The contaminants identified here are those with an HQ above 1 for all areas (see attachment) Presented here to indicate prevalent contamination
      4019pdf Excavation depth based on elevation and visual determinations
      4009pdf
      4011pdf
      4010pdfChanged remedy to MNR
      4011pdfChanged remedy to MNR
      4017pdf
      966pdf
      584pdf
      964pdf
      4013pdf
      4018pdf
      4021pdf
      1025pdf
      1026pdf
      4014pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403252
      77pdf
      561pdf
      4022pdf
      558pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0403765
      391pdf
      4030pdf
      4031pdf
      4032pdf
      393pdf
      httpwwwepagovregion04superfundsitesnpltennesseetennprotnhtml
      562pdf
      563pdf
      4031pdf
      4033pdfROD states However if certain excavated sediments appear to be uncontaminated then those sediments shall be subjected to sampling and analyses for the PAHs The action levels for sediment removal will reflect EPAs excess lifetime carcinogenic risk range of 1 x 10 6 to 1 x 10 4 (See Table G - 9) Its unclear whether or which concentrations will be used for an action level but the text and table are addded as a reference
      4034pdfNo remedial action in Reaches B and C See second page of attachment
      570pdf
      1031pdf
      4043pdf
      4044pdf
      4043pdf
      4043pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406082
      592pdf
      592pdfSite soils included in volume
      No Reach A removal action decision documents exist on EPA HQ or region websites
      httpwwwepagovregion4superfundsitesnplnorthcarolinawardtrnchtml
      593pdf
      590pdf
      591pdf
      4040pdf
      4041pdf
      4042pdf
      4041pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0501228
      5070pdf
      15pdf
      20pdfThis value represents Estimated 30-Year Net Present Worth to excavate and consolidate sediment in landfill
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      17pdf
      5170pdf
      5171pdf
      5172pdf
      533pdf
      532pdf
      Website httpwwwepagovregion5sitescontinentalindexhtm
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0507723
      5059pdf
      5173pdf
      5174pdf
      5180pdf
      5175pdf
      5057pdf
      5137pdf
      5093pdf
      5176pdfDeposit DD is located in OU2 but it is considered part of the OU3 response
      5179pdf
      5062pdf
      5181pdf
      5051pdf
      5092pdf
      5177pdf
      213pdf
      5058pdf
      Website httpwwwepagovregion5sitesfoxriverindexhtml
      5092pdf
      5178pdfAlso see Fox River ROD Amendment 2007 pg 14 Table 2 for documentation of the OU 5 dredge volume being included in the OU4
      213pdf
      5217pdf
      5094pdf
      5096pdf
      214pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500760
      33pdf
      5063pdfBackfill stated on second page of attachment
      35pdfIncludes floodplain material
      32pdf
      Website httpwwwepagovR5SupernplillinoisILD980823991htm
      32pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0508120
      5003pdf
      5002pdf
      5005pdf
      5060pdfEstimated from map in 5 year report
      5004pdf
      5004pdf
      5006pdf
      5001pdf
      5168pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500083
      5108pdf
      5222pdf
      5208pdf
      5022pdf
      5131pdf
      5209pdf
      Website httpwwwepagovregion5sitesoutboardmarine
      5205pdf
      514pdf
      515pdf
      5120pdf
      514pdf
      5120pdf
      514pdf
      5212pdf
      5125pdf
      5126pdf
      5127pdf
      5123pdf
      5128pdf
      Website ttpcumulisepagovsupercpadcursitescsitinfocfmid=0501181
      5024pdf
      5160pdfIncludes sediments and soils
      5026pdf
      5025pdf
      5024pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0505188
      5203pdf
      5202pdf
      5146pdf
      5044pdf
      5037pdf
      5045pdf
      5142pdf
      5142pdf
      Website httpwwwepagovregion5sitessheboygan
      5046pdf
      5145pdf
      5043pdf
      5140pdf
      5142pdf
      5142pdf
      5035pdf
      5144pdf
      5042pdf
      5036pdf
      5142pdf
      5142pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0502194
      150pdf
      148pdf
      149pdf
      5157pdf
      147pdf
      147pdfNo update provided in 2012 FYR
      5027pdf
      5156pdf
      Website httpwwwepagovregion5cleanupvelsicolmichiganindexhtml
      5154pdf
      5164pdf
      5164pdf
      5151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0601752
      6001pdf
      986pdf
      6004pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      987pdf
      983pdf
      981pdf
      984pdf
      6014pdf
      6006pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0602911
      1043pdf
      1044pdf
      6008pdf
      6009pdfA list of principal parameters is provided without risk context COCs or risk drivers in sediments are not identified
      1047pdfPossible that visually clean performance standard also applies to marsh sediments
      1045pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0600574
      1049pdf
      153pdf
      1050pdf
      1051pdf
      6010pdfConstruction and disposal only
      6011pdf
      1052pdf
      Wesbite httpcumulisepagovsupercpadcursitescsitinfocfmid=0800445
      8003pdf
      311pdfIncludes Area 1 sediments and 30K cy in area 3
      625pdf
      624pdf
      8002pdf
      Website httpwwwepagovregion8superfundmtmilltown
      8050pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800357
      8018pdf
      8017pdf
      1019pdf
      1018pdf
      8023pdf
      8012pdf
      8013pdf
      8015pdf
      website httpwww2epagovregion8rocky-mountain-arsenal
      8020pdf
      8019pdf
      8012pdf
      8015pdf
      website httpwwwrmaarmymil
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800694
      629pdf
      8024pdf
      630pdf
      8025pdf
      8026pdf
      8027pdfSediment and soil are often used interchangeably in the ROD
      628pdf
      627pdf
      8026pdf
      628pdf
      8026pdf
      8028pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800416
      8037pdf
      1021pdf
      1022pdf
      8043pdf
      1023pdf
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Websitehttpwww2epagovregion8silver-bow-creek-butte-area
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpdeqmtgovREMMWCBConstructionServicesSectionSilverBowCreekdefaultmcpx
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901755
      9015pdf
      596pdf
      1237pdf
      1236pdf
      1235pdf
      1234pdf
      980pdf
      1238pdf
      1234pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDCAD980498612OpenDocument
      1234pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901129
      1245pdf
      9002pdf
      1240pdfThis cost does not include $18M for bank stabilization
      1239pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDcad009106527OpenDocument
      543pdf
      1239pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902734
      1249pdf
      41pdf
      545pdf
      39pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpyosemiteepagovR9SFUNDR9SFDOCWNSF3dec8ba3252368428825742600743733c01ef2be6ec9ab9c8825737f002bf719OpenDocument978
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902440
      1254pdf
      156pdf
      974pdf
      975pdf
      1250pdfDieldrin is also a COC but only has a CUL for surface water
      1252pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfvwsoalphabeticUnited+Heckathorn+CoOpenDocument
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000981
      10-030pdf
      Name in ROD However name on CB website is NSTF Areawide Sediment covered within OU1 ROD was later divided into separate OUs except for removal actions conducted at Olympic View This removal action is summarized here
      1104pdf
      1105pdf
      1105pdf
      1106pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1106pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc923e8d62480494ad483882564f80082a1c0OpenDocument
      10-030pdf(formerly OU6)
      10-100pdf
      1101pdf
      1100pdf
      1099pdf
      1097pdf
      10-002pdf10 acres as of 2009
      1097pdf
      1097pdf
      1097pdf
      10-030pdf
      1071pdf
      1076pdf
      1073pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1072pdf
      10-030pdf
      1066pdf
      1061pdf Quantity does not include Blair Waterway dredging 1993 ESD states that Blair is not part of ROD cleanup and is for navigational purposes
      1062pdf
      1063pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      10-030pdf
      1060pdf
      1059pdf
      1059pdf
      1059pdf
      1067pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1070pdf
      1111pdf
      1112pdf
      1115pdf
      1113pdf
      10-030pdf
      10-098pdf
      1121pdf
      1079pdf
      1094pdf
      1094pdf
      1078pdf
      1122pdfThis is strictly a construction cost that appears to include construction of CDF and pile removal as well as dredging and capping
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 25
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 089
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      10-030pdf
      10-008pdf
      1081pdf
      1082pdf
      10-009pdf
      1084pdf
      1085pdf
      1087pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000020OU 8 is not included because OU was reommended for no further action in 2003 ROD
      1123pdf
      10-022pdf
      1134pdfCapping took place after dredging to in part maintain original depths
      1138pdf
      433pdfROD estimated remedy would cost $15M but 2002 ESD estimated it as $12M
      1133pdf
      1130pdf
      949pdf
      1135pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc9235a64831b6521f46b8825650200836f1cOpenDocument
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      1136pdf
      1124pdf
      10-023pdf
      1128pdf
      10-028pdf
      434pdf
      1125pdf
      1130pdf
      10-024pdf
      1126pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-025pdf
      1142pdf
      10-095pdf
      1144pdf
      1141pdf
      1143pdf
      1146pdf
      1146pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1000020
      1152pdf
      162pdf
      1148pdf
      314pdf
      633pdf
      1149pdf
      1153pdf
      431pdf
      1150pdf
      431pdf
      1151pdf
      Website httpyosemiteepagovR10CLEANUPNSF7d19cd587dff1eee8825685f007d56b72dd5ab7462e4f004882567b30057eb7bOpenDocument
      431pdf
      1151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000339
      166pdf
      49pdf
      1158pdf
      1159pdf
      1157pdf
      1157pdf
      Website httpwwwdeqstateoruslqcunwrmccormickbaxter
      1290pdf
      1157pdf
      1157pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1001134
      1291pdf
      1163pdf
      1164pdf
      1292pdf
      1293pdfAlthough not called MNR remedy is to monitor contaminant levels until the goal is achieved which is MNR
      10-061pdf
      1165pdfThis cost includes capping of the upland landfill A breakout for just the sediment portion was not provided
      1166pdfThis cost includes the fire training area and upland landfill cover A breakout of just the sediment remediation was not provided
      1167pdf
      1169pdfconsidered at conceptual target for sediment
      1292pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1169pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000611
      1177pdf
      10-031pdf
      10-031pdf
      1179pdf
      1178pdf
      1173pdf
      1181pdf
      1176pdf
      1174pdf
      1173pdf
      1181pdf
      1176pdf
      1173pdf
      1181pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1001107
      1182pdf
      10-040pdf
      1242pdf
      1244pdf
      1243pdf
      1188pdf
      1189pdf
      1187pdf
      1183pdf
      1185pdf
      10-041pdf
      10-042pdf
      1189pdf
      1185pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1002095
      46pdfIncludes soil excavation quantity in total volume
      10-039pdf
      408pdfIncludes cost for excavating nearshore soil
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate that sediment is not toxic
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate sediment that is not toxic
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000612
      10-066pdf
      1216pdf
      10-044pdf
      10-071pdf
      10-068pdf
      10-068pdf
      Website httpyosemiteepagovR10CLEANUPNSFsitesWyckoff
      10-068pdf
      10-075pdf
      10-113pdf
      409pdf
      1218pdf
      202pdf
      202pdf
      202pdf
      10-064pdf
      10-072pdf
      1219pdf
      1214pdf
      1214pdf
      1214pdf
      1215pdfRequirement for intertidal sediments
      423pdf
      10-047pdf
      10-046pdf
      1209pdf
      1208pdf
      1207pdf
      1203pdf
      1202pdf5 mgkg criteria for areas requiring dredging21 mgkg criteria for areas requiring a 1-meter thick cap 059 for thin layer capping
      1203pdf
      1204pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      2195pdf
      2136pdfCleanup goals for biological endpoints were not provided
      2136pdfCleanup goals for biological endpoints were not provided
      2127pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0900993
      Website httpwwwepagovregion9superfundpvshelf
      9003pdf
      9004pdf
      9005pdf
      9005pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      613pdf
      1-030pdf
      1-064pdf
      683pdf
      475pdf
      2085pdfHowever see RAO of 50 ppm
      2085pdf
      2085pdf
      1-102pdf
      1278pdf
      1279pdf
      1278pdf
      2092pdf
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      2097pdf
      763pdf
      1003pdf
      2030pdfIts unclear the extent to which 10 mgkg is considered the cleanup level ROD language and FYR note is attached The closest to being definitive is on p 34 of attachment the cleanup goal of about 10 mgkg
      2123pdf
      2062pdf
      2129pdf
      186pdf
      2117pdf
      2043pdf
      2043pdf
      963pdf Attachment incl language from ROD and ESD
      11pdf
      11pdf
      11pdf
      11pdf
      11pdf
      23pdf
      396pdf
      4019pdf
      597pdf
      4045pdf
      4045pdf
      4045pdf
      586pdf
      585pdf
      4057pdfSediment concentration associated with protective fish tissue concentration is lt10ppb
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      5137pdf
      5050pdf
      5050pdf
      34pdf
      5001pdf
      5109pdfAction level or cleanup level of North Ditch remediation never stated in ROD ROD amendment five year reviews or construction completion report
      277pdf
      5122pdf
      526pdf
      5045pdf
      5139pdf
      5141pdf
      5155pdf
      982pdf
      6003pdf
      8002pdfNo sediment cleanup levels cleanup levels pertain to groundwater or surface water
      1024pdf
      979pdf
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      9006pdf
      9006pdf
      9006pdf
      9006pdf
      1251pdf
      1106pdf
      1103pdf
      1103pdf
      1103pdf
      1103pdf
      1072pdf
      1065pdf
      1065pdf
      1069pdf
      1069pdf
      1069pdf
      1070pdf
      1116pdf
      1091pdf
      1091pdf
      1091pdf
      1091pdf
      1114pdfTable 13 in the ROD lists Zinc SQO as 059 This appears to be an error Table 12 of the ROD lists 059 for mercury and 410 for zinc
      1074pdf
      1074pdf
      1089pdf
      1089pdf
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1136pdfConfirmational number of 76 mgkg (OC) established for TBT
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-025pdf76 ppm (OC) 1335 ppb (dw)TBT is a confirmational number See attachment
      10-096pdf
      10-096pdf
      164pdf
      312pdf
      164pdf
      164pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      1181pdf
      1181pdf
      1181pdf
      1187pdf
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (041 ppm) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (970 ppm [OC]) is considered a conceptual target
      9006pdf
      9006pdf
      6018pdf
      6018pdf
      5184pdfCalled residual cover here
      5185pdfTermed post-dredge residual sand cover
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406638
      4048pdf
      4049pdf
      4050pdf
      4051pdf
      4051pdf
      4051pdf
      4051pdf
      httpepagovregion4superfundsitesnpltennesseecopbastnhtml
      4051pdf
      4051pdf
      4051pdf
      1-045pdf
      1-045pdf
      1-030pdf
      1-046augmentedreplaced sand cap in 2011
      1-047pdf
      httpwwwepagovregion02superfundnplonondagalakeindexhtml
      Ley Creek subsite not included because the volume removedmanaged was less than 10K cy
      2179pdf
      2165pdf
      2167pdf
      2166pdf
      2054pdf
      2054pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      1300pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      5186pdf
      3007pdfSame factsheet as of Jan 2014
      httpepagovregion4superfundsitesnplalabamaamerbrasalhtml
      httpepagovregion4superfundsitesnplmississippiamercrewkmshtml
      httpyosemiteepagovr10cleanupnsf22f04d62fa63974288256da6005f9868cabb84db584c955f8825697f00049beeOpenDocument
      10-056pdf
      10-058pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0503034
      5187pdf
      5188pdf
      5189pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinasangschtml
      5195pdf
      5194pdf
      6023pdf
      10-060pdfROD amendment did not specify the volume of instream sediments vs floodplain material
      10-062pdf
      10-063pdf
      10-064pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      10-069pdf
      10-069pdf
      10-083pdf
      1203pdf
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (370 ppm [OC]) is considered a conceptual target
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      Website httpyosemiteepagovr10cleanupnsfsitesmccormick_baxter
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-087pdf
      10-097pdf
      10-101pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      1246pdfCap placed in areas exceeding CUL
      1246pdfCap placed in areas exceeding CUL
      9014pdf
      8044pdf
      8046pdf
      8051pdf
      6026pdf
      6026pdf
      6026pdf
      6026pdf
      6027pdf
      5196pdf
      5197pdf
      5203pdf
      5204pdf
      5206pdf
      5207pdf
      5210pdf
      5022pdf
      httpwwwepagovregion5cleanupmississinewaindexhtml
      5213pdf
      5214pdf
      5215pdf
      5216pdfAmended cost for OU 2-5 does not include Phase 1 in OU4
      4056pdf
      4061pdf
      4062pdf
      4063pdf
      4065pdfBackfill in at least portions of site N of 38th St area unclear
      4066pdf
      4075pdf
      4075pdf
      4076pdf
      4051pdf
      69pdf
      2053pdf
      2181pdf -- most recent factsheet as of 2014-Jan
      2181pdf -- most recent factsheet as of 2014-Aug
      ROD also describes NYSDEC-regulated action removing channel sediment (4200 cy) and floodplain sedimentsoil (63000 cy)
      2185pdf
      2196pdf
      2197pdf Remedy componentsareas not broken out
      httpwwwepagovhudson
      2198pdf
      1-058pdf
      1-059pdf Soil and sediment not differentiated
      2205pdf
      2204pdf
      1-065pdf
      613pdf
      1-067pdf
      1-071pdf
      1-072pdf
      1-013pdf
      1-073pdf
      698pdf
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93d01550369a32b31bb8525691f0063f6d6OpenDocument
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101028
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8584c38df37ade1998525764f005a96d3OpenDocumentampHighlight=0callahan
      1-076pdf
      1-075pdf
      1-078pdf
      1-078pdf
      1-078pdf
      1-078pdfNote that the dredging and subaqueous disposal of sediments was changed from OU1 to OU3 in the 2013 ESD
      1-078pdf
      1-078pdf
      1-080pdfAs of 2014-Jan
      1-077pdf
      1-081pdf only dredge operation
      httpwwwepagovregion02superfundnplraritanbayslag
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206276
      1-082pdf
      1-083pdf
      1-083pdf level specified on p 3 of 4
      1-083pdf 1-083pdf level specified on p 3 of 4
      1-086pdf
      1-085pdf
      1-087pdf Total cost ROD does not specify cost of sediment portion
      2206pdf
      2206pdf
      2206pdf
      2207pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201690
      2208pdf
      2210pdf
      2211pdf
      2212pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206222
      httpwwwepagovregion2superfundnplgowanus
      2213pdf
      2214pdf
      2214pdf
      2215pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1002655
      httpyosemiteepagovr10cleanupnsf32e58b284950a4fc882578480000fdcc9458199e8119eba3882572910069d808OpenDocument
      10-102pdf
      10-104pdf
      10-105pdf
      10-105pdf
      10-106pdf
      10-107pdf
      10-108pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driverf
      10-110pdf
      10-111pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-093pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8bbe0100a535e8840852576e90053b186OpenDocument
      1-090pdf - soilsediment volumes not differentiated
      1-090pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-089pdf
      1-091pdf
      1-092pdf
      Fish tissue remedial goal appears to only apply to the Allendale and Lyman Mill Pond areas not lyman mill stream sediment
      1-096pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-098pdf
      1-099pdf
      1-099pdf
      2218pdf
      2219pdf
      2219pdf
      2220pdf
      2222pdf
      2123pdf
      2225pdf
      2173pdf
      2116pdf
      5109pdf
      5223pdf
      10-125pdf
      10-125pdf
      10-125pdf
      1-100pdfFloodplain vs sediments not differentiated
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93de720462345729a4f8525691f0063f6e1OpenDocument
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631E704D6C17F74EA678525697B0008CCAAOpenDocument
      1-101pdf
      httpwwwepagovregion02superfundnplaluminumcompany
      2200pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinakopchschtml
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0405546
      httpwwwepagovregion4superfundsitesnplalabamatriatenvalhtml
      877pdf
      877pdf
      877pdf
      877pdf
      6024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000195
      httpyosemiteepagovr10cleanupnsfsitesbh
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101388
      Reg Site OU Area Name Fieldwork Dates Dredge (1000 cu yds) Excavate (1000 cu yds) Back-fill (Residual Cap) Cap (acre) MNR (acre) EMNR Thin Cover (acre) In Situ Treatment (acres) Other Estimated Cost (in millions) Actual Cost (in millions) COC Sample Matrix Action Level (ppm) Cleanup Level (ppm) Remediation Goal (ppm)
      1 CALLAHAN MINING CORP 3 SedimentsCap Ongoing 101 No $21 Copper Sediment 790
      Lead 710
      Callahan Mine (Region 1 Website) Zinc 5100
      1 CENTREDALE MANOR RESTORATION PROJECT 1 Allendale Pond and Lyman Mill Pond Sediment 156 If needed 605 Benzo(a)pyrene Fish 00015
      Dieldrin 00011
      Technical Chlordane 013
      Aroclor 1254 0037
      Aroclor 1268 0011
      2378-Tetrachlorodibenzo-p-dioxin 00000022
      Total Aroclors 0076
      44-DDD 00062
      44-DDE 0018
      DioxinsFurans TEQ 0000044
      Benzo(a)pyrene Sediment 14
      Dibenz(ah)anthracene 097
      Dieldrin 00026
      Technical Chlordane 04
      Aroclor 1254 0031
      Aroclor 1268 0023
      Arsenic 39
      Centredale Manor Restoration Project (Region 1 Website) 2378-Tetrachlorodibenzo-p-dioxin 0000015
      Lyman Mill Stream Sediment 205 Yes 225 165 Coplanar PCBs (TEQ)3 0000025
      Total Aroclors 006
      Selenium 11
      Zinc 221
      44-DDD 00084
      44-DDE 0006
      Aluminum 8210
      Barium 134
      Vanadium 376
      N-Nitroso-di-n-propylamine 046
      1 LORING AIR FORCE BASE 13 East Branch of Greenlaw Brook 1997 - 1998 38 (Est) Yes 481 Total PAHs Sediment 35
      86 (Act) Total 44-DDTDDDDDE 028
      Loring Air Force Base (Region 1 Website) Aroclor 1260 1
      Total Chlordanes 048
      Lead 218
      44-DDD Fish 0018
      44-DDE 0013
      44-DDT 0013
      Aroclor 1242 00022
      Aroclor 1260 00022
      Heptaclor 000098
      Chlordane Alpha 00034
      Chlordane Gamma 00034
      1 NEW BEDFORD 1 Acushnet River North of Wood Street (within Upper Harbor) 1202 - 303 900 (throughout OU1) 156 (Act) No 2002 ESD $317 (for all of OU 1) Operation ongoing PCBs Sediment (Upper Harbor) 10
      Region 1 New Bedford Website Upper and Lower Harbor 2004 - Ongoing 2011 ESD $422-1200 (for all of OU1) Sediment (Lower Harbor) 50
      Sediment intertidal areas with public access or abutting recreational land use 25
      Sediment saltmarsh areas with little to no public access (aka Marsh Island) 50
      Sediment intertidal areas with abutting residential land use 1
      Seafood 002
      2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000
      1 NEWPORT NAVAL EDUCATION amp TRAINING CENTER 4 McAllister Point Landfill (Narrangasett Bay) 22001 - 122001 34 (Est) Yes 226 Anthracene Sediment 051 051
      Fluorene 02 02
      46000 tons (Act)(cyds not provided) PCBs 36 36
      NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website Pyrene 3 3
      Copper Porewater 00529 00529
      Nickel 00337 00337
      1 NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1 1
      Nyanza Chemical Waste DumpRegion 1 Website 4 Sudbury River ROD Date September 2010 Area not specified 84 85 MERCURY Sediment 10 (EMNR)
      MERCURY Fish (largemouth bass yellow perch bullhead) 048
      1 PINE STREET CANAL 1 Turning Basin Pine Street Canal and Wetlands 2002-2004 2004 78 (Act) (GeotextileSand Cap) 44 PAHs Sediment ER-M Values
      Region 1 Pine Street Canal Website 82010 - 22011 08 2011 organoclay cap (size not specified) Metals and Cyanide ER-M Values
      1 SULLIVANS LEDGE 1 Unnamed Stream Ponds A and B 1998-2002 19 (Est) Yes upper portion of stream diverted PCBs Sediment 20 uggC
      Region 1 Sullivans Ledge website 86 (Act)
      2 Middle Marsh Wetlands 1998-2001 52 (Est) Yes 28 PCBs 20 uggC
      255 (Act)
      2 BATAVIA LANDFILL 1 Wetland Areas June 2001 - June 2003 25 (Est) Yes 13 (soil and sediment) 75 (soil and sediment) PAHs Sediment Visual NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals
      Deleted from NPL 11292005 Act Wetland area volume not specified LEAD
      2 BRIDGEPORT RENTAL amp OIL SERVICES 2 Little Timber Creek Swamp ROD dateSeptember 2006Remedial Action 2009-2011 175 (Est) Yes Area not specified 106 (Est) 125 PCBs Sediment 10 10
      Region 2 Bridgeport Rental amp Oil Services Website LEAD 1000 1000
      Total Petroleum Hydrocarbons None None
      2 BURNT FLY BOG 2 Downstream Area and Westerly Wetlands 11795 - 1996 gt6000 tons (Act) (soil and sediment) 22 LEAD Sediment 250
      PCBs 5
      3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment 400049
      2 GENERAL MOTORS (CENTRAL FOUNDRY DIVISION) 1 St Lawrence River 61995 - 111995 13 (Act) 2 (Act) 215 PCBs Sediment 1
      Turtle CreekTurtle Cove 1004 - 305 23 (Act) (soil and sediments) 01 01
      Raquette River 602 - 503 14 (Act) 1
      2 GOWANUS CANAL 1 Canal Sediments ROD Date Sept 2013 588 (Est) Area not stated (dredgecap remedy) In-situ stabilization of 3-5 feet of NAPL-containing sediments PAHs Sediment 20
      Gowanus Canal (Region 2 Website) Holding Tanks for CSO Control Copper 80
      Lead 94
      2 Grasse River Superfund Site(aka Alcoa Aggregation Site) Grasse River ROD Date April 2014 109 Yes 284 2431 PCBs Sediment 1
      Grasse River(Region 2 Website) Fish 001-005 (Final Remedial Goal)026-036(Interim Target Concentrations)
      2 HOOKER (102ND STREET) 1 Niagara River Embayment 71996 - 111996 28 (dredge to 2 feet) Yes $36 - 56 PAHs METALS CHLORINATED ORGANICS (MULTIPLE) Sediment 01(organics) New York State Sediment TBCs
      Deleted from NPL 852004 Sediment 02(Mercury)
      2 HUDSON RIVER PCBS 2 Upper Hudson River (Section 1) ROD dateFebruary 2002 Field work 2009-ongoing 1560 (Est) Yes Area not specified 2250 PCBs Fish 005
      Sediment 3 gm2 (MPA) 1
      Hudson River PCBs EPA Website Upper Hudson River (Section 2) 580 (Est) Sediment 10 gm2 (MPA) 1
      Fish 005
      Upper Hudson River (Section 3) 510 (Est) Sediment 1
      Fish 005
      2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001 (change in ESD from dredging to excavation) 981 (Est) ROD 21 INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC Sediment Not specified
      85000 Tons (Act) ESD 50-75
      2 LOVE CANALDeleted from NPL 9302004 2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001 0001
      2 MARATHON BATTERY CORP 1 East Foundry Cove Marsh and Constitution Marsh 91993 - 31995 30 (Est) Yesbentonite clay layer 40 CADMIUM Biological Sampling None
      Sediment 100 100
      Deleted from NPL 10181996 2 East Foundry Cove West Foundry Cove and the Cold Spring Pier Area 91993 - 31995 56 (Est) 485 CADMIUM Biological Sampling None
      Actual not specified by area
      Sediment Excavate up to 1 ft 95 Removal 10 mgkg
      2 ONONDAGA LAKE 2 Onondaga Lake Bottoms Subsite ROD dateJuly 2005 2407 (Est) 425 (Est) 1771 154 (Est) 414 MERCURY and others Sediment 08 014-2
      Operations Ongoing METHYL Hg Fish 03
      5 LCP Bridge St SiteWest Flume and Wetland AB June 2005 - July 2007 543 (Est)917 (Act) Yes 96 MERCURY Sediment 02
      20 Geddes Brook NineMile Creek Reach BC CD ROD DateApril 2009June 2012 - ongoing 59 (Est) Combined with Dredge volume Yes Partial Channel Re-location 189 MERCURY and others Sediment 015
      Region 2 Onondaga Lake Website Mercury Fish 01-03
      24 Geddes Brook NineMile Creek Reach AB June 2012 - 16 (Est) 42 (Est) Yes 151 MERCURY and others Sediment Soil (flood plain) 015
      Fish 01 - 03
      2 Raritan Bay Slag 0 ROD Date May 2013 34 (Est) 787 Lead Sediment 400 400
      Raritan Bay Slag (Region 2 Website)
      2 REYNOLDS METALS CONot on the NPL - Superfund Alternative Site 1 St Lawrence amp Raquett Rivers 412001 - 102001 52 (Est) 54 (Act) 35 PAHs Sediment 10
      86 (Act) PCBs 1
      TDBFs 0001
      2 RICHARDSON HILL ROAD LANDFILLPOND 1 South Pond and Herrick Hollow Creek 2004 285 (Act) 139 PCBs Sediment 1 1
      2 ROEBLING STEEL CO 5 Delaware River and Crafts Creek 2010-2013 116 (Est) Yes 11 PAHs Sediment See Attached
      240 (Act) Metals
      2 VINELAND CHEMICAL CO INC 3 River Areas (Blackwater Branch Floodplain amp Maurice River) 2006 - ongoing 626 Yes 11 ARSENIC Sediment 20 20 exposed 120 submerged
      4 Union Lake Sediments Remedy not yet initiated Unknown Yes Sediment Washing 129 ARSENIC Sediment Unknown 120
      2 YORK OIL CO 2 Contamination Pathways - Western Wetland 2000-2001 11 (Est) Yes 33 LEAD Sediment Not specified
      15 (Act) PCBs Complete Removal or 1
      Contamination Pathways - Northwestern Wetland 50 PCBs Sediment 1 Contingent on biological and chemical testing
      LEAD Not specified
      3 ATLANTIC WOOD INDUSTRIES INC 3 River Water and Sediments 2010-Ongoing 6 7 126 (Dredging and Disposal) tPAHs Sediment 45 to 100
      Region 3 Atlantic Wood Industries Website 157 (Est) 100
      3 EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL) 3 North Wetlands 1997 - 12897 95 (Act) Yes 12 3 CADMIUM Sediment 60
      LEAD 1200
      ZINC 5600
      5 South Wetlands 1997 - 12897 37 (Act) Yes 42 Unknown CADMIUM Sediment 60
      LEAD 1200
      Region 3 EI duPont Website ZINC 5600
      7 Christina River 51099 - 9899 11 (Act) Yes 47 Unknown CADMIUM Sediment 20
      LEAD 700
      ZINC 3000
      3 KOPPERS CO INC (NEWPORT PLANT) 1 Wetlands Ponds and Hershey Run ROD dateSeptember 2005 58 (Est) Unknown Re-channelize portion of Hershey Run 5176 PAHs Sediment 150
      Region 3 Koppers Co Inc Website Remedy not yet initiated
      3 METAL BANKS 1 RiverMudflat Sediments 2008-2010 12 (Est) Yes Unknown (Act) 1727 Unknown PCBs Sediment 1 1
      METAL BANK (Regional Website) OU Name SOIL EXCAVCONTAIN
      4 AMERICAN BRASS INC 1 Cedar Creek ROD dateAugust 2006 94 (Est) Yes 39 BORON Sediment 28
      COPPER 220
      Dunham Creek 38 (Est) LEAD 170
      American Brass Inc (Regional Website) ZINC 780
      PCB-1260 429
      4 AMERICAN CREOSOTE WORKS INC 0 Railroad Lake and Hughes Creek ROD date September 2007 40 (Est) Yes $20 (Total) TOTAL PAH Sediment 100
      American Creosote Works Inc(Regional Website)
      4 COPPER BASIN MINING DISTRICT SITE 5 Copper Basin ReachOcoee No 3 ReservoirParksville Reservoir ROD date September 2011 Area Not Specified (approx 14 river miles) 23 PCBs Sediment
      Arsenic Sediment
      Cadmium Sediment
      Copper Sediment 680 (Copper Basin Reach)
      640 (Ocoee 3 amp Parksville Reservoirs)
      Region 4 Copper Basin Mining District Site website Iron Sediment 57000 (CBR)
      53000 (O3R amp PR)
      Lead Sediment 145 (CBR)
      250 (O3R amp PR)
      Mercury Fish
      Zinc Sediment 2200 (CBR)
      970 (O3R amp PR)
      4 DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company) 2 Lower Roanoke River ROD dateSeptember 2008 143 river miles 196 Dioxin Fish 3 ppt
      Sediment Unknown
      Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website 4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment 0001
      4 KOPPERS CO INC (CHARLESTON PLANT) 1 Ashley River 7101 - 12101 0 (Est) $05 (ROD)3 (ESD) 282 PAHs Sediment Weight of Evidence Approach None
      3 (Act)
      Barge Canal 42003 ESD selected MNR for the area 32 (Est)0 (Act) 0 (Est)32 (Act) $045 (ROD) 01
      01 (ESD) Arsenic
      Region 4 Koppers Co Inc (Charleston Plant) North Marsh Sediments No info 15 (Act) 1000 linear feet 025 acre (Est)1300 linear feet (Act) 17 23
      South Marsh Sediments 3103 - 6103 19 tons (Act) 15 (Est)2 (Act) Lead
      4 SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION 2 Twelve Mile CreekLake Hartwell ROD date62894 730 (Est) 321 PCBs Fish 2
      Lake Hartwell (Regional Website) Sediment 1
      4 TENNESSEE PRODUCTS 1 Chattanooga Creek - Middle Reach September 2005 - September 2007 142 (Est) $94 (ROD) PAHs Sediment Visual
      Region 4 Tennesse Products Website 107000 tons (Act)Followed by capping 71 (Act)Aquablock $257 (ESD)
      Chattanooga Creek NTCRA 1997-1998 229 Yes Visual
      4 TRIANATENNESSEE RIVER 0 Reach AHuntsville Spring Branch - Indian Creek 4186 - 101487 Rerouted river buried in-place sediments DDT Fish (channel catfish) No sediment CUL 5
      Region 4 TrianaTennessee River Website Fish (smallmouth buffalo) No sediment CUL
      Fish (largemouth bass) No sediment CUL
      4 WARD TRANSFORMER Reach A (Removal Action) June 2007 - 2009 150000 tons (Est)Approx 400000 tons (Act) PCB Sediment 1
      Region 4 Website 1 Reach B C D and lower Brier Creek ROD dateSeptember 2008Remedy not yet initiated 13 (soil and sediment) (Est) Yes $37 (Total) PCB Sediment 1
      Fish 005
      Brier Creek Reservoir Lake Crabtree and Lower Crabtree Creek ~25 river miles Sediment None
      Fish 005
      5 CONTINENTAL STEEL 3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est) 12 BENZO(A)PYRENE Sediment 8 16
      BENZO(BampK)FLOURANTHENE 7 14
      BENZO(A)ANTHRACENE 95 19
      INDENO(123-CD)PYRENE 465 093
      ARSENIC 19
      BERYLLIUM 084
      ARCHLOR-1016 3 1
      ARCHLOR-1242 3 1
      ARCHLOR-1254 3 1
      ARCHLOR-1248 3 1
      ARCHLOR-1260 3 1
      Region 5 Continental Steel Website 4 Markland Avenue Quarry 3252008 - 612010 175 Yes297000 cy 11 BENZO(A)ANTHRACENE Sediment 05
      BENZO(A)PYRENE 05
      BENZO(BampK) FLOURANTHENE 08
      DI-BENZ(AH) ANTHRACENE 02
      INDENO(123-CD)PYRENE 04
      ARCHLOR-1248 1
      ARSENIC 19
      LEAD 400
      5 FOX RIVER NRDAPCB RELEASESProposed to be added to the NPL 1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 PCBs Sediment 1 025 (SWAC)
      2 Appleton to Little Rapids MNR RemedyROD Date 122002 3 (Est) Yes 273 (Est) 20 river miles 136 (Est) 390 (2005 ROD Amendment) Sediment
      3 Little Rapids to De Pere 42009 - ongoing 227 (Est) Sediment 1 SWAC 028
      Fish (Walleye) 005
      Lower Fox River Cleanup Website 4 De Pere to Green Bay 2007 - ongoing 3216 (Est) Sediment 1 SWAC 025
      Fish (Walleye) 005
      5 Green Bay MNR RemedyROD Date 62003 Approx 2700 sq miles Sediment 1
      701(2010 ESD)
      5 KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER) 0 Kress Creek Site Summer 2005 - 2012 43 (Est) Yes $719 (Total) 128 RADIUM 226 Sediment 72 picoCuries per gram (pCig) combined radium
      Region 5 Kerr-McGee Website 129 (Act) RADIUM 228
      5 LITTLE MISSISSINEWA RIVERNot on the NPL - Other Cleanup Activity Private Party-Lead Cleanup 0 Little Mississinewa River Spring 2005 - Fall 2009 57 (Est)100000 tons (Act) Yes 25 miles (Est) 27 20 PCBs Sediment 4 (0-1ft) 5 (deeper than 1ft) 1 (0-1ft)5 (deeper than 1ft)
      Little Mississinewa River(Region 5 Website) Fish Unknown
      5 OUTBOARD MARINE CORP 1 North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below 71992 to 91992 55 (Est) Yes 074 PCBs Sediment Unknown
      Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below 1991-1992 523 (EST)30 (ACT) 131 50 (upper harbor)
      OUTBOARD MARINE CORP (Region 5 Website) 4 formerly 1 OMC Plant 2 North and South DitchROD Date August 20072012 ROD Amendment 2010-2012 40 (soil and sediment) (Est) Yes 73 PCBs Sediment 1
      PAHs 2
      1 HarborSlip No 3(2009 ROD Amendment) 2012-2013 195 (Est) Yes 349 PCBs Fish (Sport) 003 - 01
      Sediment 1 02 (SWAC)
      5 SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI) 2 Area 9 -- Lake Embayment 1295 - 0697 36 (Est) Yes PCBs Sediment 05
      54 (Act)
      5 SHEBOYGAN HARBOR amp RIVER 1 Lower River and Inner Harbor Completed in 2012 53 (ROD)51 (ESD) Yes (ROD) 12 PCBs Sediment 26 05
      51 (ACT) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Region 5 Sheboygan River and Harbor Superfund Site Website Middle River Remedy not yet startedAOC dateFebruary 2009 7 miles 2 Sediment 26 05
      Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Upper River Sept 2004 - October 2007 21 (Est) 31 Sediment None (88 mass removal of PCB) 05
      21 (Act) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      5 Torch Lake 2 Surface Waters ROD DateMarch 311994 No Action Copper
      NPL DeletionFeb 5 2002
      5 VELSICOL CHEMICAL CORP (MICHIGAN) 2 Pine RiverSt Louis Impoundment 1999 - 2005 640 (Act) Yes Unknown area(2 ft compacted clay) $60 (Total) $30 (as of 2002) DDT Carp Smallmouth Bass 1708
      Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5 15
      Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000
      6 ALCOA (POINT COMFORT)LAVACA BAY 1 Natural Recovery Areas 122001 - ongoing Area not specified 161 MERCURY Sediment Hg 025 Marsh 05 Open Water
      North of Dredge Island NA Actual ROD PAHs 448 Total
      Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act) PAHs
      Witco Marsh 12006 - 42006 57
      Chlor-Alkali Process Area (Treatability Study) August 1998 (Phase I)January 1999 (Phase II) 80 (Act) 1952 MERCURY Mass removal
      6 BAILEY WASTE DISPOSAL 1 North Marsh Area January 1996 - September 1996 6 (EST) Unknown Sediment None
      20 (tar and sediment) (Act)
      Deleted from NPL 10152007
      6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995 47 (ROD Est)150 (ESD Est)170 (Act) Yes 226 PAHs Sediment 1300
      8 MILLTOWN RESERVOIR SEDIMENTS 1 Milltown Reservoir Sediments Remediation completed Dec 2010 2600 (Est) Yes Channel realignment and construction 140 ARSENICCADMIUMCOPPERLEADZINC Sediment None
      Region 8 Milltown Reservoir Sediments Website 2560 (Act)
      8 ROCKY MOUNTAIN ARSENAL (USARMY) 3 Lake Sediments Remediation Project June 1999 - Aug 1999 19 (Est) Yes (Est) Area not specified 39 ALDRIN Sediment 38
      33 (Act) No (Act) DIELDRIN 37
      CHLORDANE 12
      ROCKY MOUNTAIN ARSENAL (Region 8 Website) DDE None
      DDT 14
      ROCKY MOUNTAIN ARSENAL (US Army Website) MERCURY 82
      ARSENIC 270
      8 SHARON STEEL CORP (MIDVALE TAILINGS) 1 Marshy Area Aug 1996 - Sept 1996 436 (Est) Yes (elevation raised above water line) 047 ARSENIC Sediment 70
      Deleted from NPL 9242004 100 (Act) LEAD 500
      CADMIUM None
      8 SILVER BOW CREEKBUTTE AREA 1 Streamside Tailing (Silver Bow Creek) July 1999 - Ongoing 73 (ROD Est) Yes Channel realignment and construction (176 miles) $44 (ROD)$98 (ESD) ARSENIC Sediment None 200 979
      CADMIUM 20 099
      COPPER 1000 316
      SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website) LEAD 1000 358
      ZINC 1000 None
      SILVER BOW CREEKBUTTE AREA (MT STATE Website) Sediment Trap MERCURY 10 018
      9 IRON MOUNTAIN MINE 5 Spring Creek Arm 2008-20011 200 (Est) 15 area not specified 186 ARSENIC Sediment Sediment susceptible to erosion dredged to a specific elevation None
      ROD dateSeptember 2004 COPPER
      Region 9 Iron Mountain Mine Website IRON
      9 MCCORMICK amp BAXTER CREOSOTING CO 3 Old Mormon Slough 2006 88 (Est) area not specified 35 DIOXIN Sediment 000021 TEQ 0000021 TEQ
      Region 9 Website McCormick and Baxter Creosoting 88 (Act) PAHs 333 (OC) 333 (OC)
      9 MOFFETT NAVAL AIR STATION 8 Site 27 - Northern Channel completed in 12007 656 (soil and sediment) (Est) Yes 68 TOTAL PCBs Sediment 035 035
      TOTAL DDT 00648 00648
      TOTAL CHLORDANE 0931 0931
      CADMIUM 184 184
      Naval Air Station Moffett Field Website LEAD 173 173
      MERCURY 152 152
      SELENIUM 0926 0926
      SILVER 137 137
      ZINC 720 720
      9 MONTROSE CHEMICAL CORP 5 Palos Verde Shelf Interim ROD Date September 2009 300 Area not specified DDT Sediment 46 (OC) interim23 (OC) Final
      White Croaker 04
      Water 022 ngL
      Palos Verdes Shelf (Region 9 Website) PCBs Sediment 7 (OC)
      White Croaker 007
      Water 0064 ngL
      9 UNITED HECKATHORN CO 1 Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)65 (Proj) Yes 7 DDT Sediment dredge all soft sediments 059 (average)
      Region 9 United Heckathorn Co Website
      10 Bunker Hill Mining and Metallurgical 3 Upper Basin ROD Amendment date Aug 2012 Not specified Arsenic Sediment
      Cadmium
      Runker Hill Mining and Metallurgical (Regional Website) Copper
      Lead 530
      Mercury
      Silver
      Zinc
      10 COMMENCEMENT BAY NEAR SHORETIDE FLATSPartial deletion (St Paul Waterway) 1996 1 Olympic View Resource Area (NTCRA) Completed in 102002 11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ 000002 TEQ
      COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website) 19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 20 (Est) 174 ARSENIC Sediment preponderance of evidence approach 93
      10 (Act) COPPER 390
      LEAD 450
      ZINC 410
      1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13 067
      1 Sitcum Waterway completed in 1994 428 (Act) 45 (Act) 4 ARSENIC Sediment 160 57
      COPPER 1100 390
      1 Hylebos Waterway 32003-22005 940 11 20 46 ARSENIC Sediment 97 57
      HEX-CB 01 0022
      HPAHs 32 17
      PCBs 045 03
      Occidental Site Removal Action (NTCRA) completed March 2003 36 (Act) 10 PCE Sediment 0057
      1 Thea Foss and Wheeler-Osgood Waterways 2002-2006 423 (Act) 32 (Est) 21 (Est) 4 (Est) 60 82 CADMIUM Sediment 66 51
      HPAHs 22 17
      LEAD 580 450
      MERCURY 077 059
      ZINC 490 410
      1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes 22 (Act) 05 (Act) 87 (Act) 125 COPPER Sediment 470 390
      MERCURY 071 059
      LPAHs None 52
      HPAHs None 17
      10 HARBOR ISLAND (LEAD) 7 Lockheed Sediments 7703 - 2405 18 cy (Est) 5 (Act) 12 (Act) In dredge areas $15(ROD) $12(ESD) 20 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      70 (Act) COPPER 390 (Dredge and Cap) 390
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      LEAD 530 (Dredge) 450 (Cap) 450
      LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      MERCURY 059 (Dredge) 041 (Cap) 041
      Region 10 Harbor Island (Lead) Web Site PCBs 65(OC) (Dredge) 12(OC) (Cap) 12 (OC)
      ZINC 960 (Dredge) 410 (Cap) 410
      TBT Not available Not available
      9 Todd Shipyard Sediments 7604 - 22007 5 (Act)(223235 sq ft) Yes In dredge areas No area given $45-$69 21 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      COPPER 390 (Dredge and Cap) 390
      LEAD 530 (Dredge) 450 (Cap) 450
      MERCURY 059 (Dredge) 041 (Cap) 041
      116 (Est) ZINC 960 (Dredge) 410 (Cap) 410
      220 (Act) LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      PCBs 65 (OC) (Dredge)12(OC) (Cap) 12 (OC)
      TBT Not available not available
      10 East Waterway Sediments NTCRA 11204 - 31605 (removal action)No ROD completed for this OU 206 (Act) - Removal action 13 (Act) In dredge area 17 16 MERCURY Sediment 041
      PCBs 12 (OC)
      10 KETCHIKAN PULP COMPANY 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est) 87 (Act) Yes 50 (Est) 52 (Act) 21 (Est) 27(Act) 44 31 4-METHYL-PHENOL Sediment 17 Not Stated Benthic toxicity community structure and chemistry
      Not on the NPL - Superfund Alternative Sited AMMONIA 120
      Region 10 Ketchikan Pulp Company Web Site SULFIDE None
      10 LOCKHEED WEST SEATTLE 1 Lockheed West ROD Date August 2013 167 potential use in shallow areas yes 116 DredgeEMNR 477 PCB Sediment Washington State CSL or SQS 0002
      Arsenic 7
      Lead 11
      Copper 114
      Lockheed West Seattle (Region 10 Website) Mercury 041 (subtidal)017 (intertidal)
      284 EMNR only Carcinogenic PAHs (TEQ) 0009
      TBT 043 (subtidal)2 (intertidal)
      DioxinsFurans 0000002
      Multiple Others see attached
      10 MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT) 4 Sediments 72004-92005 23 (Act)organoclay 23 12 ARSENIC Sediment 12
      Region 10 McCormick and Baxter Creosoting DIOXINSFURANS 000008
      ORDEQ McCormick amp Baxter Creosoting Co Web Site 15 (Est) PAHs 2
      PCP 100
      Arsenic (III) Water 190 μgL
      Chromium (III) 210 μgL
      Copper 12 μgL
      Zinc 110 μgL
      PCP 13 μgL
      Acenaphthene 520 μgL
      Fluoranthene 54 μgL
      Naphthalene 620 μgL
      Total cPAHs 031 μgL
      Dioxinsfurans 1x10-5 ngL
      10 OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA) 1 Clam Bay Sediments 61999 - 102001 7-10 (Est) Yes Area not specified 5 46 71 PCBs Sediment 013 004
      COPPER 390
      LEAD 450
      ZINC 410
      10 (Act) SILVER 61
      2 4-DIMETHYL-PHENOL 0029
      PCBs Shellfish (intertidal clams) 0042
      10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005 35 (Est) 50 (Est) 49 15 LMWPAHs Sediment 780(OC) 370(OC)
      58 (Act) HMWPAHs 5300(OC) 960(OC)
      98 (Act) Capped dredge areas PCBs 12 (OC) (trigger for sediments to 10 feet depth) 12 (OC)
      10 PUGET SOUND NAVAL SHIPYARD COMPLEX 2 OUB Marine 61600 - 3104 200 (Est) 5 211 9 12 PCBs Fish (English sole) 0023 ww
      Sediment 12 (OC) dredgecap 6 (OC) EMNR 3 (OC) SWAC12 (OC)) SWAC
      225 (Act) Sediment in state owned adjacent lands 9 (OC) EMNR
      MERCURY Sediment 3 where PCBs greater than 6 (OC)
      10 ST MARIES CREOSOTE - proposed to be added to the NPL 0 Shoreline Nearshore and Offshore Sediment ROD dateJuly 2007 29 (Est) Yes 108 LPAHs Sediment 370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)
      St Maries Creosote (Regional Website) Remediation Ongoing HPAHs 960 (OC) (17 if TOC lt02or gt4)
      10 WYCKOFF COEAGLE HARBOR 1 East HarborPhase 1 - NTCRA 91993 -31994 (Phase 1) 54 (Act) 117 MERCURY Sediment (toxicity test opt-out)
      LPAHs 780 (OC)
      Region 10 Wyckoff Eagle Harbor Web Site HPAHs 5300 (OC)
      East HarborWest Beach Sediments 2007-2008 48 (Act) 23 MERCURY Sediment 059 subtidal 059
      LPAHs 780 (OC) subtidal 780 (OC)
      HPAHs 5300 (OC) subtidal 5300 (OC)
      East HarborIntertidal and Subtidal Sediments 2000-2002 30(Act) $6-20 MERCURY Sediment 059 059
      LPAHs 780 (OC) 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      3 West Harbor 31997 - 121997 13-92 (Est) Yes 12 - 31 (includes EMNR) 49 see cap $62 - $16 MERCURY Sediment 5 21059 059 (dw)
      LPAHs 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      71
Page 6: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

BRIDGEPORT RENTAL amp OIL SERVICES

PCBs 10

LEAD 1000

Total Petroleum Hydrocarbons None

LEAD 250

PCBs 5

3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment

St Lawrence River 61995 - 111995 13 (Act) 2 (Act)

Turtle CreekTurtle Cove 1004 - 305

23 (Act) (soil and sediments)

01

Raquette River 602 - 503 14 (Act)

GOWANUS CANAL ROD Date Sept 2013588 (Est)

Area not stated (dredgecap remedy)

In-situ stabilization of 3-5 feet of NAPL-containing sediments

PAHs

Holding Tanks for CSO Control

Copper

Lead

Grasse River Superfund Site(aka Alcoa Aggregation Site)

2431 Sediment 1

Yes Area not specified

Region 2 Bridgeport Rental amp Oil Services Website

175 (Est) 106 (Est)

1

Little Timber Creek Swamp

2 Sediment

20

80

94

g

None

125 Sediment

LEAD 11292005

area volume not specified

2

2

BURNT FLY BOG

2Downstream Area and Westerly Wetlands

400049

2

11795 - 1996

gt6000 tons (Act) (soil and sediment)

10

1000

ROD dateSeptember

Sediment

PCBs Sediment

22

1

1

GENERAL MOTORS (CENTRAL FOUNDRY DIVISION)

1

Gowanus Canal (Region 2 Website)

215 01

Canal Sediments

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Grasse River(Region 2 Website) Fish

001-005 (Final Remedial Goal)

026-036(Interim Target Concentrations)

HOOKER (102ND STREET) Sediment 01

(organics)

Deleted from NPL 852004 Sediment 02

(Mercury)

Fish 005

Sediment 3 gm2 (MPA)Sediment 10 gm2 (MPA)Fish 005SedimentFish 005

(change in ESD from dredging to excavation)

981 (Est) ROD 21

85000 Tons (Act) ESD 50-75

2

LOVE CANAL

Deleted from NPL 9302004

2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001

Biological Sampling None

Sediment 100

56 (Est)

Sediment Excavate up to 1 ft

580 (Est)

HUDSON RIVER PCBS

ROD Date April 2014

Upper Hudson River (Section 2)

Grasse River

Hudson River PCBs EPA Website Upper Hudson

River (Section 3) 510 (Est)

None

0001

Not specified

New York State Sediment TBCs

11

PCBs284

$36 - 56

2 109 Yes

Yes2 1 Niagara River Embayment 71996 - 111996 28 (dredge

to 2 feet)

PCBs

1

PAHs METALS CHLORINATED ORGANICS (MULTIPLE)

22502 2

Upper Hudson River (Section 1)

ROD dateFebruary 20 Area not specified

1560 (Est)

Yes

2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001

485 CADMIUM

INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC

Sediment

CADMIUM

Biological Sampling

100

2

MARATHON BATTERY CORP 1

East Foundry Cove Marsh and Constitution Marsh

91993 - 31995

Actual not sp

30 (Est)

Deleted from NPL 10181996 2

East Foundry Cove West Foundry Cove and the Cold Spring Pier Area

91993 - 31995

Yesbentonite clay layer

40

95 Removal 10 mgkg

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

ROD dateJuly 2005

MERCURY and others Sediment 014-2

Operations Ongoing

5LCP Bridge St SiteWest Flume and Wetland AB

June 2005 - July 2007

543 (Est)917 (Act) Yes 96 MERCURY Sediment 02

MERCURY and others Sediment

Mercury Fish 01-03

Sediment Soil (flood plain)

Fish 01 - 03

Raritan Bay Slag

Raritan Bay Slag (Region 2 Website)

52 (Est) PAHs 1086 (Act) PCBs 1

TDBFs 0001

2RICHARDSON HILL ROAD LANDFILLPOND

1South Pond and Herrick Hollow Creek

2004 285 (Act) 139 PCBs Sediment 1

116 (Est) PAHs

240 (Act) Metals

3

River Areas (Blackwater Branch Floodplain amp Maurice River)

2006 - ongoing 626 Yes 11 ARSENIC Sediment 20

4 Union Lake Sediments Remedy not yet initiat Unknown Yes Sediment

Washing 129 ARSENIC Sediment Unknown

2000-2001 11 (Est) LEAD Not specified

METHYL Hg Fish

2

ONONDAGA LAKE

Region 2 Onondaga Lake Website

03

0 400

See Attached

20 exposed 120 submerged

1

Lead 400Sediment787ROD Date May 2013 34 (Est)

425 (Est) 1771 154 (Est)

2

2 Onondaga Lake Bottoms Subsite 2407 (Est)

Geddes Brook NineMile Creek Reach BC CD

ROD DateApril 2009

June 2012 - ongoing

59 (Est)20

24Geddes Brook NineMile Creek Reach AB

414

Combined with Dredge volume

Yes

151

Partial Channel Re-location

June 2012 - 16 (Est) 42 (Est) Yes MERCURY and others

015

54 (Act) Sediment

189

2

REYNOLDS METALS CO

Not on the NPL - Superfund Alternative Site

1 St Lawrence amp Raquett Rivers 412001 - 102001 35

ROEBLING STEEL CO 5 Delaware River and

Crafts Creek Sediment2010-2013 Yes2 11

2 VINELAND CHEMICAL CO INC

120

08

015

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

15 (Act) PCBs

Complete Removal or

1

PCBs

1 Contingent on biological and chemical testing

LEAD Not specified

ATLANTIC WOOD INDUSTRIES INC 6 7 45 to 100

Region 3 Atlantic Wood Industries Website

157 (Est) 100

CADMIUM 60LEAD 1200ZINC 5600CADMIUM 60LEAD 1200

ZINC 5600

CADMIUM 20LEAD 700ZINC 3000

KOPPERS CO INC (NEWPORT PLANT)

ROD dateSeptember 2005

Region 3 Koppers Co Inc Website

Remedy not yet initiated

METAL BANKS RiverMudflat Sediments

METAL BANK (Regional Website)

OU Name SOIL EXCAVCONTAIN

BORONCOPPERLEADZINC

PCB-1260

Sediment

Unknown

Contamination Pathways - Northwestern Wetland

River Water and Sediments

1

PAHs

3

2010-Ongoing

Cedar Creek

Dunham Creek

Christina River

1727

39

37 (Act)

Yes

Yes

Unknown (Act)

Yes

33

Yes

2

50

Contamination Pathways - Western Wetland

126 (Dredging and Disposal)

Sediment

Sediment

2 YORK OIL CO

Sediment

Sediment

tPAHs3 3

12

7 51099 - 9899 11 (Act)

425 South Wetlands 1997 - 12897

95 (Act)

3

3 North Wetlands 1997 - 12897EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL)

Region 3 EI duPont Website

150

47

Sediment 1

Unknown

Sediment

Re-channelize portion of Hershey Run

Sediment

Unknown

PCBs12 (Est)

58 (Est) Unknown3 1

3 1 2008-2010

Wetlands Ponds and Hershey Run

4 1 ROD dateAugust 2006

94 (Est)

38 (Est)Yes

AMERICAN BRASS INC

American Brass Inc (Regional Website) 429

170780

22028

Yes

Sediment

5176

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

AMERICAN CREOSOTE WORKS INC

American Creosote Works Inc(Regional Website)

Arsenic Sediment

Cadmium Sediment

Fish 3 ppt

Sediment

$20 (Total) TOTAL PAH Sediment 100

DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company)

ROD dateSeptember 2008

Unknown

23

Mercury

143 river miles Dioxin

0

PCBs

196

53000 (O3R amp PR)

57000 (CBR)

640 (Ocoee 3 amp Parksville Reservoirs)

680 (Copper Basin Reach)

5

2200 (CBR)

2

4

Lower Roanoke River

4

Sediment

970 (O3R amp PR)

Sediment

Iron Sediment

Sediment

250 (O3R amp PR)

Yes

Sediment

COPPER BASIN MINING DISTRICT SITE

Copper Basin Reach

Ocoee No 3 Reservoir

Parksville Reservoir

ROD date September 2011

Fish

Region 4 Copper Basin Mining District Site website

4 ROD date September 2007 40 (Est)

Copper

Zinc

Area Not Specified (approx 14 river miles)

Railroad Lake and Hughes Creek

Lead

145 (CBR)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website

4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment

0 (Est) 3 (Act)

$045 (ROD)

01 (ESD)

North Marsh Sediments No info 15 (Act)

1000 linear feet 025 acre (Est)1300 linear feet (Act)

SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION

Fish 2

Lake Hartwell (Regional Website) Sediment

TENNESSEE PRODUCTS 142 (Est) $94 (ROD) Visual

107000 tons (Act)Followed by capping

71 (Act)Aquablock $257 (ESD)

Chattanooga Creek NTCRA 1997-1998 229 Yes Visual

TRIANATENNESSEE RIVER

Fish (channel catfish)

Region 4 TrianaTennessee River Website

Fish (smallmouth buffalo)

Fish (largemouth bass)

WARD TRANSFORMER

Reach A (Removal Action) June 2007 - 2009

150000 tons (Est)Approx 400000 tons (Act)

PCB Sediment

Region 4 Website Sediment

Fish 005

PAHs

Arsenic

Region 4 Tennesse Products Website

1

1

4 1

Ashley River 7101 - 12101

South Marsh Sediments

Barge Canal

Region 4 Koppers Co Inc (Charleston Plant)

KOPPERS CO INC (CHARLESTON PLANT)

0001

32 (Est)0 (Act)

0 (Est)32 (Act)

3103 - 6103

SedimentWeight of Evidence Approach

$05 (ROD)3 (ESD)

Lead

42003 ESD selected MNR for the area

19 tons (Act) 15 (Est)2 (Act)

730 (Est)

17

282

23

01

321 PCBs

1

4 2Twelve Mile CreekLake Hartwell

ROD date62894

Chattanooga Creek - Middle Reach

September 2005 - September 2007 PAHs Sediment

4 0

Reach AHuntsville Spring Branch - Indian Creek

4186 - 101487 DDT 5

Rerouted river buried in-place sediments

No sediment CUL

4Reach B C D and lower Brier Creek

13 (soil and sediment) (Est)ROD date

S t b 2008

Yes

No sediment CUL

No sediment CUL

1

1

None

4

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Sediment

Fish 005

BENZO(A)PYRENE 8

BENZO(BampK)FLOURANTHENE 7

BENZO(A)ANTHRACENE 95

INDENO(123-CD)PYRENE 465

ARSENICBERYLLIUMARCHLOR-1016 3ARCHLOR-1242 3ARCHLOR-1254 3ARCHLOR-1248 3ARCHLOR-1260 3BENZO(A)ANTHRACENE

BENZO(A)PYRENE

BENZO(BampK) FLOURANTHENEDI-BENZ(AH) ANTHRACENEINDENO(123-CD)PYRENEARCHLOR-1248ARSENICLEAD

1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 Sediment 1

2 Appleton to Little Rapids

MNR RemedyROD Date 122002 3 (Est) 20 river

miles Sediment

Sediment 1

Fish (Walleye) 005

Sediment 1

Fish (Walleye) 005

MNR RemedyROD Date 62003

Approx 2700 sq miles

1

701(2010 ESD)

5 PCBs

1

CONTINENTAL STEEL

Region 5 Continental Steel Website

FOX RIVER NRDAPCB RELEASES

Proposed to be added to the NPL

Lower Fox River Cleanup Website

4

Sediment

02

04

119

PCBBrier Creek Reservoir Lake Crabtree and Lower Crabtree Creek

September 2008

Remedy not yet initiated

12

~25 river miles

$37 (Total)

4 Markland Avenue Quarry 3252008 - 612010

5

3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est)

08

1

400

Sediment

14

19

1

11

175Yes

297000 cy

SWAC 025

SWAC 028

11

390 (2005 ROD Amendment)

3273 (Est) 136 (Est)

3216 (Est)

227 (Est)

De Pere to Green Bay 2007 - ongoing

Little Rapids to De Pere 42009 - ongoing

Yes

5 Green Bay

05

Sediment

025 (SWAC)

05

16

19084

093

None

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER)

43 (Est) Yes RADIUM 226

Region 5 Kerr-McGee Website 129 (Act) RADIUM 228

LITTLE MISSISSINEWA RIVER

Not on the NPL - Other Cleanup Activity Private Party-Lead Cleanup

Sediment4 (0-1ft) 5 (deeper than 1ft)

Little Mississinewa River

(Region 5 Website)

Fish Unknown

North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below

71992 to 91992 55 (Est) Yes 074

Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below

1991-1992523 (EST)

30 (ACT)131

2010-2012 PCBs 1

PAHs 2

Fish (Sport) 003 - 01

1 (0-1ft)5 (deeper than 1ft)

72 picoCuries per gram (pCig) combined radium

Yes

57 (Est)

100000 tons (Act)

Kress Creek Site

5 0 Little Mississinewa River

Spring 2005 - Fall 2009

5 0 Summer 2005 - 2012

2012-2013 195 (Est)

$719 (Total) Sediment128

PCBs25 miles (Est) 27 20

OUTBOARD MARINE CORP (Region 5 Website)

4 formerly 1

1HarborSlip No 3(2009 ROD Amendment)

Sediment

PCBs

5

OUTBOARD MARINE CORP 1

Yes40 (soil and sediment) (Est)

Unknown

50 (upper harbor)

Sediment

73

OMC Plant 2 North and South DitchROD Date August 2007

2012 ROD Amendment

Yes PCBs349

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

36 (Est)

54 (Act)

53 (ROD)51 (ESD) Sediment 26

51 (ACT)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Sediment 26Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

21 (Est) SedimentNone (88 mass removal of PCB)

21 (Act)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Copper

VELSICOL CHEMICAL CORP (MICHIGAN)

640 (Act) Carp Smallmouth Bass 1708

Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5

Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000

Natural Recovery Areas 122001 - ongoing Area not

specified

North of Dredge Island NA Actual ROD

Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act)

MERCURY

Pine RiverSt Louis Impoundment

05

Sediment

Amendment)

PCBsYes Sediment

Sediment 1

5

SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI)

2 Area 9 -- Lake Embayment 1295 - 0697

SHEBOYGAN HARBOR amp RIVER

1

Lower River and Inner Harbor Completed in 2012

Region 5 Sheboygan River and Harbor Superfund Site Website

Middle River

Remedy not yet startedAOC dateFebruary 2009

02 (SWAC)

05

05

05

Yes (ROD)

7 miles

12

PCBs

Sept 2004 - October 2007

5 DDT

Unknown area

5 Torch Lake 2

Yes

6

$60 (Total)

ALCOA (POINT COMFORT)LAVACA BAY

1PAHs 448 Total

Upper River 31

Surface WatersNPL DeletionFeb 5 2002

ROD DateMarch 311994

5

$30 (as of 2002)2 1999 - 2005

No Action

161

15

Hg 025 Marsh 05 Open Water

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Witco Marsh 12006 - 42006 57

Chlor-Alkali Process Area (Treatability Study)

August 1998 (Phase I)January 1999 (Phase II)

80 (Act) 1952 MERCURY Mass removal

20 (tar and sediment) (Act)

6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995

47 (ROD Est)150 (ESD Est)170 (Act)

Yes 226 PAHs Sediment 1300

MILLTOWN RESERVOIR SEDIMENTS

2600 (Est)

Region 8 Milltown Reservoir Sediments Website

2560 (Act)

ROCKY MOUNTAIN ARSENAL (USARMY) 19 (Est) Yes (Est) ALDRIN 38

DIELDRIN 37

CHLORDANE 12

ROCKY MOUNTAIN ARSENAL (Region 8 Website)

DDE None

DDT 14

ROCKY MOUNTAIN ARSENAL (US Army Website)

MERCURY 82

ARSENIC 270

SHARON STEEL CORP (MIDVALE TAILINGS)

1 436 (Est) ARSENIC 70

Sediment None

PAHs

North Marsh Area Unknown Sediment None

6 (EST)

8 1 Milltown Reservoir Sediments

Remediation completed Dec 2010

Deleted from NPL 10152007

6

BAILEY WASTE DISPOSAL

1 January 1996 - September 1996

Yes

39 Sediment

Channel realignment and construction

ARSENICCADMIUMCOPPERLEADZINC

140

8 3Lake Sediments Remediation Project

June 1999 - Aug 1999

No (Act)33 (Act)

Yes

Area not specified

Aug 1996 - Sept

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

100 (Act) LEAD 500

CADMIUM None

ARSENIC 200 979CADMIUM 20 099

COPPER 1000 316

LEAD 1000 358

ZINC 1000 None

SILVER BOW CREEKBUTTE AREA (MT STATE Website)

Sediment Trap MERCURY 10 018

2008-20011 ARSENIC

COPPERRegion 9 Iron Mountain Mine Website

IRON

MCCORMICK amp BAXTER CREOSOTING CO

88 (Est) DIOXIN 000021 TEQ

Region 9 Website McCormick and Baxter Creosoting

88 (Act) PAHs 333 (OC)

TOTAL PCBs 035TOTAL DDT 00648TOTAL CHLORDANE 0931

CADMIUM 184LEAD 173MERCURY 152SELENIUM 0926SILVER 137ZINC 720

MONTROSE CHEMICAL CORP DDT Sediment

White Croaker 04

Water

Palos Verdes Shelf (Region 9 Website) PCBs Sediment

White Croaker 007

Water

9 300 Area not specifiedPalos Verde Shelf

46 (OC) interim23 (OC) Final

00648

Sediment

(elevation raised above water line)

047

SILVER BOW CREEKBUTTE AREA

1 Streamside Tailing (Silver Bow Creek)

Deleted from NPL 9242004

Marshy Area

1996

Sediment

Channel realignment and construction (176 miles)

July 1999 - Ongoing 73 (ROD Est) Yes None

0000021 TEQ

Yes

Sediment susceptible to erosion dredged to a specific elevation

None186

Sediment

Sediment$44 (ROD)$98 (ESD)

15 area not specified9

IRON MOUNTAIN MINE

5 Spring Creek Arm 200 (Est)

8

ROD dateSeptember 2004

SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website)

9 3 Old Mormon Slough 2006

9

MOFFETT NAVAL AIR STATION

8 Site 27 - Northern Channel completed in 12007

Naval Air Station Moffett Field Website

68

area not specified 35

173152

0064 ngL

Sediment

0931656 (soil and sediment) (Est)

035

333 (OC)

184

0926137720

022 ngL

7 (OC)

8

5 Interim ROD Date September 2009

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

UNITED HECKATHORN CO

Region 9 United Heckathorn Co WebsiteBunker Hill Mining and Metallurgical 3 Arsenic

CadmiumRunker Hill Mining and Metallurgical (Regional Website)

Copper

LeadMercurySilverZinc

COMMENCEMENT BAY NEAR SHORETIDE FLATS

Partial deletion (St Paul Waterway) 1996

1Olympic View Resource Area (NTCRA)

Completed in 102002

11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ

20 (Est) ARSENIC10 (Act) COPPER

LEADZINC

1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13

ARSENIC 160COPPER 1100ARSENIC 97HEX-CB 01HPAHs 32PCBs 045

Occidental Site Removal Action (NTCRA)

completed March 2003 36 (Act) 10 PCE Sediment

CADMIUM 66HPAHs 22LEAD 580MERCURY 077ZINC 490COPPER 470MERCURY 071LPAHs NoneHPAHs None

18 cy (Est) ARSENIC 93 (Dredge) 57 (Cap)

70 (Act) COPPER 390 (Dredge and Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

Sediment

1752

57

000002 TEQ

530

dredge all soft sediments

preponderance of evidence approach

DDT SedimentYes 7 059 (average)Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)

65 (Proj)

10

COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website)

1 Sitcum Waterway completed in 1994 428 (Act)

19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 174 Sediment 390

450410

Sediment 39045 (Act) 4

1

Hylebos Waterway 32003-22005 940 11 20

17450

46

03

0022Sediment 17

05 (Act) 87 (Act)

4 (Est)

57

21 (Est)

Sediment

82 Sediment

125

60

390

22 (Act)

32 (Est)

059

1Thea Foss and Wheeler-Osgood Waterways

2002-2006 423 (Act)

1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes

HARBOR ISLAND

059410

57

390

960 (OC)

067

93

0057

51

ROD Amendment date Aug 201210 Upper Basin Not specified

9 1

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

LEAD 530 (Dredge) 450 (Cap)

LPAHs780(OC) (Dredge) 370(OC) (Cap)

MERCURY 059 (Dredge) 041 (Cap)

PCBs65(OC) (Dredge) 12(OC) (Cap)

ZINC 960 (Dredge) 410 (Cap)

TBT Not available

ARSENIC 93 (Dredge) 57 (Cap)

COPPER 390 (Dredge and Cap)

LEAD 530 (Dredge) 450 (Cap)

MERCURY 059 (Dredge) 041 (Cap)

116 (Est) ZINC 960 (Dredge) 410 (Cap)

220 (Act) LPAHs780(OC) (Dredge) 370(OC) (Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

PCBs65 (OC) (Dredge)12(OC) (Cap)

TBT Not available

MERCURY

PCBs

KETCHIKAN PULP COMPANY

4-METHYL-PHENOL 17

Not on the NPL - Superfund Alternative Sited

AMMONIA 120

Region 10 Ketchikan Pulp Company Web Site

SULFIDE None

PCB

0002

57

370 (OC)

Yes In dredge areas No area given

370 (OC)

041

12 (OC)

$15(ROD) $12(ESD) 20 Sediment

5 (Act)(223235 sq ft)

10

Todd Shipyard Sediments 7604 - 22007

Region 10 Harbor Island (Lead) Web Site

9

5 (Act)12 (Act) In dredge areas

10

(LEAD)

7 Lockheed Sediments 7703 - 2405

East Waterway Sediments NTCRA

11204 - 31605 (removal action)No ROD completed for this OU

206 (Act) - Removal action

13 (Act) In dredge area

$45-$69 21 Sediment

17 16 Sediment

21 (Est) 27(Act) 44Yes 50 (Est)

52 (Act) 31 Sediment

410

10 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est)

87 (Act)

Not Stated Benthic toxicity community structure and chemistry

Not available

390

450

12 (OC)

450

041

12 (OC)

041

410

960 (OC)

not available

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Arsenic

Lead

Copper

Mercury

Carcinogenic PAHs (TEQ)

TBT

DioxinsFurans

Multiple Others

MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT)

ARSENIC

Region 10 McCormick and Baxter Creosoting

DIOXINSFURANS

PAHs

PCP

Arsenic (III)

Chromium (III)

Copper

Zinc

PCP

Acenaphthene

Fluoranthene

10 Sediment

11

7

041 (subtidal)017 (intertidal)

114

see attached

0009

LOCKHEED WEST SEATTLE

Lockheed West Seattle (Region 10 Website)

Lockheed West ROD Date August 2013

116 DredgeE

MNR

284 EMNR only

1 167potential use in shallow areas

yes 477

54 μgL

520 μgL

13 μgL

10

190 μgL

23 12

Water

23 (Act)organoclay

4 72004-92005Sediments

000008

100

Sediment

ORDEQ McCormick amp Baxter Creosoting Co Web Site

15 (Est)

12 μgL

2

12

110 μgL

210 μgL

043 (subtidal)2 (intertidal)

Washington State CSL or SQS

0000002

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Naphthalene

Total cPAHs

Dioxinsfurans

PCBs 004COPPERLEADZINCSILVER2 4-DIMETHYL-PHENOL

PCBs Shellfish (intertidal clams) 0042

50 (Est) LMWPAHs 780(OC)

58 (Act) HMWPAHs 5300(OC)

98 (Act)Capped dredge areas

PCBs

12 (OC) (trigger for sediments to 10 feet depth)

Fish (English sole) 0023 ww

Sediment12 (OC) dredgecap 6 (OC) EMNR

Sediment in state owned adjacent lands

9 (OC) EMNR

MERCURY Sediment3 where PCBs greater than 6 (OC)

ST MARIES CREOSOTE - proposed to be added to the NPL

ROD dateJuly 2007 LPAHs

370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)

St Maries Creosote (Regional Website)

Remediation Ongoing HPAHs

960 (OC) (17 if TOC lt02or gt4)

7-10 (Est)

200 (Est)

10 (Act)

35 (Est)

510

OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA)

1 Clam Bay Sediments 61999 - 102001

15

450

Area not specifiedYes

12 (OC)

46 71Sediment

013390

61

0029

410

10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005

960(OC)49 Sediment

12

PCBs

3 (OC) SWAC12 (OC)) SWAC

10PUGET SOUND NAVAL SHIPYARD COMPLEX

2 OUB Marine 61600 - 3104

225 (Act)

10 0Shoreline Nearshore and Offshore Sediment

29 (Est) Yes

211 9

108 Sediment

5

1x10-5 ngL

031 μgL

620 μgL

370(OC)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

MERCURY (toxicity test opt-out)

LPAHs 780 (OC)

HPAHs 5300 (OC)

MERCURY 059 subtidal

LPAHs 780 (OC) subtidal

HPAHs 5300 (OC) subtidal

MERCURY 059

LPAHs 780 (OC)

HPAHs 12 dw intertidal

MERCURY 5 21059LPAHs

HPAHs 12 dw intertidal

48 (Act)

30(Act)

54 (Act)

Region 10 Wyckoff Eagle Harbor Web Site

East HarborWest Beach Sediments

2007-2008

31997 - 121997 13-92 (Est) Yes

10

WYCKOFF COEAGLE HARBOR

1

East HarborPhase 1 - NTCRA

91993 -31994 (Phase 1)

East HarborIntertidal and Subtidal Sediments

2000-2002

3 West Harbor

117

780 (OC)

23

$6-20

Sediment

Sediment

059 (dw)

5300 (OC)

780 (OC)

5300 (OC)

5300 (OC)

Sediment

059

49 $62 - $16 Sediment12 - 31 (includes EMNR)

see cap

059

780 (OC)

  • READ_FIRST
  • Tier 1 Sites - Remedial
    • READ_FIRST

      The 2002 memo Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sitesestablished at 2 tier system of headquarters consultations to encourage national consistency in makingdecisions at Superfund and RCRA Corrective Action sediment sites Tier 1 sites are defined as sites wherethe proposed sediment action will address more than 10000 cubic yards or five acres of contaminatedsediment Consultation for Tier 1 sites involves the submission of the draft Proposed Remedy or draftEECA and a discussion of how the 11 principles were considered to the Regional Coordinator 30 daysprior to the public comment period Tier 2 sites are a subset of the Tier 1 sites that are large complex orcontroversial and are subject to consultation with the Contaminated Sediments Technical AdvisoryGroup throughout the RIFS and remedy selection stagesThis Tier 1 Tracking list is an EPA OSRTI product largely developed by the Army Core of Engineers and isintended to be a resource for contaminated sediment RPMs headquarters and regional technical staffand others supporting the remedy decision making process at these sites The list tracks the Tier 1 sitesthat have signed a decision document and documents the remedy selected theestimated and actual costs of the remedy the contaminants of concern and the associatedcontaminated media the Action Levels the Clean-up Levels (CUL) the Remediation Goals (RG) and theSediment Remedial Action Objectives (RAO) For those sites where the remedy has been implementedand a Five-year Review (FYR) has been completed the list also documents whether monitoring wasconducted for the FYR data was presented in the report and the CULs RGs and RAOs were met A keyaspect of this list is that the references for all the data in this spreadsheet are easily located Each cellcontaining data is hyperlinked to a PDF with the page or pages from the relevant public document thatreports the data Each PDF includes the cover page of the report with the information necessary tolocate the complete document and the data included in the spreadsheet is highlighted in the text of thePDF All of the information and documents included in this tracing list are publically availabledocumentsThis Version has been published to the internet with all of the hyperlinks removed We apologize for the inconvenience EPA is currently updating its websites and is temporarily unable to publish the Tier 1 Tracking List with the hyperlinks to the Cited Documents The Remedial Action Objectives and Five Year Review data columns have been removed from this version because they are largely narrative text and require the context provided by the hyperlinked documents in order to be properly understood When the Internet upgrade is complete the Fully cited version will be published Until then any questions regarding this Tier 1 Tracking List can be directed to Matt Lambert EPA Office Of Superfund REmediation and Technology Innovation (lambertmatthewepagov)The Tier 1 Tracking List includes sites in the Remedial Program where a Proposed Plan and Record of Decision were signed The sites are organized by EPA Region number and then listed alphabetically by name Due to the structure of the list columns cannot be filtered or sorted

      Tier 1 Sites - Remedial

      264pdf
      Websitehttpcumulisepagovsupercpadcursitescsitinfocfmid=0101431
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100948
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101479
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100744
      216pdf
      1-011pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100743
      Website httpwwwepagovnbhindexhtml
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631F8CFE11E53EFA23C8525691F0063F6E8OpenDocument
      1-009pdf
      260pdf
      702pdf
      Website httpyosemiteepagovr1npl_padnsf31c4fec03a0762d285256bb80076489ca48c071b6a314e1c8525691f0063f6ddOpenDocument
      1-068pdf
      608pdf
      610pdf
      611pdf
      612pdf
      631pdf
      681pdf Soil and sediment not differentiated
      682pdf
      1-057pdf
      692pdf
      695pdf
      700pdf
      703pdforig 1998 estimate
      1-035pdf
      679pdf
      1-005pdf
      636pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      638pdf
      636pdf
      1-010pdf
      1-074pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      1-017pdf
      1-018pdf
      1-020pdf
      215pdf
      694pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-024pdf
      1-023pdf
      1-025pdf
      1-026pdf
      1-027pdf
      1-027pdf
      1-028pdf
      1-025pdf
      1-047pdf
      1-031pdf
      1-033pdf
      1-034pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101074
      1-012pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201766
      738pdfDates are for entire construction not only sediment portion
      356pdf
      2058pdf
      735pdfThis represents cost estimate for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1266pdfThis represents actual cost for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1268pdf
      2083pdf
      1268pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200364
      2203pdf
      372pdf
      739pdf
      740pdf
      371pdfIn-situ treatment with sorptive agents
      371pdf
      1259pdf
      373pdf
      Website httpwwwepagovr02earthsuperfundnpl0200364chtm
      1259pdf
      373pdf
      1259pdf
      373pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200528
      1272pdf
      177pdf
      477pdf
      1261pdf
      2086pdf
      478pdf
      2086pdf
      478pdf
      Northerly wetlands and tar patch area were determined to be more like soil removals as they were not submerged Westerly wetlandds has a surface water stream running through it that is monitored for sediments so it is retained
      1273pdf
      2088pdfMNR doesnt have fieldwork dates but site fieldwork dates are included
      1274pdfNo specific area for MNR provided 21 acres is area of westerly wetlands for which MNR is selected
      2006pdf
      2087pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0201644
      456pdf
      218pdf
      457pdf
      2093pdf
      2094pdf
      178pdf
      2011pdf
      1279pdf
      461pdf
      56pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201706
      463pdf
      2016pdf
      463pdf
      2016pdf
      2091pdf
      2015pdf
      2015pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0202229
      990pdf
      993pdf
      1014pdf
      1299pdf
      2018pdf
      996pdf
      990pdf
      991pdf
      991pdf
      992pdf
      996pdf
      996pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200557
      2019pdf
      997pdf Remedy componentsareas not broken out
      2098pdf
      2096pdfInfo only on Alycon Lake no info on Rabbit Run or Chestnut Branch
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201290
      2033pdf
      764pdf
      2023pdf
      2024pdf
      2024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201491
      2032pdf
      1002pdf
      1001pdf
      2221pdf
      2031pdf
      2032pdf
      2102pdf
      2029pdf
      2028pdf
      2134pdf
      2030pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0203382
      2072pdf
      518pdf
      2228pdf MNR area was not stated Calculation Profundal areas 08= 154 profundal area = 1925 acres - 154 TLC acres = 1771 MNR acres
      518pdf
      2073pdf
      2075pdf
      2079pdf
      2123pdf
      2126pdf
      1005pdfAttachment has 2 sections one from the ROD the other from the FYR
      1006pdf
      2124pdf
      2125pdf
      2070pdf
      2059pdf
      2059pdf
      2059pdf
      2128pdf
      2060pdf
      2061pdf
      2127pdf
      2063pdf
      2063pdf
      2064pdf
      2065pdf
      2066pdf
      2130pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201465
      369pdf
      2133pdf
      2034pdf
      1008pdf
      2131pdf
      183pdf
      2177pdf
      2131pdf
      183pdf
      2131pdf
      183pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201770
      2036pdf
      64pdf
      1009pdfIncludes entire remedy sediment portion is not defined
      2038pdf
      2037pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200439
      2174pdf
      1012pdf
      2042pdf
      2041pdf
      2041pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200209
      2171pdf
      2051pdf
      523pdf
      2046pdf
      2044pdf
      2049pdf
      2162pdf
      2052pdf
      2053pdf
      2047pdf
      2045pdf
      2050pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201202
      69pdf
      2170pdf
      2054pdf
      2120pdf
      2054pdf
      2054pdf
      2118pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0302836
      Website httpcfpubepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0302836
      3006pdf
      497pdf Apparently same area as EMNR
      498pdf Apparently same area as MNR
      496pdf
      3001pdfWeb site COC list is much more extensive then tPAH
      497pdf
      497pdf
      httpwwwepagovreg3hwmdnplVAD990710410htm
      499pdf
      499pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300093
      1605pdf
      224pdf
      1601pdf
      1614pdf
      1606pdf
      1606pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1605pdf
      482pdf
      73pdf
      1615pdf
      656pdf
      1606pdf
      1617pdf
      1617pdf
      1617pdf
      1617pdf
      Website httpwwwepagovreg3hwmdsupersitesDED980555122indexhtm
      1617pdf
      1617pdf
      1605pdf
      483pdf
      74pdf
      484pdf
      657pdf
      1606pdf
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300092
      1622pdf
      1621pdf
      1039pdf
      959pdf
      1040pdf
      958pdf
      1623pdf
      665pdf
      httpwwwepagovreg3hwmdnplDED980552244htm
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300951
      1624pdf
      3008pdf
      961pdf
      960pdf
      3002pdfArea not stated No mention of sediment capping or marine mattress in ROD or ESDs
      962pdf
      1625pdf
      1626pdf
      1627pdf
      1628pdf
      Websitehttpwwwepagovreg3hwmdnplPAD046557096htm
      Website httpcumulisepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0300951Provided to indicate formal OU name
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0406299
      Construction completed but no documents are available
      12pdf
      578pdf
      579pdf
      4001pdf
      4001pdf
      12pdf
      4001pdf
      4001pdf
      4001pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0402260
      No information on websites regarding status of sediment work unclear as of Jan 2014
      21pdf
      4002pdf
      53pdfCost of sediment remedy is not broken out
      4003pdf
      Website hhttpcumulisepagovsupercpadcursitescsitinfocfmid=0403156
      400pdf
      580pdf
      4004pdf
      Website httpwwwepagovregion4superfundsitesnplnorthcarolinawcoplwtpnchtml
      395pdf
      402pdf
      396pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403350
      4008pdf
      4007pdf
      4023pdf
      965pdf
      4020pdfThe ROD and FYR do not directly state the COCs for the sediment remedy and there are not contaminant-specific cleanup levels The contaminants identified here are those with an HQ above 1 for all areas (see attachment) Presented here to indicate prevalent contamination
      4019pdf Excavation depth based on elevation and visual determinations
      4009pdf
      4011pdf
      4010pdfChanged remedy to MNR
      4011pdfChanged remedy to MNR
      4017pdf
      966pdf
      584pdf
      964pdf
      4013pdf
      4018pdf
      4021pdf
      1025pdf
      1026pdf
      4014pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403252
      77pdf
      561pdf
      4022pdf
      558pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0403765
      391pdf
      4030pdf
      4031pdf
      4032pdf
      393pdf
      httpwwwepagovregion04superfundsitesnpltennesseetennprotnhtml
      562pdf
      563pdf
      4031pdf
      4033pdfROD states However if certain excavated sediments appear to be uncontaminated then those sediments shall be subjected to sampling and analyses for the PAHs The action levels for sediment removal will reflect EPAs excess lifetime carcinogenic risk range of 1 x 10 6 to 1 x 10 4 (See Table G - 9) Its unclear whether or which concentrations will be used for an action level but the text and table are addded as a reference
      4034pdfNo remedial action in Reaches B and C See second page of attachment
      570pdf
      1031pdf
      4043pdf
      4044pdf
      4043pdf
      4043pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406082
      592pdf
      592pdfSite soils included in volume
      No Reach A removal action decision documents exist on EPA HQ or region websites
      httpwwwepagovregion4superfundsitesnplnorthcarolinawardtrnchtml
      593pdf
      590pdf
      591pdf
      4040pdf
      4041pdf
      4042pdf
      4041pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0501228
      5070pdf
      15pdf
      20pdfThis value represents Estimated 30-Year Net Present Worth to excavate and consolidate sediment in landfill
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      17pdf
      5170pdf
      5171pdf
      5172pdf
      533pdf
      532pdf
      Website httpwwwepagovregion5sitescontinentalindexhtm
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0507723
      5059pdf
      5173pdf
      5174pdf
      5180pdf
      5175pdf
      5057pdf
      5137pdf
      5093pdf
      5176pdfDeposit DD is located in OU2 but it is considered part of the OU3 response
      5179pdf
      5062pdf
      5181pdf
      5051pdf
      5092pdf
      5177pdf
      213pdf
      5058pdf
      Website httpwwwepagovregion5sitesfoxriverindexhtml
      5092pdf
      5178pdfAlso see Fox River ROD Amendment 2007 pg 14 Table 2 for documentation of the OU 5 dredge volume being included in the OU4
      213pdf
      5217pdf
      5094pdf
      5096pdf
      214pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500760
      33pdf
      5063pdfBackfill stated on second page of attachment
      35pdfIncludes floodplain material
      32pdf
      Website httpwwwepagovR5SupernplillinoisILD980823991htm
      32pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0508120
      5003pdf
      5002pdf
      5005pdf
      5060pdfEstimated from map in 5 year report
      5004pdf
      5004pdf
      5006pdf
      5001pdf
      5168pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500083
      5108pdf
      5222pdf
      5208pdf
      5022pdf
      5131pdf
      5209pdf
      Website httpwwwepagovregion5sitesoutboardmarine
      5205pdf
      514pdf
      515pdf
      5120pdf
      514pdf
      5120pdf
      514pdf
      5212pdf
      5125pdf
      5126pdf
      5127pdf
      5123pdf
      5128pdf
      Website ttpcumulisepagovsupercpadcursitescsitinfocfmid=0501181
      5024pdf
      5160pdfIncludes sediments and soils
      5026pdf
      5025pdf
      5024pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0505188
      5203pdf
      5202pdf
      5146pdf
      5044pdf
      5037pdf
      5045pdf
      5142pdf
      5142pdf
      Website httpwwwepagovregion5sitessheboygan
      5046pdf
      5145pdf
      5043pdf
      5140pdf
      5142pdf
      5142pdf
      5035pdf
      5144pdf
      5042pdf
      5036pdf
      5142pdf
      5142pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0502194
      150pdf
      148pdf
      149pdf
      5157pdf
      147pdf
      147pdfNo update provided in 2012 FYR
      5027pdf
      5156pdf
      Website httpwwwepagovregion5cleanupvelsicolmichiganindexhtml
      5154pdf
      5164pdf
      5164pdf
      5151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0601752
      6001pdf
      986pdf
      6004pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      987pdf
      983pdf
      981pdf
      984pdf
      6014pdf
      6006pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0602911
      1043pdf
      1044pdf
      6008pdf
      6009pdfA list of principal parameters is provided without risk context COCs or risk drivers in sediments are not identified
      1047pdfPossible that visually clean performance standard also applies to marsh sediments
      1045pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0600574
      1049pdf
      153pdf
      1050pdf
      1051pdf
      6010pdfConstruction and disposal only
      6011pdf
      1052pdf
      Wesbite httpcumulisepagovsupercpadcursitescsitinfocfmid=0800445
      8003pdf
      311pdfIncludes Area 1 sediments and 30K cy in area 3
      625pdf
      624pdf
      8002pdf
      Website httpwwwepagovregion8superfundmtmilltown
      8050pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800357
      8018pdf
      8017pdf
      1019pdf
      1018pdf
      8023pdf
      8012pdf
      8013pdf
      8015pdf
      website httpwww2epagovregion8rocky-mountain-arsenal
      8020pdf
      8019pdf
      8012pdf
      8015pdf
      website httpwwwrmaarmymil
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800694
      629pdf
      8024pdf
      630pdf
      8025pdf
      8026pdf
      8027pdfSediment and soil are often used interchangeably in the ROD
      628pdf
      627pdf
      8026pdf
      628pdf
      8026pdf
      8028pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800416
      8037pdf
      1021pdf
      1022pdf
      8043pdf
      1023pdf
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Websitehttpwww2epagovregion8silver-bow-creek-butte-area
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpdeqmtgovREMMWCBConstructionServicesSectionSilverBowCreekdefaultmcpx
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901755
      9015pdf
      596pdf
      1237pdf
      1236pdf
      1235pdf
      1234pdf
      980pdf
      1238pdf
      1234pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDCAD980498612OpenDocument
      1234pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901129
      1245pdf
      9002pdf
      1240pdfThis cost does not include $18M for bank stabilization
      1239pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDcad009106527OpenDocument
      543pdf
      1239pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902734
      1249pdf
      41pdf
      545pdf
      39pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpyosemiteepagovR9SFUNDR9SFDOCWNSF3dec8ba3252368428825742600743733c01ef2be6ec9ab9c8825737f002bf719OpenDocument978
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902440
      1254pdf
      156pdf
      974pdf
      975pdf
      1250pdfDieldrin is also a COC but only has a CUL for surface water
      1252pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfvwsoalphabeticUnited+Heckathorn+CoOpenDocument
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000981
      10-030pdf
      Name in ROD However name on CB website is NSTF Areawide Sediment covered within OU1 ROD was later divided into separate OUs except for removal actions conducted at Olympic View This removal action is summarized here
      1104pdf
      1105pdf
      1105pdf
      1106pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1106pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc923e8d62480494ad483882564f80082a1c0OpenDocument
      10-030pdf(formerly OU6)
      10-100pdf
      1101pdf
      1100pdf
      1099pdf
      1097pdf
      10-002pdf10 acres as of 2009
      1097pdf
      1097pdf
      1097pdf
      10-030pdf
      1071pdf
      1076pdf
      1073pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1072pdf
      10-030pdf
      1066pdf
      1061pdf Quantity does not include Blair Waterway dredging 1993 ESD states that Blair is not part of ROD cleanup and is for navigational purposes
      1062pdf
      1063pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      10-030pdf
      1060pdf
      1059pdf
      1059pdf
      1059pdf
      1067pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1070pdf
      1111pdf
      1112pdf
      1115pdf
      1113pdf
      10-030pdf
      10-098pdf
      1121pdf
      1079pdf
      1094pdf
      1094pdf
      1078pdf
      1122pdfThis is strictly a construction cost that appears to include construction of CDF and pile removal as well as dredging and capping
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 25
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 089
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      10-030pdf
      10-008pdf
      1081pdf
      1082pdf
      10-009pdf
      1084pdf
      1085pdf
      1087pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000020OU 8 is not included because OU was reommended for no further action in 2003 ROD
      1123pdf
      10-022pdf
      1134pdfCapping took place after dredging to in part maintain original depths
      1138pdf
      433pdfROD estimated remedy would cost $15M but 2002 ESD estimated it as $12M
      1133pdf
      1130pdf
      949pdf
      1135pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc9235a64831b6521f46b8825650200836f1cOpenDocument
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      1136pdf
      1124pdf
      10-023pdf
      1128pdf
      10-028pdf
      434pdf
      1125pdf
      1130pdf
      10-024pdf
      1126pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-025pdf
      1142pdf
      10-095pdf
      1144pdf
      1141pdf
      1143pdf
      1146pdf
      1146pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1000020
      1152pdf
      162pdf
      1148pdf
      314pdf
      633pdf
      1149pdf
      1153pdf
      431pdf
      1150pdf
      431pdf
      1151pdf
      Website httpyosemiteepagovR10CLEANUPNSF7d19cd587dff1eee8825685f007d56b72dd5ab7462e4f004882567b30057eb7bOpenDocument
      431pdf
      1151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000339
      166pdf
      49pdf
      1158pdf
      1159pdf
      1157pdf
      1157pdf
      Website httpwwwdeqstateoruslqcunwrmccormickbaxter
      1290pdf
      1157pdf
      1157pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1001134
      1291pdf
      1163pdf
      1164pdf
      1292pdf
      1293pdfAlthough not called MNR remedy is to monitor contaminant levels until the goal is achieved which is MNR
      10-061pdf
      1165pdfThis cost includes capping of the upland landfill A breakout for just the sediment portion was not provided
      1166pdfThis cost includes the fire training area and upland landfill cover A breakout of just the sediment remediation was not provided
      1167pdf
      1169pdfconsidered at conceptual target for sediment
      1292pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1169pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000611
      1177pdf
      10-031pdf
      10-031pdf
      1179pdf
      1178pdf
      1173pdf
      1181pdf
      1176pdf
      1174pdf
      1173pdf
      1181pdf
      1176pdf
      1173pdf
      1181pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1001107
      1182pdf
      10-040pdf
      1242pdf
      1244pdf
      1243pdf
      1188pdf
      1189pdf
      1187pdf
      1183pdf
      1185pdf
      10-041pdf
      10-042pdf
      1189pdf
      1185pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1002095
      46pdfIncludes soil excavation quantity in total volume
      10-039pdf
      408pdfIncludes cost for excavating nearshore soil
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate that sediment is not toxic
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate sediment that is not toxic
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000612
      10-066pdf
      1216pdf
      10-044pdf
      10-071pdf
      10-068pdf
      10-068pdf
      Website httpyosemiteepagovR10CLEANUPNSFsitesWyckoff
      10-068pdf
      10-075pdf
      10-113pdf
      409pdf
      1218pdf
      202pdf
      202pdf
      202pdf
      10-064pdf
      10-072pdf
      1219pdf
      1214pdf
      1214pdf
      1214pdf
      1215pdfRequirement for intertidal sediments
      423pdf
      10-047pdf
      10-046pdf
      1209pdf
      1208pdf
      1207pdf
      1203pdf
      1202pdf5 mgkg criteria for areas requiring dredging21 mgkg criteria for areas requiring a 1-meter thick cap 059 for thin layer capping
      1203pdf
      1204pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      2195pdf
      2136pdfCleanup goals for biological endpoints were not provided
      2136pdfCleanup goals for biological endpoints were not provided
      2127pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0900993
      Website httpwwwepagovregion9superfundpvshelf
      9003pdf
      9004pdf
      9005pdf
      9005pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      613pdf
      1-030pdf
      1-064pdf
      683pdf
      475pdf
      2085pdfHowever see RAO of 50 ppm
      2085pdf
      2085pdf
      1-102pdf
      1278pdf
      1279pdf
      1278pdf
      2092pdf
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      2097pdf
      763pdf
      1003pdf
      2030pdfIts unclear the extent to which 10 mgkg is considered the cleanup level ROD language and FYR note is attached The closest to being definitive is on p 34 of attachment the cleanup goal of about 10 mgkg
      2123pdf
      2062pdf
      2129pdf
      186pdf
      2117pdf
      2043pdf
      2043pdf
      963pdf Attachment incl language from ROD and ESD
      11pdf
      11pdf
      11pdf
      11pdf
      11pdf
      23pdf
      396pdf
      4019pdf
      597pdf
      4045pdf
      4045pdf
      4045pdf
      586pdf
      585pdf
      4057pdfSediment concentration associated with protective fish tissue concentration is lt10ppb
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      5137pdf
      5050pdf
      5050pdf
      34pdf
      5001pdf
      5109pdfAction level or cleanup level of North Ditch remediation never stated in ROD ROD amendment five year reviews or construction completion report
      277pdf
      5122pdf
      526pdf
      5045pdf
      5139pdf
      5141pdf
      5155pdf
      982pdf
      6003pdf
      8002pdfNo sediment cleanup levels cleanup levels pertain to groundwater or surface water
      1024pdf
      979pdf
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      9006pdf
      9006pdf
      9006pdf
      9006pdf
      1251pdf
      1106pdf
      1103pdf
      1103pdf
      1103pdf
      1103pdf
      1072pdf
      1065pdf
      1065pdf
      1069pdf
      1069pdf
      1069pdf
      1070pdf
      1116pdf
      1091pdf
      1091pdf
      1091pdf
      1091pdf
      1114pdfTable 13 in the ROD lists Zinc SQO as 059 This appears to be an error Table 12 of the ROD lists 059 for mercury and 410 for zinc
      1074pdf
      1074pdf
      1089pdf
      1089pdf
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1136pdfConfirmational number of 76 mgkg (OC) established for TBT
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-025pdf76 ppm (OC) 1335 ppb (dw)TBT is a confirmational number See attachment
      10-096pdf
      10-096pdf
      164pdf
      312pdf
      164pdf
      164pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      1181pdf
      1181pdf
      1181pdf
      1187pdf
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (041 ppm) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (970 ppm [OC]) is considered a conceptual target
      9006pdf
      9006pdf
      6018pdf
      6018pdf
      5184pdfCalled residual cover here
      5185pdfTermed post-dredge residual sand cover
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406638
      4048pdf
      4049pdf
      4050pdf
      4051pdf
      4051pdf
      4051pdf
      4051pdf
      httpepagovregion4superfundsitesnpltennesseecopbastnhtml
      4051pdf
      4051pdf
      4051pdf
      1-045pdf
      1-045pdf
      1-030pdf
      1-046augmentedreplaced sand cap in 2011
      1-047pdf
      httpwwwepagovregion02superfundnplonondagalakeindexhtml
      Ley Creek subsite not included because the volume removedmanaged was less than 10K cy
      2179pdf
      2165pdf
      2167pdf
      2166pdf
      2054pdf
      2054pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      1300pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      5186pdf
      3007pdfSame factsheet as of Jan 2014
      httpepagovregion4superfundsitesnplalabamaamerbrasalhtml
      httpepagovregion4superfundsitesnplmississippiamercrewkmshtml
      httpyosemiteepagovr10cleanupnsf22f04d62fa63974288256da6005f9868cabb84db584c955f8825697f00049beeOpenDocument
      10-056pdf
      10-058pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0503034
      5187pdf
      5188pdf
      5189pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinasangschtml
      5195pdf
      5194pdf
      6023pdf
      10-060pdfROD amendment did not specify the volume of instream sediments vs floodplain material
      10-062pdf
      10-063pdf
      10-064pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      10-069pdf
      10-069pdf
      10-083pdf
      1203pdf
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (370 ppm [OC]) is considered a conceptual target
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      Website httpyosemiteepagovr10cleanupnsfsitesmccormick_baxter
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-087pdf
      10-097pdf
      10-101pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      1246pdfCap placed in areas exceeding CUL
      1246pdfCap placed in areas exceeding CUL
      9014pdf
      8044pdf
      8046pdf
      8051pdf
      6026pdf
      6026pdf
      6026pdf
      6026pdf
      6027pdf
      5196pdf
      5197pdf
      5203pdf
      5204pdf
      5206pdf
      5207pdf
      5210pdf
      5022pdf
      httpwwwepagovregion5cleanupmississinewaindexhtml
      5213pdf
      5214pdf
      5215pdf
      5216pdfAmended cost for OU 2-5 does not include Phase 1 in OU4
      4056pdf
      4061pdf
      4062pdf
      4063pdf
      4065pdfBackfill in at least portions of site N of 38th St area unclear
      4066pdf
      4075pdf
      4075pdf
      4076pdf
      4051pdf
      69pdf
      2053pdf
      2181pdf -- most recent factsheet as of 2014-Jan
      2181pdf -- most recent factsheet as of 2014-Aug
      ROD also describes NYSDEC-regulated action removing channel sediment (4200 cy) and floodplain sedimentsoil (63000 cy)
      2185pdf
      2196pdf
      2197pdf Remedy componentsareas not broken out
      httpwwwepagovhudson
      2198pdf
      1-058pdf
      1-059pdf Soil and sediment not differentiated
      2205pdf
      2204pdf
      1-065pdf
      613pdf
      1-067pdf
      1-071pdf
      1-072pdf
      1-013pdf
      1-073pdf
      698pdf
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93d01550369a32b31bb8525691f0063f6d6OpenDocument
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101028
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8584c38df37ade1998525764f005a96d3OpenDocumentampHighlight=0callahan
      1-076pdf
      1-075pdf
      1-078pdf
      1-078pdf
      1-078pdf
      1-078pdfNote that the dredging and subaqueous disposal of sediments was changed from OU1 to OU3 in the 2013 ESD
      1-078pdf
      1-078pdf
      1-080pdfAs of 2014-Jan
      1-077pdf
      1-081pdf only dredge operation
      httpwwwepagovregion02superfundnplraritanbayslag
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206276
      1-082pdf
      1-083pdf
      1-083pdf level specified on p 3 of 4
      1-083pdf 1-083pdf level specified on p 3 of 4
      1-086pdf
      1-085pdf
      1-087pdf Total cost ROD does not specify cost of sediment portion
      2206pdf
      2206pdf
      2206pdf
      2207pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201690
      2208pdf
      2210pdf
      2211pdf
      2212pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206222
      httpwwwepagovregion2superfundnplgowanus
      2213pdf
      2214pdf
      2214pdf
      2215pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1002655
      httpyosemiteepagovr10cleanupnsf32e58b284950a4fc882578480000fdcc9458199e8119eba3882572910069d808OpenDocument
      10-102pdf
      10-104pdf
      10-105pdf
      10-105pdf
      10-106pdf
      10-107pdf
      10-108pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driverf
      10-110pdf
      10-111pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-093pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8bbe0100a535e8840852576e90053b186OpenDocument
      1-090pdf - soilsediment volumes not differentiated
      1-090pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-089pdf
      1-091pdf
      1-092pdf
      Fish tissue remedial goal appears to only apply to the Allendale and Lyman Mill Pond areas not lyman mill stream sediment
      1-096pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-098pdf
      1-099pdf
      1-099pdf
      2218pdf
      2219pdf
      2219pdf
      2220pdf
      2222pdf
      2123pdf
      2225pdf
      2173pdf
      2116pdf
      5109pdf
      5223pdf
      10-125pdf
      10-125pdf
      10-125pdf
      1-100pdfFloodplain vs sediments not differentiated
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93de720462345729a4f8525691f0063f6e1OpenDocument
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631E704D6C17F74EA678525697B0008CCAAOpenDocument
      1-101pdf
      httpwwwepagovregion02superfundnplaluminumcompany
      2200pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinakopchschtml
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0405546
      httpwwwepagovregion4superfundsitesnplalabamatriatenvalhtml
      877pdf
      877pdf
      877pdf
      877pdf
      6024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000195
      httpyosemiteepagovr10cleanupnsfsitesbh
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101388
      Reg Site OU Area Name Fieldwork Dates Dredge (1000 cu yds) Excavate (1000 cu yds) Back-fill (Residual Cap) Cap (acre) MNR (acre) EMNR Thin Cover (acre) In Situ Treatment (acres) Other Estimated Cost (in millions) Actual Cost (in millions) COC Sample Matrix Action Level (ppm) Cleanup Level (ppm) Remediation Goal (ppm)
      1 CALLAHAN MINING CORP 3 SedimentsCap Ongoing 101 No $21 Copper Sediment 790
      Lead 710
      Callahan Mine (Region 1 Website) Zinc 5100
      1 CENTREDALE MANOR RESTORATION PROJECT 1 Allendale Pond and Lyman Mill Pond Sediment 156 If needed 605 Benzo(a)pyrene Fish 00015
      Dieldrin 00011
      Technical Chlordane 013
      Aroclor 1254 0037
      Aroclor 1268 0011
      2378-Tetrachlorodibenzo-p-dioxin 00000022
      Total Aroclors 0076
      44-DDD 00062
      44-DDE 0018
      DioxinsFurans TEQ 0000044
      Benzo(a)pyrene Sediment 14
      Dibenz(ah)anthracene 097
      Dieldrin 00026
      Technical Chlordane 04
      Aroclor 1254 0031
      Aroclor 1268 0023
      Arsenic 39
      Centredale Manor Restoration Project (Region 1 Website) 2378-Tetrachlorodibenzo-p-dioxin 0000015
      Lyman Mill Stream Sediment 205 Yes 225 165 Coplanar PCBs (TEQ)3 0000025
      Total Aroclors 006
      Selenium 11
      Zinc 221
      44-DDD 00084
      44-DDE 0006
      Aluminum 8210
      Barium 134
      Vanadium 376
      N-Nitroso-di-n-propylamine 046
      1 LORING AIR FORCE BASE 13 East Branch of Greenlaw Brook 1997 - 1998 38 (Est) Yes 481 Total PAHs Sediment 35
      86 (Act) Total 44-DDTDDDDDE 028
      Loring Air Force Base (Region 1 Website) Aroclor 1260 1
      Total Chlordanes 048
      Lead 218
      44-DDD Fish 0018
      44-DDE 0013
      44-DDT 0013
      Aroclor 1242 00022
      Aroclor 1260 00022
      Heptaclor 000098
      Chlordane Alpha 00034
      Chlordane Gamma 00034
      1 NEW BEDFORD 1 Acushnet River North of Wood Street (within Upper Harbor) 1202 - 303 900 (throughout OU1) 156 (Act) No 2002 ESD $317 (for all of OU 1) Operation ongoing PCBs Sediment (Upper Harbor) 10
      Region 1 New Bedford Website Upper and Lower Harbor 2004 - Ongoing 2011 ESD $422-1200 (for all of OU1) Sediment (Lower Harbor) 50
      Sediment intertidal areas with public access or abutting recreational land use 25
      Sediment saltmarsh areas with little to no public access (aka Marsh Island) 50
      Sediment intertidal areas with abutting residential land use 1
      Seafood 002
      2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000
      1 NEWPORT NAVAL EDUCATION amp TRAINING CENTER 4 McAllister Point Landfill (Narrangasett Bay) 22001 - 122001 34 (Est) Yes 226 Anthracene Sediment 051 051
      Fluorene 02 02
      46000 tons (Act)(cyds not provided) PCBs 36 36
      NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website Pyrene 3 3
      Copper Porewater 00529 00529
      Nickel 00337 00337
      1 NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1 1
      Nyanza Chemical Waste DumpRegion 1 Website 4 Sudbury River ROD Date September 2010 Area not specified 84 85 MERCURY Sediment 10 (EMNR)
      MERCURY Fish (largemouth bass yellow perch bullhead) 048
      1 PINE STREET CANAL 1 Turning Basin Pine Street Canal and Wetlands 2002-2004 2004 78 (Act) (GeotextileSand Cap) 44 PAHs Sediment ER-M Values
      Region 1 Pine Street Canal Website 82010 - 22011 08 2011 organoclay cap (size not specified) Metals and Cyanide ER-M Values
      1 SULLIVANS LEDGE 1 Unnamed Stream Ponds A and B 1998-2002 19 (Est) Yes upper portion of stream diverted PCBs Sediment 20 uggC
      Region 1 Sullivans Ledge website 86 (Act)
      2 Middle Marsh Wetlands 1998-2001 52 (Est) Yes 28 PCBs 20 uggC
      255 (Act)
      2 BATAVIA LANDFILL 1 Wetland Areas June 2001 - June 2003 25 (Est) Yes 13 (soil and sediment) 75 (soil and sediment) PAHs Sediment Visual NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals
      Deleted from NPL 11292005 Act Wetland area volume not specified LEAD
      2 BRIDGEPORT RENTAL amp OIL SERVICES 2 Little Timber Creek Swamp ROD dateSeptember 2006Remedial Action 2009-2011 175 (Est) Yes Area not specified 106 (Est) 125 PCBs Sediment 10 10
      Region 2 Bridgeport Rental amp Oil Services Website LEAD 1000 1000
      Total Petroleum Hydrocarbons None None
      2 BURNT FLY BOG 2 Downstream Area and Westerly Wetlands 11795 - 1996 gt6000 tons (Act) (soil and sediment) 22 LEAD Sediment 250
      PCBs 5
      3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment 400049
      2 GENERAL MOTORS (CENTRAL FOUNDRY DIVISION) 1 St Lawrence River 61995 - 111995 13 (Act) 2 (Act) 215 PCBs Sediment 1
      Turtle CreekTurtle Cove 1004 - 305 23 (Act) (soil and sediments) 01 01
      Raquette River 602 - 503 14 (Act) 1
      2 GOWANUS CANAL 1 Canal Sediments ROD Date Sept 2013 588 (Est) Area not stated (dredgecap remedy) In-situ stabilization of 3-5 feet of NAPL-containing sediments PAHs Sediment 20
      Gowanus Canal (Region 2 Website) Holding Tanks for CSO Control Copper 80
      Lead 94
      2 Grasse River Superfund Site(aka Alcoa Aggregation Site) Grasse River ROD Date April 2014 109 Yes 284 2431 PCBs Sediment 1
      Grasse River(Region 2 Website) Fish 001-005 (Final Remedial Goal)026-036(Interim Target Concentrations)
      2 HOOKER (102ND STREET) 1 Niagara River Embayment 71996 - 111996 28 (dredge to 2 feet) Yes $36 - 56 PAHs METALS CHLORINATED ORGANICS (MULTIPLE) Sediment 01(organics) New York State Sediment TBCs
      Deleted from NPL 852004 Sediment 02(Mercury)
      2 HUDSON RIVER PCBS 2 Upper Hudson River (Section 1) ROD dateFebruary 2002 Field work 2009-ongoing 1560 (Est) Yes Area not specified 2250 PCBs Fish 005
      Sediment 3 gm2 (MPA) 1
      Hudson River PCBs EPA Website Upper Hudson River (Section 2) 580 (Est) Sediment 10 gm2 (MPA) 1
      Fish 005
      Upper Hudson River (Section 3) 510 (Est) Sediment 1
      Fish 005
      2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001 (change in ESD from dredging to excavation) 981 (Est) ROD 21 INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC Sediment Not specified
      85000 Tons (Act) ESD 50-75
      2 LOVE CANALDeleted from NPL 9302004 2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001 0001
      2 MARATHON BATTERY CORP 1 East Foundry Cove Marsh and Constitution Marsh 91993 - 31995 30 (Est) Yesbentonite clay layer 40 CADMIUM Biological Sampling None
      Sediment 100 100
      Deleted from NPL 10181996 2 East Foundry Cove West Foundry Cove and the Cold Spring Pier Area 91993 - 31995 56 (Est) 485 CADMIUM Biological Sampling None
      Actual not specified by area
      Sediment Excavate up to 1 ft 95 Removal 10 mgkg
      2 ONONDAGA LAKE 2 Onondaga Lake Bottoms Subsite ROD dateJuly 2005 2407 (Est) 425 (Est) 1771 154 (Est) 414 MERCURY and others Sediment 08 014-2
      Operations Ongoing METHYL Hg Fish 03
      5 LCP Bridge St SiteWest Flume and Wetland AB June 2005 - July 2007 543 (Est)917 (Act) Yes 96 MERCURY Sediment 02
      20 Geddes Brook NineMile Creek Reach BC CD ROD DateApril 2009June 2012 - ongoing 59 (Est) Combined with Dredge volume Yes Partial Channel Re-location 189 MERCURY and others Sediment 015
      Region 2 Onondaga Lake Website Mercury Fish 01-03
      24 Geddes Brook NineMile Creek Reach AB June 2012 - 16 (Est) 42 (Est) Yes 151 MERCURY and others Sediment Soil (flood plain) 015
      Fish 01 - 03
      2 Raritan Bay Slag 0 ROD Date May 2013 34 (Est) 787 Lead Sediment 400 400
      Raritan Bay Slag (Region 2 Website)
      2 REYNOLDS METALS CONot on the NPL - Superfund Alternative Site 1 St Lawrence amp Raquett Rivers 412001 - 102001 52 (Est) 54 (Act) 35 PAHs Sediment 10
      86 (Act) PCBs 1
      TDBFs 0001
      2 RICHARDSON HILL ROAD LANDFILLPOND 1 South Pond and Herrick Hollow Creek 2004 285 (Act) 139 PCBs Sediment 1 1
      2 ROEBLING STEEL CO 5 Delaware River and Crafts Creek 2010-2013 116 (Est) Yes 11 PAHs Sediment See Attached
      240 (Act) Metals
      2 VINELAND CHEMICAL CO INC 3 River Areas (Blackwater Branch Floodplain amp Maurice River) 2006 - ongoing 626 Yes 11 ARSENIC Sediment 20 20 exposed 120 submerged
      4 Union Lake Sediments Remedy not yet initiated Unknown Yes Sediment Washing 129 ARSENIC Sediment Unknown 120
      2 YORK OIL CO 2 Contamination Pathways - Western Wetland 2000-2001 11 (Est) Yes 33 LEAD Sediment Not specified
      15 (Act) PCBs Complete Removal or 1
      Contamination Pathways - Northwestern Wetland 50 PCBs Sediment 1 Contingent on biological and chemical testing
      LEAD Not specified
      3 ATLANTIC WOOD INDUSTRIES INC 3 River Water and Sediments 2010-Ongoing 6 7 126 (Dredging and Disposal) tPAHs Sediment 45 to 100
      Region 3 Atlantic Wood Industries Website 157 (Est) 100
      3 EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL) 3 North Wetlands 1997 - 12897 95 (Act) Yes 12 3 CADMIUM Sediment 60
      LEAD 1200
      ZINC 5600
      5 South Wetlands 1997 - 12897 37 (Act) Yes 42 Unknown CADMIUM Sediment 60
      LEAD 1200
      Region 3 EI duPont Website ZINC 5600
      7 Christina River 51099 - 9899 11 (Act) Yes 47 Unknown CADMIUM Sediment 20
      LEAD 700
      ZINC 3000
      3 KOPPERS CO INC (NEWPORT PLANT) 1 Wetlands Ponds and Hershey Run ROD dateSeptember 2005 58 (Est) Unknown Re-channelize portion of Hershey Run 5176 PAHs Sediment 150
      Region 3 Koppers Co Inc Website Remedy not yet initiated
      3 METAL BANKS 1 RiverMudflat Sediments 2008-2010 12 (Est) Yes Unknown (Act) 1727 Unknown PCBs Sediment 1 1
      METAL BANK (Regional Website) OU Name SOIL EXCAVCONTAIN
      4 AMERICAN BRASS INC 1 Cedar Creek ROD dateAugust 2006 94 (Est) Yes 39 BORON Sediment 28
      COPPER 220
      Dunham Creek 38 (Est) LEAD 170
      American Brass Inc (Regional Website) ZINC 780
      PCB-1260 429
      4 AMERICAN CREOSOTE WORKS INC 0 Railroad Lake and Hughes Creek ROD date September 2007 40 (Est) Yes $20 (Total) TOTAL PAH Sediment 100
      American Creosote Works Inc(Regional Website)
      4 COPPER BASIN MINING DISTRICT SITE 5 Copper Basin ReachOcoee No 3 ReservoirParksville Reservoir ROD date September 2011 Area Not Specified (approx 14 river miles) 23 PCBs Sediment
      Arsenic Sediment
      Cadmium Sediment
      Copper Sediment 680 (Copper Basin Reach)
      640 (Ocoee 3 amp Parksville Reservoirs)
      Region 4 Copper Basin Mining District Site website Iron Sediment 57000 (CBR)
      53000 (O3R amp PR)
      Lead Sediment 145 (CBR)
      250 (O3R amp PR)
      Mercury Fish
      Zinc Sediment 2200 (CBR)
      970 (O3R amp PR)
      4 DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company) 2 Lower Roanoke River ROD dateSeptember 2008 143 river miles 196 Dioxin Fish 3 ppt
      Sediment Unknown
      Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website 4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment 0001
      4 KOPPERS CO INC (CHARLESTON PLANT) 1 Ashley River 7101 - 12101 0 (Est) $05 (ROD)3 (ESD) 282 PAHs Sediment Weight of Evidence Approach None
      3 (Act)
      Barge Canal 42003 ESD selected MNR for the area 32 (Est)0 (Act) 0 (Est)32 (Act) $045 (ROD) 01
      01 (ESD) Arsenic
      Region 4 Koppers Co Inc (Charleston Plant) North Marsh Sediments No info 15 (Act) 1000 linear feet 025 acre (Est)1300 linear feet (Act) 17 23
      South Marsh Sediments 3103 - 6103 19 tons (Act) 15 (Est)2 (Act) Lead
      4 SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION 2 Twelve Mile CreekLake Hartwell ROD date62894 730 (Est) 321 PCBs Fish 2
      Lake Hartwell (Regional Website) Sediment 1
      4 TENNESSEE PRODUCTS 1 Chattanooga Creek - Middle Reach September 2005 - September 2007 142 (Est) $94 (ROD) PAHs Sediment Visual
      Region 4 Tennesse Products Website 107000 tons (Act)Followed by capping 71 (Act)Aquablock $257 (ESD)
      Chattanooga Creek NTCRA 1997-1998 229 Yes Visual
      4 TRIANATENNESSEE RIVER 0 Reach AHuntsville Spring Branch - Indian Creek 4186 - 101487 Rerouted river buried in-place sediments DDT Fish (channel catfish) No sediment CUL 5
      Region 4 TrianaTennessee River Website Fish (smallmouth buffalo) No sediment CUL
      Fish (largemouth bass) No sediment CUL
      4 WARD TRANSFORMER Reach A (Removal Action) June 2007 - 2009 150000 tons (Est)Approx 400000 tons (Act) PCB Sediment 1
      Region 4 Website 1 Reach B C D and lower Brier Creek ROD dateSeptember 2008Remedy not yet initiated 13 (soil and sediment) (Est) Yes $37 (Total) PCB Sediment 1
      Fish 005
      Brier Creek Reservoir Lake Crabtree and Lower Crabtree Creek ~25 river miles Sediment None
      Fish 005
      5 CONTINENTAL STEEL 3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est) 12 BENZO(A)PYRENE Sediment 8 16
      BENZO(BampK)FLOURANTHENE 7 14
      BENZO(A)ANTHRACENE 95 19
      INDENO(123-CD)PYRENE 465 093
      ARSENIC 19
      BERYLLIUM 084
      ARCHLOR-1016 3 1
      ARCHLOR-1242 3 1
      ARCHLOR-1254 3 1
      ARCHLOR-1248 3 1
      ARCHLOR-1260 3 1
      Region 5 Continental Steel Website 4 Markland Avenue Quarry 3252008 - 612010 175 Yes297000 cy 11 BENZO(A)ANTHRACENE Sediment 05
      BENZO(A)PYRENE 05
      BENZO(BampK) FLOURANTHENE 08
      DI-BENZ(AH) ANTHRACENE 02
      INDENO(123-CD)PYRENE 04
      ARCHLOR-1248 1
      ARSENIC 19
      LEAD 400
      5 FOX RIVER NRDAPCB RELEASESProposed to be added to the NPL 1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 PCBs Sediment 1 025 (SWAC)
      2 Appleton to Little Rapids MNR RemedyROD Date 122002 3 (Est) Yes 273 (Est) 20 river miles 136 (Est) 390 (2005 ROD Amendment) Sediment
      3 Little Rapids to De Pere 42009 - ongoing 227 (Est) Sediment 1 SWAC 028
      Fish (Walleye) 005
      Lower Fox River Cleanup Website 4 De Pere to Green Bay 2007 - ongoing 3216 (Est) Sediment 1 SWAC 025
      Fish (Walleye) 005
      5 Green Bay MNR RemedyROD Date 62003 Approx 2700 sq miles Sediment 1
      701(2010 ESD)
      5 KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER) 0 Kress Creek Site Summer 2005 - 2012 43 (Est) Yes $719 (Total) 128 RADIUM 226 Sediment 72 picoCuries per gram (pCig) combined radium
      Region 5 Kerr-McGee Website 129 (Act) RADIUM 228
      5 LITTLE MISSISSINEWA RIVERNot on the NPL - Other Cleanup Activity Private Party-Lead Cleanup 0 Little Mississinewa River Spring 2005 - Fall 2009 57 (Est)100000 tons (Act) Yes 25 miles (Est) 27 20 PCBs Sediment 4 (0-1ft) 5 (deeper than 1ft) 1 (0-1ft)5 (deeper than 1ft)
      Little Mississinewa River(Region 5 Website) Fish Unknown
      5 OUTBOARD MARINE CORP 1 North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below 71992 to 91992 55 (Est) Yes 074 PCBs Sediment Unknown
      Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below 1991-1992 523 (EST)30 (ACT) 131 50 (upper harbor)
      OUTBOARD MARINE CORP (Region 5 Website) 4 formerly 1 OMC Plant 2 North and South DitchROD Date August 20072012 ROD Amendment 2010-2012 40 (soil and sediment) (Est) Yes 73 PCBs Sediment 1
      PAHs 2
      1 HarborSlip No 3(2009 ROD Amendment) 2012-2013 195 (Est) Yes 349 PCBs Fish (Sport) 003 - 01
      Sediment 1 02 (SWAC)
      5 SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI) 2 Area 9 -- Lake Embayment 1295 - 0697 36 (Est) Yes PCBs Sediment 05
      54 (Act)
      5 SHEBOYGAN HARBOR amp RIVER 1 Lower River and Inner Harbor Completed in 2012 53 (ROD)51 (ESD) Yes (ROD) 12 PCBs Sediment 26 05
      51 (ACT) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Region 5 Sheboygan River and Harbor Superfund Site Website Middle River Remedy not yet startedAOC dateFebruary 2009 7 miles 2 Sediment 26 05
      Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Upper River Sept 2004 - October 2007 21 (Est) 31 Sediment None (88 mass removal of PCB) 05
      21 (Act) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      5 Torch Lake 2 Surface Waters ROD DateMarch 311994 No Action Copper
      NPL DeletionFeb 5 2002
      5 VELSICOL CHEMICAL CORP (MICHIGAN) 2 Pine RiverSt Louis Impoundment 1999 - 2005 640 (Act) Yes Unknown area(2 ft compacted clay) $60 (Total) $30 (as of 2002) DDT Carp Smallmouth Bass 1708
      Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5 15
      Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000
      6 ALCOA (POINT COMFORT)LAVACA BAY 1 Natural Recovery Areas 122001 - ongoing Area not specified 161 MERCURY Sediment Hg 025 Marsh 05 Open Water
      North of Dredge Island NA Actual ROD PAHs 448 Total
      Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act) PAHs
      Witco Marsh 12006 - 42006 57
      Chlor-Alkali Process Area (Treatability Study) August 1998 (Phase I)January 1999 (Phase II) 80 (Act) 1952 MERCURY Mass removal
      6 BAILEY WASTE DISPOSAL 1 North Marsh Area January 1996 - September 1996 6 (EST) Unknown Sediment None
      20 (tar and sediment) (Act)
      Deleted from NPL 10152007
      6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995 47 (ROD Est)150 (ESD Est)170 (Act) Yes 226 PAHs Sediment 1300
      8 MILLTOWN RESERVOIR SEDIMENTS 1 Milltown Reservoir Sediments Remediation completed Dec 2010 2600 (Est) Yes Channel realignment and construction 140 ARSENICCADMIUMCOPPERLEADZINC Sediment None
      Region 8 Milltown Reservoir Sediments Website 2560 (Act)
      8 ROCKY MOUNTAIN ARSENAL (USARMY) 3 Lake Sediments Remediation Project June 1999 - Aug 1999 19 (Est) Yes (Est) Area not specified 39 ALDRIN Sediment 38
      33 (Act) No (Act) DIELDRIN 37
      CHLORDANE 12
      ROCKY MOUNTAIN ARSENAL (Region 8 Website) DDE None
      DDT 14
      ROCKY MOUNTAIN ARSENAL (US Army Website) MERCURY 82
      ARSENIC 270
      8 SHARON STEEL CORP (MIDVALE TAILINGS) 1 Marshy Area Aug 1996 - Sept 1996 436 (Est) Yes (elevation raised above water line) 047 ARSENIC Sediment 70
      Deleted from NPL 9242004 100 (Act) LEAD 500
      CADMIUM None
      8 SILVER BOW CREEKBUTTE AREA 1 Streamside Tailing (Silver Bow Creek) July 1999 - Ongoing 73 (ROD Est) Yes Channel realignment and construction (176 miles) $44 (ROD)$98 (ESD) ARSENIC Sediment None 200 979
      CADMIUM 20 099
      COPPER 1000 316
      SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website) LEAD 1000 358
      ZINC 1000 None
      SILVER BOW CREEKBUTTE AREA (MT STATE Website) Sediment Trap MERCURY 10 018
      9 IRON MOUNTAIN MINE 5 Spring Creek Arm 2008-20011 200 (Est) 15 area not specified 186 ARSENIC Sediment Sediment susceptible to erosion dredged to a specific elevation None
      ROD dateSeptember 2004 COPPER
      Region 9 Iron Mountain Mine Website IRON
      9 MCCORMICK amp BAXTER CREOSOTING CO 3 Old Mormon Slough 2006 88 (Est) area not specified 35 DIOXIN Sediment 000021 TEQ 0000021 TEQ
      Region 9 Website McCormick and Baxter Creosoting 88 (Act) PAHs 333 (OC) 333 (OC)
      9 MOFFETT NAVAL AIR STATION 8 Site 27 - Northern Channel completed in 12007 656 (soil and sediment) (Est) Yes 68 TOTAL PCBs Sediment 035 035
      TOTAL DDT 00648 00648
      TOTAL CHLORDANE 0931 0931
      CADMIUM 184 184
      Naval Air Station Moffett Field Website LEAD 173 173
      MERCURY 152 152
      SELENIUM 0926 0926
      SILVER 137 137
      ZINC 720 720
      9 MONTROSE CHEMICAL CORP 5 Palos Verde Shelf Interim ROD Date September 2009 300 Area not specified DDT Sediment 46 (OC) interim23 (OC) Final
      White Croaker 04
      Water 022 ngL
      Palos Verdes Shelf (Region 9 Website) PCBs Sediment 7 (OC)
      White Croaker 007
      Water 0064 ngL
      9 UNITED HECKATHORN CO 1 Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)65 (Proj) Yes 7 DDT Sediment dredge all soft sediments 059 (average)
      Region 9 United Heckathorn Co Website
      10 Bunker Hill Mining and Metallurgical 3 Upper Basin ROD Amendment date Aug 2012 Not specified Arsenic Sediment
      Cadmium
      Runker Hill Mining and Metallurgical (Regional Website) Copper
      Lead 530
      Mercury
      Silver
      Zinc
      10 COMMENCEMENT BAY NEAR SHORETIDE FLATSPartial deletion (St Paul Waterway) 1996 1 Olympic View Resource Area (NTCRA) Completed in 102002 11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ 000002 TEQ
      COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website) 19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 20 (Est) 174 ARSENIC Sediment preponderance of evidence approach 93
      10 (Act) COPPER 390
      LEAD 450
      ZINC 410
      1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13 067
      1 Sitcum Waterway completed in 1994 428 (Act) 45 (Act) 4 ARSENIC Sediment 160 57
      COPPER 1100 390
      1 Hylebos Waterway 32003-22005 940 11 20 46 ARSENIC Sediment 97 57
      HEX-CB 01 0022
      HPAHs 32 17
      PCBs 045 03
      Occidental Site Removal Action (NTCRA) completed March 2003 36 (Act) 10 PCE Sediment 0057
      1 Thea Foss and Wheeler-Osgood Waterways 2002-2006 423 (Act) 32 (Est) 21 (Est) 4 (Est) 60 82 CADMIUM Sediment 66 51
      HPAHs 22 17
      LEAD 580 450
      MERCURY 077 059
      ZINC 490 410
      1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes 22 (Act) 05 (Act) 87 (Act) 125 COPPER Sediment 470 390
      MERCURY 071 059
      LPAHs None 52
      HPAHs None 17
      10 HARBOR ISLAND (LEAD) 7 Lockheed Sediments 7703 - 2405 18 cy (Est) 5 (Act) 12 (Act) In dredge areas $15(ROD) $12(ESD) 20 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      70 (Act) COPPER 390 (Dredge and Cap) 390
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      LEAD 530 (Dredge) 450 (Cap) 450
      LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      MERCURY 059 (Dredge) 041 (Cap) 041
      Region 10 Harbor Island (Lead) Web Site PCBs 65(OC) (Dredge) 12(OC) (Cap) 12 (OC)
      ZINC 960 (Dredge) 410 (Cap) 410
      TBT Not available Not available
      9 Todd Shipyard Sediments 7604 - 22007 5 (Act)(223235 sq ft) Yes In dredge areas No area given $45-$69 21 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      COPPER 390 (Dredge and Cap) 390
      LEAD 530 (Dredge) 450 (Cap) 450
      MERCURY 059 (Dredge) 041 (Cap) 041
      116 (Est) ZINC 960 (Dredge) 410 (Cap) 410
      220 (Act) LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      PCBs 65 (OC) (Dredge)12(OC) (Cap) 12 (OC)
      TBT Not available not available
      10 East Waterway Sediments NTCRA 11204 - 31605 (removal action)No ROD completed for this OU 206 (Act) - Removal action 13 (Act) In dredge area 17 16 MERCURY Sediment 041
      PCBs 12 (OC)
      10 KETCHIKAN PULP COMPANY 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est) 87 (Act) Yes 50 (Est) 52 (Act) 21 (Est) 27(Act) 44 31 4-METHYL-PHENOL Sediment 17 Not Stated Benthic toxicity community structure and chemistry
      Not on the NPL - Superfund Alternative Sited AMMONIA 120
      Region 10 Ketchikan Pulp Company Web Site SULFIDE None
      10 LOCKHEED WEST SEATTLE 1 Lockheed West ROD Date August 2013 167 potential use in shallow areas yes 116 DredgeEMNR 477 PCB Sediment Washington State CSL or SQS 0002
      Arsenic 7
      Lead 11
      Copper 114
      Lockheed West Seattle (Region 10 Website) Mercury 041 (subtidal)017 (intertidal)
      284 EMNR only Carcinogenic PAHs (TEQ) 0009
      TBT 043 (subtidal)2 (intertidal)
      DioxinsFurans 0000002
      Multiple Others see attached
      10 MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT) 4 Sediments 72004-92005 23 (Act)organoclay 23 12 ARSENIC Sediment 12
      Region 10 McCormick and Baxter Creosoting DIOXINSFURANS 000008
      ORDEQ McCormick amp Baxter Creosoting Co Web Site 15 (Est) PAHs 2
      PCP 100
      Arsenic (III) Water 190 μgL
      Chromium (III) 210 μgL
      Copper 12 μgL
      Zinc 110 μgL
      PCP 13 μgL
      Acenaphthene 520 μgL
      Fluoranthene 54 μgL
      Naphthalene 620 μgL
      Total cPAHs 031 μgL
      Dioxinsfurans 1x10-5 ngL
      10 OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA) 1 Clam Bay Sediments 61999 - 102001 7-10 (Est) Yes Area not specified 5 46 71 PCBs Sediment 013 004
      COPPER 390
      LEAD 450
      ZINC 410
      10 (Act) SILVER 61
      2 4-DIMETHYL-PHENOL 0029
      PCBs Shellfish (intertidal clams) 0042
      10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005 35 (Est) 50 (Est) 49 15 LMWPAHs Sediment 780(OC) 370(OC)
      58 (Act) HMWPAHs 5300(OC) 960(OC)
      98 (Act) Capped dredge areas PCBs 12 (OC) (trigger for sediments to 10 feet depth) 12 (OC)
      10 PUGET SOUND NAVAL SHIPYARD COMPLEX 2 OUB Marine 61600 - 3104 200 (Est) 5 211 9 12 PCBs Fish (English sole) 0023 ww
      Sediment 12 (OC) dredgecap 6 (OC) EMNR 3 (OC) SWAC12 (OC)) SWAC
      225 (Act) Sediment in state owned adjacent lands 9 (OC) EMNR
      MERCURY Sediment 3 where PCBs greater than 6 (OC)
      10 ST MARIES CREOSOTE - proposed to be added to the NPL 0 Shoreline Nearshore and Offshore Sediment ROD dateJuly 2007 29 (Est) Yes 108 LPAHs Sediment 370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)
      St Maries Creosote (Regional Website) Remediation Ongoing HPAHs 960 (OC) (17 if TOC lt02or gt4)
      10 WYCKOFF COEAGLE HARBOR 1 East HarborPhase 1 - NTCRA 91993 -31994 (Phase 1) 54 (Act) 117 MERCURY Sediment (toxicity test opt-out)
      LPAHs 780 (OC)
      Region 10 Wyckoff Eagle Harbor Web Site HPAHs 5300 (OC)
      East HarborWest Beach Sediments 2007-2008 48 (Act) 23 MERCURY Sediment 059 subtidal 059
      LPAHs 780 (OC) subtidal 780 (OC)
      HPAHs 5300 (OC) subtidal 5300 (OC)
      East HarborIntertidal and Subtidal Sediments 2000-2002 30(Act) $6-20 MERCURY Sediment 059 059
      LPAHs 780 (OC) 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      3 West Harbor 31997 - 121997 13-92 (Est) Yes 12 - 31 (includes EMNR) 49 see cap $62 - $16 MERCURY Sediment 5 21059 059 (dw)
      LPAHs 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      71
Page 7: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Grasse River(Region 2 Website) Fish

001-005 (Final Remedial Goal)

026-036(Interim Target Concentrations)

HOOKER (102ND STREET) Sediment 01

(organics)

Deleted from NPL 852004 Sediment 02

(Mercury)

Fish 005

Sediment 3 gm2 (MPA)Sediment 10 gm2 (MPA)Fish 005SedimentFish 005

(change in ESD from dredging to excavation)

981 (Est) ROD 21

85000 Tons (Act) ESD 50-75

2

LOVE CANAL

Deleted from NPL 9302004

2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001

Biological Sampling None

Sediment 100

56 (Est)

Sediment Excavate up to 1 ft

580 (Est)

HUDSON RIVER PCBS

ROD Date April 2014

Upper Hudson River (Section 2)

Grasse River

Hudson River PCBs EPA Website Upper Hudson

River (Section 3) 510 (Est)

None

0001

Not specified

New York State Sediment TBCs

11

PCBs284

$36 - 56

2 109 Yes

Yes2 1 Niagara River Embayment 71996 - 111996 28 (dredge

to 2 feet)

PCBs

1

PAHs METALS CHLORINATED ORGANICS (MULTIPLE)

22502 2

Upper Hudson River (Section 1)

ROD dateFebruary 20 Area not specified

1560 (Est)

Yes

2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001

485 CADMIUM

INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC

Sediment

CADMIUM

Biological Sampling

100

2

MARATHON BATTERY CORP 1

East Foundry Cove Marsh and Constitution Marsh

91993 - 31995

Actual not sp

30 (Est)

Deleted from NPL 10181996 2

East Foundry Cove West Foundry Cove and the Cold Spring Pier Area

91993 - 31995

Yesbentonite clay layer

40

95 Removal 10 mgkg

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

ROD dateJuly 2005

MERCURY and others Sediment 014-2

Operations Ongoing

5LCP Bridge St SiteWest Flume and Wetland AB

June 2005 - July 2007

543 (Est)917 (Act) Yes 96 MERCURY Sediment 02

MERCURY and others Sediment

Mercury Fish 01-03

Sediment Soil (flood plain)

Fish 01 - 03

Raritan Bay Slag

Raritan Bay Slag (Region 2 Website)

52 (Est) PAHs 1086 (Act) PCBs 1

TDBFs 0001

2RICHARDSON HILL ROAD LANDFILLPOND

1South Pond and Herrick Hollow Creek

2004 285 (Act) 139 PCBs Sediment 1

116 (Est) PAHs

240 (Act) Metals

3

River Areas (Blackwater Branch Floodplain amp Maurice River)

2006 - ongoing 626 Yes 11 ARSENIC Sediment 20

4 Union Lake Sediments Remedy not yet initiat Unknown Yes Sediment

Washing 129 ARSENIC Sediment Unknown

2000-2001 11 (Est) LEAD Not specified

METHYL Hg Fish

2

ONONDAGA LAKE

Region 2 Onondaga Lake Website

03

0 400

See Attached

20 exposed 120 submerged

1

Lead 400Sediment787ROD Date May 2013 34 (Est)

425 (Est) 1771 154 (Est)

2

2 Onondaga Lake Bottoms Subsite 2407 (Est)

Geddes Brook NineMile Creek Reach BC CD

ROD DateApril 2009

June 2012 - ongoing

59 (Est)20

24Geddes Brook NineMile Creek Reach AB

414

Combined with Dredge volume

Yes

151

Partial Channel Re-location

June 2012 - 16 (Est) 42 (Est) Yes MERCURY and others

015

54 (Act) Sediment

189

2

REYNOLDS METALS CO

Not on the NPL - Superfund Alternative Site

1 St Lawrence amp Raquett Rivers 412001 - 102001 35

ROEBLING STEEL CO 5 Delaware River and

Crafts Creek Sediment2010-2013 Yes2 11

2 VINELAND CHEMICAL CO INC

120

08

015

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

15 (Act) PCBs

Complete Removal or

1

PCBs

1 Contingent on biological and chemical testing

LEAD Not specified

ATLANTIC WOOD INDUSTRIES INC 6 7 45 to 100

Region 3 Atlantic Wood Industries Website

157 (Est) 100

CADMIUM 60LEAD 1200ZINC 5600CADMIUM 60LEAD 1200

ZINC 5600

CADMIUM 20LEAD 700ZINC 3000

KOPPERS CO INC (NEWPORT PLANT)

ROD dateSeptember 2005

Region 3 Koppers Co Inc Website

Remedy not yet initiated

METAL BANKS RiverMudflat Sediments

METAL BANK (Regional Website)

OU Name SOIL EXCAVCONTAIN

BORONCOPPERLEADZINC

PCB-1260

Sediment

Unknown

Contamination Pathways - Northwestern Wetland

River Water and Sediments

1

PAHs

3

2010-Ongoing

Cedar Creek

Dunham Creek

Christina River

1727

39

37 (Act)

Yes

Yes

Unknown (Act)

Yes

33

Yes

2

50

Contamination Pathways - Western Wetland

126 (Dredging and Disposal)

Sediment

Sediment

2 YORK OIL CO

Sediment

Sediment

tPAHs3 3

12

7 51099 - 9899 11 (Act)

425 South Wetlands 1997 - 12897

95 (Act)

3

3 North Wetlands 1997 - 12897EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL)

Region 3 EI duPont Website

150

47

Sediment 1

Unknown

Sediment

Re-channelize portion of Hershey Run

Sediment

Unknown

PCBs12 (Est)

58 (Est) Unknown3 1

3 1 2008-2010

Wetlands Ponds and Hershey Run

4 1 ROD dateAugust 2006

94 (Est)

38 (Est)Yes

AMERICAN BRASS INC

American Brass Inc (Regional Website) 429

170780

22028

Yes

Sediment

5176

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

AMERICAN CREOSOTE WORKS INC

American Creosote Works Inc(Regional Website)

Arsenic Sediment

Cadmium Sediment

Fish 3 ppt

Sediment

$20 (Total) TOTAL PAH Sediment 100

DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company)

ROD dateSeptember 2008

Unknown

23

Mercury

143 river miles Dioxin

0

PCBs

196

53000 (O3R amp PR)

57000 (CBR)

640 (Ocoee 3 amp Parksville Reservoirs)

680 (Copper Basin Reach)

5

2200 (CBR)

2

4

Lower Roanoke River

4

Sediment

970 (O3R amp PR)

Sediment

Iron Sediment

Sediment

250 (O3R amp PR)

Yes

Sediment

COPPER BASIN MINING DISTRICT SITE

Copper Basin Reach

Ocoee No 3 Reservoir

Parksville Reservoir

ROD date September 2011

Fish

Region 4 Copper Basin Mining District Site website

4 ROD date September 2007 40 (Est)

Copper

Zinc

Area Not Specified (approx 14 river miles)

Railroad Lake and Hughes Creek

Lead

145 (CBR)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website

4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment

0 (Est) 3 (Act)

$045 (ROD)

01 (ESD)

North Marsh Sediments No info 15 (Act)

1000 linear feet 025 acre (Est)1300 linear feet (Act)

SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION

Fish 2

Lake Hartwell (Regional Website) Sediment

TENNESSEE PRODUCTS 142 (Est) $94 (ROD) Visual

107000 tons (Act)Followed by capping

71 (Act)Aquablock $257 (ESD)

Chattanooga Creek NTCRA 1997-1998 229 Yes Visual

TRIANATENNESSEE RIVER

Fish (channel catfish)

Region 4 TrianaTennessee River Website

Fish (smallmouth buffalo)

Fish (largemouth bass)

WARD TRANSFORMER

Reach A (Removal Action) June 2007 - 2009

150000 tons (Est)Approx 400000 tons (Act)

PCB Sediment

Region 4 Website Sediment

Fish 005

PAHs

Arsenic

Region 4 Tennesse Products Website

1

1

4 1

Ashley River 7101 - 12101

South Marsh Sediments

Barge Canal

Region 4 Koppers Co Inc (Charleston Plant)

KOPPERS CO INC (CHARLESTON PLANT)

0001

32 (Est)0 (Act)

0 (Est)32 (Act)

3103 - 6103

SedimentWeight of Evidence Approach

$05 (ROD)3 (ESD)

Lead

42003 ESD selected MNR for the area

19 tons (Act) 15 (Est)2 (Act)

730 (Est)

17

282

23

01

321 PCBs

1

4 2Twelve Mile CreekLake Hartwell

ROD date62894

Chattanooga Creek - Middle Reach

September 2005 - September 2007 PAHs Sediment

4 0

Reach AHuntsville Spring Branch - Indian Creek

4186 - 101487 DDT 5

Rerouted river buried in-place sediments

No sediment CUL

4Reach B C D and lower Brier Creek

13 (soil and sediment) (Est)ROD date

S t b 2008

Yes

No sediment CUL

No sediment CUL

1

1

None

4

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Sediment

Fish 005

BENZO(A)PYRENE 8

BENZO(BampK)FLOURANTHENE 7

BENZO(A)ANTHRACENE 95

INDENO(123-CD)PYRENE 465

ARSENICBERYLLIUMARCHLOR-1016 3ARCHLOR-1242 3ARCHLOR-1254 3ARCHLOR-1248 3ARCHLOR-1260 3BENZO(A)ANTHRACENE

BENZO(A)PYRENE

BENZO(BampK) FLOURANTHENEDI-BENZ(AH) ANTHRACENEINDENO(123-CD)PYRENEARCHLOR-1248ARSENICLEAD

1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 Sediment 1

2 Appleton to Little Rapids

MNR RemedyROD Date 122002 3 (Est) 20 river

miles Sediment

Sediment 1

Fish (Walleye) 005

Sediment 1

Fish (Walleye) 005

MNR RemedyROD Date 62003

Approx 2700 sq miles

1

701(2010 ESD)

5 PCBs

1

CONTINENTAL STEEL

Region 5 Continental Steel Website

FOX RIVER NRDAPCB RELEASES

Proposed to be added to the NPL

Lower Fox River Cleanup Website

4

Sediment

02

04

119

PCBBrier Creek Reservoir Lake Crabtree and Lower Crabtree Creek

September 2008

Remedy not yet initiated

12

~25 river miles

$37 (Total)

4 Markland Avenue Quarry 3252008 - 612010

5

3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est)

08

1

400

Sediment

14

19

1

11

175Yes

297000 cy

SWAC 025

SWAC 028

11

390 (2005 ROD Amendment)

3273 (Est) 136 (Est)

3216 (Est)

227 (Est)

De Pere to Green Bay 2007 - ongoing

Little Rapids to De Pere 42009 - ongoing

Yes

5 Green Bay

05

Sediment

025 (SWAC)

05

16

19084

093

None

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER)

43 (Est) Yes RADIUM 226

Region 5 Kerr-McGee Website 129 (Act) RADIUM 228

LITTLE MISSISSINEWA RIVER

Not on the NPL - Other Cleanup Activity Private Party-Lead Cleanup

Sediment4 (0-1ft) 5 (deeper than 1ft)

Little Mississinewa River

(Region 5 Website)

Fish Unknown

North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below

71992 to 91992 55 (Est) Yes 074

Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below

1991-1992523 (EST)

30 (ACT)131

2010-2012 PCBs 1

PAHs 2

Fish (Sport) 003 - 01

1 (0-1ft)5 (deeper than 1ft)

72 picoCuries per gram (pCig) combined radium

Yes

57 (Est)

100000 tons (Act)

Kress Creek Site

5 0 Little Mississinewa River

Spring 2005 - Fall 2009

5 0 Summer 2005 - 2012

2012-2013 195 (Est)

$719 (Total) Sediment128

PCBs25 miles (Est) 27 20

OUTBOARD MARINE CORP (Region 5 Website)

4 formerly 1

1HarborSlip No 3(2009 ROD Amendment)

Sediment

PCBs

5

OUTBOARD MARINE CORP 1

Yes40 (soil and sediment) (Est)

Unknown

50 (upper harbor)

Sediment

73

OMC Plant 2 North and South DitchROD Date August 2007

2012 ROD Amendment

Yes PCBs349

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

36 (Est)

54 (Act)

53 (ROD)51 (ESD) Sediment 26

51 (ACT)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Sediment 26Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

21 (Est) SedimentNone (88 mass removal of PCB)

21 (Act)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Copper

VELSICOL CHEMICAL CORP (MICHIGAN)

640 (Act) Carp Smallmouth Bass 1708

Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5

Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000

Natural Recovery Areas 122001 - ongoing Area not

specified

North of Dredge Island NA Actual ROD

Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act)

MERCURY

Pine RiverSt Louis Impoundment

05

Sediment

Amendment)

PCBsYes Sediment

Sediment 1

5

SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI)

2 Area 9 -- Lake Embayment 1295 - 0697

SHEBOYGAN HARBOR amp RIVER

1

Lower River and Inner Harbor Completed in 2012

Region 5 Sheboygan River and Harbor Superfund Site Website

Middle River

Remedy not yet startedAOC dateFebruary 2009

02 (SWAC)

05

05

05

Yes (ROD)

7 miles

12

PCBs

Sept 2004 - October 2007

5 DDT

Unknown area

5 Torch Lake 2

Yes

6

$60 (Total)

ALCOA (POINT COMFORT)LAVACA BAY

1PAHs 448 Total

Upper River 31

Surface WatersNPL DeletionFeb 5 2002

ROD DateMarch 311994

5

$30 (as of 2002)2 1999 - 2005

No Action

161

15

Hg 025 Marsh 05 Open Water

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Witco Marsh 12006 - 42006 57

Chlor-Alkali Process Area (Treatability Study)

August 1998 (Phase I)January 1999 (Phase II)

80 (Act) 1952 MERCURY Mass removal

20 (tar and sediment) (Act)

6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995

47 (ROD Est)150 (ESD Est)170 (Act)

Yes 226 PAHs Sediment 1300

MILLTOWN RESERVOIR SEDIMENTS

2600 (Est)

Region 8 Milltown Reservoir Sediments Website

2560 (Act)

ROCKY MOUNTAIN ARSENAL (USARMY) 19 (Est) Yes (Est) ALDRIN 38

DIELDRIN 37

CHLORDANE 12

ROCKY MOUNTAIN ARSENAL (Region 8 Website)

DDE None

DDT 14

ROCKY MOUNTAIN ARSENAL (US Army Website)

MERCURY 82

ARSENIC 270

SHARON STEEL CORP (MIDVALE TAILINGS)

1 436 (Est) ARSENIC 70

Sediment None

PAHs

North Marsh Area Unknown Sediment None

6 (EST)

8 1 Milltown Reservoir Sediments

Remediation completed Dec 2010

Deleted from NPL 10152007

6

BAILEY WASTE DISPOSAL

1 January 1996 - September 1996

Yes

39 Sediment

Channel realignment and construction

ARSENICCADMIUMCOPPERLEADZINC

140

8 3Lake Sediments Remediation Project

June 1999 - Aug 1999

No (Act)33 (Act)

Yes

Area not specified

Aug 1996 - Sept

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

100 (Act) LEAD 500

CADMIUM None

ARSENIC 200 979CADMIUM 20 099

COPPER 1000 316

LEAD 1000 358

ZINC 1000 None

SILVER BOW CREEKBUTTE AREA (MT STATE Website)

Sediment Trap MERCURY 10 018

2008-20011 ARSENIC

COPPERRegion 9 Iron Mountain Mine Website

IRON

MCCORMICK amp BAXTER CREOSOTING CO

88 (Est) DIOXIN 000021 TEQ

Region 9 Website McCormick and Baxter Creosoting

88 (Act) PAHs 333 (OC)

TOTAL PCBs 035TOTAL DDT 00648TOTAL CHLORDANE 0931

CADMIUM 184LEAD 173MERCURY 152SELENIUM 0926SILVER 137ZINC 720

MONTROSE CHEMICAL CORP DDT Sediment

White Croaker 04

Water

Palos Verdes Shelf (Region 9 Website) PCBs Sediment

White Croaker 007

Water

9 300 Area not specifiedPalos Verde Shelf

46 (OC) interim23 (OC) Final

00648

Sediment

(elevation raised above water line)

047

SILVER BOW CREEKBUTTE AREA

1 Streamside Tailing (Silver Bow Creek)

Deleted from NPL 9242004

Marshy Area

1996

Sediment

Channel realignment and construction (176 miles)

July 1999 - Ongoing 73 (ROD Est) Yes None

0000021 TEQ

Yes

Sediment susceptible to erosion dredged to a specific elevation

None186

Sediment

Sediment$44 (ROD)$98 (ESD)

15 area not specified9

IRON MOUNTAIN MINE

5 Spring Creek Arm 200 (Est)

8

ROD dateSeptember 2004

SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website)

9 3 Old Mormon Slough 2006

9

MOFFETT NAVAL AIR STATION

8 Site 27 - Northern Channel completed in 12007

Naval Air Station Moffett Field Website

68

area not specified 35

173152

0064 ngL

Sediment

0931656 (soil and sediment) (Est)

035

333 (OC)

184

0926137720

022 ngL

7 (OC)

8

5 Interim ROD Date September 2009

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

UNITED HECKATHORN CO

Region 9 United Heckathorn Co WebsiteBunker Hill Mining and Metallurgical 3 Arsenic

CadmiumRunker Hill Mining and Metallurgical (Regional Website)

Copper

LeadMercurySilverZinc

COMMENCEMENT BAY NEAR SHORETIDE FLATS

Partial deletion (St Paul Waterway) 1996

1Olympic View Resource Area (NTCRA)

Completed in 102002

11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ

20 (Est) ARSENIC10 (Act) COPPER

LEADZINC

1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13

ARSENIC 160COPPER 1100ARSENIC 97HEX-CB 01HPAHs 32PCBs 045

Occidental Site Removal Action (NTCRA)

completed March 2003 36 (Act) 10 PCE Sediment

CADMIUM 66HPAHs 22LEAD 580MERCURY 077ZINC 490COPPER 470MERCURY 071LPAHs NoneHPAHs None

18 cy (Est) ARSENIC 93 (Dredge) 57 (Cap)

70 (Act) COPPER 390 (Dredge and Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

Sediment

1752

57

000002 TEQ

530

dredge all soft sediments

preponderance of evidence approach

DDT SedimentYes 7 059 (average)Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)

65 (Proj)

10

COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website)

1 Sitcum Waterway completed in 1994 428 (Act)

19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 174 Sediment 390

450410

Sediment 39045 (Act) 4

1

Hylebos Waterway 32003-22005 940 11 20

17450

46

03

0022Sediment 17

05 (Act) 87 (Act)

4 (Est)

57

21 (Est)

Sediment

82 Sediment

125

60

390

22 (Act)

32 (Est)

059

1Thea Foss and Wheeler-Osgood Waterways

2002-2006 423 (Act)

1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes

HARBOR ISLAND

059410

57

390

960 (OC)

067

93

0057

51

ROD Amendment date Aug 201210 Upper Basin Not specified

9 1

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

LEAD 530 (Dredge) 450 (Cap)

LPAHs780(OC) (Dredge) 370(OC) (Cap)

MERCURY 059 (Dredge) 041 (Cap)

PCBs65(OC) (Dredge) 12(OC) (Cap)

ZINC 960 (Dredge) 410 (Cap)

TBT Not available

ARSENIC 93 (Dredge) 57 (Cap)

COPPER 390 (Dredge and Cap)

LEAD 530 (Dredge) 450 (Cap)

MERCURY 059 (Dredge) 041 (Cap)

116 (Est) ZINC 960 (Dredge) 410 (Cap)

220 (Act) LPAHs780(OC) (Dredge) 370(OC) (Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

PCBs65 (OC) (Dredge)12(OC) (Cap)

TBT Not available

MERCURY

PCBs

KETCHIKAN PULP COMPANY

4-METHYL-PHENOL 17

Not on the NPL - Superfund Alternative Sited

AMMONIA 120

Region 10 Ketchikan Pulp Company Web Site

SULFIDE None

PCB

0002

57

370 (OC)

Yes In dredge areas No area given

370 (OC)

041

12 (OC)

$15(ROD) $12(ESD) 20 Sediment

5 (Act)(223235 sq ft)

10

Todd Shipyard Sediments 7604 - 22007

Region 10 Harbor Island (Lead) Web Site

9

5 (Act)12 (Act) In dredge areas

10

(LEAD)

7 Lockheed Sediments 7703 - 2405

East Waterway Sediments NTCRA

11204 - 31605 (removal action)No ROD completed for this OU

206 (Act) - Removal action

13 (Act) In dredge area

$45-$69 21 Sediment

17 16 Sediment

21 (Est) 27(Act) 44Yes 50 (Est)

52 (Act) 31 Sediment

410

10 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est)

87 (Act)

Not Stated Benthic toxicity community structure and chemistry

Not available

390

450

12 (OC)

450

041

12 (OC)

041

410

960 (OC)

not available

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Arsenic

Lead

Copper

Mercury

Carcinogenic PAHs (TEQ)

TBT

DioxinsFurans

Multiple Others

MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT)

ARSENIC

Region 10 McCormick and Baxter Creosoting

DIOXINSFURANS

PAHs

PCP

Arsenic (III)

Chromium (III)

Copper

Zinc

PCP

Acenaphthene

Fluoranthene

10 Sediment

11

7

041 (subtidal)017 (intertidal)

114

see attached

0009

LOCKHEED WEST SEATTLE

Lockheed West Seattle (Region 10 Website)

Lockheed West ROD Date August 2013

116 DredgeE

MNR

284 EMNR only

1 167potential use in shallow areas

yes 477

54 μgL

520 μgL

13 μgL

10

190 μgL

23 12

Water

23 (Act)organoclay

4 72004-92005Sediments

000008

100

Sediment

ORDEQ McCormick amp Baxter Creosoting Co Web Site

15 (Est)

12 μgL

2

12

110 μgL

210 μgL

043 (subtidal)2 (intertidal)

Washington State CSL or SQS

0000002

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Naphthalene

Total cPAHs

Dioxinsfurans

PCBs 004COPPERLEADZINCSILVER2 4-DIMETHYL-PHENOL

PCBs Shellfish (intertidal clams) 0042

50 (Est) LMWPAHs 780(OC)

58 (Act) HMWPAHs 5300(OC)

98 (Act)Capped dredge areas

PCBs

12 (OC) (trigger for sediments to 10 feet depth)

Fish (English sole) 0023 ww

Sediment12 (OC) dredgecap 6 (OC) EMNR

Sediment in state owned adjacent lands

9 (OC) EMNR

MERCURY Sediment3 where PCBs greater than 6 (OC)

ST MARIES CREOSOTE - proposed to be added to the NPL

ROD dateJuly 2007 LPAHs

370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)

St Maries Creosote (Regional Website)

Remediation Ongoing HPAHs

960 (OC) (17 if TOC lt02or gt4)

7-10 (Est)

200 (Est)

10 (Act)

35 (Est)

510

OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA)

1 Clam Bay Sediments 61999 - 102001

15

450

Area not specifiedYes

12 (OC)

46 71Sediment

013390

61

0029

410

10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005

960(OC)49 Sediment

12

PCBs

3 (OC) SWAC12 (OC)) SWAC

10PUGET SOUND NAVAL SHIPYARD COMPLEX

2 OUB Marine 61600 - 3104

225 (Act)

10 0Shoreline Nearshore and Offshore Sediment

29 (Est) Yes

211 9

108 Sediment

5

1x10-5 ngL

031 μgL

620 μgL

370(OC)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

MERCURY (toxicity test opt-out)

LPAHs 780 (OC)

HPAHs 5300 (OC)

MERCURY 059 subtidal

LPAHs 780 (OC) subtidal

HPAHs 5300 (OC) subtidal

MERCURY 059

LPAHs 780 (OC)

HPAHs 12 dw intertidal

MERCURY 5 21059LPAHs

HPAHs 12 dw intertidal

48 (Act)

30(Act)

54 (Act)

Region 10 Wyckoff Eagle Harbor Web Site

East HarborWest Beach Sediments

2007-2008

31997 - 121997 13-92 (Est) Yes

10

WYCKOFF COEAGLE HARBOR

1

East HarborPhase 1 - NTCRA

91993 -31994 (Phase 1)

East HarborIntertidal and Subtidal Sediments

2000-2002

3 West Harbor

117

780 (OC)

23

$6-20

Sediment

Sediment

059 (dw)

5300 (OC)

780 (OC)

5300 (OC)

5300 (OC)

Sediment

059

49 $62 - $16 Sediment12 - 31 (includes EMNR)

see cap

059

780 (OC)

  • READ_FIRST
  • Tier 1 Sites - Remedial
    • READ_FIRST

      The 2002 memo Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sitesestablished at 2 tier system of headquarters consultations to encourage national consistency in makingdecisions at Superfund and RCRA Corrective Action sediment sites Tier 1 sites are defined as sites wherethe proposed sediment action will address more than 10000 cubic yards or five acres of contaminatedsediment Consultation for Tier 1 sites involves the submission of the draft Proposed Remedy or draftEECA and a discussion of how the 11 principles were considered to the Regional Coordinator 30 daysprior to the public comment period Tier 2 sites are a subset of the Tier 1 sites that are large complex orcontroversial and are subject to consultation with the Contaminated Sediments Technical AdvisoryGroup throughout the RIFS and remedy selection stagesThis Tier 1 Tracking list is an EPA OSRTI product largely developed by the Army Core of Engineers and isintended to be a resource for contaminated sediment RPMs headquarters and regional technical staffand others supporting the remedy decision making process at these sites The list tracks the Tier 1 sitesthat have signed a decision document and documents the remedy selected theestimated and actual costs of the remedy the contaminants of concern and the associatedcontaminated media the Action Levels the Clean-up Levels (CUL) the Remediation Goals (RG) and theSediment Remedial Action Objectives (RAO) For those sites where the remedy has been implementedand a Five-year Review (FYR) has been completed the list also documents whether monitoring wasconducted for the FYR data was presented in the report and the CULs RGs and RAOs were met A keyaspect of this list is that the references for all the data in this spreadsheet are easily located Each cellcontaining data is hyperlinked to a PDF with the page or pages from the relevant public document thatreports the data Each PDF includes the cover page of the report with the information necessary tolocate the complete document and the data included in the spreadsheet is highlighted in the text of thePDF All of the information and documents included in this tracing list are publically availabledocumentsThis Version has been published to the internet with all of the hyperlinks removed We apologize for the inconvenience EPA is currently updating its websites and is temporarily unable to publish the Tier 1 Tracking List with the hyperlinks to the Cited Documents The Remedial Action Objectives and Five Year Review data columns have been removed from this version because they are largely narrative text and require the context provided by the hyperlinked documents in order to be properly understood When the Internet upgrade is complete the Fully cited version will be published Until then any questions regarding this Tier 1 Tracking List can be directed to Matt Lambert EPA Office Of Superfund REmediation and Technology Innovation (lambertmatthewepagov)The Tier 1 Tracking List includes sites in the Remedial Program where a Proposed Plan and Record of Decision were signed The sites are organized by EPA Region number and then listed alphabetically by name Due to the structure of the list columns cannot be filtered or sorted

      Tier 1 Sites - Remedial

      264pdf
      Websitehttpcumulisepagovsupercpadcursitescsitinfocfmid=0101431
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100948
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101479
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100744
      216pdf
      1-011pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100743
      Website httpwwwepagovnbhindexhtml
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631F8CFE11E53EFA23C8525691F0063F6E8OpenDocument
      1-009pdf
      260pdf
      702pdf
      Website httpyosemiteepagovr1npl_padnsf31c4fec03a0762d285256bb80076489ca48c071b6a314e1c8525691f0063f6ddOpenDocument
      1-068pdf
      608pdf
      610pdf
      611pdf
      612pdf
      631pdf
      681pdf Soil and sediment not differentiated
      682pdf
      1-057pdf
      692pdf
      695pdf
      700pdf
      703pdforig 1998 estimate
      1-035pdf
      679pdf
      1-005pdf
      636pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      638pdf
      636pdf
      1-010pdf
      1-074pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      1-017pdf
      1-018pdf
      1-020pdf
      215pdf
      694pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-024pdf
      1-023pdf
      1-025pdf
      1-026pdf
      1-027pdf
      1-027pdf
      1-028pdf
      1-025pdf
      1-047pdf
      1-031pdf
      1-033pdf
      1-034pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101074
      1-012pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201766
      738pdfDates are for entire construction not only sediment portion
      356pdf
      2058pdf
      735pdfThis represents cost estimate for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1266pdfThis represents actual cost for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1268pdf
      2083pdf
      1268pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200364
      2203pdf
      372pdf
      739pdf
      740pdf
      371pdfIn-situ treatment with sorptive agents
      371pdf
      1259pdf
      373pdf
      Website httpwwwepagovr02earthsuperfundnpl0200364chtm
      1259pdf
      373pdf
      1259pdf
      373pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200528
      1272pdf
      177pdf
      477pdf
      1261pdf
      2086pdf
      478pdf
      2086pdf
      478pdf
      Northerly wetlands and tar patch area were determined to be more like soil removals as they were not submerged Westerly wetlandds has a surface water stream running through it that is monitored for sediments so it is retained
      1273pdf
      2088pdfMNR doesnt have fieldwork dates but site fieldwork dates are included
      1274pdfNo specific area for MNR provided 21 acres is area of westerly wetlands for which MNR is selected
      2006pdf
      2087pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0201644
      456pdf
      218pdf
      457pdf
      2093pdf
      2094pdf
      178pdf
      2011pdf
      1279pdf
      461pdf
      56pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201706
      463pdf
      2016pdf
      463pdf
      2016pdf
      2091pdf
      2015pdf
      2015pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0202229
      990pdf
      993pdf
      1014pdf
      1299pdf
      2018pdf
      996pdf
      990pdf
      991pdf
      991pdf
      992pdf
      996pdf
      996pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200557
      2019pdf
      997pdf Remedy componentsareas not broken out
      2098pdf
      2096pdfInfo only on Alycon Lake no info on Rabbit Run or Chestnut Branch
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201290
      2033pdf
      764pdf
      2023pdf
      2024pdf
      2024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201491
      2032pdf
      1002pdf
      1001pdf
      2221pdf
      2031pdf
      2032pdf
      2102pdf
      2029pdf
      2028pdf
      2134pdf
      2030pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0203382
      2072pdf
      518pdf
      2228pdf MNR area was not stated Calculation Profundal areas 08= 154 profundal area = 1925 acres - 154 TLC acres = 1771 MNR acres
      518pdf
      2073pdf
      2075pdf
      2079pdf
      2123pdf
      2126pdf
      1005pdfAttachment has 2 sections one from the ROD the other from the FYR
      1006pdf
      2124pdf
      2125pdf
      2070pdf
      2059pdf
      2059pdf
      2059pdf
      2128pdf
      2060pdf
      2061pdf
      2127pdf
      2063pdf
      2063pdf
      2064pdf
      2065pdf
      2066pdf
      2130pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201465
      369pdf
      2133pdf
      2034pdf
      1008pdf
      2131pdf
      183pdf
      2177pdf
      2131pdf
      183pdf
      2131pdf
      183pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201770
      2036pdf
      64pdf
      1009pdfIncludes entire remedy sediment portion is not defined
      2038pdf
      2037pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200439
      2174pdf
      1012pdf
      2042pdf
      2041pdf
      2041pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200209
      2171pdf
      2051pdf
      523pdf
      2046pdf
      2044pdf
      2049pdf
      2162pdf
      2052pdf
      2053pdf
      2047pdf
      2045pdf
      2050pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201202
      69pdf
      2170pdf
      2054pdf
      2120pdf
      2054pdf
      2054pdf
      2118pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0302836
      Website httpcfpubepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0302836
      3006pdf
      497pdf Apparently same area as EMNR
      498pdf Apparently same area as MNR
      496pdf
      3001pdfWeb site COC list is much more extensive then tPAH
      497pdf
      497pdf
      httpwwwepagovreg3hwmdnplVAD990710410htm
      499pdf
      499pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300093
      1605pdf
      224pdf
      1601pdf
      1614pdf
      1606pdf
      1606pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1605pdf
      482pdf
      73pdf
      1615pdf
      656pdf
      1606pdf
      1617pdf
      1617pdf
      1617pdf
      1617pdf
      Website httpwwwepagovreg3hwmdsupersitesDED980555122indexhtm
      1617pdf
      1617pdf
      1605pdf
      483pdf
      74pdf
      484pdf
      657pdf
      1606pdf
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300092
      1622pdf
      1621pdf
      1039pdf
      959pdf
      1040pdf
      958pdf
      1623pdf
      665pdf
      httpwwwepagovreg3hwmdnplDED980552244htm
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300951
      1624pdf
      3008pdf
      961pdf
      960pdf
      3002pdfArea not stated No mention of sediment capping or marine mattress in ROD or ESDs
      962pdf
      1625pdf
      1626pdf
      1627pdf
      1628pdf
      Websitehttpwwwepagovreg3hwmdnplPAD046557096htm
      Website httpcumulisepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0300951Provided to indicate formal OU name
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0406299
      Construction completed but no documents are available
      12pdf
      578pdf
      579pdf
      4001pdf
      4001pdf
      12pdf
      4001pdf
      4001pdf
      4001pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0402260
      No information on websites regarding status of sediment work unclear as of Jan 2014
      21pdf
      4002pdf
      53pdfCost of sediment remedy is not broken out
      4003pdf
      Website hhttpcumulisepagovsupercpadcursitescsitinfocfmid=0403156
      400pdf
      580pdf
      4004pdf
      Website httpwwwepagovregion4superfundsitesnplnorthcarolinawcoplwtpnchtml
      395pdf
      402pdf
      396pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403350
      4008pdf
      4007pdf
      4023pdf
      965pdf
      4020pdfThe ROD and FYR do not directly state the COCs for the sediment remedy and there are not contaminant-specific cleanup levels The contaminants identified here are those with an HQ above 1 for all areas (see attachment) Presented here to indicate prevalent contamination
      4019pdf Excavation depth based on elevation and visual determinations
      4009pdf
      4011pdf
      4010pdfChanged remedy to MNR
      4011pdfChanged remedy to MNR
      4017pdf
      966pdf
      584pdf
      964pdf
      4013pdf
      4018pdf
      4021pdf
      1025pdf
      1026pdf
      4014pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403252
      77pdf
      561pdf
      4022pdf
      558pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0403765
      391pdf
      4030pdf
      4031pdf
      4032pdf
      393pdf
      httpwwwepagovregion04superfundsitesnpltennesseetennprotnhtml
      562pdf
      563pdf
      4031pdf
      4033pdfROD states However if certain excavated sediments appear to be uncontaminated then those sediments shall be subjected to sampling and analyses for the PAHs The action levels for sediment removal will reflect EPAs excess lifetime carcinogenic risk range of 1 x 10 6 to 1 x 10 4 (See Table G - 9) Its unclear whether or which concentrations will be used for an action level but the text and table are addded as a reference
      4034pdfNo remedial action in Reaches B and C See second page of attachment
      570pdf
      1031pdf
      4043pdf
      4044pdf
      4043pdf
      4043pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406082
      592pdf
      592pdfSite soils included in volume
      No Reach A removal action decision documents exist on EPA HQ or region websites
      httpwwwepagovregion4superfundsitesnplnorthcarolinawardtrnchtml
      593pdf
      590pdf
      591pdf
      4040pdf
      4041pdf
      4042pdf
      4041pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0501228
      5070pdf
      15pdf
      20pdfThis value represents Estimated 30-Year Net Present Worth to excavate and consolidate sediment in landfill
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      17pdf
      5170pdf
      5171pdf
      5172pdf
      533pdf
      532pdf
      Website httpwwwepagovregion5sitescontinentalindexhtm
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0507723
      5059pdf
      5173pdf
      5174pdf
      5180pdf
      5175pdf
      5057pdf
      5137pdf
      5093pdf
      5176pdfDeposit DD is located in OU2 but it is considered part of the OU3 response
      5179pdf
      5062pdf
      5181pdf
      5051pdf
      5092pdf
      5177pdf
      213pdf
      5058pdf
      Website httpwwwepagovregion5sitesfoxriverindexhtml
      5092pdf
      5178pdfAlso see Fox River ROD Amendment 2007 pg 14 Table 2 for documentation of the OU 5 dredge volume being included in the OU4
      213pdf
      5217pdf
      5094pdf
      5096pdf
      214pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500760
      33pdf
      5063pdfBackfill stated on second page of attachment
      35pdfIncludes floodplain material
      32pdf
      Website httpwwwepagovR5SupernplillinoisILD980823991htm
      32pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0508120
      5003pdf
      5002pdf
      5005pdf
      5060pdfEstimated from map in 5 year report
      5004pdf
      5004pdf
      5006pdf
      5001pdf
      5168pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500083
      5108pdf
      5222pdf
      5208pdf
      5022pdf
      5131pdf
      5209pdf
      Website httpwwwepagovregion5sitesoutboardmarine
      5205pdf
      514pdf
      515pdf
      5120pdf
      514pdf
      5120pdf
      514pdf
      5212pdf
      5125pdf
      5126pdf
      5127pdf
      5123pdf
      5128pdf
      Website ttpcumulisepagovsupercpadcursitescsitinfocfmid=0501181
      5024pdf
      5160pdfIncludes sediments and soils
      5026pdf
      5025pdf
      5024pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0505188
      5203pdf
      5202pdf
      5146pdf
      5044pdf
      5037pdf
      5045pdf
      5142pdf
      5142pdf
      Website httpwwwepagovregion5sitessheboygan
      5046pdf
      5145pdf
      5043pdf
      5140pdf
      5142pdf
      5142pdf
      5035pdf
      5144pdf
      5042pdf
      5036pdf
      5142pdf
      5142pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0502194
      150pdf
      148pdf
      149pdf
      5157pdf
      147pdf
      147pdfNo update provided in 2012 FYR
      5027pdf
      5156pdf
      Website httpwwwepagovregion5cleanupvelsicolmichiganindexhtml
      5154pdf
      5164pdf
      5164pdf
      5151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0601752
      6001pdf
      986pdf
      6004pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      987pdf
      983pdf
      981pdf
      984pdf
      6014pdf
      6006pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0602911
      1043pdf
      1044pdf
      6008pdf
      6009pdfA list of principal parameters is provided without risk context COCs or risk drivers in sediments are not identified
      1047pdfPossible that visually clean performance standard also applies to marsh sediments
      1045pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0600574
      1049pdf
      153pdf
      1050pdf
      1051pdf
      6010pdfConstruction and disposal only
      6011pdf
      1052pdf
      Wesbite httpcumulisepagovsupercpadcursitescsitinfocfmid=0800445
      8003pdf
      311pdfIncludes Area 1 sediments and 30K cy in area 3
      625pdf
      624pdf
      8002pdf
      Website httpwwwepagovregion8superfundmtmilltown
      8050pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800357
      8018pdf
      8017pdf
      1019pdf
      1018pdf
      8023pdf
      8012pdf
      8013pdf
      8015pdf
      website httpwww2epagovregion8rocky-mountain-arsenal
      8020pdf
      8019pdf
      8012pdf
      8015pdf
      website httpwwwrmaarmymil
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800694
      629pdf
      8024pdf
      630pdf
      8025pdf
      8026pdf
      8027pdfSediment and soil are often used interchangeably in the ROD
      628pdf
      627pdf
      8026pdf
      628pdf
      8026pdf
      8028pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800416
      8037pdf
      1021pdf
      1022pdf
      8043pdf
      1023pdf
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Websitehttpwww2epagovregion8silver-bow-creek-butte-area
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpdeqmtgovREMMWCBConstructionServicesSectionSilverBowCreekdefaultmcpx
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901755
      9015pdf
      596pdf
      1237pdf
      1236pdf
      1235pdf
      1234pdf
      980pdf
      1238pdf
      1234pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDCAD980498612OpenDocument
      1234pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901129
      1245pdf
      9002pdf
      1240pdfThis cost does not include $18M for bank stabilization
      1239pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDcad009106527OpenDocument
      543pdf
      1239pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902734
      1249pdf
      41pdf
      545pdf
      39pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpyosemiteepagovR9SFUNDR9SFDOCWNSF3dec8ba3252368428825742600743733c01ef2be6ec9ab9c8825737f002bf719OpenDocument978
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902440
      1254pdf
      156pdf
      974pdf
      975pdf
      1250pdfDieldrin is also a COC but only has a CUL for surface water
      1252pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfvwsoalphabeticUnited+Heckathorn+CoOpenDocument
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000981
      10-030pdf
      Name in ROD However name on CB website is NSTF Areawide Sediment covered within OU1 ROD was later divided into separate OUs except for removal actions conducted at Olympic View This removal action is summarized here
      1104pdf
      1105pdf
      1105pdf
      1106pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1106pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc923e8d62480494ad483882564f80082a1c0OpenDocument
      10-030pdf(formerly OU6)
      10-100pdf
      1101pdf
      1100pdf
      1099pdf
      1097pdf
      10-002pdf10 acres as of 2009
      1097pdf
      1097pdf
      1097pdf
      10-030pdf
      1071pdf
      1076pdf
      1073pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1072pdf
      10-030pdf
      1066pdf
      1061pdf Quantity does not include Blair Waterway dredging 1993 ESD states that Blair is not part of ROD cleanup and is for navigational purposes
      1062pdf
      1063pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      10-030pdf
      1060pdf
      1059pdf
      1059pdf
      1059pdf
      1067pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1070pdf
      1111pdf
      1112pdf
      1115pdf
      1113pdf
      10-030pdf
      10-098pdf
      1121pdf
      1079pdf
      1094pdf
      1094pdf
      1078pdf
      1122pdfThis is strictly a construction cost that appears to include construction of CDF and pile removal as well as dredging and capping
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 25
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 089
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      10-030pdf
      10-008pdf
      1081pdf
      1082pdf
      10-009pdf
      1084pdf
      1085pdf
      1087pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000020OU 8 is not included because OU was reommended for no further action in 2003 ROD
      1123pdf
      10-022pdf
      1134pdfCapping took place after dredging to in part maintain original depths
      1138pdf
      433pdfROD estimated remedy would cost $15M but 2002 ESD estimated it as $12M
      1133pdf
      1130pdf
      949pdf
      1135pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc9235a64831b6521f46b8825650200836f1cOpenDocument
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      1136pdf
      1124pdf
      10-023pdf
      1128pdf
      10-028pdf
      434pdf
      1125pdf
      1130pdf
      10-024pdf
      1126pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-025pdf
      1142pdf
      10-095pdf
      1144pdf
      1141pdf
      1143pdf
      1146pdf
      1146pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1000020
      1152pdf
      162pdf
      1148pdf
      314pdf
      633pdf
      1149pdf
      1153pdf
      431pdf
      1150pdf
      431pdf
      1151pdf
      Website httpyosemiteepagovR10CLEANUPNSF7d19cd587dff1eee8825685f007d56b72dd5ab7462e4f004882567b30057eb7bOpenDocument
      431pdf
      1151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000339
      166pdf
      49pdf
      1158pdf
      1159pdf
      1157pdf
      1157pdf
      Website httpwwwdeqstateoruslqcunwrmccormickbaxter
      1290pdf
      1157pdf
      1157pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1001134
      1291pdf
      1163pdf
      1164pdf
      1292pdf
      1293pdfAlthough not called MNR remedy is to monitor contaminant levels until the goal is achieved which is MNR
      10-061pdf
      1165pdfThis cost includes capping of the upland landfill A breakout for just the sediment portion was not provided
      1166pdfThis cost includes the fire training area and upland landfill cover A breakout of just the sediment remediation was not provided
      1167pdf
      1169pdfconsidered at conceptual target for sediment
      1292pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1169pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000611
      1177pdf
      10-031pdf
      10-031pdf
      1179pdf
      1178pdf
      1173pdf
      1181pdf
      1176pdf
      1174pdf
      1173pdf
      1181pdf
      1176pdf
      1173pdf
      1181pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1001107
      1182pdf
      10-040pdf
      1242pdf
      1244pdf
      1243pdf
      1188pdf
      1189pdf
      1187pdf
      1183pdf
      1185pdf
      10-041pdf
      10-042pdf
      1189pdf
      1185pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1002095
      46pdfIncludes soil excavation quantity in total volume
      10-039pdf
      408pdfIncludes cost for excavating nearshore soil
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate that sediment is not toxic
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate sediment that is not toxic
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000612
      10-066pdf
      1216pdf
      10-044pdf
      10-071pdf
      10-068pdf
      10-068pdf
      Website httpyosemiteepagovR10CLEANUPNSFsitesWyckoff
      10-068pdf
      10-075pdf
      10-113pdf
      409pdf
      1218pdf
      202pdf
      202pdf
      202pdf
      10-064pdf
      10-072pdf
      1219pdf
      1214pdf
      1214pdf
      1214pdf
      1215pdfRequirement for intertidal sediments
      423pdf
      10-047pdf
      10-046pdf
      1209pdf
      1208pdf
      1207pdf
      1203pdf
      1202pdf5 mgkg criteria for areas requiring dredging21 mgkg criteria for areas requiring a 1-meter thick cap 059 for thin layer capping
      1203pdf
      1204pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      2195pdf
      2136pdfCleanup goals for biological endpoints were not provided
      2136pdfCleanup goals for biological endpoints were not provided
      2127pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0900993
      Website httpwwwepagovregion9superfundpvshelf
      9003pdf
      9004pdf
      9005pdf
      9005pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      613pdf
      1-030pdf
      1-064pdf
      683pdf
      475pdf
      2085pdfHowever see RAO of 50 ppm
      2085pdf
      2085pdf
      1-102pdf
      1278pdf
      1279pdf
      1278pdf
      2092pdf
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      2097pdf
      763pdf
      1003pdf
      2030pdfIts unclear the extent to which 10 mgkg is considered the cleanup level ROD language and FYR note is attached The closest to being definitive is on p 34 of attachment the cleanup goal of about 10 mgkg
      2123pdf
      2062pdf
      2129pdf
      186pdf
      2117pdf
      2043pdf
      2043pdf
      963pdf Attachment incl language from ROD and ESD
      11pdf
      11pdf
      11pdf
      11pdf
      11pdf
      23pdf
      396pdf
      4019pdf
      597pdf
      4045pdf
      4045pdf
      4045pdf
      586pdf
      585pdf
      4057pdfSediment concentration associated with protective fish tissue concentration is lt10ppb
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      5137pdf
      5050pdf
      5050pdf
      34pdf
      5001pdf
      5109pdfAction level or cleanup level of North Ditch remediation never stated in ROD ROD amendment five year reviews or construction completion report
      277pdf
      5122pdf
      526pdf
      5045pdf
      5139pdf
      5141pdf
      5155pdf
      982pdf
      6003pdf
      8002pdfNo sediment cleanup levels cleanup levels pertain to groundwater or surface water
      1024pdf
      979pdf
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      9006pdf
      9006pdf
      9006pdf
      9006pdf
      1251pdf
      1106pdf
      1103pdf
      1103pdf
      1103pdf
      1103pdf
      1072pdf
      1065pdf
      1065pdf
      1069pdf
      1069pdf
      1069pdf
      1070pdf
      1116pdf
      1091pdf
      1091pdf
      1091pdf
      1091pdf
      1114pdfTable 13 in the ROD lists Zinc SQO as 059 This appears to be an error Table 12 of the ROD lists 059 for mercury and 410 for zinc
      1074pdf
      1074pdf
      1089pdf
      1089pdf
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1136pdfConfirmational number of 76 mgkg (OC) established for TBT
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-025pdf76 ppm (OC) 1335 ppb (dw)TBT is a confirmational number See attachment
      10-096pdf
      10-096pdf
      164pdf
      312pdf
      164pdf
      164pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      1181pdf
      1181pdf
      1181pdf
      1187pdf
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (041 ppm) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (970 ppm [OC]) is considered a conceptual target
      9006pdf
      9006pdf
      6018pdf
      6018pdf
      5184pdfCalled residual cover here
      5185pdfTermed post-dredge residual sand cover
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406638
      4048pdf
      4049pdf
      4050pdf
      4051pdf
      4051pdf
      4051pdf
      4051pdf
      httpepagovregion4superfundsitesnpltennesseecopbastnhtml
      4051pdf
      4051pdf
      4051pdf
      1-045pdf
      1-045pdf
      1-030pdf
      1-046augmentedreplaced sand cap in 2011
      1-047pdf
      httpwwwepagovregion02superfundnplonondagalakeindexhtml
      Ley Creek subsite not included because the volume removedmanaged was less than 10K cy
      2179pdf
      2165pdf
      2167pdf
      2166pdf
      2054pdf
      2054pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      1300pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      5186pdf
      3007pdfSame factsheet as of Jan 2014
      httpepagovregion4superfundsitesnplalabamaamerbrasalhtml
      httpepagovregion4superfundsitesnplmississippiamercrewkmshtml
      httpyosemiteepagovr10cleanupnsf22f04d62fa63974288256da6005f9868cabb84db584c955f8825697f00049beeOpenDocument
      10-056pdf
      10-058pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0503034
      5187pdf
      5188pdf
      5189pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinasangschtml
      5195pdf
      5194pdf
      6023pdf
      10-060pdfROD amendment did not specify the volume of instream sediments vs floodplain material
      10-062pdf
      10-063pdf
      10-064pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      10-069pdf
      10-069pdf
      10-083pdf
      1203pdf
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (370 ppm [OC]) is considered a conceptual target
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      Website httpyosemiteepagovr10cleanupnsfsitesmccormick_baxter
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-087pdf
      10-097pdf
      10-101pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      1246pdfCap placed in areas exceeding CUL
      1246pdfCap placed in areas exceeding CUL
      9014pdf
      8044pdf
      8046pdf
      8051pdf
      6026pdf
      6026pdf
      6026pdf
      6026pdf
      6027pdf
      5196pdf
      5197pdf
      5203pdf
      5204pdf
      5206pdf
      5207pdf
      5210pdf
      5022pdf
      httpwwwepagovregion5cleanupmississinewaindexhtml
      5213pdf
      5214pdf
      5215pdf
      5216pdfAmended cost for OU 2-5 does not include Phase 1 in OU4
      4056pdf
      4061pdf
      4062pdf
      4063pdf
      4065pdfBackfill in at least portions of site N of 38th St area unclear
      4066pdf
      4075pdf
      4075pdf
      4076pdf
      4051pdf
      69pdf
      2053pdf
      2181pdf -- most recent factsheet as of 2014-Jan
      2181pdf -- most recent factsheet as of 2014-Aug
      ROD also describes NYSDEC-regulated action removing channel sediment (4200 cy) and floodplain sedimentsoil (63000 cy)
      2185pdf
      2196pdf
      2197pdf Remedy componentsareas not broken out
      httpwwwepagovhudson
      2198pdf
      1-058pdf
      1-059pdf Soil and sediment not differentiated
      2205pdf
      2204pdf
      1-065pdf
      613pdf
      1-067pdf
      1-071pdf
      1-072pdf
      1-013pdf
      1-073pdf
      698pdf
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93d01550369a32b31bb8525691f0063f6d6OpenDocument
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101028
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8584c38df37ade1998525764f005a96d3OpenDocumentampHighlight=0callahan
      1-076pdf
      1-075pdf
      1-078pdf
      1-078pdf
      1-078pdf
      1-078pdfNote that the dredging and subaqueous disposal of sediments was changed from OU1 to OU3 in the 2013 ESD
      1-078pdf
      1-078pdf
      1-080pdfAs of 2014-Jan
      1-077pdf
      1-081pdf only dredge operation
      httpwwwepagovregion02superfundnplraritanbayslag
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206276
      1-082pdf
      1-083pdf
      1-083pdf level specified on p 3 of 4
      1-083pdf 1-083pdf level specified on p 3 of 4
      1-086pdf
      1-085pdf
      1-087pdf Total cost ROD does not specify cost of sediment portion
      2206pdf
      2206pdf
      2206pdf
      2207pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201690
      2208pdf
      2210pdf
      2211pdf
      2212pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206222
      httpwwwepagovregion2superfundnplgowanus
      2213pdf
      2214pdf
      2214pdf
      2215pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1002655
      httpyosemiteepagovr10cleanupnsf32e58b284950a4fc882578480000fdcc9458199e8119eba3882572910069d808OpenDocument
      10-102pdf
      10-104pdf
      10-105pdf
      10-105pdf
      10-106pdf
      10-107pdf
      10-108pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driverf
      10-110pdf
      10-111pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-093pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8bbe0100a535e8840852576e90053b186OpenDocument
      1-090pdf - soilsediment volumes not differentiated
      1-090pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-089pdf
      1-091pdf
      1-092pdf
      Fish tissue remedial goal appears to only apply to the Allendale and Lyman Mill Pond areas not lyman mill stream sediment
      1-096pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-098pdf
      1-099pdf
      1-099pdf
      2218pdf
      2219pdf
      2219pdf
      2220pdf
      2222pdf
      2123pdf
      2225pdf
      2173pdf
      2116pdf
      5109pdf
      5223pdf
      10-125pdf
      10-125pdf
      10-125pdf
      1-100pdfFloodplain vs sediments not differentiated
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93de720462345729a4f8525691f0063f6e1OpenDocument
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631E704D6C17F74EA678525697B0008CCAAOpenDocument
      1-101pdf
      httpwwwepagovregion02superfundnplaluminumcompany
      2200pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinakopchschtml
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0405546
      httpwwwepagovregion4superfundsitesnplalabamatriatenvalhtml
      877pdf
      877pdf
      877pdf
      877pdf
      6024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000195
      httpyosemiteepagovr10cleanupnsfsitesbh
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101388
      Reg Site OU Area Name Fieldwork Dates Dredge (1000 cu yds) Excavate (1000 cu yds) Back-fill (Residual Cap) Cap (acre) MNR (acre) EMNR Thin Cover (acre) In Situ Treatment (acres) Other Estimated Cost (in millions) Actual Cost (in millions) COC Sample Matrix Action Level (ppm) Cleanup Level (ppm) Remediation Goal (ppm)
      1 CALLAHAN MINING CORP 3 SedimentsCap Ongoing 101 No $21 Copper Sediment 790
      Lead 710
      Callahan Mine (Region 1 Website) Zinc 5100
      1 CENTREDALE MANOR RESTORATION PROJECT 1 Allendale Pond and Lyman Mill Pond Sediment 156 If needed 605 Benzo(a)pyrene Fish 00015
      Dieldrin 00011
      Technical Chlordane 013
      Aroclor 1254 0037
      Aroclor 1268 0011
      2378-Tetrachlorodibenzo-p-dioxin 00000022
      Total Aroclors 0076
      44-DDD 00062
      44-DDE 0018
      DioxinsFurans TEQ 0000044
      Benzo(a)pyrene Sediment 14
      Dibenz(ah)anthracene 097
      Dieldrin 00026
      Technical Chlordane 04
      Aroclor 1254 0031
      Aroclor 1268 0023
      Arsenic 39
      Centredale Manor Restoration Project (Region 1 Website) 2378-Tetrachlorodibenzo-p-dioxin 0000015
      Lyman Mill Stream Sediment 205 Yes 225 165 Coplanar PCBs (TEQ)3 0000025
      Total Aroclors 006
      Selenium 11
      Zinc 221
      44-DDD 00084
      44-DDE 0006
      Aluminum 8210
      Barium 134
      Vanadium 376
      N-Nitroso-di-n-propylamine 046
      1 LORING AIR FORCE BASE 13 East Branch of Greenlaw Brook 1997 - 1998 38 (Est) Yes 481 Total PAHs Sediment 35
      86 (Act) Total 44-DDTDDDDDE 028
      Loring Air Force Base (Region 1 Website) Aroclor 1260 1
      Total Chlordanes 048
      Lead 218
      44-DDD Fish 0018
      44-DDE 0013
      44-DDT 0013
      Aroclor 1242 00022
      Aroclor 1260 00022
      Heptaclor 000098
      Chlordane Alpha 00034
      Chlordane Gamma 00034
      1 NEW BEDFORD 1 Acushnet River North of Wood Street (within Upper Harbor) 1202 - 303 900 (throughout OU1) 156 (Act) No 2002 ESD $317 (for all of OU 1) Operation ongoing PCBs Sediment (Upper Harbor) 10
      Region 1 New Bedford Website Upper and Lower Harbor 2004 - Ongoing 2011 ESD $422-1200 (for all of OU1) Sediment (Lower Harbor) 50
      Sediment intertidal areas with public access or abutting recreational land use 25
      Sediment saltmarsh areas with little to no public access (aka Marsh Island) 50
      Sediment intertidal areas with abutting residential land use 1
      Seafood 002
      2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000
      1 NEWPORT NAVAL EDUCATION amp TRAINING CENTER 4 McAllister Point Landfill (Narrangasett Bay) 22001 - 122001 34 (Est) Yes 226 Anthracene Sediment 051 051
      Fluorene 02 02
      46000 tons (Act)(cyds not provided) PCBs 36 36
      NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website Pyrene 3 3
      Copper Porewater 00529 00529
      Nickel 00337 00337
      1 NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1 1
      Nyanza Chemical Waste DumpRegion 1 Website 4 Sudbury River ROD Date September 2010 Area not specified 84 85 MERCURY Sediment 10 (EMNR)
      MERCURY Fish (largemouth bass yellow perch bullhead) 048
      1 PINE STREET CANAL 1 Turning Basin Pine Street Canal and Wetlands 2002-2004 2004 78 (Act) (GeotextileSand Cap) 44 PAHs Sediment ER-M Values
      Region 1 Pine Street Canal Website 82010 - 22011 08 2011 organoclay cap (size not specified) Metals and Cyanide ER-M Values
      1 SULLIVANS LEDGE 1 Unnamed Stream Ponds A and B 1998-2002 19 (Est) Yes upper portion of stream diverted PCBs Sediment 20 uggC
      Region 1 Sullivans Ledge website 86 (Act)
      2 Middle Marsh Wetlands 1998-2001 52 (Est) Yes 28 PCBs 20 uggC
      255 (Act)
      2 BATAVIA LANDFILL 1 Wetland Areas June 2001 - June 2003 25 (Est) Yes 13 (soil and sediment) 75 (soil and sediment) PAHs Sediment Visual NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals
      Deleted from NPL 11292005 Act Wetland area volume not specified LEAD
      2 BRIDGEPORT RENTAL amp OIL SERVICES 2 Little Timber Creek Swamp ROD dateSeptember 2006Remedial Action 2009-2011 175 (Est) Yes Area not specified 106 (Est) 125 PCBs Sediment 10 10
      Region 2 Bridgeport Rental amp Oil Services Website LEAD 1000 1000
      Total Petroleum Hydrocarbons None None
      2 BURNT FLY BOG 2 Downstream Area and Westerly Wetlands 11795 - 1996 gt6000 tons (Act) (soil and sediment) 22 LEAD Sediment 250
      PCBs 5
      3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment 400049
      2 GENERAL MOTORS (CENTRAL FOUNDRY DIVISION) 1 St Lawrence River 61995 - 111995 13 (Act) 2 (Act) 215 PCBs Sediment 1
      Turtle CreekTurtle Cove 1004 - 305 23 (Act) (soil and sediments) 01 01
      Raquette River 602 - 503 14 (Act) 1
      2 GOWANUS CANAL 1 Canal Sediments ROD Date Sept 2013 588 (Est) Area not stated (dredgecap remedy) In-situ stabilization of 3-5 feet of NAPL-containing sediments PAHs Sediment 20
      Gowanus Canal (Region 2 Website) Holding Tanks for CSO Control Copper 80
      Lead 94
      2 Grasse River Superfund Site(aka Alcoa Aggregation Site) Grasse River ROD Date April 2014 109 Yes 284 2431 PCBs Sediment 1
      Grasse River(Region 2 Website) Fish 001-005 (Final Remedial Goal)026-036(Interim Target Concentrations)
      2 HOOKER (102ND STREET) 1 Niagara River Embayment 71996 - 111996 28 (dredge to 2 feet) Yes $36 - 56 PAHs METALS CHLORINATED ORGANICS (MULTIPLE) Sediment 01(organics) New York State Sediment TBCs
      Deleted from NPL 852004 Sediment 02(Mercury)
      2 HUDSON RIVER PCBS 2 Upper Hudson River (Section 1) ROD dateFebruary 2002 Field work 2009-ongoing 1560 (Est) Yes Area not specified 2250 PCBs Fish 005
      Sediment 3 gm2 (MPA) 1
      Hudson River PCBs EPA Website Upper Hudson River (Section 2) 580 (Est) Sediment 10 gm2 (MPA) 1
      Fish 005
      Upper Hudson River (Section 3) 510 (Est) Sediment 1
      Fish 005
      2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001 (change in ESD from dredging to excavation) 981 (Est) ROD 21 INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC Sediment Not specified
      85000 Tons (Act) ESD 50-75
      2 LOVE CANALDeleted from NPL 9302004 2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001 0001
      2 MARATHON BATTERY CORP 1 East Foundry Cove Marsh and Constitution Marsh 91993 - 31995 30 (Est) Yesbentonite clay layer 40 CADMIUM Biological Sampling None
      Sediment 100 100
      Deleted from NPL 10181996 2 East Foundry Cove West Foundry Cove and the Cold Spring Pier Area 91993 - 31995 56 (Est) 485 CADMIUM Biological Sampling None
      Actual not specified by area
      Sediment Excavate up to 1 ft 95 Removal 10 mgkg
      2 ONONDAGA LAKE 2 Onondaga Lake Bottoms Subsite ROD dateJuly 2005 2407 (Est) 425 (Est) 1771 154 (Est) 414 MERCURY and others Sediment 08 014-2
      Operations Ongoing METHYL Hg Fish 03
      5 LCP Bridge St SiteWest Flume and Wetland AB June 2005 - July 2007 543 (Est)917 (Act) Yes 96 MERCURY Sediment 02
      20 Geddes Brook NineMile Creek Reach BC CD ROD DateApril 2009June 2012 - ongoing 59 (Est) Combined with Dredge volume Yes Partial Channel Re-location 189 MERCURY and others Sediment 015
      Region 2 Onondaga Lake Website Mercury Fish 01-03
      24 Geddes Brook NineMile Creek Reach AB June 2012 - 16 (Est) 42 (Est) Yes 151 MERCURY and others Sediment Soil (flood plain) 015
      Fish 01 - 03
      2 Raritan Bay Slag 0 ROD Date May 2013 34 (Est) 787 Lead Sediment 400 400
      Raritan Bay Slag (Region 2 Website)
      2 REYNOLDS METALS CONot on the NPL - Superfund Alternative Site 1 St Lawrence amp Raquett Rivers 412001 - 102001 52 (Est) 54 (Act) 35 PAHs Sediment 10
      86 (Act) PCBs 1
      TDBFs 0001
      2 RICHARDSON HILL ROAD LANDFILLPOND 1 South Pond and Herrick Hollow Creek 2004 285 (Act) 139 PCBs Sediment 1 1
      2 ROEBLING STEEL CO 5 Delaware River and Crafts Creek 2010-2013 116 (Est) Yes 11 PAHs Sediment See Attached
      240 (Act) Metals
      2 VINELAND CHEMICAL CO INC 3 River Areas (Blackwater Branch Floodplain amp Maurice River) 2006 - ongoing 626 Yes 11 ARSENIC Sediment 20 20 exposed 120 submerged
      4 Union Lake Sediments Remedy not yet initiated Unknown Yes Sediment Washing 129 ARSENIC Sediment Unknown 120
      2 YORK OIL CO 2 Contamination Pathways - Western Wetland 2000-2001 11 (Est) Yes 33 LEAD Sediment Not specified
      15 (Act) PCBs Complete Removal or 1
      Contamination Pathways - Northwestern Wetland 50 PCBs Sediment 1 Contingent on biological and chemical testing
      LEAD Not specified
      3 ATLANTIC WOOD INDUSTRIES INC 3 River Water and Sediments 2010-Ongoing 6 7 126 (Dredging and Disposal) tPAHs Sediment 45 to 100
      Region 3 Atlantic Wood Industries Website 157 (Est) 100
      3 EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL) 3 North Wetlands 1997 - 12897 95 (Act) Yes 12 3 CADMIUM Sediment 60
      LEAD 1200
      ZINC 5600
      5 South Wetlands 1997 - 12897 37 (Act) Yes 42 Unknown CADMIUM Sediment 60
      LEAD 1200
      Region 3 EI duPont Website ZINC 5600
      7 Christina River 51099 - 9899 11 (Act) Yes 47 Unknown CADMIUM Sediment 20
      LEAD 700
      ZINC 3000
      3 KOPPERS CO INC (NEWPORT PLANT) 1 Wetlands Ponds and Hershey Run ROD dateSeptember 2005 58 (Est) Unknown Re-channelize portion of Hershey Run 5176 PAHs Sediment 150
      Region 3 Koppers Co Inc Website Remedy not yet initiated
      3 METAL BANKS 1 RiverMudflat Sediments 2008-2010 12 (Est) Yes Unknown (Act) 1727 Unknown PCBs Sediment 1 1
      METAL BANK (Regional Website) OU Name SOIL EXCAVCONTAIN
      4 AMERICAN BRASS INC 1 Cedar Creek ROD dateAugust 2006 94 (Est) Yes 39 BORON Sediment 28
      COPPER 220
      Dunham Creek 38 (Est) LEAD 170
      American Brass Inc (Regional Website) ZINC 780
      PCB-1260 429
      4 AMERICAN CREOSOTE WORKS INC 0 Railroad Lake and Hughes Creek ROD date September 2007 40 (Est) Yes $20 (Total) TOTAL PAH Sediment 100
      American Creosote Works Inc(Regional Website)
      4 COPPER BASIN MINING DISTRICT SITE 5 Copper Basin ReachOcoee No 3 ReservoirParksville Reservoir ROD date September 2011 Area Not Specified (approx 14 river miles) 23 PCBs Sediment
      Arsenic Sediment
      Cadmium Sediment
      Copper Sediment 680 (Copper Basin Reach)
      640 (Ocoee 3 amp Parksville Reservoirs)
      Region 4 Copper Basin Mining District Site website Iron Sediment 57000 (CBR)
      53000 (O3R amp PR)
      Lead Sediment 145 (CBR)
      250 (O3R amp PR)
      Mercury Fish
      Zinc Sediment 2200 (CBR)
      970 (O3R amp PR)
      4 DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company) 2 Lower Roanoke River ROD dateSeptember 2008 143 river miles 196 Dioxin Fish 3 ppt
      Sediment Unknown
      Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website 4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment 0001
      4 KOPPERS CO INC (CHARLESTON PLANT) 1 Ashley River 7101 - 12101 0 (Est) $05 (ROD)3 (ESD) 282 PAHs Sediment Weight of Evidence Approach None
      3 (Act)
      Barge Canal 42003 ESD selected MNR for the area 32 (Est)0 (Act) 0 (Est)32 (Act) $045 (ROD) 01
      01 (ESD) Arsenic
      Region 4 Koppers Co Inc (Charleston Plant) North Marsh Sediments No info 15 (Act) 1000 linear feet 025 acre (Est)1300 linear feet (Act) 17 23
      South Marsh Sediments 3103 - 6103 19 tons (Act) 15 (Est)2 (Act) Lead
      4 SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION 2 Twelve Mile CreekLake Hartwell ROD date62894 730 (Est) 321 PCBs Fish 2
      Lake Hartwell (Regional Website) Sediment 1
      4 TENNESSEE PRODUCTS 1 Chattanooga Creek - Middle Reach September 2005 - September 2007 142 (Est) $94 (ROD) PAHs Sediment Visual
      Region 4 Tennesse Products Website 107000 tons (Act)Followed by capping 71 (Act)Aquablock $257 (ESD)
      Chattanooga Creek NTCRA 1997-1998 229 Yes Visual
      4 TRIANATENNESSEE RIVER 0 Reach AHuntsville Spring Branch - Indian Creek 4186 - 101487 Rerouted river buried in-place sediments DDT Fish (channel catfish) No sediment CUL 5
      Region 4 TrianaTennessee River Website Fish (smallmouth buffalo) No sediment CUL
      Fish (largemouth bass) No sediment CUL
      4 WARD TRANSFORMER Reach A (Removal Action) June 2007 - 2009 150000 tons (Est)Approx 400000 tons (Act) PCB Sediment 1
      Region 4 Website 1 Reach B C D and lower Brier Creek ROD dateSeptember 2008Remedy not yet initiated 13 (soil and sediment) (Est) Yes $37 (Total) PCB Sediment 1
      Fish 005
      Brier Creek Reservoir Lake Crabtree and Lower Crabtree Creek ~25 river miles Sediment None
      Fish 005
      5 CONTINENTAL STEEL 3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est) 12 BENZO(A)PYRENE Sediment 8 16
      BENZO(BampK)FLOURANTHENE 7 14
      BENZO(A)ANTHRACENE 95 19
      INDENO(123-CD)PYRENE 465 093
      ARSENIC 19
      BERYLLIUM 084
      ARCHLOR-1016 3 1
      ARCHLOR-1242 3 1
      ARCHLOR-1254 3 1
      ARCHLOR-1248 3 1
      ARCHLOR-1260 3 1
      Region 5 Continental Steel Website 4 Markland Avenue Quarry 3252008 - 612010 175 Yes297000 cy 11 BENZO(A)ANTHRACENE Sediment 05
      BENZO(A)PYRENE 05
      BENZO(BampK) FLOURANTHENE 08
      DI-BENZ(AH) ANTHRACENE 02
      INDENO(123-CD)PYRENE 04
      ARCHLOR-1248 1
      ARSENIC 19
      LEAD 400
      5 FOX RIVER NRDAPCB RELEASESProposed to be added to the NPL 1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 PCBs Sediment 1 025 (SWAC)
      2 Appleton to Little Rapids MNR RemedyROD Date 122002 3 (Est) Yes 273 (Est) 20 river miles 136 (Est) 390 (2005 ROD Amendment) Sediment
      3 Little Rapids to De Pere 42009 - ongoing 227 (Est) Sediment 1 SWAC 028
      Fish (Walleye) 005
      Lower Fox River Cleanup Website 4 De Pere to Green Bay 2007 - ongoing 3216 (Est) Sediment 1 SWAC 025
      Fish (Walleye) 005
      5 Green Bay MNR RemedyROD Date 62003 Approx 2700 sq miles Sediment 1
      701(2010 ESD)
      5 KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER) 0 Kress Creek Site Summer 2005 - 2012 43 (Est) Yes $719 (Total) 128 RADIUM 226 Sediment 72 picoCuries per gram (pCig) combined radium
      Region 5 Kerr-McGee Website 129 (Act) RADIUM 228
      5 LITTLE MISSISSINEWA RIVERNot on the NPL - Other Cleanup Activity Private Party-Lead Cleanup 0 Little Mississinewa River Spring 2005 - Fall 2009 57 (Est)100000 tons (Act) Yes 25 miles (Est) 27 20 PCBs Sediment 4 (0-1ft) 5 (deeper than 1ft) 1 (0-1ft)5 (deeper than 1ft)
      Little Mississinewa River(Region 5 Website) Fish Unknown
      5 OUTBOARD MARINE CORP 1 North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below 71992 to 91992 55 (Est) Yes 074 PCBs Sediment Unknown
      Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below 1991-1992 523 (EST)30 (ACT) 131 50 (upper harbor)
      OUTBOARD MARINE CORP (Region 5 Website) 4 formerly 1 OMC Plant 2 North and South DitchROD Date August 20072012 ROD Amendment 2010-2012 40 (soil and sediment) (Est) Yes 73 PCBs Sediment 1
      PAHs 2
      1 HarborSlip No 3(2009 ROD Amendment) 2012-2013 195 (Est) Yes 349 PCBs Fish (Sport) 003 - 01
      Sediment 1 02 (SWAC)
      5 SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI) 2 Area 9 -- Lake Embayment 1295 - 0697 36 (Est) Yes PCBs Sediment 05
      54 (Act)
      5 SHEBOYGAN HARBOR amp RIVER 1 Lower River and Inner Harbor Completed in 2012 53 (ROD)51 (ESD) Yes (ROD) 12 PCBs Sediment 26 05
      51 (ACT) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Region 5 Sheboygan River and Harbor Superfund Site Website Middle River Remedy not yet startedAOC dateFebruary 2009 7 miles 2 Sediment 26 05
      Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Upper River Sept 2004 - October 2007 21 (Est) 31 Sediment None (88 mass removal of PCB) 05
      21 (Act) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      5 Torch Lake 2 Surface Waters ROD DateMarch 311994 No Action Copper
      NPL DeletionFeb 5 2002
      5 VELSICOL CHEMICAL CORP (MICHIGAN) 2 Pine RiverSt Louis Impoundment 1999 - 2005 640 (Act) Yes Unknown area(2 ft compacted clay) $60 (Total) $30 (as of 2002) DDT Carp Smallmouth Bass 1708
      Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5 15
      Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000
      6 ALCOA (POINT COMFORT)LAVACA BAY 1 Natural Recovery Areas 122001 - ongoing Area not specified 161 MERCURY Sediment Hg 025 Marsh 05 Open Water
      North of Dredge Island NA Actual ROD PAHs 448 Total
      Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act) PAHs
      Witco Marsh 12006 - 42006 57
      Chlor-Alkali Process Area (Treatability Study) August 1998 (Phase I)January 1999 (Phase II) 80 (Act) 1952 MERCURY Mass removal
      6 BAILEY WASTE DISPOSAL 1 North Marsh Area January 1996 - September 1996 6 (EST) Unknown Sediment None
      20 (tar and sediment) (Act)
      Deleted from NPL 10152007
      6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995 47 (ROD Est)150 (ESD Est)170 (Act) Yes 226 PAHs Sediment 1300
      8 MILLTOWN RESERVOIR SEDIMENTS 1 Milltown Reservoir Sediments Remediation completed Dec 2010 2600 (Est) Yes Channel realignment and construction 140 ARSENICCADMIUMCOPPERLEADZINC Sediment None
      Region 8 Milltown Reservoir Sediments Website 2560 (Act)
      8 ROCKY MOUNTAIN ARSENAL (USARMY) 3 Lake Sediments Remediation Project June 1999 - Aug 1999 19 (Est) Yes (Est) Area not specified 39 ALDRIN Sediment 38
      33 (Act) No (Act) DIELDRIN 37
      CHLORDANE 12
      ROCKY MOUNTAIN ARSENAL (Region 8 Website) DDE None
      DDT 14
      ROCKY MOUNTAIN ARSENAL (US Army Website) MERCURY 82
      ARSENIC 270
      8 SHARON STEEL CORP (MIDVALE TAILINGS) 1 Marshy Area Aug 1996 - Sept 1996 436 (Est) Yes (elevation raised above water line) 047 ARSENIC Sediment 70
      Deleted from NPL 9242004 100 (Act) LEAD 500
      CADMIUM None
      8 SILVER BOW CREEKBUTTE AREA 1 Streamside Tailing (Silver Bow Creek) July 1999 - Ongoing 73 (ROD Est) Yes Channel realignment and construction (176 miles) $44 (ROD)$98 (ESD) ARSENIC Sediment None 200 979
      CADMIUM 20 099
      COPPER 1000 316
      SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website) LEAD 1000 358
      ZINC 1000 None
      SILVER BOW CREEKBUTTE AREA (MT STATE Website) Sediment Trap MERCURY 10 018
      9 IRON MOUNTAIN MINE 5 Spring Creek Arm 2008-20011 200 (Est) 15 area not specified 186 ARSENIC Sediment Sediment susceptible to erosion dredged to a specific elevation None
      ROD dateSeptember 2004 COPPER
      Region 9 Iron Mountain Mine Website IRON
      9 MCCORMICK amp BAXTER CREOSOTING CO 3 Old Mormon Slough 2006 88 (Est) area not specified 35 DIOXIN Sediment 000021 TEQ 0000021 TEQ
      Region 9 Website McCormick and Baxter Creosoting 88 (Act) PAHs 333 (OC) 333 (OC)
      9 MOFFETT NAVAL AIR STATION 8 Site 27 - Northern Channel completed in 12007 656 (soil and sediment) (Est) Yes 68 TOTAL PCBs Sediment 035 035
      TOTAL DDT 00648 00648
      TOTAL CHLORDANE 0931 0931
      CADMIUM 184 184
      Naval Air Station Moffett Field Website LEAD 173 173
      MERCURY 152 152
      SELENIUM 0926 0926
      SILVER 137 137
      ZINC 720 720
      9 MONTROSE CHEMICAL CORP 5 Palos Verde Shelf Interim ROD Date September 2009 300 Area not specified DDT Sediment 46 (OC) interim23 (OC) Final
      White Croaker 04
      Water 022 ngL
      Palos Verdes Shelf (Region 9 Website) PCBs Sediment 7 (OC)
      White Croaker 007
      Water 0064 ngL
      9 UNITED HECKATHORN CO 1 Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)65 (Proj) Yes 7 DDT Sediment dredge all soft sediments 059 (average)
      Region 9 United Heckathorn Co Website
      10 Bunker Hill Mining and Metallurgical 3 Upper Basin ROD Amendment date Aug 2012 Not specified Arsenic Sediment
      Cadmium
      Runker Hill Mining and Metallurgical (Regional Website) Copper
      Lead 530
      Mercury
      Silver
      Zinc
      10 COMMENCEMENT BAY NEAR SHORETIDE FLATSPartial deletion (St Paul Waterway) 1996 1 Olympic View Resource Area (NTCRA) Completed in 102002 11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ 000002 TEQ
      COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website) 19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 20 (Est) 174 ARSENIC Sediment preponderance of evidence approach 93
      10 (Act) COPPER 390
      LEAD 450
      ZINC 410
      1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13 067
      1 Sitcum Waterway completed in 1994 428 (Act) 45 (Act) 4 ARSENIC Sediment 160 57
      COPPER 1100 390
      1 Hylebos Waterway 32003-22005 940 11 20 46 ARSENIC Sediment 97 57
      HEX-CB 01 0022
      HPAHs 32 17
      PCBs 045 03
      Occidental Site Removal Action (NTCRA) completed March 2003 36 (Act) 10 PCE Sediment 0057
      1 Thea Foss and Wheeler-Osgood Waterways 2002-2006 423 (Act) 32 (Est) 21 (Est) 4 (Est) 60 82 CADMIUM Sediment 66 51
      HPAHs 22 17
      LEAD 580 450
      MERCURY 077 059
      ZINC 490 410
      1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes 22 (Act) 05 (Act) 87 (Act) 125 COPPER Sediment 470 390
      MERCURY 071 059
      LPAHs None 52
      HPAHs None 17
      10 HARBOR ISLAND (LEAD) 7 Lockheed Sediments 7703 - 2405 18 cy (Est) 5 (Act) 12 (Act) In dredge areas $15(ROD) $12(ESD) 20 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      70 (Act) COPPER 390 (Dredge and Cap) 390
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      LEAD 530 (Dredge) 450 (Cap) 450
      LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      MERCURY 059 (Dredge) 041 (Cap) 041
      Region 10 Harbor Island (Lead) Web Site PCBs 65(OC) (Dredge) 12(OC) (Cap) 12 (OC)
      ZINC 960 (Dredge) 410 (Cap) 410
      TBT Not available Not available
      9 Todd Shipyard Sediments 7604 - 22007 5 (Act)(223235 sq ft) Yes In dredge areas No area given $45-$69 21 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      COPPER 390 (Dredge and Cap) 390
      LEAD 530 (Dredge) 450 (Cap) 450
      MERCURY 059 (Dredge) 041 (Cap) 041
      116 (Est) ZINC 960 (Dredge) 410 (Cap) 410
      220 (Act) LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      PCBs 65 (OC) (Dredge)12(OC) (Cap) 12 (OC)
      TBT Not available not available
      10 East Waterway Sediments NTCRA 11204 - 31605 (removal action)No ROD completed for this OU 206 (Act) - Removal action 13 (Act) In dredge area 17 16 MERCURY Sediment 041
      PCBs 12 (OC)
      10 KETCHIKAN PULP COMPANY 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est) 87 (Act) Yes 50 (Est) 52 (Act) 21 (Est) 27(Act) 44 31 4-METHYL-PHENOL Sediment 17 Not Stated Benthic toxicity community structure and chemistry
      Not on the NPL - Superfund Alternative Sited AMMONIA 120
      Region 10 Ketchikan Pulp Company Web Site SULFIDE None
      10 LOCKHEED WEST SEATTLE 1 Lockheed West ROD Date August 2013 167 potential use in shallow areas yes 116 DredgeEMNR 477 PCB Sediment Washington State CSL or SQS 0002
      Arsenic 7
      Lead 11
      Copper 114
      Lockheed West Seattle (Region 10 Website) Mercury 041 (subtidal)017 (intertidal)
      284 EMNR only Carcinogenic PAHs (TEQ) 0009
      TBT 043 (subtidal)2 (intertidal)
      DioxinsFurans 0000002
      Multiple Others see attached
      10 MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT) 4 Sediments 72004-92005 23 (Act)organoclay 23 12 ARSENIC Sediment 12
      Region 10 McCormick and Baxter Creosoting DIOXINSFURANS 000008
      ORDEQ McCormick amp Baxter Creosoting Co Web Site 15 (Est) PAHs 2
      PCP 100
      Arsenic (III) Water 190 μgL
      Chromium (III) 210 μgL
      Copper 12 μgL
      Zinc 110 μgL
      PCP 13 μgL
      Acenaphthene 520 μgL
      Fluoranthene 54 μgL
      Naphthalene 620 μgL
      Total cPAHs 031 μgL
      Dioxinsfurans 1x10-5 ngL
      10 OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA) 1 Clam Bay Sediments 61999 - 102001 7-10 (Est) Yes Area not specified 5 46 71 PCBs Sediment 013 004
      COPPER 390
      LEAD 450
      ZINC 410
      10 (Act) SILVER 61
      2 4-DIMETHYL-PHENOL 0029
      PCBs Shellfish (intertidal clams) 0042
      10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005 35 (Est) 50 (Est) 49 15 LMWPAHs Sediment 780(OC) 370(OC)
      58 (Act) HMWPAHs 5300(OC) 960(OC)
      98 (Act) Capped dredge areas PCBs 12 (OC) (trigger for sediments to 10 feet depth) 12 (OC)
      10 PUGET SOUND NAVAL SHIPYARD COMPLEX 2 OUB Marine 61600 - 3104 200 (Est) 5 211 9 12 PCBs Fish (English sole) 0023 ww
      Sediment 12 (OC) dredgecap 6 (OC) EMNR 3 (OC) SWAC12 (OC)) SWAC
      225 (Act) Sediment in state owned adjacent lands 9 (OC) EMNR
      MERCURY Sediment 3 where PCBs greater than 6 (OC)
      10 ST MARIES CREOSOTE - proposed to be added to the NPL 0 Shoreline Nearshore and Offshore Sediment ROD dateJuly 2007 29 (Est) Yes 108 LPAHs Sediment 370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)
      St Maries Creosote (Regional Website) Remediation Ongoing HPAHs 960 (OC) (17 if TOC lt02or gt4)
      10 WYCKOFF COEAGLE HARBOR 1 East HarborPhase 1 - NTCRA 91993 -31994 (Phase 1) 54 (Act) 117 MERCURY Sediment (toxicity test opt-out)
      LPAHs 780 (OC)
      Region 10 Wyckoff Eagle Harbor Web Site HPAHs 5300 (OC)
      East HarborWest Beach Sediments 2007-2008 48 (Act) 23 MERCURY Sediment 059 subtidal 059
      LPAHs 780 (OC) subtidal 780 (OC)
      HPAHs 5300 (OC) subtidal 5300 (OC)
      East HarborIntertidal and Subtidal Sediments 2000-2002 30(Act) $6-20 MERCURY Sediment 059 059
      LPAHs 780 (OC) 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      3 West Harbor 31997 - 121997 13-92 (Est) Yes 12 - 31 (includes EMNR) 49 see cap $62 - $16 MERCURY Sediment 5 21059 059 (dw)
      LPAHs 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      71
Page 8: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

ROD dateJuly 2005

MERCURY and others Sediment 014-2

Operations Ongoing

5LCP Bridge St SiteWest Flume and Wetland AB

June 2005 - July 2007

543 (Est)917 (Act) Yes 96 MERCURY Sediment 02

MERCURY and others Sediment

Mercury Fish 01-03

Sediment Soil (flood plain)

Fish 01 - 03

Raritan Bay Slag

Raritan Bay Slag (Region 2 Website)

52 (Est) PAHs 1086 (Act) PCBs 1

TDBFs 0001

2RICHARDSON HILL ROAD LANDFILLPOND

1South Pond and Herrick Hollow Creek

2004 285 (Act) 139 PCBs Sediment 1

116 (Est) PAHs

240 (Act) Metals

3

River Areas (Blackwater Branch Floodplain amp Maurice River)

2006 - ongoing 626 Yes 11 ARSENIC Sediment 20

4 Union Lake Sediments Remedy not yet initiat Unknown Yes Sediment

Washing 129 ARSENIC Sediment Unknown

2000-2001 11 (Est) LEAD Not specified

METHYL Hg Fish

2

ONONDAGA LAKE

Region 2 Onondaga Lake Website

03

0 400

See Attached

20 exposed 120 submerged

1

Lead 400Sediment787ROD Date May 2013 34 (Est)

425 (Est) 1771 154 (Est)

2

2 Onondaga Lake Bottoms Subsite 2407 (Est)

Geddes Brook NineMile Creek Reach BC CD

ROD DateApril 2009

June 2012 - ongoing

59 (Est)20

24Geddes Brook NineMile Creek Reach AB

414

Combined with Dredge volume

Yes

151

Partial Channel Re-location

June 2012 - 16 (Est) 42 (Est) Yes MERCURY and others

015

54 (Act) Sediment

189

2

REYNOLDS METALS CO

Not on the NPL - Superfund Alternative Site

1 St Lawrence amp Raquett Rivers 412001 - 102001 35

ROEBLING STEEL CO 5 Delaware River and

Crafts Creek Sediment2010-2013 Yes2 11

2 VINELAND CHEMICAL CO INC

120

08

015

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

15 (Act) PCBs

Complete Removal or

1

PCBs

1 Contingent on biological and chemical testing

LEAD Not specified

ATLANTIC WOOD INDUSTRIES INC 6 7 45 to 100

Region 3 Atlantic Wood Industries Website

157 (Est) 100

CADMIUM 60LEAD 1200ZINC 5600CADMIUM 60LEAD 1200

ZINC 5600

CADMIUM 20LEAD 700ZINC 3000

KOPPERS CO INC (NEWPORT PLANT)

ROD dateSeptember 2005

Region 3 Koppers Co Inc Website

Remedy not yet initiated

METAL BANKS RiverMudflat Sediments

METAL BANK (Regional Website)

OU Name SOIL EXCAVCONTAIN

BORONCOPPERLEADZINC

PCB-1260

Sediment

Unknown

Contamination Pathways - Northwestern Wetland

River Water and Sediments

1

PAHs

3

2010-Ongoing

Cedar Creek

Dunham Creek

Christina River

1727

39

37 (Act)

Yes

Yes

Unknown (Act)

Yes

33

Yes

2

50

Contamination Pathways - Western Wetland

126 (Dredging and Disposal)

Sediment

Sediment

2 YORK OIL CO

Sediment

Sediment

tPAHs3 3

12

7 51099 - 9899 11 (Act)

425 South Wetlands 1997 - 12897

95 (Act)

3

3 North Wetlands 1997 - 12897EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL)

Region 3 EI duPont Website

150

47

Sediment 1

Unknown

Sediment

Re-channelize portion of Hershey Run

Sediment

Unknown

PCBs12 (Est)

58 (Est) Unknown3 1

3 1 2008-2010

Wetlands Ponds and Hershey Run

4 1 ROD dateAugust 2006

94 (Est)

38 (Est)Yes

AMERICAN BRASS INC

American Brass Inc (Regional Website) 429

170780

22028

Yes

Sediment

5176

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

AMERICAN CREOSOTE WORKS INC

American Creosote Works Inc(Regional Website)

Arsenic Sediment

Cadmium Sediment

Fish 3 ppt

Sediment

$20 (Total) TOTAL PAH Sediment 100

DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company)

ROD dateSeptember 2008

Unknown

23

Mercury

143 river miles Dioxin

0

PCBs

196

53000 (O3R amp PR)

57000 (CBR)

640 (Ocoee 3 amp Parksville Reservoirs)

680 (Copper Basin Reach)

5

2200 (CBR)

2

4

Lower Roanoke River

4

Sediment

970 (O3R amp PR)

Sediment

Iron Sediment

Sediment

250 (O3R amp PR)

Yes

Sediment

COPPER BASIN MINING DISTRICT SITE

Copper Basin Reach

Ocoee No 3 Reservoir

Parksville Reservoir

ROD date September 2011

Fish

Region 4 Copper Basin Mining District Site website

4 ROD date September 2007 40 (Est)

Copper

Zinc

Area Not Specified (approx 14 river miles)

Railroad Lake and Hughes Creek

Lead

145 (CBR)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website

4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment

0 (Est) 3 (Act)

$045 (ROD)

01 (ESD)

North Marsh Sediments No info 15 (Act)

1000 linear feet 025 acre (Est)1300 linear feet (Act)

SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION

Fish 2

Lake Hartwell (Regional Website) Sediment

TENNESSEE PRODUCTS 142 (Est) $94 (ROD) Visual

107000 tons (Act)Followed by capping

71 (Act)Aquablock $257 (ESD)

Chattanooga Creek NTCRA 1997-1998 229 Yes Visual

TRIANATENNESSEE RIVER

Fish (channel catfish)

Region 4 TrianaTennessee River Website

Fish (smallmouth buffalo)

Fish (largemouth bass)

WARD TRANSFORMER

Reach A (Removal Action) June 2007 - 2009

150000 tons (Est)Approx 400000 tons (Act)

PCB Sediment

Region 4 Website Sediment

Fish 005

PAHs

Arsenic

Region 4 Tennesse Products Website

1

1

4 1

Ashley River 7101 - 12101

South Marsh Sediments

Barge Canal

Region 4 Koppers Co Inc (Charleston Plant)

KOPPERS CO INC (CHARLESTON PLANT)

0001

32 (Est)0 (Act)

0 (Est)32 (Act)

3103 - 6103

SedimentWeight of Evidence Approach

$05 (ROD)3 (ESD)

Lead

42003 ESD selected MNR for the area

19 tons (Act) 15 (Est)2 (Act)

730 (Est)

17

282

23

01

321 PCBs

1

4 2Twelve Mile CreekLake Hartwell

ROD date62894

Chattanooga Creek - Middle Reach

September 2005 - September 2007 PAHs Sediment

4 0

Reach AHuntsville Spring Branch - Indian Creek

4186 - 101487 DDT 5

Rerouted river buried in-place sediments

No sediment CUL

4Reach B C D and lower Brier Creek

13 (soil and sediment) (Est)ROD date

S t b 2008

Yes

No sediment CUL

No sediment CUL

1

1

None

4

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Sediment

Fish 005

BENZO(A)PYRENE 8

BENZO(BampK)FLOURANTHENE 7

BENZO(A)ANTHRACENE 95

INDENO(123-CD)PYRENE 465

ARSENICBERYLLIUMARCHLOR-1016 3ARCHLOR-1242 3ARCHLOR-1254 3ARCHLOR-1248 3ARCHLOR-1260 3BENZO(A)ANTHRACENE

BENZO(A)PYRENE

BENZO(BampK) FLOURANTHENEDI-BENZ(AH) ANTHRACENEINDENO(123-CD)PYRENEARCHLOR-1248ARSENICLEAD

1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 Sediment 1

2 Appleton to Little Rapids

MNR RemedyROD Date 122002 3 (Est) 20 river

miles Sediment

Sediment 1

Fish (Walleye) 005

Sediment 1

Fish (Walleye) 005

MNR RemedyROD Date 62003

Approx 2700 sq miles

1

701(2010 ESD)

5 PCBs

1

CONTINENTAL STEEL

Region 5 Continental Steel Website

FOX RIVER NRDAPCB RELEASES

Proposed to be added to the NPL

Lower Fox River Cleanup Website

4

Sediment

02

04

119

PCBBrier Creek Reservoir Lake Crabtree and Lower Crabtree Creek

September 2008

Remedy not yet initiated

12

~25 river miles

$37 (Total)

4 Markland Avenue Quarry 3252008 - 612010

5

3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est)

08

1

400

Sediment

14

19

1

11

175Yes

297000 cy

SWAC 025

SWAC 028

11

390 (2005 ROD Amendment)

3273 (Est) 136 (Est)

3216 (Est)

227 (Est)

De Pere to Green Bay 2007 - ongoing

Little Rapids to De Pere 42009 - ongoing

Yes

5 Green Bay

05

Sediment

025 (SWAC)

05

16

19084

093

None

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER)

43 (Est) Yes RADIUM 226

Region 5 Kerr-McGee Website 129 (Act) RADIUM 228

LITTLE MISSISSINEWA RIVER

Not on the NPL - Other Cleanup Activity Private Party-Lead Cleanup

Sediment4 (0-1ft) 5 (deeper than 1ft)

Little Mississinewa River

(Region 5 Website)

Fish Unknown

North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below

71992 to 91992 55 (Est) Yes 074

Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below

1991-1992523 (EST)

30 (ACT)131

2010-2012 PCBs 1

PAHs 2

Fish (Sport) 003 - 01

1 (0-1ft)5 (deeper than 1ft)

72 picoCuries per gram (pCig) combined radium

Yes

57 (Est)

100000 tons (Act)

Kress Creek Site

5 0 Little Mississinewa River

Spring 2005 - Fall 2009

5 0 Summer 2005 - 2012

2012-2013 195 (Est)

$719 (Total) Sediment128

PCBs25 miles (Est) 27 20

OUTBOARD MARINE CORP (Region 5 Website)

4 formerly 1

1HarborSlip No 3(2009 ROD Amendment)

Sediment

PCBs

5

OUTBOARD MARINE CORP 1

Yes40 (soil and sediment) (Est)

Unknown

50 (upper harbor)

Sediment

73

OMC Plant 2 North and South DitchROD Date August 2007

2012 ROD Amendment

Yes PCBs349

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

36 (Est)

54 (Act)

53 (ROD)51 (ESD) Sediment 26

51 (ACT)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Sediment 26Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

21 (Est) SedimentNone (88 mass removal of PCB)

21 (Act)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Copper

VELSICOL CHEMICAL CORP (MICHIGAN)

640 (Act) Carp Smallmouth Bass 1708

Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5

Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000

Natural Recovery Areas 122001 - ongoing Area not

specified

North of Dredge Island NA Actual ROD

Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act)

MERCURY

Pine RiverSt Louis Impoundment

05

Sediment

Amendment)

PCBsYes Sediment

Sediment 1

5

SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI)

2 Area 9 -- Lake Embayment 1295 - 0697

SHEBOYGAN HARBOR amp RIVER

1

Lower River and Inner Harbor Completed in 2012

Region 5 Sheboygan River and Harbor Superfund Site Website

Middle River

Remedy not yet startedAOC dateFebruary 2009

02 (SWAC)

05

05

05

Yes (ROD)

7 miles

12

PCBs

Sept 2004 - October 2007

5 DDT

Unknown area

5 Torch Lake 2

Yes

6

$60 (Total)

ALCOA (POINT COMFORT)LAVACA BAY

1PAHs 448 Total

Upper River 31

Surface WatersNPL DeletionFeb 5 2002

ROD DateMarch 311994

5

$30 (as of 2002)2 1999 - 2005

No Action

161

15

Hg 025 Marsh 05 Open Water

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Witco Marsh 12006 - 42006 57

Chlor-Alkali Process Area (Treatability Study)

August 1998 (Phase I)January 1999 (Phase II)

80 (Act) 1952 MERCURY Mass removal

20 (tar and sediment) (Act)

6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995

47 (ROD Est)150 (ESD Est)170 (Act)

Yes 226 PAHs Sediment 1300

MILLTOWN RESERVOIR SEDIMENTS

2600 (Est)

Region 8 Milltown Reservoir Sediments Website

2560 (Act)

ROCKY MOUNTAIN ARSENAL (USARMY) 19 (Est) Yes (Est) ALDRIN 38

DIELDRIN 37

CHLORDANE 12

ROCKY MOUNTAIN ARSENAL (Region 8 Website)

DDE None

DDT 14

ROCKY MOUNTAIN ARSENAL (US Army Website)

MERCURY 82

ARSENIC 270

SHARON STEEL CORP (MIDVALE TAILINGS)

1 436 (Est) ARSENIC 70

Sediment None

PAHs

North Marsh Area Unknown Sediment None

6 (EST)

8 1 Milltown Reservoir Sediments

Remediation completed Dec 2010

Deleted from NPL 10152007

6

BAILEY WASTE DISPOSAL

1 January 1996 - September 1996

Yes

39 Sediment

Channel realignment and construction

ARSENICCADMIUMCOPPERLEADZINC

140

8 3Lake Sediments Remediation Project

June 1999 - Aug 1999

No (Act)33 (Act)

Yes

Area not specified

Aug 1996 - Sept

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

100 (Act) LEAD 500

CADMIUM None

ARSENIC 200 979CADMIUM 20 099

COPPER 1000 316

LEAD 1000 358

ZINC 1000 None

SILVER BOW CREEKBUTTE AREA (MT STATE Website)

Sediment Trap MERCURY 10 018

2008-20011 ARSENIC

COPPERRegion 9 Iron Mountain Mine Website

IRON

MCCORMICK amp BAXTER CREOSOTING CO

88 (Est) DIOXIN 000021 TEQ

Region 9 Website McCormick and Baxter Creosoting

88 (Act) PAHs 333 (OC)

TOTAL PCBs 035TOTAL DDT 00648TOTAL CHLORDANE 0931

CADMIUM 184LEAD 173MERCURY 152SELENIUM 0926SILVER 137ZINC 720

MONTROSE CHEMICAL CORP DDT Sediment

White Croaker 04

Water

Palos Verdes Shelf (Region 9 Website) PCBs Sediment

White Croaker 007

Water

9 300 Area not specifiedPalos Verde Shelf

46 (OC) interim23 (OC) Final

00648

Sediment

(elevation raised above water line)

047

SILVER BOW CREEKBUTTE AREA

1 Streamside Tailing (Silver Bow Creek)

Deleted from NPL 9242004

Marshy Area

1996

Sediment

Channel realignment and construction (176 miles)

July 1999 - Ongoing 73 (ROD Est) Yes None

0000021 TEQ

Yes

Sediment susceptible to erosion dredged to a specific elevation

None186

Sediment

Sediment$44 (ROD)$98 (ESD)

15 area not specified9

IRON MOUNTAIN MINE

5 Spring Creek Arm 200 (Est)

8

ROD dateSeptember 2004

SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website)

9 3 Old Mormon Slough 2006

9

MOFFETT NAVAL AIR STATION

8 Site 27 - Northern Channel completed in 12007

Naval Air Station Moffett Field Website

68

area not specified 35

173152

0064 ngL

Sediment

0931656 (soil and sediment) (Est)

035

333 (OC)

184

0926137720

022 ngL

7 (OC)

8

5 Interim ROD Date September 2009

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

UNITED HECKATHORN CO

Region 9 United Heckathorn Co WebsiteBunker Hill Mining and Metallurgical 3 Arsenic

CadmiumRunker Hill Mining and Metallurgical (Regional Website)

Copper

LeadMercurySilverZinc

COMMENCEMENT BAY NEAR SHORETIDE FLATS

Partial deletion (St Paul Waterway) 1996

1Olympic View Resource Area (NTCRA)

Completed in 102002

11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ

20 (Est) ARSENIC10 (Act) COPPER

LEADZINC

1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13

ARSENIC 160COPPER 1100ARSENIC 97HEX-CB 01HPAHs 32PCBs 045

Occidental Site Removal Action (NTCRA)

completed March 2003 36 (Act) 10 PCE Sediment

CADMIUM 66HPAHs 22LEAD 580MERCURY 077ZINC 490COPPER 470MERCURY 071LPAHs NoneHPAHs None

18 cy (Est) ARSENIC 93 (Dredge) 57 (Cap)

70 (Act) COPPER 390 (Dredge and Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

Sediment

1752

57

000002 TEQ

530

dredge all soft sediments

preponderance of evidence approach

DDT SedimentYes 7 059 (average)Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)

65 (Proj)

10

COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website)

1 Sitcum Waterway completed in 1994 428 (Act)

19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 174 Sediment 390

450410

Sediment 39045 (Act) 4

1

Hylebos Waterway 32003-22005 940 11 20

17450

46

03

0022Sediment 17

05 (Act) 87 (Act)

4 (Est)

57

21 (Est)

Sediment

82 Sediment

125

60

390

22 (Act)

32 (Est)

059

1Thea Foss and Wheeler-Osgood Waterways

2002-2006 423 (Act)

1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes

HARBOR ISLAND

059410

57

390

960 (OC)

067

93

0057

51

ROD Amendment date Aug 201210 Upper Basin Not specified

9 1

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

LEAD 530 (Dredge) 450 (Cap)

LPAHs780(OC) (Dredge) 370(OC) (Cap)

MERCURY 059 (Dredge) 041 (Cap)

PCBs65(OC) (Dredge) 12(OC) (Cap)

ZINC 960 (Dredge) 410 (Cap)

TBT Not available

ARSENIC 93 (Dredge) 57 (Cap)

COPPER 390 (Dredge and Cap)

LEAD 530 (Dredge) 450 (Cap)

MERCURY 059 (Dredge) 041 (Cap)

116 (Est) ZINC 960 (Dredge) 410 (Cap)

220 (Act) LPAHs780(OC) (Dredge) 370(OC) (Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

PCBs65 (OC) (Dredge)12(OC) (Cap)

TBT Not available

MERCURY

PCBs

KETCHIKAN PULP COMPANY

4-METHYL-PHENOL 17

Not on the NPL - Superfund Alternative Sited

AMMONIA 120

Region 10 Ketchikan Pulp Company Web Site

SULFIDE None

PCB

0002

57

370 (OC)

Yes In dredge areas No area given

370 (OC)

041

12 (OC)

$15(ROD) $12(ESD) 20 Sediment

5 (Act)(223235 sq ft)

10

Todd Shipyard Sediments 7604 - 22007

Region 10 Harbor Island (Lead) Web Site

9

5 (Act)12 (Act) In dredge areas

10

(LEAD)

7 Lockheed Sediments 7703 - 2405

East Waterway Sediments NTCRA

11204 - 31605 (removal action)No ROD completed for this OU

206 (Act) - Removal action

13 (Act) In dredge area

$45-$69 21 Sediment

17 16 Sediment

21 (Est) 27(Act) 44Yes 50 (Est)

52 (Act) 31 Sediment

410

10 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est)

87 (Act)

Not Stated Benthic toxicity community structure and chemistry

Not available

390

450

12 (OC)

450

041

12 (OC)

041

410

960 (OC)

not available

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Arsenic

Lead

Copper

Mercury

Carcinogenic PAHs (TEQ)

TBT

DioxinsFurans

Multiple Others

MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT)

ARSENIC

Region 10 McCormick and Baxter Creosoting

DIOXINSFURANS

PAHs

PCP

Arsenic (III)

Chromium (III)

Copper

Zinc

PCP

Acenaphthene

Fluoranthene

10 Sediment

11

7

041 (subtidal)017 (intertidal)

114

see attached

0009

LOCKHEED WEST SEATTLE

Lockheed West Seattle (Region 10 Website)

Lockheed West ROD Date August 2013

116 DredgeE

MNR

284 EMNR only

1 167potential use in shallow areas

yes 477

54 μgL

520 μgL

13 μgL

10

190 μgL

23 12

Water

23 (Act)organoclay

4 72004-92005Sediments

000008

100

Sediment

ORDEQ McCormick amp Baxter Creosoting Co Web Site

15 (Est)

12 μgL

2

12

110 μgL

210 μgL

043 (subtidal)2 (intertidal)

Washington State CSL or SQS

0000002

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Naphthalene

Total cPAHs

Dioxinsfurans

PCBs 004COPPERLEADZINCSILVER2 4-DIMETHYL-PHENOL

PCBs Shellfish (intertidal clams) 0042

50 (Est) LMWPAHs 780(OC)

58 (Act) HMWPAHs 5300(OC)

98 (Act)Capped dredge areas

PCBs

12 (OC) (trigger for sediments to 10 feet depth)

Fish (English sole) 0023 ww

Sediment12 (OC) dredgecap 6 (OC) EMNR

Sediment in state owned adjacent lands

9 (OC) EMNR

MERCURY Sediment3 where PCBs greater than 6 (OC)

ST MARIES CREOSOTE - proposed to be added to the NPL

ROD dateJuly 2007 LPAHs

370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)

St Maries Creosote (Regional Website)

Remediation Ongoing HPAHs

960 (OC) (17 if TOC lt02or gt4)

7-10 (Est)

200 (Est)

10 (Act)

35 (Est)

510

OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA)

1 Clam Bay Sediments 61999 - 102001

15

450

Area not specifiedYes

12 (OC)

46 71Sediment

013390

61

0029

410

10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005

960(OC)49 Sediment

12

PCBs

3 (OC) SWAC12 (OC)) SWAC

10PUGET SOUND NAVAL SHIPYARD COMPLEX

2 OUB Marine 61600 - 3104

225 (Act)

10 0Shoreline Nearshore and Offshore Sediment

29 (Est) Yes

211 9

108 Sediment

5

1x10-5 ngL

031 μgL

620 μgL

370(OC)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

MERCURY (toxicity test opt-out)

LPAHs 780 (OC)

HPAHs 5300 (OC)

MERCURY 059 subtidal

LPAHs 780 (OC) subtidal

HPAHs 5300 (OC) subtidal

MERCURY 059

LPAHs 780 (OC)

HPAHs 12 dw intertidal

MERCURY 5 21059LPAHs

HPAHs 12 dw intertidal

48 (Act)

30(Act)

54 (Act)

Region 10 Wyckoff Eagle Harbor Web Site

East HarborWest Beach Sediments

2007-2008

31997 - 121997 13-92 (Est) Yes

10

WYCKOFF COEAGLE HARBOR

1

East HarborPhase 1 - NTCRA

91993 -31994 (Phase 1)

East HarborIntertidal and Subtidal Sediments

2000-2002

3 West Harbor

117

780 (OC)

23

$6-20

Sediment

Sediment

059 (dw)

5300 (OC)

780 (OC)

5300 (OC)

5300 (OC)

Sediment

059

49 $62 - $16 Sediment12 - 31 (includes EMNR)

see cap

059

780 (OC)

  • READ_FIRST
  • Tier 1 Sites - Remedial
    • READ_FIRST

      The 2002 memo Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sitesestablished at 2 tier system of headquarters consultations to encourage national consistency in makingdecisions at Superfund and RCRA Corrective Action sediment sites Tier 1 sites are defined as sites wherethe proposed sediment action will address more than 10000 cubic yards or five acres of contaminatedsediment Consultation for Tier 1 sites involves the submission of the draft Proposed Remedy or draftEECA and a discussion of how the 11 principles were considered to the Regional Coordinator 30 daysprior to the public comment period Tier 2 sites are a subset of the Tier 1 sites that are large complex orcontroversial and are subject to consultation with the Contaminated Sediments Technical AdvisoryGroup throughout the RIFS and remedy selection stagesThis Tier 1 Tracking list is an EPA OSRTI product largely developed by the Army Core of Engineers and isintended to be a resource for contaminated sediment RPMs headquarters and regional technical staffand others supporting the remedy decision making process at these sites The list tracks the Tier 1 sitesthat have signed a decision document and documents the remedy selected theestimated and actual costs of the remedy the contaminants of concern and the associatedcontaminated media the Action Levels the Clean-up Levels (CUL) the Remediation Goals (RG) and theSediment Remedial Action Objectives (RAO) For those sites where the remedy has been implementedand a Five-year Review (FYR) has been completed the list also documents whether monitoring wasconducted for the FYR data was presented in the report and the CULs RGs and RAOs were met A keyaspect of this list is that the references for all the data in this spreadsheet are easily located Each cellcontaining data is hyperlinked to a PDF with the page or pages from the relevant public document thatreports the data Each PDF includes the cover page of the report with the information necessary tolocate the complete document and the data included in the spreadsheet is highlighted in the text of thePDF All of the information and documents included in this tracing list are publically availabledocumentsThis Version has been published to the internet with all of the hyperlinks removed We apologize for the inconvenience EPA is currently updating its websites and is temporarily unable to publish the Tier 1 Tracking List with the hyperlinks to the Cited Documents The Remedial Action Objectives and Five Year Review data columns have been removed from this version because they are largely narrative text and require the context provided by the hyperlinked documents in order to be properly understood When the Internet upgrade is complete the Fully cited version will be published Until then any questions regarding this Tier 1 Tracking List can be directed to Matt Lambert EPA Office Of Superfund REmediation and Technology Innovation (lambertmatthewepagov)The Tier 1 Tracking List includes sites in the Remedial Program where a Proposed Plan and Record of Decision were signed The sites are organized by EPA Region number and then listed alphabetically by name Due to the structure of the list columns cannot be filtered or sorted

      Tier 1 Sites - Remedial

      264pdf
      Websitehttpcumulisepagovsupercpadcursitescsitinfocfmid=0101431
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100948
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101479
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100744
      216pdf
      1-011pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100743
      Website httpwwwepagovnbhindexhtml
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631F8CFE11E53EFA23C8525691F0063F6E8OpenDocument
      1-009pdf
      260pdf
      702pdf
      Website httpyosemiteepagovr1npl_padnsf31c4fec03a0762d285256bb80076489ca48c071b6a314e1c8525691f0063f6ddOpenDocument
      1-068pdf
      608pdf
      610pdf
      611pdf
      612pdf
      631pdf
      681pdf Soil and sediment not differentiated
      682pdf
      1-057pdf
      692pdf
      695pdf
      700pdf
      703pdforig 1998 estimate
      1-035pdf
      679pdf
      1-005pdf
      636pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      638pdf
      636pdf
      1-010pdf
      1-074pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      1-017pdf
      1-018pdf
      1-020pdf
      215pdf
      694pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-024pdf
      1-023pdf
      1-025pdf
      1-026pdf
      1-027pdf
      1-027pdf
      1-028pdf
      1-025pdf
      1-047pdf
      1-031pdf
      1-033pdf
      1-034pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101074
      1-012pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201766
      738pdfDates are for entire construction not only sediment portion
      356pdf
      2058pdf
      735pdfThis represents cost estimate for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1266pdfThis represents actual cost for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1268pdf
      2083pdf
      1268pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200364
      2203pdf
      372pdf
      739pdf
      740pdf
      371pdfIn-situ treatment with sorptive agents
      371pdf
      1259pdf
      373pdf
      Website httpwwwepagovr02earthsuperfundnpl0200364chtm
      1259pdf
      373pdf
      1259pdf
      373pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200528
      1272pdf
      177pdf
      477pdf
      1261pdf
      2086pdf
      478pdf
      2086pdf
      478pdf
      Northerly wetlands and tar patch area were determined to be more like soil removals as they were not submerged Westerly wetlandds has a surface water stream running through it that is monitored for sediments so it is retained
      1273pdf
      2088pdfMNR doesnt have fieldwork dates but site fieldwork dates are included
      1274pdfNo specific area for MNR provided 21 acres is area of westerly wetlands for which MNR is selected
      2006pdf
      2087pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0201644
      456pdf
      218pdf
      457pdf
      2093pdf
      2094pdf
      178pdf
      2011pdf
      1279pdf
      461pdf
      56pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201706
      463pdf
      2016pdf
      463pdf
      2016pdf
      2091pdf
      2015pdf
      2015pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0202229
      990pdf
      993pdf
      1014pdf
      1299pdf
      2018pdf
      996pdf
      990pdf
      991pdf
      991pdf
      992pdf
      996pdf
      996pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200557
      2019pdf
      997pdf Remedy componentsareas not broken out
      2098pdf
      2096pdfInfo only on Alycon Lake no info on Rabbit Run or Chestnut Branch
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201290
      2033pdf
      764pdf
      2023pdf
      2024pdf
      2024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201491
      2032pdf
      1002pdf
      1001pdf
      2221pdf
      2031pdf
      2032pdf
      2102pdf
      2029pdf
      2028pdf
      2134pdf
      2030pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0203382
      2072pdf
      518pdf
      2228pdf MNR area was not stated Calculation Profundal areas 08= 154 profundal area = 1925 acres - 154 TLC acres = 1771 MNR acres
      518pdf
      2073pdf
      2075pdf
      2079pdf
      2123pdf
      2126pdf
      1005pdfAttachment has 2 sections one from the ROD the other from the FYR
      1006pdf
      2124pdf
      2125pdf
      2070pdf
      2059pdf
      2059pdf
      2059pdf
      2128pdf
      2060pdf
      2061pdf
      2127pdf
      2063pdf
      2063pdf
      2064pdf
      2065pdf
      2066pdf
      2130pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201465
      369pdf
      2133pdf
      2034pdf
      1008pdf
      2131pdf
      183pdf
      2177pdf
      2131pdf
      183pdf
      2131pdf
      183pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201770
      2036pdf
      64pdf
      1009pdfIncludes entire remedy sediment portion is not defined
      2038pdf
      2037pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200439
      2174pdf
      1012pdf
      2042pdf
      2041pdf
      2041pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200209
      2171pdf
      2051pdf
      523pdf
      2046pdf
      2044pdf
      2049pdf
      2162pdf
      2052pdf
      2053pdf
      2047pdf
      2045pdf
      2050pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201202
      69pdf
      2170pdf
      2054pdf
      2120pdf
      2054pdf
      2054pdf
      2118pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0302836
      Website httpcfpubepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0302836
      3006pdf
      497pdf Apparently same area as EMNR
      498pdf Apparently same area as MNR
      496pdf
      3001pdfWeb site COC list is much more extensive then tPAH
      497pdf
      497pdf
      httpwwwepagovreg3hwmdnplVAD990710410htm
      499pdf
      499pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300093
      1605pdf
      224pdf
      1601pdf
      1614pdf
      1606pdf
      1606pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1605pdf
      482pdf
      73pdf
      1615pdf
      656pdf
      1606pdf
      1617pdf
      1617pdf
      1617pdf
      1617pdf
      Website httpwwwepagovreg3hwmdsupersitesDED980555122indexhtm
      1617pdf
      1617pdf
      1605pdf
      483pdf
      74pdf
      484pdf
      657pdf
      1606pdf
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300092
      1622pdf
      1621pdf
      1039pdf
      959pdf
      1040pdf
      958pdf
      1623pdf
      665pdf
      httpwwwepagovreg3hwmdnplDED980552244htm
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300951
      1624pdf
      3008pdf
      961pdf
      960pdf
      3002pdfArea not stated No mention of sediment capping or marine mattress in ROD or ESDs
      962pdf
      1625pdf
      1626pdf
      1627pdf
      1628pdf
      Websitehttpwwwepagovreg3hwmdnplPAD046557096htm
      Website httpcumulisepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0300951Provided to indicate formal OU name
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0406299
      Construction completed but no documents are available
      12pdf
      578pdf
      579pdf
      4001pdf
      4001pdf
      12pdf
      4001pdf
      4001pdf
      4001pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0402260
      No information on websites regarding status of sediment work unclear as of Jan 2014
      21pdf
      4002pdf
      53pdfCost of sediment remedy is not broken out
      4003pdf
      Website hhttpcumulisepagovsupercpadcursitescsitinfocfmid=0403156
      400pdf
      580pdf
      4004pdf
      Website httpwwwepagovregion4superfundsitesnplnorthcarolinawcoplwtpnchtml
      395pdf
      402pdf
      396pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403350
      4008pdf
      4007pdf
      4023pdf
      965pdf
      4020pdfThe ROD and FYR do not directly state the COCs for the sediment remedy and there are not contaminant-specific cleanup levels The contaminants identified here are those with an HQ above 1 for all areas (see attachment) Presented here to indicate prevalent contamination
      4019pdf Excavation depth based on elevation and visual determinations
      4009pdf
      4011pdf
      4010pdfChanged remedy to MNR
      4011pdfChanged remedy to MNR
      4017pdf
      966pdf
      584pdf
      964pdf
      4013pdf
      4018pdf
      4021pdf
      1025pdf
      1026pdf
      4014pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403252
      77pdf
      561pdf
      4022pdf
      558pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0403765
      391pdf
      4030pdf
      4031pdf
      4032pdf
      393pdf
      httpwwwepagovregion04superfundsitesnpltennesseetennprotnhtml
      562pdf
      563pdf
      4031pdf
      4033pdfROD states However if certain excavated sediments appear to be uncontaminated then those sediments shall be subjected to sampling and analyses for the PAHs The action levels for sediment removal will reflect EPAs excess lifetime carcinogenic risk range of 1 x 10 6 to 1 x 10 4 (See Table G - 9) Its unclear whether or which concentrations will be used for an action level but the text and table are addded as a reference
      4034pdfNo remedial action in Reaches B and C See second page of attachment
      570pdf
      1031pdf
      4043pdf
      4044pdf
      4043pdf
      4043pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406082
      592pdf
      592pdfSite soils included in volume
      No Reach A removal action decision documents exist on EPA HQ or region websites
      httpwwwepagovregion4superfundsitesnplnorthcarolinawardtrnchtml
      593pdf
      590pdf
      591pdf
      4040pdf
      4041pdf
      4042pdf
      4041pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0501228
      5070pdf
      15pdf
      20pdfThis value represents Estimated 30-Year Net Present Worth to excavate and consolidate sediment in landfill
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      17pdf
      5170pdf
      5171pdf
      5172pdf
      533pdf
      532pdf
      Website httpwwwepagovregion5sitescontinentalindexhtm
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0507723
      5059pdf
      5173pdf
      5174pdf
      5180pdf
      5175pdf
      5057pdf
      5137pdf
      5093pdf
      5176pdfDeposit DD is located in OU2 but it is considered part of the OU3 response
      5179pdf
      5062pdf
      5181pdf
      5051pdf
      5092pdf
      5177pdf
      213pdf
      5058pdf
      Website httpwwwepagovregion5sitesfoxriverindexhtml
      5092pdf
      5178pdfAlso see Fox River ROD Amendment 2007 pg 14 Table 2 for documentation of the OU 5 dredge volume being included in the OU4
      213pdf
      5217pdf
      5094pdf
      5096pdf
      214pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500760
      33pdf
      5063pdfBackfill stated on second page of attachment
      35pdfIncludes floodplain material
      32pdf
      Website httpwwwepagovR5SupernplillinoisILD980823991htm
      32pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0508120
      5003pdf
      5002pdf
      5005pdf
      5060pdfEstimated from map in 5 year report
      5004pdf
      5004pdf
      5006pdf
      5001pdf
      5168pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500083
      5108pdf
      5222pdf
      5208pdf
      5022pdf
      5131pdf
      5209pdf
      Website httpwwwepagovregion5sitesoutboardmarine
      5205pdf
      514pdf
      515pdf
      5120pdf
      514pdf
      5120pdf
      514pdf
      5212pdf
      5125pdf
      5126pdf
      5127pdf
      5123pdf
      5128pdf
      Website ttpcumulisepagovsupercpadcursitescsitinfocfmid=0501181
      5024pdf
      5160pdfIncludes sediments and soils
      5026pdf
      5025pdf
      5024pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0505188
      5203pdf
      5202pdf
      5146pdf
      5044pdf
      5037pdf
      5045pdf
      5142pdf
      5142pdf
      Website httpwwwepagovregion5sitessheboygan
      5046pdf
      5145pdf
      5043pdf
      5140pdf
      5142pdf
      5142pdf
      5035pdf
      5144pdf
      5042pdf
      5036pdf
      5142pdf
      5142pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0502194
      150pdf
      148pdf
      149pdf
      5157pdf
      147pdf
      147pdfNo update provided in 2012 FYR
      5027pdf
      5156pdf
      Website httpwwwepagovregion5cleanupvelsicolmichiganindexhtml
      5154pdf
      5164pdf
      5164pdf
      5151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0601752
      6001pdf
      986pdf
      6004pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      987pdf
      983pdf
      981pdf
      984pdf
      6014pdf
      6006pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0602911
      1043pdf
      1044pdf
      6008pdf
      6009pdfA list of principal parameters is provided without risk context COCs or risk drivers in sediments are not identified
      1047pdfPossible that visually clean performance standard also applies to marsh sediments
      1045pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0600574
      1049pdf
      153pdf
      1050pdf
      1051pdf
      6010pdfConstruction and disposal only
      6011pdf
      1052pdf
      Wesbite httpcumulisepagovsupercpadcursitescsitinfocfmid=0800445
      8003pdf
      311pdfIncludes Area 1 sediments and 30K cy in area 3
      625pdf
      624pdf
      8002pdf
      Website httpwwwepagovregion8superfundmtmilltown
      8050pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800357
      8018pdf
      8017pdf
      1019pdf
      1018pdf
      8023pdf
      8012pdf
      8013pdf
      8015pdf
      website httpwww2epagovregion8rocky-mountain-arsenal
      8020pdf
      8019pdf
      8012pdf
      8015pdf
      website httpwwwrmaarmymil
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800694
      629pdf
      8024pdf
      630pdf
      8025pdf
      8026pdf
      8027pdfSediment and soil are often used interchangeably in the ROD
      628pdf
      627pdf
      8026pdf
      628pdf
      8026pdf
      8028pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800416
      8037pdf
      1021pdf
      1022pdf
      8043pdf
      1023pdf
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Websitehttpwww2epagovregion8silver-bow-creek-butte-area
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpdeqmtgovREMMWCBConstructionServicesSectionSilverBowCreekdefaultmcpx
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901755
      9015pdf
      596pdf
      1237pdf
      1236pdf
      1235pdf
      1234pdf
      980pdf
      1238pdf
      1234pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDCAD980498612OpenDocument
      1234pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901129
      1245pdf
      9002pdf
      1240pdfThis cost does not include $18M for bank stabilization
      1239pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDcad009106527OpenDocument
      543pdf
      1239pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902734
      1249pdf
      41pdf
      545pdf
      39pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpyosemiteepagovR9SFUNDR9SFDOCWNSF3dec8ba3252368428825742600743733c01ef2be6ec9ab9c8825737f002bf719OpenDocument978
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902440
      1254pdf
      156pdf
      974pdf
      975pdf
      1250pdfDieldrin is also a COC but only has a CUL for surface water
      1252pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfvwsoalphabeticUnited+Heckathorn+CoOpenDocument
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000981
      10-030pdf
      Name in ROD However name on CB website is NSTF Areawide Sediment covered within OU1 ROD was later divided into separate OUs except for removal actions conducted at Olympic View This removal action is summarized here
      1104pdf
      1105pdf
      1105pdf
      1106pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1106pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc923e8d62480494ad483882564f80082a1c0OpenDocument
      10-030pdf(formerly OU6)
      10-100pdf
      1101pdf
      1100pdf
      1099pdf
      1097pdf
      10-002pdf10 acres as of 2009
      1097pdf
      1097pdf
      1097pdf
      10-030pdf
      1071pdf
      1076pdf
      1073pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1072pdf
      10-030pdf
      1066pdf
      1061pdf Quantity does not include Blair Waterway dredging 1993 ESD states that Blair is not part of ROD cleanup and is for navigational purposes
      1062pdf
      1063pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      10-030pdf
      1060pdf
      1059pdf
      1059pdf
      1059pdf
      1067pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1070pdf
      1111pdf
      1112pdf
      1115pdf
      1113pdf
      10-030pdf
      10-098pdf
      1121pdf
      1079pdf
      1094pdf
      1094pdf
      1078pdf
      1122pdfThis is strictly a construction cost that appears to include construction of CDF and pile removal as well as dredging and capping
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 25
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 089
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      10-030pdf
      10-008pdf
      1081pdf
      1082pdf
      10-009pdf
      1084pdf
      1085pdf
      1087pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000020OU 8 is not included because OU was reommended for no further action in 2003 ROD
      1123pdf
      10-022pdf
      1134pdfCapping took place after dredging to in part maintain original depths
      1138pdf
      433pdfROD estimated remedy would cost $15M but 2002 ESD estimated it as $12M
      1133pdf
      1130pdf
      949pdf
      1135pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc9235a64831b6521f46b8825650200836f1cOpenDocument
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      1136pdf
      1124pdf
      10-023pdf
      1128pdf
      10-028pdf
      434pdf
      1125pdf
      1130pdf
      10-024pdf
      1126pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-025pdf
      1142pdf
      10-095pdf
      1144pdf
      1141pdf
      1143pdf
      1146pdf
      1146pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1000020
      1152pdf
      162pdf
      1148pdf
      314pdf
      633pdf
      1149pdf
      1153pdf
      431pdf
      1150pdf
      431pdf
      1151pdf
      Website httpyosemiteepagovR10CLEANUPNSF7d19cd587dff1eee8825685f007d56b72dd5ab7462e4f004882567b30057eb7bOpenDocument
      431pdf
      1151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000339
      166pdf
      49pdf
      1158pdf
      1159pdf
      1157pdf
      1157pdf
      Website httpwwwdeqstateoruslqcunwrmccormickbaxter
      1290pdf
      1157pdf
      1157pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1001134
      1291pdf
      1163pdf
      1164pdf
      1292pdf
      1293pdfAlthough not called MNR remedy is to monitor contaminant levels until the goal is achieved which is MNR
      10-061pdf
      1165pdfThis cost includes capping of the upland landfill A breakout for just the sediment portion was not provided
      1166pdfThis cost includes the fire training area and upland landfill cover A breakout of just the sediment remediation was not provided
      1167pdf
      1169pdfconsidered at conceptual target for sediment
      1292pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1169pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000611
      1177pdf
      10-031pdf
      10-031pdf
      1179pdf
      1178pdf
      1173pdf
      1181pdf
      1176pdf
      1174pdf
      1173pdf
      1181pdf
      1176pdf
      1173pdf
      1181pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1001107
      1182pdf
      10-040pdf
      1242pdf
      1244pdf
      1243pdf
      1188pdf
      1189pdf
      1187pdf
      1183pdf
      1185pdf
      10-041pdf
      10-042pdf
      1189pdf
      1185pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1002095
      46pdfIncludes soil excavation quantity in total volume
      10-039pdf
      408pdfIncludes cost for excavating nearshore soil
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate that sediment is not toxic
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate sediment that is not toxic
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000612
      10-066pdf
      1216pdf
      10-044pdf
      10-071pdf
      10-068pdf
      10-068pdf
      Website httpyosemiteepagovR10CLEANUPNSFsitesWyckoff
      10-068pdf
      10-075pdf
      10-113pdf
      409pdf
      1218pdf
      202pdf
      202pdf
      202pdf
      10-064pdf
      10-072pdf
      1219pdf
      1214pdf
      1214pdf
      1214pdf
      1215pdfRequirement for intertidal sediments
      423pdf
      10-047pdf
      10-046pdf
      1209pdf
      1208pdf
      1207pdf
      1203pdf
      1202pdf5 mgkg criteria for areas requiring dredging21 mgkg criteria for areas requiring a 1-meter thick cap 059 for thin layer capping
      1203pdf
      1204pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      2195pdf
      2136pdfCleanup goals for biological endpoints were not provided
      2136pdfCleanup goals for biological endpoints were not provided
      2127pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0900993
      Website httpwwwepagovregion9superfundpvshelf
      9003pdf
      9004pdf
      9005pdf
      9005pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      613pdf
      1-030pdf
      1-064pdf
      683pdf
      475pdf
      2085pdfHowever see RAO of 50 ppm
      2085pdf
      2085pdf
      1-102pdf
      1278pdf
      1279pdf
      1278pdf
      2092pdf
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      2097pdf
      763pdf
      1003pdf
      2030pdfIts unclear the extent to which 10 mgkg is considered the cleanup level ROD language and FYR note is attached The closest to being definitive is on p 34 of attachment the cleanup goal of about 10 mgkg
      2123pdf
      2062pdf
      2129pdf
      186pdf
      2117pdf
      2043pdf
      2043pdf
      963pdf Attachment incl language from ROD and ESD
      11pdf
      11pdf
      11pdf
      11pdf
      11pdf
      23pdf
      396pdf
      4019pdf
      597pdf
      4045pdf
      4045pdf
      4045pdf
      586pdf
      585pdf
      4057pdfSediment concentration associated with protective fish tissue concentration is lt10ppb
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      5137pdf
      5050pdf
      5050pdf
      34pdf
      5001pdf
      5109pdfAction level or cleanup level of North Ditch remediation never stated in ROD ROD amendment five year reviews or construction completion report
      277pdf
      5122pdf
      526pdf
      5045pdf
      5139pdf
      5141pdf
      5155pdf
      982pdf
      6003pdf
      8002pdfNo sediment cleanup levels cleanup levels pertain to groundwater or surface water
      1024pdf
      979pdf
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      9006pdf
      9006pdf
      9006pdf
      9006pdf
      1251pdf
      1106pdf
      1103pdf
      1103pdf
      1103pdf
      1103pdf
      1072pdf
      1065pdf
      1065pdf
      1069pdf
      1069pdf
      1069pdf
      1070pdf
      1116pdf
      1091pdf
      1091pdf
      1091pdf
      1091pdf
      1114pdfTable 13 in the ROD lists Zinc SQO as 059 This appears to be an error Table 12 of the ROD lists 059 for mercury and 410 for zinc
      1074pdf
      1074pdf
      1089pdf
      1089pdf
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1136pdfConfirmational number of 76 mgkg (OC) established for TBT
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-025pdf76 ppm (OC) 1335 ppb (dw)TBT is a confirmational number See attachment
      10-096pdf
      10-096pdf
      164pdf
      312pdf
      164pdf
      164pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      1181pdf
      1181pdf
      1181pdf
      1187pdf
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (041 ppm) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (970 ppm [OC]) is considered a conceptual target
      9006pdf
      9006pdf
      6018pdf
      6018pdf
      5184pdfCalled residual cover here
      5185pdfTermed post-dredge residual sand cover
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406638
      4048pdf
      4049pdf
      4050pdf
      4051pdf
      4051pdf
      4051pdf
      4051pdf
      httpepagovregion4superfundsitesnpltennesseecopbastnhtml
      4051pdf
      4051pdf
      4051pdf
      1-045pdf
      1-045pdf
      1-030pdf
      1-046augmentedreplaced sand cap in 2011
      1-047pdf
      httpwwwepagovregion02superfundnplonondagalakeindexhtml
      Ley Creek subsite not included because the volume removedmanaged was less than 10K cy
      2179pdf
      2165pdf
      2167pdf
      2166pdf
      2054pdf
      2054pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      1300pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      5186pdf
      3007pdfSame factsheet as of Jan 2014
      httpepagovregion4superfundsitesnplalabamaamerbrasalhtml
      httpepagovregion4superfundsitesnplmississippiamercrewkmshtml
      httpyosemiteepagovr10cleanupnsf22f04d62fa63974288256da6005f9868cabb84db584c955f8825697f00049beeOpenDocument
      10-056pdf
      10-058pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0503034
      5187pdf
      5188pdf
      5189pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinasangschtml
      5195pdf
      5194pdf
      6023pdf
      10-060pdfROD amendment did not specify the volume of instream sediments vs floodplain material
      10-062pdf
      10-063pdf
      10-064pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      10-069pdf
      10-069pdf
      10-083pdf
      1203pdf
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (370 ppm [OC]) is considered a conceptual target
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      Website httpyosemiteepagovr10cleanupnsfsitesmccormick_baxter
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-087pdf
      10-097pdf
      10-101pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      1246pdfCap placed in areas exceeding CUL
      1246pdfCap placed in areas exceeding CUL
      9014pdf
      8044pdf
      8046pdf
      8051pdf
      6026pdf
      6026pdf
      6026pdf
      6026pdf
      6027pdf
      5196pdf
      5197pdf
      5203pdf
      5204pdf
      5206pdf
      5207pdf
      5210pdf
      5022pdf
      httpwwwepagovregion5cleanupmississinewaindexhtml
      5213pdf
      5214pdf
      5215pdf
      5216pdfAmended cost for OU 2-5 does not include Phase 1 in OU4
      4056pdf
      4061pdf
      4062pdf
      4063pdf
      4065pdfBackfill in at least portions of site N of 38th St area unclear
      4066pdf
      4075pdf
      4075pdf
      4076pdf
      4051pdf
      69pdf
      2053pdf
      2181pdf -- most recent factsheet as of 2014-Jan
      2181pdf -- most recent factsheet as of 2014-Aug
      ROD also describes NYSDEC-regulated action removing channel sediment (4200 cy) and floodplain sedimentsoil (63000 cy)
      2185pdf
      2196pdf
      2197pdf Remedy componentsareas not broken out
      httpwwwepagovhudson
      2198pdf
      1-058pdf
      1-059pdf Soil and sediment not differentiated
      2205pdf
      2204pdf
      1-065pdf
      613pdf
      1-067pdf
      1-071pdf
      1-072pdf
      1-013pdf
      1-073pdf
      698pdf
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93d01550369a32b31bb8525691f0063f6d6OpenDocument
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101028
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8584c38df37ade1998525764f005a96d3OpenDocumentampHighlight=0callahan
      1-076pdf
      1-075pdf
      1-078pdf
      1-078pdf
      1-078pdf
      1-078pdfNote that the dredging and subaqueous disposal of sediments was changed from OU1 to OU3 in the 2013 ESD
      1-078pdf
      1-078pdf
      1-080pdfAs of 2014-Jan
      1-077pdf
      1-081pdf only dredge operation
      httpwwwepagovregion02superfundnplraritanbayslag
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206276
      1-082pdf
      1-083pdf
      1-083pdf level specified on p 3 of 4
      1-083pdf 1-083pdf level specified on p 3 of 4
      1-086pdf
      1-085pdf
      1-087pdf Total cost ROD does not specify cost of sediment portion
      2206pdf
      2206pdf
      2206pdf
      2207pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201690
      2208pdf
      2210pdf
      2211pdf
      2212pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206222
      httpwwwepagovregion2superfundnplgowanus
      2213pdf
      2214pdf
      2214pdf
      2215pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1002655
      httpyosemiteepagovr10cleanupnsf32e58b284950a4fc882578480000fdcc9458199e8119eba3882572910069d808OpenDocument
      10-102pdf
      10-104pdf
      10-105pdf
      10-105pdf
      10-106pdf
      10-107pdf
      10-108pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driverf
      10-110pdf
      10-111pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-093pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8bbe0100a535e8840852576e90053b186OpenDocument
      1-090pdf - soilsediment volumes not differentiated
      1-090pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-089pdf
      1-091pdf
      1-092pdf
      Fish tissue remedial goal appears to only apply to the Allendale and Lyman Mill Pond areas not lyman mill stream sediment
      1-096pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-098pdf
      1-099pdf
      1-099pdf
      2218pdf
      2219pdf
      2219pdf
      2220pdf
      2222pdf
      2123pdf
      2225pdf
      2173pdf
      2116pdf
      5109pdf
      5223pdf
      10-125pdf
      10-125pdf
      10-125pdf
      1-100pdfFloodplain vs sediments not differentiated
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93de720462345729a4f8525691f0063f6e1OpenDocument
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631E704D6C17F74EA678525697B0008CCAAOpenDocument
      1-101pdf
      httpwwwepagovregion02superfundnplaluminumcompany
      2200pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinakopchschtml
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0405546
      httpwwwepagovregion4superfundsitesnplalabamatriatenvalhtml
      877pdf
      877pdf
      877pdf
      877pdf
      6024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000195
      httpyosemiteepagovr10cleanupnsfsitesbh
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101388
      Reg Site OU Area Name Fieldwork Dates Dredge (1000 cu yds) Excavate (1000 cu yds) Back-fill (Residual Cap) Cap (acre) MNR (acre) EMNR Thin Cover (acre) In Situ Treatment (acres) Other Estimated Cost (in millions) Actual Cost (in millions) COC Sample Matrix Action Level (ppm) Cleanup Level (ppm) Remediation Goal (ppm)
      1 CALLAHAN MINING CORP 3 SedimentsCap Ongoing 101 No $21 Copper Sediment 790
      Lead 710
      Callahan Mine (Region 1 Website) Zinc 5100
      1 CENTREDALE MANOR RESTORATION PROJECT 1 Allendale Pond and Lyman Mill Pond Sediment 156 If needed 605 Benzo(a)pyrene Fish 00015
      Dieldrin 00011
      Technical Chlordane 013
      Aroclor 1254 0037
      Aroclor 1268 0011
      2378-Tetrachlorodibenzo-p-dioxin 00000022
      Total Aroclors 0076
      44-DDD 00062
      44-DDE 0018
      DioxinsFurans TEQ 0000044
      Benzo(a)pyrene Sediment 14
      Dibenz(ah)anthracene 097
      Dieldrin 00026
      Technical Chlordane 04
      Aroclor 1254 0031
      Aroclor 1268 0023
      Arsenic 39
      Centredale Manor Restoration Project (Region 1 Website) 2378-Tetrachlorodibenzo-p-dioxin 0000015
      Lyman Mill Stream Sediment 205 Yes 225 165 Coplanar PCBs (TEQ)3 0000025
      Total Aroclors 006
      Selenium 11
      Zinc 221
      44-DDD 00084
      44-DDE 0006
      Aluminum 8210
      Barium 134
      Vanadium 376
      N-Nitroso-di-n-propylamine 046
      1 LORING AIR FORCE BASE 13 East Branch of Greenlaw Brook 1997 - 1998 38 (Est) Yes 481 Total PAHs Sediment 35
      86 (Act) Total 44-DDTDDDDDE 028
      Loring Air Force Base (Region 1 Website) Aroclor 1260 1
      Total Chlordanes 048
      Lead 218
      44-DDD Fish 0018
      44-DDE 0013
      44-DDT 0013
      Aroclor 1242 00022
      Aroclor 1260 00022
      Heptaclor 000098
      Chlordane Alpha 00034
      Chlordane Gamma 00034
      1 NEW BEDFORD 1 Acushnet River North of Wood Street (within Upper Harbor) 1202 - 303 900 (throughout OU1) 156 (Act) No 2002 ESD $317 (for all of OU 1) Operation ongoing PCBs Sediment (Upper Harbor) 10
      Region 1 New Bedford Website Upper and Lower Harbor 2004 - Ongoing 2011 ESD $422-1200 (for all of OU1) Sediment (Lower Harbor) 50
      Sediment intertidal areas with public access or abutting recreational land use 25
      Sediment saltmarsh areas with little to no public access (aka Marsh Island) 50
      Sediment intertidal areas with abutting residential land use 1
      Seafood 002
      2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000
      1 NEWPORT NAVAL EDUCATION amp TRAINING CENTER 4 McAllister Point Landfill (Narrangasett Bay) 22001 - 122001 34 (Est) Yes 226 Anthracene Sediment 051 051
      Fluorene 02 02
      46000 tons (Act)(cyds not provided) PCBs 36 36
      NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website Pyrene 3 3
      Copper Porewater 00529 00529
      Nickel 00337 00337
      1 NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1 1
      Nyanza Chemical Waste DumpRegion 1 Website 4 Sudbury River ROD Date September 2010 Area not specified 84 85 MERCURY Sediment 10 (EMNR)
      MERCURY Fish (largemouth bass yellow perch bullhead) 048
      1 PINE STREET CANAL 1 Turning Basin Pine Street Canal and Wetlands 2002-2004 2004 78 (Act) (GeotextileSand Cap) 44 PAHs Sediment ER-M Values
      Region 1 Pine Street Canal Website 82010 - 22011 08 2011 organoclay cap (size not specified) Metals and Cyanide ER-M Values
      1 SULLIVANS LEDGE 1 Unnamed Stream Ponds A and B 1998-2002 19 (Est) Yes upper portion of stream diverted PCBs Sediment 20 uggC
      Region 1 Sullivans Ledge website 86 (Act)
      2 Middle Marsh Wetlands 1998-2001 52 (Est) Yes 28 PCBs 20 uggC
      255 (Act)
      2 BATAVIA LANDFILL 1 Wetland Areas June 2001 - June 2003 25 (Est) Yes 13 (soil and sediment) 75 (soil and sediment) PAHs Sediment Visual NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals
      Deleted from NPL 11292005 Act Wetland area volume not specified LEAD
      2 BRIDGEPORT RENTAL amp OIL SERVICES 2 Little Timber Creek Swamp ROD dateSeptember 2006Remedial Action 2009-2011 175 (Est) Yes Area not specified 106 (Est) 125 PCBs Sediment 10 10
      Region 2 Bridgeport Rental amp Oil Services Website LEAD 1000 1000
      Total Petroleum Hydrocarbons None None
      2 BURNT FLY BOG 2 Downstream Area and Westerly Wetlands 11795 - 1996 gt6000 tons (Act) (soil and sediment) 22 LEAD Sediment 250
      PCBs 5
      3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment 400049
      2 GENERAL MOTORS (CENTRAL FOUNDRY DIVISION) 1 St Lawrence River 61995 - 111995 13 (Act) 2 (Act) 215 PCBs Sediment 1
      Turtle CreekTurtle Cove 1004 - 305 23 (Act) (soil and sediments) 01 01
      Raquette River 602 - 503 14 (Act) 1
      2 GOWANUS CANAL 1 Canal Sediments ROD Date Sept 2013 588 (Est) Area not stated (dredgecap remedy) In-situ stabilization of 3-5 feet of NAPL-containing sediments PAHs Sediment 20
      Gowanus Canal (Region 2 Website) Holding Tanks for CSO Control Copper 80
      Lead 94
      2 Grasse River Superfund Site(aka Alcoa Aggregation Site) Grasse River ROD Date April 2014 109 Yes 284 2431 PCBs Sediment 1
      Grasse River(Region 2 Website) Fish 001-005 (Final Remedial Goal)026-036(Interim Target Concentrations)
      2 HOOKER (102ND STREET) 1 Niagara River Embayment 71996 - 111996 28 (dredge to 2 feet) Yes $36 - 56 PAHs METALS CHLORINATED ORGANICS (MULTIPLE) Sediment 01(organics) New York State Sediment TBCs
      Deleted from NPL 852004 Sediment 02(Mercury)
      2 HUDSON RIVER PCBS 2 Upper Hudson River (Section 1) ROD dateFebruary 2002 Field work 2009-ongoing 1560 (Est) Yes Area not specified 2250 PCBs Fish 005
      Sediment 3 gm2 (MPA) 1
      Hudson River PCBs EPA Website Upper Hudson River (Section 2) 580 (Est) Sediment 10 gm2 (MPA) 1
      Fish 005
      Upper Hudson River (Section 3) 510 (Est) Sediment 1
      Fish 005
      2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001 (change in ESD from dredging to excavation) 981 (Est) ROD 21 INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC Sediment Not specified
      85000 Tons (Act) ESD 50-75
      2 LOVE CANALDeleted from NPL 9302004 2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001 0001
      2 MARATHON BATTERY CORP 1 East Foundry Cove Marsh and Constitution Marsh 91993 - 31995 30 (Est) Yesbentonite clay layer 40 CADMIUM Biological Sampling None
      Sediment 100 100
      Deleted from NPL 10181996 2 East Foundry Cove West Foundry Cove and the Cold Spring Pier Area 91993 - 31995 56 (Est) 485 CADMIUM Biological Sampling None
      Actual not specified by area
      Sediment Excavate up to 1 ft 95 Removal 10 mgkg
      2 ONONDAGA LAKE 2 Onondaga Lake Bottoms Subsite ROD dateJuly 2005 2407 (Est) 425 (Est) 1771 154 (Est) 414 MERCURY and others Sediment 08 014-2
      Operations Ongoing METHYL Hg Fish 03
      5 LCP Bridge St SiteWest Flume and Wetland AB June 2005 - July 2007 543 (Est)917 (Act) Yes 96 MERCURY Sediment 02
      20 Geddes Brook NineMile Creek Reach BC CD ROD DateApril 2009June 2012 - ongoing 59 (Est) Combined with Dredge volume Yes Partial Channel Re-location 189 MERCURY and others Sediment 015
      Region 2 Onondaga Lake Website Mercury Fish 01-03
      24 Geddes Brook NineMile Creek Reach AB June 2012 - 16 (Est) 42 (Est) Yes 151 MERCURY and others Sediment Soil (flood plain) 015
      Fish 01 - 03
      2 Raritan Bay Slag 0 ROD Date May 2013 34 (Est) 787 Lead Sediment 400 400
      Raritan Bay Slag (Region 2 Website)
      2 REYNOLDS METALS CONot on the NPL - Superfund Alternative Site 1 St Lawrence amp Raquett Rivers 412001 - 102001 52 (Est) 54 (Act) 35 PAHs Sediment 10
      86 (Act) PCBs 1
      TDBFs 0001
      2 RICHARDSON HILL ROAD LANDFILLPOND 1 South Pond and Herrick Hollow Creek 2004 285 (Act) 139 PCBs Sediment 1 1
      2 ROEBLING STEEL CO 5 Delaware River and Crafts Creek 2010-2013 116 (Est) Yes 11 PAHs Sediment See Attached
      240 (Act) Metals
      2 VINELAND CHEMICAL CO INC 3 River Areas (Blackwater Branch Floodplain amp Maurice River) 2006 - ongoing 626 Yes 11 ARSENIC Sediment 20 20 exposed 120 submerged
      4 Union Lake Sediments Remedy not yet initiated Unknown Yes Sediment Washing 129 ARSENIC Sediment Unknown 120
      2 YORK OIL CO 2 Contamination Pathways - Western Wetland 2000-2001 11 (Est) Yes 33 LEAD Sediment Not specified
      15 (Act) PCBs Complete Removal or 1
      Contamination Pathways - Northwestern Wetland 50 PCBs Sediment 1 Contingent on biological and chemical testing
      LEAD Not specified
      3 ATLANTIC WOOD INDUSTRIES INC 3 River Water and Sediments 2010-Ongoing 6 7 126 (Dredging and Disposal) tPAHs Sediment 45 to 100
      Region 3 Atlantic Wood Industries Website 157 (Est) 100
      3 EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL) 3 North Wetlands 1997 - 12897 95 (Act) Yes 12 3 CADMIUM Sediment 60
      LEAD 1200
      ZINC 5600
      5 South Wetlands 1997 - 12897 37 (Act) Yes 42 Unknown CADMIUM Sediment 60
      LEAD 1200
      Region 3 EI duPont Website ZINC 5600
      7 Christina River 51099 - 9899 11 (Act) Yes 47 Unknown CADMIUM Sediment 20
      LEAD 700
      ZINC 3000
      3 KOPPERS CO INC (NEWPORT PLANT) 1 Wetlands Ponds and Hershey Run ROD dateSeptember 2005 58 (Est) Unknown Re-channelize portion of Hershey Run 5176 PAHs Sediment 150
      Region 3 Koppers Co Inc Website Remedy not yet initiated
      3 METAL BANKS 1 RiverMudflat Sediments 2008-2010 12 (Est) Yes Unknown (Act) 1727 Unknown PCBs Sediment 1 1
      METAL BANK (Regional Website) OU Name SOIL EXCAVCONTAIN
      4 AMERICAN BRASS INC 1 Cedar Creek ROD dateAugust 2006 94 (Est) Yes 39 BORON Sediment 28
      COPPER 220
      Dunham Creek 38 (Est) LEAD 170
      American Brass Inc (Regional Website) ZINC 780
      PCB-1260 429
      4 AMERICAN CREOSOTE WORKS INC 0 Railroad Lake and Hughes Creek ROD date September 2007 40 (Est) Yes $20 (Total) TOTAL PAH Sediment 100
      American Creosote Works Inc(Regional Website)
      4 COPPER BASIN MINING DISTRICT SITE 5 Copper Basin ReachOcoee No 3 ReservoirParksville Reservoir ROD date September 2011 Area Not Specified (approx 14 river miles) 23 PCBs Sediment
      Arsenic Sediment
      Cadmium Sediment
      Copper Sediment 680 (Copper Basin Reach)
      640 (Ocoee 3 amp Parksville Reservoirs)
      Region 4 Copper Basin Mining District Site website Iron Sediment 57000 (CBR)
      53000 (O3R amp PR)
      Lead Sediment 145 (CBR)
      250 (O3R amp PR)
      Mercury Fish
      Zinc Sediment 2200 (CBR)
      970 (O3R amp PR)
      4 DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company) 2 Lower Roanoke River ROD dateSeptember 2008 143 river miles 196 Dioxin Fish 3 ppt
      Sediment Unknown
      Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website 4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment 0001
      4 KOPPERS CO INC (CHARLESTON PLANT) 1 Ashley River 7101 - 12101 0 (Est) $05 (ROD)3 (ESD) 282 PAHs Sediment Weight of Evidence Approach None
      3 (Act)
      Barge Canal 42003 ESD selected MNR for the area 32 (Est)0 (Act) 0 (Est)32 (Act) $045 (ROD) 01
      01 (ESD) Arsenic
      Region 4 Koppers Co Inc (Charleston Plant) North Marsh Sediments No info 15 (Act) 1000 linear feet 025 acre (Est)1300 linear feet (Act) 17 23
      South Marsh Sediments 3103 - 6103 19 tons (Act) 15 (Est)2 (Act) Lead
      4 SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION 2 Twelve Mile CreekLake Hartwell ROD date62894 730 (Est) 321 PCBs Fish 2
      Lake Hartwell (Regional Website) Sediment 1
      4 TENNESSEE PRODUCTS 1 Chattanooga Creek - Middle Reach September 2005 - September 2007 142 (Est) $94 (ROD) PAHs Sediment Visual
      Region 4 Tennesse Products Website 107000 tons (Act)Followed by capping 71 (Act)Aquablock $257 (ESD)
      Chattanooga Creek NTCRA 1997-1998 229 Yes Visual
      4 TRIANATENNESSEE RIVER 0 Reach AHuntsville Spring Branch - Indian Creek 4186 - 101487 Rerouted river buried in-place sediments DDT Fish (channel catfish) No sediment CUL 5
      Region 4 TrianaTennessee River Website Fish (smallmouth buffalo) No sediment CUL
      Fish (largemouth bass) No sediment CUL
      4 WARD TRANSFORMER Reach A (Removal Action) June 2007 - 2009 150000 tons (Est)Approx 400000 tons (Act) PCB Sediment 1
      Region 4 Website 1 Reach B C D and lower Brier Creek ROD dateSeptember 2008Remedy not yet initiated 13 (soil and sediment) (Est) Yes $37 (Total) PCB Sediment 1
      Fish 005
      Brier Creek Reservoir Lake Crabtree and Lower Crabtree Creek ~25 river miles Sediment None
      Fish 005
      5 CONTINENTAL STEEL 3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est) 12 BENZO(A)PYRENE Sediment 8 16
      BENZO(BampK)FLOURANTHENE 7 14
      BENZO(A)ANTHRACENE 95 19
      INDENO(123-CD)PYRENE 465 093
      ARSENIC 19
      BERYLLIUM 084
      ARCHLOR-1016 3 1
      ARCHLOR-1242 3 1
      ARCHLOR-1254 3 1
      ARCHLOR-1248 3 1
      ARCHLOR-1260 3 1
      Region 5 Continental Steel Website 4 Markland Avenue Quarry 3252008 - 612010 175 Yes297000 cy 11 BENZO(A)ANTHRACENE Sediment 05
      BENZO(A)PYRENE 05
      BENZO(BampK) FLOURANTHENE 08
      DI-BENZ(AH) ANTHRACENE 02
      INDENO(123-CD)PYRENE 04
      ARCHLOR-1248 1
      ARSENIC 19
      LEAD 400
      5 FOX RIVER NRDAPCB RELEASESProposed to be added to the NPL 1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 PCBs Sediment 1 025 (SWAC)
      2 Appleton to Little Rapids MNR RemedyROD Date 122002 3 (Est) Yes 273 (Est) 20 river miles 136 (Est) 390 (2005 ROD Amendment) Sediment
      3 Little Rapids to De Pere 42009 - ongoing 227 (Est) Sediment 1 SWAC 028
      Fish (Walleye) 005
      Lower Fox River Cleanup Website 4 De Pere to Green Bay 2007 - ongoing 3216 (Est) Sediment 1 SWAC 025
      Fish (Walleye) 005
      5 Green Bay MNR RemedyROD Date 62003 Approx 2700 sq miles Sediment 1
      701(2010 ESD)
      5 KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER) 0 Kress Creek Site Summer 2005 - 2012 43 (Est) Yes $719 (Total) 128 RADIUM 226 Sediment 72 picoCuries per gram (pCig) combined radium
      Region 5 Kerr-McGee Website 129 (Act) RADIUM 228
      5 LITTLE MISSISSINEWA RIVERNot on the NPL - Other Cleanup Activity Private Party-Lead Cleanup 0 Little Mississinewa River Spring 2005 - Fall 2009 57 (Est)100000 tons (Act) Yes 25 miles (Est) 27 20 PCBs Sediment 4 (0-1ft) 5 (deeper than 1ft) 1 (0-1ft)5 (deeper than 1ft)
      Little Mississinewa River(Region 5 Website) Fish Unknown
      5 OUTBOARD MARINE CORP 1 North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below 71992 to 91992 55 (Est) Yes 074 PCBs Sediment Unknown
      Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below 1991-1992 523 (EST)30 (ACT) 131 50 (upper harbor)
      OUTBOARD MARINE CORP (Region 5 Website) 4 formerly 1 OMC Plant 2 North and South DitchROD Date August 20072012 ROD Amendment 2010-2012 40 (soil and sediment) (Est) Yes 73 PCBs Sediment 1
      PAHs 2
      1 HarborSlip No 3(2009 ROD Amendment) 2012-2013 195 (Est) Yes 349 PCBs Fish (Sport) 003 - 01
      Sediment 1 02 (SWAC)
      5 SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI) 2 Area 9 -- Lake Embayment 1295 - 0697 36 (Est) Yes PCBs Sediment 05
      54 (Act)
      5 SHEBOYGAN HARBOR amp RIVER 1 Lower River and Inner Harbor Completed in 2012 53 (ROD)51 (ESD) Yes (ROD) 12 PCBs Sediment 26 05
      51 (ACT) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Region 5 Sheboygan River and Harbor Superfund Site Website Middle River Remedy not yet startedAOC dateFebruary 2009 7 miles 2 Sediment 26 05
      Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Upper River Sept 2004 - October 2007 21 (Est) 31 Sediment None (88 mass removal of PCB) 05
      21 (Act) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      5 Torch Lake 2 Surface Waters ROD DateMarch 311994 No Action Copper
      NPL DeletionFeb 5 2002
      5 VELSICOL CHEMICAL CORP (MICHIGAN) 2 Pine RiverSt Louis Impoundment 1999 - 2005 640 (Act) Yes Unknown area(2 ft compacted clay) $60 (Total) $30 (as of 2002) DDT Carp Smallmouth Bass 1708
      Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5 15
      Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000
      6 ALCOA (POINT COMFORT)LAVACA BAY 1 Natural Recovery Areas 122001 - ongoing Area not specified 161 MERCURY Sediment Hg 025 Marsh 05 Open Water
      North of Dredge Island NA Actual ROD PAHs 448 Total
      Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act) PAHs
      Witco Marsh 12006 - 42006 57
      Chlor-Alkali Process Area (Treatability Study) August 1998 (Phase I)January 1999 (Phase II) 80 (Act) 1952 MERCURY Mass removal
      6 BAILEY WASTE DISPOSAL 1 North Marsh Area January 1996 - September 1996 6 (EST) Unknown Sediment None
      20 (tar and sediment) (Act)
      Deleted from NPL 10152007
      6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995 47 (ROD Est)150 (ESD Est)170 (Act) Yes 226 PAHs Sediment 1300
      8 MILLTOWN RESERVOIR SEDIMENTS 1 Milltown Reservoir Sediments Remediation completed Dec 2010 2600 (Est) Yes Channel realignment and construction 140 ARSENICCADMIUMCOPPERLEADZINC Sediment None
      Region 8 Milltown Reservoir Sediments Website 2560 (Act)
      8 ROCKY MOUNTAIN ARSENAL (USARMY) 3 Lake Sediments Remediation Project June 1999 - Aug 1999 19 (Est) Yes (Est) Area not specified 39 ALDRIN Sediment 38
      33 (Act) No (Act) DIELDRIN 37
      CHLORDANE 12
      ROCKY MOUNTAIN ARSENAL (Region 8 Website) DDE None
      DDT 14
      ROCKY MOUNTAIN ARSENAL (US Army Website) MERCURY 82
      ARSENIC 270
      8 SHARON STEEL CORP (MIDVALE TAILINGS) 1 Marshy Area Aug 1996 - Sept 1996 436 (Est) Yes (elevation raised above water line) 047 ARSENIC Sediment 70
      Deleted from NPL 9242004 100 (Act) LEAD 500
      CADMIUM None
      8 SILVER BOW CREEKBUTTE AREA 1 Streamside Tailing (Silver Bow Creek) July 1999 - Ongoing 73 (ROD Est) Yes Channel realignment and construction (176 miles) $44 (ROD)$98 (ESD) ARSENIC Sediment None 200 979
      CADMIUM 20 099
      COPPER 1000 316
      SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website) LEAD 1000 358
      ZINC 1000 None
      SILVER BOW CREEKBUTTE AREA (MT STATE Website) Sediment Trap MERCURY 10 018
      9 IRON MOUNTAIN MINE 5 Spring Creek Arm 2008-20011 200 (Est) 15 area not specified 186 ARSENIC Sediment Sediment susceptible to erosion dredged to a specific elevation None
      ROD dateSeptember 2004 COPPER
      Region 9 Iron Mountain Mine Website IRON
      9 MCCORMICK amp BAXTER CREOSOTING CO 3 Old Mormon Slough 2006 88 (Est) area not specified 35 DIOXIN Sediment 000021 TEQ 0000021 TEQ
      Region 9 Website McCormick and Baxter Creosoting 88 (Act) PAHs 333 (OC) 333 (OC)
      9 MOFFETT NAVAL AIR STATION 8 Site 27 - Northern Channel completed in 12007 656 (soil and sediment) (Est) Yes 68 TOTAL PCBs Sediment 035 035
      TOTAL DDT 00648 00648
      TOTAL CHLORDANE 0931 0931
      CADMIUM 184 184
      Naval Air Station Moffett Field Website LEAD 173 173
      MERCURY 152 152
      SELENIUM 0926 0926
      SILVER 137 137
      ZINC 720 720
      9 MONTROSE CHEMICAL CORP 5 Palos Verde Shelf Interim ROD Date September 2009 300 Area not specified DDT Sediment 46 (OC) interim23 (OC) Final
      White Croaker 04
      Water 022 ngL
      Palos Verdes Shelf (Region 9 Website) PCBs Sediment 7 (OC)
      White Croaker 007
      Water 0064 ngL
      9 UNITED HECKATHORN CO 1 Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)65 (Proj) Yes 7 DDT Sediment dredge all soft sediments 059 (average)
      Region 9 United Heckathorn Co Website
      10 Bunker Hill Mining and Metallurgical 3 Upper Basin ROD Amendment date Aug 2012 Not specified Arsenic Sediment
      Cadmium
      Runker Hill Mining and Metallurgical (Regional Website) Copper
      Lead 530
      Mercury
      Silver
      Zinc
      10 COMMENCEMENT BAY NEAR SHORETIDE FLATSPartial deletion (St Paul Waterway) 1996 1 Olympic View Resource Area (NTCRA) Completed in 102002 11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ 000002 TEQ
      COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website) 19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 20 (Est) 174 ARSENIC Sediment preponderance of evidence approach 93
      10 (Act) COPPER 390
      LEAD 450
      ZINC 410
      1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13 067
      1 Sitcum Waterway completed in 1994 428 (Act) 45 (Act) 4 ARSENIC Sediment 160 57
      COPPER 1100 390
      1 Hylebos Waterway 32003-22005 940 11 20 46 ARSENIC Sediment 97 57
      HEX-CB 01 0022
      HPAHs 32 17
      PCBs 045 03
      Occidental Site Removal Action (NTCRA) completed March 2003 36 (Act) 10 PCE Sediment 0057
      1 Thea Foss and Wheeler-Osgood Waterways 2002-2006 423 (Act) 32 (Est) 21 (Est) 4 (Est) 60 82 CADMIUM Sediment 66 51
      HPAHs 22 17
      LEAD 580 450
      MERCURY 077 059
      ZINC 490 410
      1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes 22 (Act) 05 (Act) 87 (Act) 125 COPPER Sediment 470 390
      MERCURY 071 059
      LPAHs None 52
      HPAHs None 17
      10 HARBOR ISLAND (LEAD) 7 Lockheed Sediments 7703 - 2405 18 cy (Est) 5 (Act) 12 (Act) In dredge areas $15(ROD) $12(ESD) 20 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      70 (Act) COPPER 390 (Dredge and Cap) 390
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      LEAD 530 (Dredge) 450 (Cap) 450
      LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      MERCURY 059 (Dredge) 041 (Cap) 041
      Region 10 Harbor Island (Lead) Web Site PCBs 65(OC) (Dredge) 12(OC) (Cap) 12 (OC)
      ZINC 960 (Dredge) 410 (Cap) 410
      TBT Not available Not available
      9 Todd Shipyard Sediments 7604 - 22007 5 (Act)(223235 sq ft) Yes In dredge areas No area given $45-$69 21 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      COPPER 390 (Dredge and Cap) 390
      LEAD 530 (Dredge) 450 (Cap) 450
      MERCURY 059 (Dredge) 041 (Cap) 041
      116 (Est) ZINC 960 (Dredge) 410 (Cap) 410
      220 (Act) LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      PCBs 65 (OC) (Dredge)12(OC) (Cap) 12 (OC)
      TBT Not available not available
      10 East Waterway Sediments NTCRA 11204 - 31605 (removal action)No ROD completed for this OU 206 (Act) - Removal action 13 (Act) In dredge area 17 16 MERCURY Sediment 041
      PCBs 12 (OC)
      10 KETCHIKAN PULP COMPANY 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est) 87 (Act) Yes 50 (Est) 52 (Act) 21 (Est) 27(Act) 44 31 4-METHYL-PHENOL Sediment 17 Not Stated Benthic toxicity community structure and chemistry
      Not on the NPL - Superfund Alternative Sited AMMONIA 120
      Region 10 Ketchikan Pulp Company Web Site SULFIDE None
      10 LOCKHEED WEST SEATTLE 1 Lockheed West ROD Date August 2013 167 potential use in shallow areas yes 116 DredgeEMNR 477 PCB Sediment Washington State CSL or SQS 0002
      Arsenic 7
      Lead 11
      Copper 114
      Lockheed West Seattle (Region 10 Website) Mercury 041 (subtidal)017 (intertidal)
      284 EMNR only Carcinogenic PAHs (TEQ) 0009
      TBT 043 (subtidal)2 (intertidal)
      DioxinsFurans 0000002
      Multiple Others see attached
      10 MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT) 4 Sediments 72004-92005 23 (Act)organoclay 23 12 ARSENIC Sediment 12
      Region 10 McCormick and Baxter Creosoting DIOXINSFURANS 000008
      ORDEQ McCormick amp Baxter Creosoting Co Web Site 15 (Est) PAHs 2
      PCP 100
      Arsenic (III) Water 190 μgL
      Chromium (III) 210 μgL
      Copper 12 μgL
      Zinc 110 μgL
      PCP 13 μgL
      Acenaphthene 520 μgL
      Fluoranthene 54 μgL
      Naphthalene 620 μgL
      Total cPAHs 031 μgL
      Dioxinsfurans 1x10-5 ngL
      10 OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA) 1 Clam Bay Sediments 61999 - 102001 7-10 (Est) Yes Area not specified 5 46 71 PCBs Sediment 013 004
      COPPER 390
      LEAD 450
      ZINC 410
      10 (Act) SILVER 61
      2 4-DIMETHYL-PHENOL 0029
      PCBs Shellfish (intertidal clams) 0042
      10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005 35 (Est) 50 (Est) 49 15 LMWPAHs Sediment 780(OC) 370(OC)
      58 (Act) HMWPAHs 5300(OC) 960(OC)
      98 (Act) Capped dredge areas PCBs 12 (OC) (trigger for sediments to 10 feet depth) 12 (OC)
      10 PUGET SOUND NAVAL SHIPYARD COMPLEX 2 OUB Marine 61600 - 3104 200 (Est) 5 211 9 12 PCBs Fish (English sole) 0023 ww
      Sediment 12 (OC) dredgecap 6 (OC) EMNR 3 (OC) SWAC12 (OC)) SWAC
      225 (Act) Sediment in state owned adjacent lands 9 (OC) EMNR
      MERCURY Sediment 3 where PCBs greater than 6 (OC)
      10 ST MARIES CREOSOTE - proposed to be added to the NPL 0 Shoreline Nearshore and Offshore Sediment ROD dateJuly 2007 29 (Est) Yes 108 LPAHs Sediment 370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)
      St Maries Creosote (Regional Website) Remediation Ongoing HPAHs 960 (OC) (17 if TOC lt02or gt4)
      10 WYCKOFF COEAGLE HARBOR 1 East HarborPhase 1 - NTCRA 91993 -31994 (Phase 1) 54 (Act) 117 MERCURY Sediment (toxicity test opt-out)
      LPAHs 780 (OC)
      Region 10 Wyckoff Eagle Harbor Web Site HPAHs 5300 (OC)
      East HarborWest Beach Sediments 2007-2008 48 (Act) 23 MERCURY Sediment 059 subtidal 059
      LPAHs 780 (OC) subtidal 780 (OC)
      HPAHs 5300 (OC) subtidal 5300 (OC)
      East HarborIntertidal and Subtidal Sediments 2000-2002 30(Act) $6-20 MERCURY Sediment 059 059
      LPAHs 780 (OC) 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      3 West Harbor 31997 - 121997 13-92 (Est) Yes 12 - 31 (includes EMNR) 49 see cap $62 - $16 MERCURY Sediment 5 21059 059 (dw)
      LPAHs 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      71
Page 9: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

15 (Act) PCBs

Complete Removal or

1

PCBs

1 Contingent on biological and chemical testing

LEAD Not specified

ATLANTIC WOOD INDUSTRIES INC 6 7 45 to 100

Region 3 Atlantic Wood Industries Website

157 (Est) 100

CADMIUM 60LEAD 1200ZINC 5600CADMIUM 60LEAD 1200

ZINC 5600

CADMIUM 20LEAD 700ZINC 3000

KOPPERS CO INC (NEWPORT PLANT)

ROD dateSeptember 2005

Region 3 Koppers Co Inc Website

Remedy not yet initiated

METAL BANKS RiverMudflat Sediments

METAL BANK (Regional Website)

OU Name SOIL EXCAVCONTAIN

BORONCOPPERLEADZINC

PCB-1260

Sediment

Unknown

Contamination Pathways - Northwestern Wetland

River Water and Sediments

1

PAHs

3

2010-Ongoing

Cedar Creek

Dunham Creek

Christina River

1727

39

37 (Act)

Yes

Yes

Unknown (Act)

Yes

33

Yes

2

50

Contamination Pathways - Western Wetland

126 (Dredging and Disposal)

Sediment

Sediment

2 YORK OIL CO

Sediment

Sediment

tPAHs3 3

12

7 51099 - 9899 11 (Act)

425 South Wetlands 1997 - 12897

95 (Act)

3

3 North Wetlands 1997 - 12897EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL)

Region 3 EI duPont Website

150

47

Sediment 1

Unknown

Sediment

Re-channelize portion of Hershey Run

Sediment

Unknown

PCBs12 (Est)

58 (Est) Unknown3 1

3 1 2008-2010

Wetlands Ponds and Hershey Run

4 1 ROD dateAugust 2006

94 (Est)

38 (Est)Yes

AMERICAN BRASS INC

American Brass Inc (Regional Website) 429

170780

22028

Yes

Sediment

5176

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

AMERICAN CREOSOTE WORKS INC

American Creosote Works Inc(Regional Website)

Arsenic Sediment

Cadmium Sediment

Fish 3 ppt

Sediment

$20 (Total) TOTAL PAH Sediment 100

DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company)

ROD dateSeptember 2008

Unknown

23

Mercury

143 river miles Dioxin

0

PCBs

196

53000 (O3R amp PR)

57000 (CBR)

640 (Ocoee 3 amp Parksville Reservoirs)

680 (Copper Basin Reach)

5

2200 (CBR)

2

4

Lower Roanoke River

4

Sediment

970 (O3R amp PR)

Sediment

Iron Sediment

Sediment

250 (O3R amp PR)

Yes

Sediment

COPPER BASIN MINING DISTRICT SITE

Copper Basin Reach

Ocoee No 3 Reservoir

Parksville Reservoir

ROD date September 2011

Fish

Region 4 Copper Basin Mining District Site website

4 ROD date September 2007 40 (Est)

Copper

Zinc

Area Not Specified (approx 14 river miles)

Railroad Lake and Hughes Creek

Lead

145 (CBR)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website

4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment

0 (Est) 3 (Act)

$045 (ROD)

01 (ESD)

North Marsh Sediments No info 15 (Act)

1000 linear feet 025 acre (Est)1300 linear feet (Act)

SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION

Fish 2

Lake Hartwell (Regional Website) Sediment

TENNESSEE PRODUCTS 142 (Est) $94 (ROD) Visual

107000 tons (Act)Followed by capping

71 (Act)Aquablock $257 (ESD)

Chattanooga Creek NTCRA 1997-1998 229 Yes Visual

TRIANATENNESSEE RIVER

Fish (channel catfish)

Region 4 TrianaTennessee River Website

Fish (smallmouth buffalo)

Fish (largemouth bass)

WARD TRANSFORMER

Reach A (Removal Action) June 2007 - 2009

150000 tons (Est)Approx 400000 tons (Act)

PCB Sediment

Region 4 Website Sediment

Fish 005

PAHs

Arsenic

Region 4 Tennesse Products Website

1

1

4 1

Ashley River 7101 - 12101

South Marsh Sediments

Barge Canal

Region 4 Koppers Co Inc (Charleston Plant)

KOPPERS CO INC (CHARLESTON PLANT)

0001

32 (Est)0 (Act)

0 (Est)32 (Act)

3103 - 6103

SedimentWeight of Evidence Approach

$05 (ROD)3 (ESD)

Lead

42003 ESD selected MNR for the area

19 tons (Act) 15 (Est)2 (Act)

730 (Est)

17

282

23

01

321 PCBs

1

4 2Twelve Mile CreekLake Hartwell

ROD date62894

Chattanooga Creek - Middle Reach

September 2005 - September 2007 PAHs Sediment

4 0

Reach AHuntsville Spring Branch - Indian Creek

4186 - 101487 DDT 5

Rerouted river buried in-place sediments

No sediment CUL

4Reach B C D and lower Brier Creek

13 (soil and sediment) (Est)ROD date

S t b 2008

Yes

No sediment CUL

No sediment CUL

1

1

None

4

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Sediment

Fish 005

BENZO(A)PYRENE 8

BENZO(BampK)FLOURANTHENE 7

BENZO(A)ANTHRACENE 95

INDENO(123-CD)PYRENE 465

ARSENICBERYLLIUMARCHLOR-1016 3ARCHLOR-1242 3ARCHLOR-1254 3ARCHLOR-1248 3ARCHLOR-1260 3BENZO(A)ANTHRACENE

BENZO(A)PYRENE

BENZO(BampK) FLOURANTHENEDI-BENZ(AH) ANTHRACENEINDENO(123-CD)PYRENEARCHLOR-1248ARSENICLEAD

1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 Sediment 1

2 Appleton to Little Rapids

MNR RemedyROD Date 122002 3 (Est) 20 river

miles Sediment

Sediment 1

Fish (Walleye) 005

Sediment 1

Fish (Walleye) 005

MNR RemedyROD Date 62003

Approx 2700 sq miles

1

701(2010 ESD)

5 PCBs

1

CONTINENTAL STEEL

Region 5 Continental Steel Website

FOX RIVER NRDAPCB RELEASES

Proposed to be added to the NPL

Lower Fox River Cleanup Website

4

Sediment

02

04

119

PCBBrier Creek Reservoir Lake Crabtree and Lower Crabtree Creek

September 2008

Remedy not yet initiated

12

~25 river miles

$37 (Total)

4 Markland Avenue Quarry 3252008 - 612010

5

3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est)

08

1

400

Sediment

14

19

1

11

175Yes

297000 cy

SWAC 025

SWAC 028

11

390 (2005 ROD Amendment)

3273 (Est) 136 (Est)

3216 (Est)

227 (Est)

De Pere to Green Bay 2007 - ongoing

Little Rapids to De Pere 42009 - ongoing

Yes

5 Green Bay

05

Sediment

025 (SWAC)

05

16

19084

093

None

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER)

43 (Est) Yes RADIUM 226

Region 5 Kerr-McGee Website 129 (Act) RADIUM 228

LITTLE MISSISSINEWA RIVER

Not on the NPL - Other Cleanup Activity Private Party-Lead Cleanup

Sediment4 (0-1ft) 5 (deeper than 1ft)

Little Mississinewa River

(Region 5 Website)

Fish Unknown

North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below

71992 to 91992 55 (Est) Yes 074

Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below

1991-1992523 (EST)

30 (ACT)131

2010-2012 PCBs 1

PAHs 2

Fish (Sport) 003 - 01

1 (0-1ft)5 (deeper than 1ft)

72 picoCuries per gram (pCig) combined radium

Yes

57 (Est)

100000 tons (Act)

Kress Creek Site

5 0 Little Mississinewa River

Spring 2005 - Fall 2009

5 0 Summer 2005 - 2012

2012-2013 195 (Est)

$719 (Total) Sediment128

PCBs25 miles (Est) 27 20

OUTBOARD MARINE CORP (Region 5 Website)

4 formerly 1

1HarborSlip No 3(2009 ROD Amendment)

Sediment

PCBs

5

OUTBOARD MARINE CORP 1

Yes40 (soil and sediment) (Est)

Unknown

50 (upper harbor)

Sediment

73

OMC Plant 2 North and South DitchROD Date August 2007

2012 ROD Amendment

Yes PCBs349

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

36 (Est)

54 (Act)

53 (ROD)51 (ESD) Sediment 26

51 (ACT)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Sediment 26Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

21 (Est) SedimentNone (88 mass removal of PCB)

21 (Act)

Fish (Smallmouth bass Walleye Trout Carp Catfish)

031 063 009 258 253

Copper

VELSICOL CHEMICAL CORP (MICHIGAN)

640 (Act) Carp Smallmouth Bass 1708

Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5

Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000

Natural Recovery Areas 122001 - ongoing Area not

specified

North of Dredge Island NA Actual ROD

Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act)

MERCURY

Pine RiverSt Louis Impoundment

05

Sediment

Amendment)

PCBsYes Sediment

Sediment 1

5

SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI)

2 Area 9 -- Lake Embayment 1295 - 0697

SHEBOYGAN HARBOR amp RIVER

1

Lower River and Inner Harbor Completed in 2012

Region 5 Sheboygan River and Harbor Superfund Site Website

Middle River

Remedy not yet startedAOC dateFebruary 2009

02 (SWAC)

05

05

05

Yes (ROD)

7 miles

12

PCBs

Sept 2004 - October 2007

5 DDT

Unknown area

5 Torch Lake 2

Yes

6

$60 (Total)

ALCOA (POINT COMFORT)LAVACA BAY

1PAHs 448 Total

Upper River 31

Surface WatersNPL DeletionFeb 5 2002

ROD DateMarch 311994

5

$30 (as of 2002)2 1999 - 2005

No Action

161

15

Hg 025 Marsh 05 Open Water

2

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Witco Marsh 12006 - 42006 57

Chlor-Alkali Process Area (Treatability Study)

August 1998 (Phase I)January 1999 (Phase II)

80 (Act) 1952 MERCURY Mass removal

20 (tar and sediment) (Act)

6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995

47 (ROD Est)150 (ESD Est)170 (Act)

Yes 226 PAHs Sediment 1300

MILLTOWN RESERVOIR SEDIMENTS

2600 (Est)

Region 8 Milltown Reservoir Sediments Website

2560 (Act)

ROCKY MOUNTAIN ARSENAL (USARMY) 19 (Est) Yes (Est) ALDRIN 38

DIELDRIN 37

CHLORDANE 12

ROCKY MOUNTAIN ARSENAL (Region 8 Website)

DDE None

DDT 14

ROCKY MOUNTAIN ARSENAL (US Army Website)

MERCURY 82

ARSENIC 270

SHARON STEEL CORP (MIDVALE TAILINGS)

1 436 (Est) ARSENIC 70

Sediment None

PAHs

North Marsh Area Unknown Sediment None

6 (EST)

8 1 Milltown Reservoir Sediments

Remediation completed Dec 2010

Deleted from NPL 10152007

6

BAILEY WASTE DISPOSAL

1 January 1996 - September 1996

Yes

39 Sediment

Channel realignment and construction

ARSENICCADMIUMCOPPERLEADZINC

140

8 3Lake Sediments Remediation Project

June 1999 - Aug 1999

No (Act)33 (Act)

Yes

Area not specified

Aug 1996 - Sept

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

100 (Act) LEAD 500

CADMIUM None

ARSENIC 200 979CADMIUM 20 099

COPPER 1000 316

LEAD 1000 358

ZINC 1000 None

SILVER BOW CREEKBUTTE AREA (MT STATE Website)

Sediment Trap MERCURY 10 018

2008-20011 ARSENIC

COPPERRegion 9 Iron Mountain Mine Website

IRON

MCCORMICK amp BAXTER CREOSOTING CO

88 (Est) DIOXIN 000021 TEQ

Region 9 Website McCormick and Baxter Creosoting

88 (Act) PAHs 333 (OC)

TOTAL PCBs 035TOTAL DDT 00648TOTAL CHLORDANE 0931

CADMIUM 184LEAD 173MERCURY 152SELENIUM 0926SILVER 137ZINC 720

MONTROSE CHEMICAL CORP DDT Sediment

White Croaker 04

Water

Palos Verdes Shelf (Region 9 Website) PCBs Sediment

White Croaker 007

Water

9 300 Area not specifiedPalos Verde Shelf

46 (OC) interim23 (OC) Final

00648

Sediment

(elevation raised above water line)

047

SILVER BOW CREEKBUTTE AREA

1 Streamside Tailing (Silver Bow Creek)

Deleted from NPL 9242004

Marshy Area

1996

Sediment

Channel realignment and construction (176 miles)

July 1999 - Ongoing 73 (ROD Est) Yes None

0000021 TEQ

Yes

Sediment susceptible to erosion dredged to a specific elevation

None186

Sediment

Sediment$44 (ROD)$98 (ESD)

15 area not specified9

IRON MOUNTAIN MINE

5 Spring Creek Arm 200 (Est)

8

ROD dateSeptember 2004

SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website)

9 3 Old Mormon Slough 2006

9

MOFFETT NAVAL AIR STATION

8 Site 27 - Northern Channel completed in 12007

Naval Air Station Moffett Field Website

68

area not specified 35

173152

0064 ngL

Sediment

0931656 (soil and sediment) (Est)

035

333 (OC)

184

0926137720

022 ngL

7 (OC)

8

5 Interim ROD Date September 2009

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

UNITED HECKATHORN CO

Region 9 United Heckathorn Co WebsiteBunker Hill Mining and Metallurgical 3 Arsenic

CadmiumRunker Hill Mining and Metallurgical (Regional Website)

Copper

LeadMercurySilverZinc

COMMENCEMENT BAY NEAR SHORETIDE FLATS

Partial deletion (St Paul Waterway) 1996

1Olympic View Resource Area (NTCRA)

Completed in 102002

11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ

20 (Est) ARSENIC10 (Act) COPPER

LEADZINC

1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13

ARSENIC 160COPPER 1100ARSENIC 97HEX-CB 01HPAHs 32PCBs 045

Occidental Site Removal Action (NTCRA)

completed March 2003 36 (Act) 10 PCE Sediment

CADMIUM 66HPAHs 22LEAD 580MERCURY 077ZINC 490COPPER 470MERCURY 071LPAHs NoneHPAHs None

18 cy (Est) ARSENIC 93 (Dredge) 57 (Cap)

70 (Act) COPPER 390 (Dredge and Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

Sediment

1752

57

000002 TEQ

530

dredge all soft sediments

preponderance of evidence approach

DDT SedimentYes 7 059 (average)Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)

65 (Proj)

10

COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website)

1 Sitcum Waterway completed in 1994 428 (Act)

19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 174 Sediment 390

450410

Sediment 39045 (Act) 4

1

Hylebos Waterway 32003-22005 940 11 20

17450

46

03

0022Sediment 17

05 (Act) 87 (Act)

4 (Est)

57

21 (Est)

Sediment

82 Sediment

125

60

390

22 (Act)

32 (Est)

059

1Thea Foss and Wheeler-Osgood Waterways

2002-2006 423 (Act)

1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes

HARBOR ISLAND

059410

57

390

960 (OC)

067

93

0057

51

ROD Amendment date Aug 201210 Upper Basin Not specified

9 1

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

LEAD 530 (Dredge) 450 (Cap)

LPAHs780(OC) (Dredge) 370(OC) (Cap)

MERCURY 059 (Dredge) 041 (Cap)

PCBs65(OC) (Dredge) 12(OC) (Cap)

ZINC 960 (Dredge) 410 (Cap)

TBT Not available

ARSENIC 93 (Dredge) 57 (Cap)

COPPER 390 (Dredge and Cap)

LEAD 530 (Dredge) 450 (Cap)

MERCURY 059 (Dredge) 041 (Cap)

116 (Est) ZINC 960 (Dredge) 410 (Cap)

220 (Act) LPAHs780(OC) (Dredge) 370(OC) (Cap)

HPAHs5300(OC) (Dredge) 960(OC) (Cap)

PCBs65 (OC) (Dredge)12(OC) (Cap)

TBT Not available

MERCURY

PCBs

KETCHIKAN PULP COMPANY

4-METHYL-PHENOL 17

Not on the NPL - Superfund Alternative Sited

AMMONIA 120

Region 10 Ketchikan Pulp Company Web Site

SULFIDE None

PCB

0002

57

370 (OC)

Yes In dredge areas No area given

370 (OC)

041

12 (OC)

$15(ROD) $12(ESD) 20 Sediment

5 (Act)(223235 sq ft)

10

Todd Shipyard Sediments 7604 - 22007

Region 10 Harbor Island (Lead) Web Site

9

5 (Act)12 (Act) In dredge areas

10

(LEAD)

7 Lockheed Sediments 7703 - 2405

East Waterway Sediments NTCRA

11204 - 31605 (removal action)No ROD completed for this OU

206 (Act) - Removal action

13 (Act) In dredge area

$45-$69 21 Sediment

17 16 Sediment

21 (Est) 27(Act) 44Yes 50 (Est)

52 (Act) 31 Sediment

410

10 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est)

87 (Act)

Not Stated Benthic toxicity community structure and chemistry

Not available

390

450

12 (OC)

450

041

12 (OC)

041

410

960 (OC)

not available

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Arsenic

Lead

Copper

Mercury

Carcinogenic PAHs (TEQ)

TBT

DioxinsFurans

Multiple Others

MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT)

ARSENIC

Region 10 McCormick and Baxter Creosoting

DIOXINSFURANS

PAHs

PCP

Arsenic (III)

Chromium (III)

Copper

Zinc

PCP

Acenaphthene

Fluoranthene

10 Sediment

11

7

041 (subtidal)017 (intertidal)

114

see attached

0009

LOCKHEED WEST SEATTLE

Lockheed West Seattle (Region 10 Website)

Lockheed West ROD Date August 2013

116 DredgeE

MNR

284 EMNR only

1 167potential use in shallow areas

yes 477

54 μgL

520 μgL

13 μgL

10

190 μgL

23 12

Water

23 (Act)organoclay

4 72004-92005Sediments

000008

100

Sediment

ORDEQ McCormick amp Baxter Creosoting Co Web Site

15 (Est)

12 μgL

2

12

110 μgL

210 μgL

043 (subtidal)2 (intertidal)

Washington State CSL or SQS

0000002

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

Naphthalene

Total cPAHs

Dioxinsfurans

PCBs 004COPPERLEADZINCSILVER2 4-DIMETHYL-PHENOL

PCBs Shellfish (intertidal clams) 0042

50 (Est) LMWPAHs 780(OC)

58 (Act) HMWPAHs 5300(OC)

98 (Act)Capped dredge areas

PCBs

12 (OC) (trigger for sediments to 10 feet depth)

Fish (English sole) 0023 ww

Sediment12 (OC) dredgecap 6 (OC) EMNR

Sediment in state owned adjacent lands

9 (OC) EMNR

MERCURY Sediment3 where PCBs greater than 6 (OC)

ST MARIES CREOSOTE - proposed to be added to the NPL

ROD dateJuly 2007 LPAHs

370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)

St Maries Creosote (Regional Website)

Remediation Ongoing HPAHs

960 (OC) (17 if TOC lt02or gt4)

7-10 (Est)

200 (Est)

10 (Act)

35 (Est)

510

OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA)

1 Clam Bay Sediments 61999 - 102001

15

450

Area not specifiedYes

12 (OC)

46 71Sediment

013390

61

0029

410

10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005

960(OC)49 Sediment

12

PCBs

3 (OC) SWAC12 (OC)) SWAC

10PUGET SOUND NAVAL SHIPYARD COMPLEX

2 OUB Marine 61600 - 3104

225 (Act)

10 0Shoreline Nearshore and Offshore Sediment

29 (Est) Yes

211 9

108 Sediment

5

1x10-5 ngL

031 μgL

620 μgL

370(OC)

790

Cleanup Level (ppm)OtherExcavate (1000 cu yds)

Back-fill (Residual Cap)

Cap (acre) MNR (acre)Reg Site Fieldwork DatesOU Area Name

Dredge (1000 cu yds)

COCActual Cost (in millions)

Action Level (ppm)

Estimated Cost (in millions)

EMNR Thin Cover (acre)

In Situ Treatment (acres)

Sample Matrix Remediation Goal (ppm)

MERCURY (toxicity test opt-out)

LPAHs 780 (OC)

HPAHs 5300 (OC)

MERCURY 059 subtidal

LPAHs 780 (OC) subtidal

HPAHs 5300 (OC) subtidal

MERCURY 059

LPAHs 780 (OC)

HPAHs 12 dw intertidal

MERCURY 5 21059LPAHs

HPAHs 12 dw intertidal

48 (Act)

30(Act)

54 (Act)

Region 10 Wyckoff Eagle Harbor Web Site

East HarborWest Beach Sediments

2007-2008

31997 - 121997 13-92 (Est) Yes

10

WYCKOFF COEAGLE HARBOR

1

East HarborPhase 1 - NTCRA

91993 -31994 (Phase 1)

East HarborIntertidal and Subtidal Sediments

2000-2002

3 West Harbor

117

780 (OC)

23

$6-20

Sediment

Sediment

059 (dw)

5300 (OC)

780 (OC)

5300 (OC)

5300 (OC)

Sediment

059

49 $62 - $16 Sediment12 - 31 (includes EMNR)

see cap

059

780 (OC)

  • READ_FIRST
  • Tier 1 Sites - Remedial
    • READ_FIRST

      The 2002 memo Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sitesestablished at 2 tier system of headquarters consultations to encourage national consistency in makingdecisions at Superfund and RCRA Corrective Action sediment sites Tier 1 sites are defined as sites wherethe proposed sediment action will address more than 10000 cubic yards or five acres of contaminatedsediment Consultation for Tier 1 sites involves the submission of the draft Proposed Remedy or draftEECA and a discussion of how the 11 principles were considered to the Regional Coordinator 30 daysprior to the public comment period Tier 2 sites are a subset of the Tier 1 sites that are large complex orcontroversial and are subject to consultation with the Contaminated Sediments Technical AdvisoryGroup throughout the RIFS and remedy selection stagesThis Tier 1 Tracking list is an EPA OSRTI product largely developed by the Army Core of Engineers and isintended to be a resource for contaminated sediment RPMs headquarters and regional technical staffand others supporting the remedy decision making process at these sites The list tracks the Tier 1 sitesthat have signed a decision document and documents the remedy selected theestimated and actual costs of the remedy the contaminants of concern and the associatedcontaminated media the Action Levels the Clean-up Levels (CUL) the Remediation Goals (RG) and theSediment Remedial Action Objectives (RAO) For those sites where the remedy has been implementedand a Five-year Review (FYR) has been completed the list also documents whether monitoring wasconducted for the FYR data was presented in the report and the CULs RGs and RAOs were met A keyaspect of this list is that the references for all the data in this spreadsheet are easily located Each cellcontaining data is hyperlinked to a PDF with the page or pages from the relevant public document thatreports the data Each PDF includes the cover page of the report with the information necessary tolocate the complete document and the data included in the spreadsheet is highlighted in the text of thePDF All of the information and documents included in this tracing list are publically availabledocumentsThis Version has been published to the internet with all of the hyperlinks removed We apologize for the inconvenience EPA is currently updating its websites and is temporarily unable to publish the Tier 1 Tracking List with the hyperlinks to the Cited Documents The Remedial Action Objectives and Five Year Review data columns have been removed from this version because they are largely narrative text and require the context provided by the hyperlinked documents in order to be properly understood When the Internet upgrade is complete the Fully cited version will be published Until then any questions regarding this Tier 1 Tracking List can be directed to Matt Lambert EPA Office Of Superfund REmediation and Technology Innovation (lambertmatthewepagov)The Tier 1 Tracking List includes sites in the Remedial Program where a Proposed Plan and Record of Decision were signed The sites are organized by EPA Region number and then listed alphabetically by name Due to the structure of the list columns cannot be filtered or sorted

      Tier 1 Sites - Remedial

      264pdf
      Websitehttpcumulisepagovsupercpadcursitescsitinfocfmid=0101431
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100948
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101479
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100744
      216pdf
      1-011pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0100743
      Website httpwwwepagovnbhindexhtml
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631F8CFE11E53EFA23C8525691F0063F6E8OpenDocument
      1-009pdf
      260pdf
      702pdf
      Website httpyosemiteepagovr1npl_padnsf31c4fec03a0762d285256bb80076489ca48c071b6a314e1c8525691f0063f6ddOpenDocument
      1-068pdf
      608pdf
      610pdf
      611pdf
      612pdf
      631pdf
      681pdf Soil and sediment not differentiated
      682pdf
      1-057pdf
      692pdf
      695pdf
      700pdf
      703pdforig 1998 estimate
      1-035pdf
      679pdf
      1-005pdf
      636pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      1-007pdf
      638pdf
      636pdf
      1-010pdf
      1-074pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      1-017pdf
      1-018pdf
      1-020pdf
      215pdf
      694pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-021pdf
      1-024pdf
      1-023pdf
      1-025pdf
      1-026pdf
      1-027pdf
      1-027pdf
      1-028pdf
      1-025pdf
      1-047pdf
      1-031pdf
      1-033pdf
      1-034pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101074
      1-012pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201766
      738pdfDates are for entire construction not only sediment portion
      356pdf
      2058pdf
      735pdfThis represents cost estimate for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1266pdfThis represents actual cost for entire remedy including soil and sediment removal and placement under a landfill cap Sediment portion is not specified
      1268pdf
      2083pdf
      1268pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200364
      2203pdf
      372pdf
      739pdf
      740pdf
      371pdfIn-situ treatment with sorptive agents
      371pdf
      1259pdf
      373pdf
      Website httpwwwepagovr02earthsuperfundnpl0200364chtm
      1259pdf
      373pdf
      1259pdf
      373pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200528
      1272pdf
      177pdf
      477pdf
      1261pdf
      2086pdf
      478pdf
      2086pdf
      478pdf
      Northerly wetlands and tar patch area were determined to be more like soil removals as they were not submerged Westerly wetlandds has a surface water stream running through it that is monitored for sediments so it is retained
      1273pdf
      2088pdfMNR doesnt have fieldwork dates but site fieldwork dates are included
      1274pdfNo specific area for MNR provided 21 acres is area of westerly wetlands for which MNR is selected
      2006pdf
      2087pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0201644
      456pdf
      218pdf
      457pdf
      2093pdf
      2094pdf
      178pdf
      2011pdf
      1279pdf
      461pdf
      56pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201706
      463pdf
      2016pdf
      463pdf
      2016pdf
      2091pdf
      2015pdf
      2015pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0202229
      990pdf
      993pdf
      1014pdf
      1299pdf
      2018pdf
      996pdf
      990pdf
      991pdf
      991pdf
      992pdf
      996pdf
      996pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200557
      2019pdf
      997pdf Remedy componentsareas not broken out
      2098pdf
      2096pdfInfo only on Alycon Lake no info on Rabbit Run or Chestnut Branch
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201290
      2033pdf
      764pdf
      2023pdf
      2024pdf
      2024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201491
      2032pdf
      1002pdf
      1001pdf
      2221pdf
      2031pdf
      2032pdf
      2102pdf
      2029pdf
      2028pdf
      2134pdf
      2030pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0203382
      2072pdf
      518pdf
      2228pdf MNR area was not stated Calculation Profundal areas 08= 154 profundal area = 1925 acres - 154 TLC acres = 1771 MNR acres
      518pdf
      2073pdf
      2075pdf
      2079pdf
      2123pdf
      2126pdf
      1005pdfAttachment has 2 sections one from the ROD the other from the FYR
      1006pdf
      2124pdf
      2125pdf
      2070pdf
      2059pdf
      2059pdf
      2059pdf
      2128pdf
      2060pdf
      2061pdf
      2127pdf
      2063pdf
      2063pdf
      2064pdf
      2065pdf
      2066pdf
      2130pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201465
      369pdf
      2133pdf
      2034pdf
      1008pdf
      2131pdf
      183pdf
      2177pdf
      2131pdf
      183pdf
      2131pdf
      183pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201770
      2036pdf
      64pdf
      1009pdfIncludes entire remedy sediment portion is not defined
      2038pdf
      2037pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200439
      2174pdf
      1012pdf
      2042pdf
      2041pdf
      2041pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0200209
      2171pdf
      2051pdf
      523pdf
      2046pdf
      2044pdf
      2049pdf
      2162pdf
      2052pdf
      2053pdf
      2047pdf
      2045pdf
      2050pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201202
      69pdf
      2170pdf
      2054pdf
      2120pdf
      2054pdf
      2054pdf
      2118pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0302836
      Website httpcfpubepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0302836
      3006pdf
      497pdf Apparently same area as EMNR
      498pdf Apparently same area as MNR
      496pdf
      3001pdfWeb site COC list is much more extensive then tPAH
      497pdf
      497pdf
      httpwwwepagovreg3hwmdnplVAD990710410htm
      499pdf
      499pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300093
      1605pdf
      224pdf
      1601pdf
      1614pdf
      1606pdf
      1606pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1616pdf
      1605pdf
      482pdf
      73pdf
      1615pdf
      656pdf
      1606pdf
      1617pdf
      1617pdf
      1617pdf
      1617pdf
      Website httpwwwepagovreg3hwmdsupersitesDED980555122indexhtm
      1617pdf
      1617pdf
      1605pdf
      483pdf
      74pdf
      484pdf
      657pdf
      1606pdf
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      1618pdf
      189pdfValues identified are Revised Site-specific Clean-up Criteria
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300092
      1622pdf
      1621pdf
      1039pdf
      959pdf
      1040pdf
      958pdf
      1623pdf
      665pdf
      httpwwwepagovreg3hwmdnplDED980552244htm
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0300951
      1624pdf
      3008pdf
      961pdf
      960pdf
      3002pdfArea not stated No mention of sediment capping or marine mattress in ROD or ESDs
      962pdf
      1625pdf
      1626pdf
      1627pdf
      1628pdf
      Websitehttpwwwepagovreg3hwmdnplPAD046557096htm
      Website httpcumulisepagovsupercpadSiteProfilesindexcfmfuseaction=secondousampid=0300951Provided to indicate formal OU name
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0406299
      Construction completed but no documents are available
      12pdf
      578pdf
      579pdf
      4001pdf
      4001pdf
      12pdf
      4001pdf
      4001pdf
      4001pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0402260
      No information on websites regarding status of sediment work unclear as of Jan 2014
      21pdf
      4002pdf
      53pdfCost of sediment remedy is not broken out
      4003pdf
      Website hhttpcumulisepagovsupercpadcursitescsitinfocfmid=0403156
      400pdf
      580pdf
      4004pdf
      Website httpwwwepagovregion4superfundsitesnplnorthcarolinawcoplwtpnchtml
      395pdf
      402pdf
      396pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403350
      4008pdf
      4007pdf
      4023pdf
      965pdf
      4020pdfThe ROD and FYR do not directly state the COCs for the sediment remedy and there are not contaminant-specific cleanup levels The contaminants identified here are those with an HQ above 1 for all areas (see attachment) Presented here to indicate prevalent contamination
      4019pdf Excavation depth based on elevation and visual determinations
      4009pdf
      4011pdf
      4010pdfChanged remedy to MNR
      4011pdfChanged remedy to MNR
      4017pdf
      966pdf
      584pdf
      964pdf
      4013pdf
      4018pdf
      4021pdf
      1025pdf
      1026pdf
      4014pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0403252
      77pdf
      561pdf
      4022pdf
      558pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0403765
      391pdf
      4030pdf
      4031pdf
      4032pdf
      393pdf
      httpwwwepagovregion04superfundsitesnpltennesseetennprotnhtml
      562pdf
      563pdf
      4031pdf
      4033pdfROD states However if certain excavated sediments appear to be uncontaminated then those sediments shall be subjected to sampling and analyses for the PAHs The action levels for sediment removal will reflect EPAs excess lifetime carcinogenic risk range of 1 x 10 6 to 1 x 10 4 (See Table G - 9) Its unclear whether or which concentrations will be used for an action level but the text and table are addded as a reference
      4034pdfNo remedial action in Reaches B and C See second page of attachment
      570pdf
      1031pdf
      4043pdf
      4044pdf
      4043pdf
      4043pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406082
      592pdf
      592pdfSite soils included in volume
      No Reach A removal action decision documents exist on EPA HQ or region websites
      httpwwwepagovregion4superfundsitesnplnorthcarolinawardtrnchtml
      593pdf
      590pdf
      591pdf
      4040pdf
      4041pdf
      4042pdf
      4041pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0501228
      5070pdf
      15pdf
      20pdfThis value represents Estimated 30-Year Net Present Worth to excavate and consolidate sediment in landfill
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      877pdf
      17pdf
      17pdf
      17pdf
      17pdf
      5170pdf
      5171pdf
      5172pdf
      533pdf
      532pdf
      Website httpwwwepagovregion5sitescontinentalindexhtm
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0507723
      5059pdf
      5173pdf
      5174pdf
      5180pdf
      5175pdf
      5057pdf
      5137pdf
      5093pdf
      5176pdfDeposit DD is located in OU2 but it is considered part of the OU3 response
      5179pdf
      5062pdf
      5181pdf
      5051pdf
      5092pdf
      5177pdf
      213pdf
      5058pdf
      Website httpwwwepagovregion5sitesfoxriverindexhtml
      5092pdf
      5178pdfAlso see Fox River ROD Amendment 2007 pg 14 Table 2 for documentation of the OU 5 dredge volume being included in the OU4
      213pdf
      5217pdf
      5094pdf
      5096pdf
      214pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500760
      33pdf
      5063pdfBackfill stated on second page of attachment
      35pdfIncludes floodplain material
      32pdf
      Website httpwwwepagovR5SupernplillinoisILD980823991htm
      32pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0508120
      5003pdf
      5002pdf
      5005pdf
      5060pdfEstimated from map in 5 year report
      5004pdf
      5004pdf
      5006pdf
      5001pdf
      5168pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0500083
      5108pdf
      5222pdf
      5208pdf
      5022pdf
      5131pdf
      5209pdf
      Website httpwwwepagovregion5sitesoutboardmarine
      5205pdf
      514pdf
      515pdf
      5120pdf
      514pdf
      5120pdf
      514pdf
      5212pdf
      5125pdf
      5126pdf
      5127pdf
      5123pdf
      5128pdf
      Website ttpcumulisepagovsupercpadcursitescsitinfocfmid=0501181
      5024pdf
      5160pdfIncludes sediments and soils
      5026pdf
      5025pdf
      5024pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0505188
      5203pdf
      5202pdf
      5146pdf
      5044pdf
      5037pdf
      5045pdf
      5142pdf
      5142pdf
      Website httpwwwepagovregion5sitessheboygan
      5046pdf
      5145pdf
      5043pdf
      5140pdf
      5142pdf
      5142pdf
      5035pdf
      5144pdf
      5042pdf
      5036pdf
      5142pdf
      5142pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0502194
      150pdf
      148pdf
      149pdf
      5157pdf
      147pdf
      147pdfNo update provided in 2012 FYR
      5027pdf
      5156pdf
      Website httpwwwepagovregion5cleanupvelsicolmichiganindexhtml
      5154pdf
      5164pdf
      5164pdf
      5151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0601752
      6001pdf
      986pdf
      6004pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      987pdf
      983pdf
      981pdf
      984pdf
      6014pdf
      6006pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0602911
      1043pdf
      1044pdf
      6008pdf
      6009pdfA list of principal parameters is provided without risk context COCs or risk drivers in sediments are not identified
      1047pdfPossible that visually clean performance standard also applies to marsh sediments
      1045pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0600574
      1049pdf
      153pdf
      1050pdf
      1051pdf
      6010pdfConstruction and disposal only
      6011pdf
      1052pdf
      Wesbite httpcumulisepagovsupercpadcursitescsitinfocfmid=0800445
      8003pdf
      311pdfIncludes Area 1 sediments and 30K cy in area 3
      625pdf
      624pdf
      8002pdf
      Website httpwwwepagovregion8superfundmtmilltown
      8050pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800357
      8018pdf
      8017pdf
      1019pdf
      1018pdf
      8023pdf
      8012pdf
      8013pdf
      8015pdf
      website httpwww2epagovregion8rocky-mountain-arsenal
      8020pdf
      8019pdf
      8012pdf
      8015pdf
      website httpwwwrmaarmymil
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      8012pdf
      8015pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800694
      629pdf
      8024pdf
      630pdf
      8025pdf
      8026pdf
      8027pdfSediment and soil are often used interchangeably in the ROD
      628pdf
      627pdf
      8026pdf
      628pdf
      8026pdf
      8028pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0800416
      8037pdf
      1021pdf
      1022pdf
      8043pdf
      1023pdf
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Websitehttpwww2epagovregion8silver-bow-creek-butte-area
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpdeqmtgovREMMWCBConstructionServicesSectionSilverBowCreekdefaultmcpx
      8039pdf
      8034pdfESD required order of magnitude criteria but never provided them They are stated in Montanas Monitoring Plan table provided in attachment after ESD language
      8035pdfApparently new cleanup levels in 2009 Prior to 2009 the Silver Bow Creek remediation goals for instream sediments matched the cleanup standards for tailings and impacted soils throughout the floodplain These standards were determined to be too high to be protective of the stream resource and more stringent standards were adopted in 2009 The new standards are based on the threshold effects concentrations (TEC) values developed by freshwater ecologists
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901755
      9015pdf
      596pdf
      1237pdf
      1236pdf
      1235pdf
      1234pdf
      980pdf
      1238pdf
      1234pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDCAD980498612OpenDocument
      1234pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0901129
      1245pdf
      9002pdf
      1240pdfThis cost does not include $18M for bank stabilization
      1239pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfViewByEPAIDcad009106527OpenDocument
      543pdf
      1239pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902734
      1249pdf
      41pdf
      545pdf
      39pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpyosemiteepagovR9SFUNDR9SFDOCWNSF3dec8ba3252368428825742600743733c01ef2be6ec9ab9c8825737f002bf719OpenDocument978
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      37pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0902440
      1254pdf
      156pdf
      974pdf
      975pdf
      1250pdfDieldrin is also a COC but only has a CUL for surface water
      1252pdf
      Website httpyosemiteepagovr9sfundr9sfdocwnsfvwsoalphabeticUnited+Heckathorn+CoOpenDocument
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000981
      10-030pdf
      Name in ROD However name on CB website is NSTF Areawide Sediment covered within OU1 ROD was later divided into separate OUs except for removal actions conducted at Olympic View This removal action is summarized here
      1104pdf
      1105pdf
      1105pdf
      1106pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1106pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc923e8d62480494ad483882564f80082a1c0OpenDocument
      10-030pdf(formerly OU6)
      10-100pdf
      1101pdf
      1100pdf
      1099pdf
      1097pdf
      10-002pdf10 acres as of 2009
      1097pdf
      1097pdf
      1097pdf
      10-030pdf
      1071pdf
      1076pdf
      1073pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1072pdf
      10-030pdf
      1066pdf
      1061pdf Quantity does not include Blair Waterway dredging 1993 ESD states that Blair is not part of ROD cleanup and is for navigational purposes
      1062pdf
      1063pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      1064pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1065pdf
      10-030pdf
      1060pdf
      1059pdf
      1059pdf
      1059pdf
      1067pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1069pdf
      1068pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1070pdf
      1111pdf
      1112pdf
      1115pdf
      1113pdf
      10-030pdf
      10-098pdf
      1121pdf
      1079pdf
      1094pdf
      1094pdf
      1078pdf
      1122pdfThis is strictly a construction cost that appears to include construction of CDF and pile removal as well as dredging and capping
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 25
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdfmouth of city = 089
      1092pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1091pdf
      10-030pdf
      10-008pdf
      1081pdf
      1082pdf
      10-009pdf
      1084pdf
      1085pdf
      1087pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1075pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      1089pdfOU1 has sediment quality objectives for many chemicals those listed are identified as the primary risk drivers or indicator chemicals for the area See attachment
      1074pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000020OU 8 is not included because OU was reommended for no further action in 2003 ROD
      1123pdf
      10-022pdf
      1134pdfCapping took place after dredging to in part maintain original depths
      1138pdf
      433pdfROD estimated remedy would cost $15M but 2002 ESD estimated it as $12M
      1133pdf
      1130pdf
      949pdf
      1135pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      949pdf
      Website httpyosemiteepagovr10cleanupnsf346a4822da38ae7088256da6005fc9235a64831b6521f46b8825650200836f1cOpenDocument
      1130pdf
      949pdf
      1130pdf
      949pdf
      1130pdf
      1136pdf
      1124pdf
      10-023pdf
      1128pdf
      10-028pdf
      434pdf
      1125pdf
      1130pdf
      10-024pdf
      1126pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-024pdf
      1130pdf
      10-025pdf
      1142pdf
      10-095pdf
      1144pdf
      1141pdf
      1143pdf
      1146pdf
      1146pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1000020
      1152pdf
      162pdf
      1148pdf
      314pdf
      633pdf
      1149pdf
      1153pdf
      431pdf
      1150pdf
      431pdf
      1151pdf
      Website httpyosemiteepagovR10CLEANUPNSF7d19cd587dff1eee8825685f007d56b72dd5ab7462e4f004882567b30057eb7bOpenDocument
      431pdf
      1151pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000339
      166pdf
      49pdf
      1158pdf
      1159pdf
      1157pdf
      1157pdf
      Website httpwwwdeqstateoruslqcunwrmccormickbaxter
      1290pdf
      1157pdf
      1157pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1001134
      1291pdf
      1163pdf
      1164pdf
      1292pdf
      1293pdfAlthough not called MNR remedy is to monitor contaminant levels until the goal is achieved which is MNR
      10-061pdf
      1165pdfThis cost includes capping of the upland landfill A breakout for just the sediment portion was not provided
      1166pdfThis cost includes the fire training area and upland landfill cover A breakout of just the sediment remediation was not provided
      1167pdf
      1169pdfconsidered at conceptual target for sediment
      1292pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1167pdf
      1169pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1000611
      1177pdf
      10-031pdf
      10-031pdf
      1179pdf
      1178pdf
      1173pdf
      1181pdf
      1176pdf
      1174pdf
      1173pdf
      1181pdf
      1176pdf
      1173pdf
      1181pdf
      Website httpcfpubepagovsupercpadcursitescsitinfocfmid=1001107
      1182pdf
      10-040pdf
      1242pdf
      1244pdf
      1243pdf
      1188pdf
      1189pdf
      1187pdf
      1183pdf
      1185pdf
      10-041pdf
      10-042pdf
      1189pdf
      1185pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=1002095
      46pdfIncludes soil excavation quantity in total volume
      10-039pdf
      408pdfIncludes cost for excavating nearshore soil
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate that sediment is not toxic
      1190pdf
      1191pdfThis is the cleanup level unless toxicity tests demonstrate sediment that is not toxic
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000612
      10-066pdf
      1216pdf
      10-044pdf
      10-071pdf
      10-068pdf
      10-068pdf
      Website httpyosemiteepagovR10CLEANUPNSFsitesWyckoff
      10-068pdf
      10-075pdf
      10-113pdf
      409pdf
      1218pdf
      202pdf
      202pdf
      202pdf
      10-064pdf
      10-072pdf
      1219pdf
      1214pdf
      1214pdf
      1214pdf
      1215pdfRequirement for intertidal sediments
      423pdf
      10-047pdf
      10-046pdf
      1209pdf
      1208pdf
      1207pdf
      1203pdf
      1202pdf5 mgkg criteria for areas requiring dredging21 mgkg criteria for areas requiring a 1-meter thick cap 059 for thin layer capping
      1203pdf
      1204pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      2195pdf
      2136pdfCleanup goals for biological endpoints were not provided
      2136pdfCleanup goals for biological endpoints were not provided
      2127pdf
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0900993
      Website httpwwwepagovregion9superfundpvshelf
      9003pdf
      9004pdf
      9005pdf
      9005pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      1-006pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      607pdf
      613pdf
      1-030pdf
      1-064pdf
      683pdf
      475pdf
      2085pdfHowever see RAO of 50 ppm
      2085pdf
      2085pdf
      1-102pdf
      1278pdf
      1279pdf
      1278pdf
      2092pdf
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      995pdfIn dredged areas tri-plus PCBs
      2097pdf
      763pdf
      1003pdf
      2030pdfIts unclear the extent to which 10 mgkg is considered the cleanup level ROD language and FYR note is attached The closest to being definitive is on p 34 of attachment the cleanup goal of about 10 mgkg
      2123pdf
      2062pdf
      2129pdf
      186pdf
      2117pdf
      2043pdf
      2043pdf
      963pdf Attachment incl language from ROD and ESD
      11pdf
      11pdf
      11pdf
      11pdf
      11pdf
      23pdf
      396pdf
      4019pdf
      597pdf
      4045pdf
      4045pdf
      4045pdf
      586pdf
      585pdf
      4057pdfSediment concentration associated with protective fish tissue concentration is lt10ppb
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      17pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      532pdf
      5137pdf
      5050pdf
      5050pdf
      34pdf
      5001pdf
      5109pdfAction level or cleanup level of North Ditch remediation never stated in ROD ROD amendment five year reviews or construction completion report
      277pdf
      5122pdf
      526pdf
      5045pdf
      5139pdf
      5141pdf
      5155pdf
      982pdf
      6003pdf
      8002pdfNo sediment cleanup levels cleanup levels pertain to groundwater or surface water
      1024pdf
      979pdf
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      1246pdfCap monitored to assess attainment of CUL see end of attachment
      9006pdf
      9006pdf
      9006pdf
      9006pdf
      1251pdf
      1106pdf
      1103pdf
      1103pdf
      1103pdf
      1103pdf
      1072pdf
      1065pdf
      1065pdf
      1069pdf
      1069pdf
      1069pdf
      1070pdf
      1116pdf
      1091pdf
      1091pdf
      1091pdf
      1091pdf
      1114pdfTable 13 in the ROD lists Zinc SQO as 059 This appears to be an error Table 12 of the ROD lists 059 for mercury and 410 for zinc
      1074pdf
      1074pdf
      1089pdf
      1089pdf
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1137pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      1136pdfConfirmational number of 76 mgkg (OC) established for TBT
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-090pdfConfirmational numbers were also established that could be used to determine future recontamination These numbers are also shown in attachment
      10-025pdf76 ppm (OC) 1335 ppb (dw)TBT is a confirmational number See attachment
      10-096pdf
      10-096pdf
      164pdf
      312pdf
      164pdf
      164pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      918pdf
      1181pdf
      1181pdf
      1181pdf
      1187pdf
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (041 ppm) is considered a conceptual target
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (970 ppm [OC]) is considered a conceptual target
      9006pdf
      9006pdf
      6018pdf
      6018pdf
      5184pdfCalled residual cover here
      5185pdfTermed post-dredge residual sand cover
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0406638
      4048pdf
      4049pdf
      4050pdf
      4051pdf
      4051pdf
      4051pdf
      4051pdf
      httpepagovregion4superfundsitesnpltennesseecopbastnhtml
      4051pdf
      4051pdf
      4051pdf
      1-045pdf
      1-045pdf
      1-030pdf
      1-046augmentedreplaced sand cap in 2011
      1-047pdf
      httpwwwepagovregion02superfundnplonondagalakeindexhtml
      Ley Creek subsite not included because the volume removedmanaged was less than 10K cy
      2179pdf
      2165pdf
      2167pdf
      2166pdf
      2054pdf
      2054pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      4052pdf
      1300pdf
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      6017pdfEMNR was selected in the 2001 ROD for this area Before the cleaned sediment from sediment removals in the area was available for the EMNR remedy this area achieved the CULs through MNR and it was determined that EMNR was no longer necessary
      5186pdf
      3007pdfSame factsheet as of Jan 2014
      httpepagovregion4superfundsitesnplalabamaamerbrasalhtml
      httpepagovregion4superfundsitesnplmississippiamercrewkmshtml
      httpyosemiteepagovr10cleanupnsf22f04d62fa63974288256da6005f9868cabb84db584c955f8825697f00049beeOpenDocument
      10-056pdf
      10-058pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      10-059pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0503034
      5187pdf
      5188pdf
      5189pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinasangschtml
      5195pdf
      5194pdf
      6023pdf
      10-060pdfROD amendment did not specify the volume of instream sediments vs floodplain material
      10-062pdf
      10-063pdf
      10-064pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      1214pdf
      10-069pdf
      10-069pdf
      10-083pdf
      1203pdf
      1210pdfAchieve in top 10 cm within 10 years after completion of sediment remediation The SQS (370 ppm [OC]) is considered a conceptual target
      10-070pdfThe SQS (041 ppm) is considered a conceptual target
      10070pdfThe SQS (370 ppm [OC]) is considered a conceptual target
      10070pdfThe SQS (970 ppm [OC]) is considered a conceptual target
      Website httpyosemiteepagovr10cleanupnsfsitesmccormick_baxter
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-084pdf
      10-087pdf
      10-097pdf
      10-101pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      9013pdf
      1246pdfCap placed in areas exceeding CUL
      1246pdfCap placed in areas exceeding CUL
      9014pdf
      8044pdf
      8046pdf
      8051pdf
      6026pdf
      6026pdf
      6026pdf
      6026pdf
      6027pdf
      5196pdf
      5197pdf
      5203pdf
      5204pdf
      5206pdf
      5207pdf
      5210pdf
      5022pdf
      httpwwwepagovregion5cleanupmississinewaindexhtml
      5213pdf
      5214pdf
      5215pdf
      5216pdfAmended cost for OU 2-5 does not include Phase 1 in OU4
      4056pdf
      4061pdf
      4062pdf
      4063pdf
      4065pdfBackfill in at least portions of site N of 38th St area unclear
      4066pdf
      4075pdf
      4075pdf
      4076pdf
      4051pdf
      69pdf
      2053pdf
      2181pdf -- most recent factsheet as of 2014-Jan
      2181pdf -- most recent factsheet as of 2014-Aug
      ROD also describes NYSDEC-regulated action removing channel sediment (4200 cy) and floodplain sedimentsoil (63000 cy)
      2185pdf
      2196pdf
      2197pdf Remedy componentsareas not broken out
      httpwwwepagovhudson
      2198pdf
      1-058pdf
      1-059pdf Soil and sediment not differentiated
      2205pdf
      2204pdf
      1-065pdf
      613pdf
      1-067pdf
      1-071pdf
      1-072pdf
      1-013pdf
      1-073pdf
      698pdf
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93d01550369a32b31bb8525691f0063f6d6OpenDocument
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101028
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8584c38df37ade1998525764f005a96d3OpenDocumentampHighlight=0callahan
      1-076pdf
      1-075pdf
      1-078pdf
      1-078pdf
      1-078pdf
      1-078pdfNote that the dredging and subaqueous disposal of sediments was changed from OU1 to OU3 in the 2013 ESD
      1-078pdf
      1-078pdf
      1-080pdfAs of 2014-Jan
      1-077pdf
      1-081pdf only dredge operation
      httpwwwepagovregion02superfundnplraritanbayslag
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206276
      1-082pdf
      1-083pdf
      1-083pdf level specified on p 3 of 4
      1-083pdf 1-083pdf level specified on p 3 of 4
      1-086pdf
      1-085pdf
      1-087pdf Total cost ROD does not specify cost of sediment portion
      2206pdf
      2206pdf
      2206pdf
      2207pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0201690
      2208pdf
      2210pdf
      2211pdf
      2212pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0206222
      httpwwwepagovregion2superfundnplgowanus
      2213pdf
      2214pdf
      2214pdf
      2215pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      2216pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1002655
      httpyosemiteepagovr10cleanupnsf32e58b284950a4fc882578480000fdcc9458199e8119eba3882572910069d808OpenDocument
      10-102pdf
      10-104pdf
      10-105pdf
      10-105pdf
      10-106pdf
      10-107pdf
      10-108pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driver
      1-110pdf - Risk Driverf
      10-110pdf
      10-111pdf
      10-109pdf
      1-110pdf - Risk Driver
      1-093pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      1-095pdf
      httpyosemiteepagovr1npl_padnsf51dc4f173ceef51d85256adf004c7ec8bbe0100a535e8840852576e90053b186OpenDocument
      1-090pdf - soilsediment volumes not differentiated
      1-090pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-089pdf
      1-091pdf
      1-092pdf
      Fish tissue remedial goal appears to only apply to the Allendale and Lyman Mill Pond areas not lyman mill stream sediment
      1-096pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-097pdf
      1-098pdf
      1-099pdf
      1-099pdf
      2218pdf
      2219pdf
      2219pdf
      2220pdf
      2222pdf
      2123pdf
      2225pdf
      2173pdf
      2116pdf
      5109pdf
      5223pdf
      10-125pdf
      10-125pdf
      10-125pdf
      1-100pdfFloodplain vs sediments not differentiated
      httpyosemiteepagovr1npl_padnsf701b6886f189ceae85256bd20014e93de720462345729a4f8525691f0063f6e1OpenDocument
      httpyosemiteepagovr1npl_padnsff52fa5c31fa8f5c885256adc0050b631E704D6C17F74EA678525697B0008CCAAOpenDocument
      1-101pdf
      httpwwwepagovregion02superfundnplaluminumcompany
      2200pdf
      httpwwwepagovregion4superfundsitesnplsouthcarolinakopchschtml
      Website httpcumulisepagovsupercpadcursitescsitinfocfmid=0405546
      httpwwwepagovregion4superfundsitesnplalabamatriatenvalhtml
      877pdf
      877pdf
      877pdf
      877pdf
      6024pdf
      httpcumulisepagovsupercpadcursitescsitinfocfmid=1000195
      httpyosemiteepagovr10cleanupnsfsitesbh
      httpcumulisepagovsupercpadcursitescsitinfocfmid=0101388
      Reg Site OU Area Name Fieldwork Dates Dredge (1000 cu yds) Excavate (1000 cu yds) Back-fill (Residual Cap) Cap (acre) MNR (acre) EMNR Thin Cover (acre) In Situ Treatment (acres) Other Estimated Cost (in millions) Actual Cost (in millions) COC Sample Matrix Action Level (ppm) Cleanup Level (ppm) Remediation Goal (ppm)
      1 CALLAHAN MINING CORP 3 SedimentsCap Ongoing 101 No $21 Copper Sediment 790
      Lead 710
      Callahan Mine (Region 1 Website) Zinc 5100
      1 CENTREDALE MANOR RESTORATION PROJECT 1 Allendale Pond and Lyman Mill Pond Sediment 156 If needed 605 Benzo(a)pyrene Fish 00015
      Dieldrin 00011
      Technical Chlordane 013
      Aroclor 1254 0037
      Aroclor 1268 0011
      2378-Tetrachlorodibenzo-p-dioxin 00000022
      Total Aroclors 0076
      44-DDD 00062
      44-DDE 0018
      DioxinsFurans TEQ 0000044
      Benzo(a)pyrene Sediment 14
      Dibenz(ah)anthracene 097
      Dieldrin 00026
      Technical Chlordane 04
      Aroclor 1254 0031
      Aroclor 1268 0023
      Arsenic 39
      Centredale Manor Restoration Project (Region 1 Website) 2378-Tetrachlorodibenzo-p-dioxin 0000015
      Lyman Mill Stream Sediment 205 Yes 225 165 Coplanar PCBs (TEQ)3 0000025
      Total Aroclors 006
      Selenium 11
      Zinc 221
      44-DDD 00084
      44-DDE 0006
      Aluminum 8210
      Barium 134
      Vanadium 376
      N-Nitroso-di-n-propylamine 046
      1 LORING AIR FORCE BASE 13 East Branch of Greenlaw Brook 1997 - 1998 38 (Est) Yes 481 Total PAHs Sediment 35
      86 (Act) Total 44-DDTDDDDDE 028
      Loring Air Force Base (Region 1 Website) Aroclor 1260 1
      Total Chlordanes 048
      Lead 218
      44-DDD Fish 0018
      44-DDE 0013
      44-DDT 0013
      Aroclor 1242 00022
      Aroclor 1260 00022
      Heptaclor 000098
      Chlordane Alpha 00034
      Chlordane Gamma 00034
      1 NEW BEDFORD 1 Acushnet River North of Wood Street (within Upper Harbor) 1202 - 303 900 (throughout OU1) 156 (Act) No 2002 ESD $317 (for all of OU 1) Operation ongoing PCBs Sediment (Upper Harbor) 10
      Region 1 New Bedford Website Upper and Lower Harbor 2004 - Ongoing 2011 ESD $422-1200 (for all of OU1) Sediment (Lower Harbor) 50
      Sediment intertidal areas with public access or abutting recreational land use 25
      Sediment saltmarsh areas with little to no public access (aka Marsh Island) 50
      Sediment intertidal areas with abutting residential land use 1
      Seafood 002
      2 Harbor Hot Spots 494 - 995 10 (Est)14 (Act) 144 PCBs Sediment 4000
      1 NEWPORT NAVAL EDUCATION amp TRAINING CENTER 4 McAllister Point Landfill (Narrangasett Bay) 22001 - 122001 34 (Est) Yes 226 Anthracene Sediment 051 051
      Fluorene 02 02
      46000 tons (Act)(cyds not provided) PCBs 36 36
      NEWPORT NAVAL EDUCATION TRAINING CENTERRegion 1 Website Pyrene 3 3
      Copper Porewater 00529 00529
      Nickel 00337 00337
      1 NYANZA CHEMICAL WASTE DUMP 3 Wetlands amp Drainage Ways 31899 - 8101 17 (Est)46 (Act) Yes 204 MERCURY Sediment 1 1
      Nyanza Chemical Waste DumpRegion 1 Website 4 Sudbury River ROD Date September 2010 Area not specified 84 85 MERCURY Sediment 10 (EMNR)
      MERCURY Fish (largemouth bass yellow perch bullhead) 048
      1 PINE STREET CANAL 1 Turning Basin Pine Street Canal and Wetlands 2002-2004 2004 78 (Act) (GeotextileSand Cap) 44 PAHs Sediment ER-M Values
      Region 1 Pine Street Canal Website 82010 - 22011 08 2011 organoclay cap (size not specified) Metals and Cyanide ER-M Values
      1 SULLIVANS LEDGE 1 Unnamed Stream Ponds A and B 1998-2002 19 (Est) Yes upper portion of stream diverted PCBs Sediment 20 uggC
      Region 1 Sullivans Ledge website 86 (Act)
      2 Middle Marsh Wetlands 1998-2001 52 (Est) Yes 28 PCBs 20 uggC
      255 (Act)
      2 BATAVIA LANDFILL 1 Wetland Areas June 2001 - June 2003 25 (Est) Yes 13 (soil and sediment) 75 (soil and sediment) PAHs Sediment Visual NYSDECs technical screening guidance for evaluating sediment contamination at hazardous waste sites will be considered as cleanup goals
      Deleted from NPL 11292005 Act Wetland area volume not specified LEAD
      2 BRIDGEPORT RENTAL amp OIL SERVICES 2 Little Timber Creek Swamp ROD dateSeptember 2006Remedial Action 2009-2011 175 (Est) Yes Area not specified 106 (Est) 125 PCBs Sediment 10 10
      Region 2 Bridgeport Rental amp Oil Services Website LEAD 1000 1000
      Total Petroleum Hydrocarbons None None
      2 BURNT FLY BOG 2 Downstream Area and Westerly Wetlands 11795 - 1996 gt6000 tons (Act) (soil and sediment) 22 LEAD Sediment 250
      PCBs 5
      3 Westerly Wetlands May 2003 - May 2004 21 01 LEADPCBs Sediment 400049
      2 GENERAL MOTORS (CENTRAL FOUNDRY DIVISION) 1 St Lawrence River 61995 - 111995 13 (Act) 2 (Act) 215 PCBs Sediment 1
      Turtle CreekTurtle Cove 1004 - 305 23 (Act) (soil and sediments) 01 01
      Raquette River 602 - 503 14 (Act) 1
      2 GOWANUS CANAL 1 Canal Sediments ROD Date Sept 2013 588 (Est) Area not stated (dredgecap remedy) In-situ stabilization of 3-5 feet of NAPL-containing sediments PAHs Sediment 20
      Gowanus Canal (Region 2 Website) Holding Tanks for CSO Control Copper 80
      Lead 94
      2 Grasse River Superfund Site(aka Alcoa Aggregation Site) Grasse River ROD Date April 2014 109 Yes 284 2431 PCBs Sediment 1
      Grasse River(Region 2 Website) Fish 001-005 (Final Remedial Goal)026-036(Interim Target Concentrations)
      2 HOOKER (102ND STREET) 1 Niagara River Embayment 71996 - 111996 28 (dredge to 2 feet) Yes $36 - 56 PAHs METALS CHLORINATED ORGANICS (MULTIPLE) Sediment 01(organics) New York State Sediment TBCs
      Deleted from NPL 852004 Sediment 02(Mercury)
      2 HUDSON RIVER PCBS 2 Upper Hudson River (Section 1) ROD dateFebruary 2002 Field work 2009-ongoing 1560 (Est) Yes Area not specified 2250 PCBs Fish 005
      Sediment 3 gm2 (MPA) 1
      Hudson River PCBs EPA Website Upper Hudson River (Section 2) 580 (Est) Sediment 10 gm2 (MPA) 1
      Fish 005
      Upper Hudson River (Section 3) 510 (Est) Sediment 1
      Fish 005
      2 LIPARI LANDFILL 3 Stream and Lake Sediments 1994-2001 (change in ESD from dredging to excavation) 981 (Est) ROD 21 INDICATOR CHEMICALS INCLUDE BENZENE BIS(2-CHLOROETHYL)ETHER 12-DICHLOROETHANE ETHYLBENZENE4-METHYL-2-PENTANONE TOLUENE XYLENES (TOTAL) ARSENIC CHROMIUM LEAD MERCURY NICKEL ZINC Sediment Not specified
      85000 Tons (Act) ESD 50-75
      2 LOVE CANALDeleted from NPL 9302004 2 Black and Bergholtz Creeks 1987-1989 14 Yes DIOXINS Sediment 0001 0001
      2 MARATHON BATTERY CORP 1 East Foundry Cove Marsh and Constitution Marsh 91993 - 31995 30 (Est) Yesbentonite clay layer 40 CADMIUM Biological Sampling None
      Sediment 100 100
      Deleted from NPL 10181996 2 East Foundry Cove West Foundry Cove and the Cold Spring Pier Area 91993 - 31995 56 (Est) 485 CADMIUM Biological Sampling None
      Actual not specified by area
      Sediment Excavate up to 1 ft 95 Removal 10 mgkg
      2 ONONDAGA LAKE 2 Onondaga Lake Bottoms Subsite ROD dateJuly 2005 2407 (Est) 425 (Est) 1771 154 (Est) 414 MERCURY and others Sediment 08 014-2
      Operations Ongoing METHYL Hg Fish 03
      5 LCP Bridge St SiteWest Flume and Wetland AB June 2005 - July 2007 543 (Est)917 (Act) Yes 96 MERCURY Sediment 02
      20 Geddes Brook NineMile Creek Reach BC CD ROD DateApril 2009June 2012 - ongoing 59 (Est) Combined with Dredge volume Yes Partial Channel Re-location 189 MERCURY and others Sediment 015
      Region 2 Onondaga Lake Website Mercury Fish 01-03
      24 Geddes Brook NineMile Creek Reach AB June 2012 - 16 (Est) 42 (Est) Yes 151 MERCURY and others Sediment Soil (flood plain) 015
      Fish 01 - 03
      2 Raritan Bay Slag 0 ROD Date May 2013 34 (Est) 787 Lead Sediment 400 400
      Raritan Bay Slag (Region 2 Website)
      2 REYNOLDS METALS CONot on the NPL - Superfund Alternative Site 1 St Lawrence amp Raquett Rivers 412001 - 102001 52 (Est) 54 (Act) 35 PAHs Sediment 10
      86 (Act) PCBs 1
      TDBFs 0001
      2 RICHARDSON HILL ROAD LANDFILLPOND 1 South Pond and Herrick Hollow Creek 2004 285 (Act) 139 PCBs Sediment 1 1
      2 ROEBLING STEEL CO 5 Delaware River and Crafts Creek 2010-2013 116 (Est) Yes 11 PAHs Sediment See Attached
      240 (Act) Metals
      2 VINELAND CHEMICAL CO INC 3 River Areas (Blackwater Branch Floodplain amp Maurice River) 2006 - ongoing 626 Yes 11 ARSENIC Sediment 20 20 exposed 120 submerged
      4 Union Lake Sediments Remedy not yet initiated Unknown Yes Sediment Washing 129 ARSENIC Sediment Unknown 120
      2 YORK OIL CO 2 Contamination Pathways - Western Wetland 2000-2001 11 (Est) Yes 33 LEAD Sediment Not specified
      15 (Act) PCBs Complete Removal or 1
      Contamination Pathways - Northwestern Wetland 50 PCBs Sediment 1 Contingent on biological and chemical testing
      LEAD Not specified
      3 ATLANTIC WOOD INDUSTRIES INC 3 River Water and Sediments 2010-Ongoing 6 7 126 (Dredging and Disposal) tPAHs Sediment 45 to 100
      Region 3 Atlantic Wood Industries Website 157 (Est) 100
      3 EI DU PONT DE NEMOURS amp CO INC (NEWPORT PIGMENT PLANT LANDFILL) 3 North Wetlands 1997 - 12897 95 (Act) Yes 12 3 CADMIUM Sediment 60
      LEAD 1200
      ZINC 5600
      5 South Wetlands 1997 - 12897 37 (Act) Yes 42 Unknown CADMIUM Sediment 60
      LEAD 1200
      Region 3 EI duPont Website ZINC 5600
      7 Christina River 51099 - 9899 11 (Act) Yes 47 Unknown CADMIUM Sediment 20
      LEAD 700
      ZINC 3000
      3 KOPPERS CO INC (NEWPORT PLANT) 1 Wetlands Ponds and Hershey Run ROD dateSeptember 2005 58 (Est) Unknown Re-channelize portion of Hershey Run 5176 PAHs Sediment 150
      Region 3 Koppers Co Inc Website Remedy not yet initiated
      3 METAL BANKS 1 RiverMudflat Sediments 2008-2010 12 (Est) Yes Unknown (Act) 1727 Unknown PCBs Sediment 1 1
      METAL BANK (Regional Website) OU Name SOIL EXCAVCONTAIN
      4 AMERICAN BRASS INC 1 Cedar Creek ROD dateAugust 2006 94 (Est) Yes 39 BORON Sediment 28
      COPPER 220
      Dunham Creek 38 (Est) LEAD 170
      American Brass Inc (Regional Website) ZINC 780
      PCB-1260 429
      4 AMERICAN CREOSOTE WORKS INC 0 Railroad Lake and Hughes Creek ROD date September 2007 40 (Est) Yes $20 (Total) TOTAL PAH Sediment 100
      American Creosote Works Inc(Regional Website)
      4 COPPER BASIN MINING DISTRICT SITE 5 Copper Basin ReachOcoee No 3 ReservoirParksville Reservoir ROD date September 2011 Area Not Specified (approx 14 river miles) 23 PCBs Sediment
      Arsenic Sediment
      Cadmium Sediment
      Copper Sediment 680 (Copper Basin Reach)
      640 (Ocoee 3 amp Parksville Reservoirs)
      Region 4 Copper Basin Mining District Site website Iron Sediment 57000 (CBR)
      53000 (O3R amp PR)
      Lead Sediment 145 (CBR)
      250 (O3R amp PR)
      Mercury Fish
      Zinc Sediment 2200 (CBR)
      970 (O3R amp PR)
      4 DOMTAR CORPORATION (Domtar formerly Weyerhaeuser Company) 2 Lower Roanoke River ROD dateSeptember 2008 143 river miles 196 Dioxin Fish 3 ppt
      Sediment Unknown
      Region 4 Weyerhaeuser Company Plymouth Wood Treating Plant Website 4 Welch Creek Area ROD dateSeptember 2007 18 (Est) 96 Dioxin Sediment 0001
      4 KOPPERS CO INC (CHARLESTON PLANT) 1 Ashley River 7101 - 12101 0 (Est) $05 (ROD)3 (ESD) 282 PAHs Sediment Weight of Evidence Approach None
      3 (Act)
      Barge Canal 42003 ESD selected MNR for the area 32 (Est)0 (Act) 0 (Est)32 (Act) $045 (ROD) 01
      01 (ESD) Arsenic
      Region 4 Koppers Co Inc (Charleston Plant) North Marsh Sediments No info 15 (Act) 1000 linear feet 025 acre (Est)1300 linear feet (Act) 17 23
      South Marsh Sediments 3103 - 6103 19 tons (Act) 15 (Est)2 (Act) Lead
      4 SANGAMO WESTON INCTWELVE-MILE CREEKLAKE HARTWELL PCB CONTAMINATION 2 Twelve Mile CreekLake Hartwell ROD date62894 730 (Est) 321 PCBs Fish 2
      Lake Hartwell (Regional Website) Sediment 1
      4 TENNESSEE PRODUCTS 1 Chattanooga Creek - Middle Reach September 2005 - September 2007 142 (Est) $94 (ROD) PAHs Sediment Visual
      Region 4 Tennesse Products Website 107000 tons (Act)Followed by capping 71 (Act)Aquablock $257 (ESD)
      Chattanooga Creek NTCRA 1997-1998 229 Yes Visual
      4 TRIANATENNESSEE RIVER 0 Reach AHuntsville Spring Branch - Indian Creek 4186 - 101487 Rerouted river buried in-place sediments DDT Fish (channel catfish) No sediment CUL 5
      Region 4 TrianaTennessee River Website Fish (smallmouth buffalo) No sediment CUL
      Fish (largemouth bass) No sediment CUL
      4 WARD TRANSFORMER Reach A (Removal Action) June 2007 - 2009 150000 tons (Est)Approx 400000 tons (Act) PCB Sediment 1
      Region 4 Website 1 Reach B C D and lower Brier Creek ROD dateSeptember 2008Remedy not yet initiated 13 (soil and sediment) (Est) Yes $37 (Total) PCB Sediment 1
      Fish 005
      Brier Creek Reservoir Lake Crabtree and Lower Crabtree Creek ~25 river miles Sediment None
      Fish 005
      5 CONTINENTAL STEEL 3 Wildcat and Kokomo Creeks 42007 - 112008 16 (Est) 12 BENZO(A)PYRENE Sediment 8 16
      BENZO(BampK)FLOURANTHENE 7 14
      BENZO(A)ANTHRACENE 95 19
      INDENO(123-CD)PYRENE 465 093
      ARSENIC 19
      BERYLLIUM 084
      ARCHLOR-1016 3 1
      ARCHLOR-1242 3 1
      ARCHLOR-1254 3 1
      ARCHLOR-1248 3 1
      ARCHLOR-1260 3 1
      Region 5 Continental Steel Website 4 Markland Avenue Quarry 3252008 - 612010 175 Yes297000 cy 11 BENZO(A)ANTHRACENE Sediment 05
      BENZO(A)PYRENE 05
      BENZO(BampK) FLOURANTHENE 08
      DI-BENZ(AH) ANTHRACENE 02
      INDENO(123-CD)PYRENE 04
      ARCHLOR-1248 1
      ARSENIC 19
      LEAD 400
      5 FOX RIVER NRDAPCB RELEASESProposed to be added to the NPL 1 Little Lake Butte des Morts 2004-2009 372 (Act) Yes 114 107 96 PCBs Sediment 1 025 (SWAC)
      2 Appleton to Little Rapids MNR RemedyROD Date 122002 3 (Est) Yes 273 (Est) 20 river miles 136 (Est) 390 (2005 ROD Amendment) Sediment
      3 Little Rapids to De Pere 42009 - ongoing 227 (Est) Sediment 1 SWAC 028
      Fish (Walleye) 005
      Lower Fox River Cleanup Website 4 De Pere to Green Bay 2007 - ongoing 3216 (Est) Sediment 1 SWAC 025
      Fish (Walleye) 005
      5 Green Bay MNR RemedyROD Date 62003 Approx 2700 sq miles Sediment 1
      701(2010 ESD)
      5 KERR-MCGEE (KRESS CREEKWEST BRANCH OF DUPAGE RIVER) 0 Kress Creek Site Summer 2005 - 2012 43 (Est) Yes $719 (Total) 128 RADIUM 226 Sediment 72 picoCuries per gram (pCig) combined radium
      Region 5 Kerr-McGee Website 129 (Act) RADIUM 228
      5 LITTLE MISSISSINEWA RIVERNot on the NPL - Other Cleanup Activity Private Party-Lead Cleanup 0 Little Mississinewa River Spring 2005 - Fall 2009 57 (Est)100000 tons (Act) Yes 25 miles (Est) 27 20 PCBs Sediment 4 (0-1ft) 5 (deeper than 1ft) 1 (0-1ft)5 (deeper than 1ft)
      Little Mississinewa River(Region 5 Website) Fish Unknown
      5 OUTBOARD MARINE CORP 1 North Ditch(1984 ROD amp1989 ROD Amendment) -- Subject to 2007 ROD Amendment See below 71992 to 91992 55 (Est) Yes 074 PCBs Sediment Unknown
      Upper HarborSlip No 3(1984 ROD) --- Subject to 2009 ROD Amendment see below 1991-1992 523 (EST)30 (ACT) 131 50 (upper harbor)
      OUTBOARD MARINE CORP (Region 5 Website) 4 formerly 1 OMC Plant 2 North and South DitchROD Date August 20072012 ROD Amendment 2010-2012 40 (soil and sediment) (Est) Yes 73 PCBs Sediment 1
      PAHs 2
      1 HarborSlip No 3(2009 ROD Amendment) 2012-2013 195 (Est) Yes 349 PCBs Fish (Sport) 003 - 01
      Sediment 1 02 (SWAC)
      5 SANGAMO ELECTRIC DUMPCRAB ORCHARD NATIONAL WILDLIFE REFUGE (USDOI) 2 Area 9 -- Lake Embayment 1295 - 0697 36 (Est) Yes PCBs Sediment 05
      54 (Act)
      5 SHEBOYGAN HARBOR amp RIVER 1 Lower River and Inner Harbor Completed in 2012 53 (ROD)51 (ESD) Yes (ROD) 12 PCBs Sediment 26 05
      51 (ACT) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Region 5 Sheboygan River and Harbor Superfund Site Website Middle River Remedy not yet startedAOC dateFebruary 2009 7 miles 2 Sediment 26 05
      Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      Upper River Sept 2004 - October 2007 21 (Est) 31 Sediment None (88 mass removal of PCB) 05
      21 (Act) Fish (Smallmouth bass Walleye Trout Carp Catfish) 031 063 009 258 253
      5 Torch Lake 2 Surface Waters ROD DateMarch 311994 No Action Copper
      NPL DeletionFeb 5 2002
      5 VELSICOL CHEMICAL CORP (MICHIGAN) 2 Pine RiverSt Louis Impoundment 1999 - 2005 640 (Act) Yes Unknown area(2 ft compacted clay) $60 (Total) $30 (as of 2002) DDT Carp Smallmouth Bass 1708
      Region 5 Velsicol Chemial Website 260 (ROD) Sediment 5 15
      Pine RiverTCRA Aug 1998 - Oct 1999 30 (Act) 3000
      6 ALCOA (POINT COMFORT)LAVACA BAY 1 Natural Recovery Areas 122001 - ongoing Area not specified 161 MERCURY Sediment Hg 025 Marsh 05 Open Water
      North of Dredge Island NA Actual ROD PAHs 448 Total
      Witco Channel Dec 2001 - Jan 2002 200 (Est)166 (Act) PAHs
      Witco Marsh 12006 - 42006 57
      Chlor-Alkali Process Area (Treatability Study) August 1998 (Phase I)January 1999 (Phase II) 80 (Act) 1952 MERCURY Mass removal
      6 BAILEY WASTE DISPOSAL 1 North Marsh Area January 1996 - September 1996 6 (EST) Unknown Sediment None
      20 (tar and sediment) (Act)
      Deleted from NPL 10152007
      6 BAYOU BONFOUCA 1 Bayou Sediments 111993 - 7281995 47 (ROD Est)150 (ESD Est)170 (Act) Yes 226 PAHs Sediment 1300
      8 MILLTOWN RESERVOIR SEDIMENTS 1 Milltown Reservoir Sediments Remediation completed Dec 2010 2600 (Est) Yes Channel realignment and construction 140 ARSENICCADMIUMCOPPERLEADZINC Sediment None
      Region 8 Milltown Reservoir Sediments Website 2560 (Act)
      8 ROCKY MOUNTAIN ARSENAL (USARMY) 3 Lake Sediments Remediation Project June 1999 - Aug 1999 19 (Est) Yes (Est) Area not specified 39 ALDRIN Sediment 38
      33 (Act) No (Act) DIELDRIN 37
      CHLORDANE 12
      ROCKY MOUNTAIN ARSENAL (Region 8 Website) DDE None
      DDT 14
      ROCKY MOUNTAIN ARSENAL (US Army Website) MERCURY 82
      ARSENIC 270
      8 SHARON STEEL CORP (MIDVALE TAILINGS) 1 Marshy Area Aug 1996 - Sept 1996 436 (Est) Yes (elevation raised above water line) 047 ARSENIC Sediment 70
      Deleted from NPL 9242004 100 (Act) LEAD 500
      CADMIUM None
      8 SILVER BOW CREEKBUTTE AREA 1 Streamside Tailing (Silver Bow Creek) July 1999 - Ongoing 73 (ROD Est) Yes Channel realignment and construction (176 miles) $44 (ROD)$98 (ESD) ARSENIC Sediment None 200 979
      CADMIUM 20 099
      COPPER 1000 316
      SILVER BOW CREEKBUTTE AREA (EPA Region 8 Website) LEAD 1000 358
      ZINC 1000 None
      SILVER BOW CREEKBUTTE AREA (MT STATE Website) Sediment Trap MERCURY 10 018
      9 IRON MOUNTAIN MINE 5 Spring Creek Arm 2008-20011 200 (Est) 15 area not specified 186 ARSENIC Sediment Sediment susceptible to erosion dredged to a specific elevation None
      ROD dateSeptember 2004 COPPER
      Region 9 Iron Mountain Mine Website IRON
      9 MCCORMICK amp BAXTER CREOSOTING CO 3 Old Mormon Slough 2006 88 (Est) area not specified 35 DIOXIN Sediment 000021 TEQ 0000021 TEQ
      Region 9 Website McCormick and Baxter Creosoting 88 (Act) PAHs 333 (OC) 333 (OC)
      9 MOFFETT NAVAL AIR STATION 8 Site 27 - Northern Channel completed in 12007 656 (soil and sediment) (Est) Yes 68 TOTAL PCBs Sediment 035 035
      TOTAL DDT 00648 00648
      TOTAL CHLORDANE 0931 0931
      CADMIUM 184 184
      Naval Air Station Moffett Field Website LEAD 173 173
      MERCURY 152 152
      SELENIUM 0926 0926
      SILVER 137 137
      ZINC 720 720
      9 MONTROSE CHEMICAL CORP 5 Palos Verde Shelf Interim ROD Date September 2009 300 Area not specified DDT Sediment 46 (OC) interim23 (OC) Final
      White Croaker 04
      Water 022 ngL
      Palos Verdes Shelf (Region 9 Website) PCBs Sediment 7 (OC)
      White Croaker 007
      Water 0064 ngL
      9 UNITED HECKATHORN CO 1 Lauritzen Channel and Parr Canal 871996 - 3311997 107 (Act)65 (Proj) Yes 7 DDT Sediment dredge all soft sediments 059 (average)
      Region 9 United Heckathorn Co Website
      10 Bunker Hill Mining and Metallurgical 3 Upper Basin ROD Amendment date Aug 2012 Not specified Arsenic Sediment
      Cadmium
      Runker Hill Mining and Metallurgical (Regional Website) Copper
      Lead 530
      Mercury
      Silver
      Zinc
      10 COMMENCEMENT BAY NEAR SHORETIDE FLATSPartial deletion (St Paul Waterway) 1996 1 Olympic View Resource Area (NTCRA) Completed in 102002 11500 tons (Act) 1 (Act) DIOXINSFURANS Sediment 000002 TEQ 000002 TEQ
      COMMENCEMENT BAY NEAR SHORETIDE FLATS (Region Website) 19 ASARCO Sediments Nov 2006 to ongoing 50 (Est) 20 (Est) 174 ARSENIC Sediment preponderance of evidence approach 93
      10 (Act) COPPER 390
      LEAD 450
      ZINC 410
      1 St Paul Waterway 71988 - 91988 17 (Act) 4-METHYL-PHENOL Sediment 13 067
      1 Sitcum Waterway completed in 1994 428 (Act) 45 (Act) 4 ARSENIC Sediment 160 57
      COPPER 1100 390
      1 Hylebos Waterway 32003-22005 940 11 20 46 ARSENIC Sediment 97 57
      HEX-CB 01 0022
      HPAHs 32 17
      PCBs 045 03
      Occidental Site Removal Action (NTCRA) completed March 2003 36 (Act) 10 PCE Sediment 0057
      1 Thea Foss and Wheeler-Osgood Waterways 2002-2006 423 (Act) 32 (Est) 21 (Est) 4 (Est) 60 82 CADMIUM Sediment 66 51
      HPAHs 22 17
      LEAD 580 450
      MERCURY 077 059
      ZINC 490 410
      1 Middle Waterway 72003 - 12005 111 (Act) 32 (Act) Yes 22 (Act) 05 (Act) 87 (Act) 125 COPPER Sediment 470 390
      MERCURY 071 059
      LPAHs None 52
      HPAHs None 17
      10 HARBOR ISLAND (LEAD) 7 Lockheed Sediments 7703 - 2405 18 cy (Est) 5 (Act) 12 (Act) In dredge areas $15(ROD) $12(ESD) 20 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      70 (Act) COPPER 390 (Dredge and Cap) 390
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      LEAD 530 (Dredge) 450 (Cap) 450
      LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      MERCURY 059 (Dredge) 041 (Cap) 041
      Region 10 Harbor Island (Lead) Web Site PCBs 65(OC) (Dredge) 12(OC) (Cap) 12 (OC)
      ZINC 960 (Dredge) 410 (Cap) 410
      TBT Not available Not available
      9 Todd Shipyard Sediments 7604 - 22007 5 (Act)(223235 sq ft) Yes In dredge areas No area given $45-$69 21 ARSENIC Sediment 93 (Dredge) 57 (Cap) 57
      COPPER 390 (Dredge and Cap) 390
      LEAD 530 (Dredge) 450 (Cap) 450
      MERCURY 059 (Dredge) 041 (Cap) 041
      116 (Est) ZINC 960 (Dredge) 410 (Cap) 410
      220 (Act) LPAHs 780(OC) (Dredge) 370(OC) (Cap) 370 (OC)
      HPAHs 5300(OC) (Dredge) 960(OC) (Cap) 960 (OC)
      PCBs 65 (OC) (Dredge)12(OC) (Cap) 12 (OC)
      TBT Not available not available
      10 East Waterway Sediments NTCRA 11204 - 31605 (removal action)No ROD completed for this OU 206 (Act) - Removal action 13 (Act) In dredge area 17 16 MERCURY Sediment 041
      PCBs 12 (OC)
      10 KETCHIKAN PULP COMPANY 2 Marine Sediments (Ward Cove) 112100 - 22401 205 (Est) 87 (Act) Yes 50 (Est) 52 (Act) 21 (Est) 27(Act) 44 31 4-METHYL-PHENOL Sediment 17 Not Stated Benthic toxicity community structure and chemistry
      Not on the NPL - Superfund Alternative Sited AMMONIA 120
      Region 10 Ketchikan Pulp Company Web Site SULFIDE None
      10 LOCKHEED WEST SEATTLE 1 Lockheed West ROD Date August 2013 167 potential use in shallow areas yes 116 DredgeEMNR 477 PCB Sediment Washington State CSL or SQS 0002
      Arsenic 7
      Lead 11
      Copper 114
      Lockheed West Seattle (Region 10 Website) Mercury 041 (subtidal)017 (intertidal)
      284 EMNR only Carcinogenic PAHs (TEQ) 0009
      TBT 043 (subtidal)2 (intertidal)
      DioxinsFurans 0000002
      Multiple Others see attached
      10 MCCORMICK amp BAXTER CREOSOTING CO (PORTLAND PLANT) 4 Sediments 72004-92005 23 (Act)organoclay 23 12 ARSENIC Sediment 12
      Region 10 McCormick and Baxter Creosoting DIOXINSFURANS 000008
      ORDEQ McCormick amp Baxter Creosoting Co Web Site 15 (Est) PAHs 2
      PCP 100
      Arsenic (III) Water 190 μgL
      Chromium (III) 210 μgL
      Copper 12 μgL
      Zinc 110 μgL
      PCP 13 μgL
      Acenaphthene 520 μgL
      Fluoranthene 54 μgL
      Naphthalene 620 μgL
      Total cPAHs 031 μgL
      Dioxinsfurans 1x10-5 ngL
      10 OLD NAVY DUMPMANCHESTER LABORATORY (USEPANOAA) 1 Clam Bay Sediments 61999 - 102001 7-10 (Est) Yes Area not specified 5 46 71 PCBs Sediment 013 004
      COPPER 390
      LEAD 450
      ZINC 410
      10 (Act) SILVER 61
      2 4-DIMETHYL-PHENOL 0029
      PCBs Shellfish (intertidal clams) 0042
      10 PACIFIC SOUND RESOURCES 2 Marine Sediments 92003 - 22005 35 (Est) 50 (Est) 49 15 LMWPAHs Sediment 780(OC) 370(OC)
      58 (Act) HMWPAHs 5300(OC) 960(OC)
      98 (Act) Capped dredge areas PCBs 12 (OC) (trigger for sediments to 10 feet depth) 12 (OC)
      10 PUGET SOUND NAVAL SHIPYARD COMPLEX 2 OUB Marine 61600 - 3104 200 (Est) 5 211 9 12 PCBs Fish (English sole) 0023 ww
      Sediment 12 (OC) dredgecap 6 (OC) EMNR 3 (OC) SWAC12 (OC)) SWAC
      225 (Act) Sediment in state owned adjacent lands 9 (OC) EMNR
      MERCURY Sediment 3 where PCBs greater than 6 (OC)
      10 ST MARIES CREOSOTE - proposed to be added to the NPL 0 Shoreline Nearshore and Offshore Sediment ROD dateJuly 2007 29 (Est) Yes 108 LPAHs Sediment 370(OC) (52 if TOC lt02 or gt4)(toxiicty test opt-out)
      St Maries Creosote (Regional Website) Remediation Ongoing HPAHs 960 (OC) (17 if TOC lt02or gt4)
      10 WYCKOFF COEAGLE HARBOR 1 East HarborPhase 1 - NTCRA 91993 -31994 (Phase 1) 54 (Act) 117 MERCURY Sediment (toxicity test opt-out)
      LPAHs 780 (OC)
      Region 10 Wyckoff Eagle Harbor Web Site HPAHs 5300 (OC)
      East HarborWest Beach Sediments 2007-2008 48 (Act) 23 MERCURY Sediment 059 subtidal 059
      LPAHs 780 (OC) subtidal 780 (OC)
      HPAHs 5300 (OC) subtidal 5300 (OC)
      East HarborIntertidal and Subtidal Sediments 2000-2002 30(Act) $6-20 MERCURY Sediment 059 059
      LPAHs 780 (OC) 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      3 West Harbor 31997 - 121997 13-92 (Est) Yes 12 - 31 (includes EMNR) 49 see cap $62 - $16 MERCURY Sediment 5 21059 059 (dw)
      LPAHs 780 (OC)
      HPAHs 12 dw intertidal 5300 (OC)
      71
Page 10: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 11: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 12: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 13: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 14: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 15: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 16: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 17: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 18: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 19: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 20: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 21: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 22: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"
Page 23: PRINCIPLES FOR MANAGING CONTAMINATED SEDIMENT RISKS AT HAZARDOUS … · 2020. 12. 6. · The 2002 memo "Principles for Managing Contaminated Sediment Risks at Hazardous Waste Sites"