presented by : ameer riad khalaf supervisor: miss.rawan al- hadad
DESCRIPTION
presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad. presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad. Rotterdam market hall. The continents : 1) Introduction . 2) General description. 3) foundation. 4)structure description . 6) What’s new. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/1.jpg)
presented by :Ameer Riad Khalaf
Supervisor:Miss.Rawan Al-Hadad
presented by :Ameer Riad Khalaf
Supervisor:Miss.Rawan Al-Hadad
![Page 2: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/2.jpg)
Rotterdam market hall
![Page 3: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/3.jpg)
The continents:1) Introduction.2) General description. 3) foundation. 4)structure description.6) What’s new.
![Page 4: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/4.jpg)
Introduction:
The city: Rotterdam
The designer :MVRDV
The developer:DHV B.V
![Page 5: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/5.jpg)
2) General description:40*70*117256 Million $
100.000 m2
![Page 6: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/6.jpg)
more Than 200 apartments
![Page 7: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/7.jpg)
(LCD )screen
![Page 8: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/8.jpg)
The balconies.
![Page 9: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/9.jpg)
Soil formation
Approximately 70 m
![Page 10: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/10.jpg)
• Pile driving • 27 m for the pressure
piles {560 mm diameter}• 29 m for the tension piles
{710 mm diameter}
•pressure force reach 3000 KN - 4000 KN
•tension force 750 KN
![Page 11: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/11.jpg)
prevent groundwater to enter the excavation
![Page 12: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/12.jpg)
CASTING THE BOTTOM OF EXCAVATION
1.35
![Page 13: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/13.jpg)
DURING PUMPING THE WATER OUT
![Page 14: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/14.jpg)
![Page 15: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/15.jpg)
![Page 16: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/16.jpg)
Structure description
![Page 17: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/17.jpg)
natural resistance
to wind loads• Walls thickness 25cm
• Slabs thickness 27 cm35 m/s
2.5 KN/M2
![Page 18: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/18.jpg)
prestressed hollow concrete
![Page 19: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/19.jpg)
Glass facades
Area of 45 by 35 supported by cables 28 mm in diameter.
![Page 20: presented by : Ameer Riad Khalaf Supervisor: Miss.Rawan Al- Hadad](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813291550346895d992769/html5/thumbnails/20.jpg)
What is new?• 1) the arch• 2) deepest excavation.• 3) LCD screen • 4) suspended glass.