presentation to ncaupg/oapc€¦ · from ntp date. corrective and preventive actions. corrective...

42
Presentation to NCAUPG/OAPC

Upload: others

Post on 18-Jan-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Presentation toNCAUPG/OAPC

Page 2: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Industry Objectives

• Ensure best quality pavements

• Assisting with QC/QA processes

• Improve the durability asphalt pavements

Page 3: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Currently

• Managing for pay

– Driven by current acceptance method

• Not focused on process capability

Page 4: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

PASIN-Quality Management System

• Managing for quality

• Process capability

• Process improvement

Page 5: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

PASIN Participants

– Pennsylvania Department of Transportation

– Federal Highway Administration

– Pennsylvania Asphalt Pavement Association

– American Council of Engineering Companies

– PA Aggregate and Concrete Association

– AASHTO Materials Reference Laboratory

– Pennsylvania Turnpike Commission

– NECEPT

Page 6: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

PASIN Implementation

1. Saywhat

you do

1. Saywhat

you do

2. Dowhat

you say

2. Dowhat

you say

3.Prove it

3.Prove it

4.Improve

it

4.Improve

it

Page 7: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

PASIN QMS Elements

• Management review• Customer focus• Corrective and preventive actions• Control of non-conforming product• Control of documents• Control of records• Internal audits• External audits

Page 8: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

PASIN Quality Manual

Page 9: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Activities to Date

• Baseline Assessment

• Conducted five pilot projects

‒ First round - a struggle

‒ PASIN implementation templates

‒ Warranty link

Page 10: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

AARs

• Increased profits

• Improvement in quality

• Senior management involvement

• Customer focus

• Corrective actions

Page 11: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Vision

• Quality Management System principles

• Standard operating procedures

• Culture change

‒ Unplanned - results unpredictable

‒ Planned - desired results

Page 12: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Culture Change - PennDOT

Limited

Involvement

QA Staff-QC PlanReview

District Staff-QCPlan Review

QA – ExternalAudits

Inspector-Contractor Audits

Page 13: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Best Practices ~ FMEA

• Failure Mode and Effect Analysis

– Failure causes

– Effects analysis

• Derived by PASIN Core Team

• Refined by industry work groups

Page 14: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Best Practices

“Techniques, methodologies, processes

or procedures that through experience

and research, have proven to reliably

lead to performance results recognized

as exceeding those achieved by most

organizations.”

Page 15: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Best Practices ~ Plant

Results in…”asphalt pavement that is: Consistent in quality Maximizes durability”

Total - 74

New Best Practices

Page 16: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Best Practices ~ Laydown

• Improve laydown quality control

• Total - 42

• New Best Practices

Page 17: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Best Practices ~ Implementation Plan

HMA PASIN Implementation Plan

Hot Mix Asphalt

PASIN Implementation Plan

Project Name and Number

Submitted by: Date: ___2008

Organization Name

Hot Mix Asphalt

Implementation Plan

Contractor

Submitted by

and date

PASIN Team

Approved by

and Date

CONTRACTOR’S

LOGO

Page 18: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

PASIN Implementation

1. Saywhat

you do

1. Saywhat

you do

2. Dowhat

you say

2. Dowhat

you say

3.Prove it

3.Prove it

4.Improve

it

4.Improve

it

Page 19: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

PASIN Implementation

PASIN Support:

Quality Manager Management Plant personnel Paving personnel PASIN Implementation Team External certified auditors

Page 20: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Implementation Plan

Company Management Team

Management

Production personnel

Paving personnel

Page 21: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Implementation Plan

Company Best Practices Support:

Develop/modify processes to meetpilot requirements

Develop and/or use required forms toassess process effectiveness

Support training by Quality Manager

Provide implementation information forinternal and PASIN external auditors

Page 22: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Implementation Plan

Contractor Internal Audit Team

Manage internal auditso schedule, implement audits and

keep records

Publish audit report

Communicate results of auditso company senior management

Page 23: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

PASIN Implementation

PASIN Implementation Team:

PennDOTo ADEo Bureau of Construction and Materialso Others

PA Asphalt Pavement Association

Consultants

Page 24: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

ManagementReview

Page 25: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

(Source: PASIN Quality Manual – Section 5)(Source: PASIN Quality Manual – Section 5)

Management Review

Management Commitment:

Monitor motoring public satisfaction Control QMS processes and products Maintain and improve QMS

Page 26: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

(Source: PASIN Quality Manual – Section 5)(Source: PASIN Quality Manual – Section 5)

Management Review (cont.)

Management Actions:

Establish a quality policy andmeasurable goals

Ensure availability of resources

Conduct periodic management reviews

Communicate importance of satisfyingcustomers’ needs

Page 27: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

(Source: PASIN Quality Manual – Section 5)(Source: PASIN Quality Manual – Section 5)

Management Review (cont.)

PASIN Quality Policy:

“We will satisfy those we serve by consistently

designing, constructing and maintaining durable, highquality asphalt highways through the use of processes

that have minimum adverse effect on surroundingcommunities and are continuously improved.”

Page 28: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

(Source: HMA Plan Implementation Template)(Source: HMA Plan Implementation Template)

Management Review (cont.)

Standard Agenda:

Quality goals Production goals Scheduling Resources QC test results Acceptance test results Audits Customer complaints Non-conformances Corrective and preventive actions

Page 29: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

(Source: HMA Plan Implementation Template)(Source: HMA Plan Implementation Template)

Management Review (cont.)

Introduction Methodology

Quality Policy Quality Objectives Management Review Team Members Standard Management Review Agenda

Implementation Plan

Action Item Responsibility Timeframefrom NTP Date

Page 30: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

InternalAudits

Page 31: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

(Source: PASIN Quality Manual - Section 8)(Source: PASIN Quality Manual - Section 8)

Internal Audits

Internal audit plan

Auditors from the company

Coaching from the PASIN team

Internal Audit Report

Page 32: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Internal AuditsInternal Audits(Source: PASIN Quality Manual - Section 8)(Source: PASIN Quality Manual - Section 8)

Has the process been planned?

Is the process carried out according to plan?

Are the planned results being achieved?

Page 33: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Internal AuditsInternal Audits(Source: PASIN Quality Manual - Section 8)(Source: PASIN Quality Manual - Section 8)

Are opportunities for improvementbeing identified and implemented?

o By correcting non-conformitieso By identifying root causes of problems and

implementing corrective actiono By identifying trends and the need for

preventive actiono By innovation

Page 34: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Internal AuditsInternal Audits(Source: PASIN Quality Manual - Section 8)(Source: PASIN Quality Manual - Section 8)

Introduction Methodology

Auditor Qualification Auditor Training, Approved Auditors Audit Plan Audit Schedule

Implementation Plan

Action Item Responsibility Timeframefrom NTP Date

Page 35: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Corrective andPreventive

Actions

Page 36: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Corrective and Preventive ActionsCorrective and Preventive Actions(Source: PASIN Quality Manual - Section 8)(Source: PASIN Quality Manual - Section 8)

Problems or potential problems

o Identifyo Recordo Analyzeo Resolveo Prevent

Page 37: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Corrective and Preventive ActionsCorrective and Preventive Actions(Source: PASIN Quality Manual - Section 8)(Source: PASIN Quality Manual - Section 8)

Action:

o Establish a Corrective & PreventiveAction Reporting System thatspecifies the use of a formalizedproblem solving approach of adegree appropriate to themagnitude of the problem.

Page 38: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Corrective and Preventive ActionsCorrective and Preventive Actions(Source: PASIN Quality Manual - Section 8)(Source: PASIN Quality Manual - Section 8)

Introduction Methodology (Root Cause Analysis)

Corrective Actions Preventive Actions Closure Tracking and Verification

Implementation Plan

Action Item Responsibility Timeframefrom NTP Date

Page 39: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Internal AuditsInternal Audits(Source: PASIN Quality Manual - Section 8)(Source: PASIN Quality Manual - Section 8)

Example Audit Plano Scope

o Organize the audit team

o Determining the starting and endingpoints of the audit (Process Flow Diagram)

o Review company documentation

o Develop and Approve audit checklists

o Schedule audit

o Complete audit reports

Page 40: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Most ImportantMost Important

Management Review

Internal Audits

Page 41: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Key for SuccessKey for Success

Every employee involvedknows what they areresponsible for as well as

what everyone else isresponsible for.

Page 42: Presentation to NCAUPG/OAPC€¦ · from NTP Date. Corrective and Preventive Actions. Corrective and Preventive Actions (Source: PASIN Quality Manual - Section 8)

Questions?