Company Profile
Kuantum Papers is in the business of production and marketing of writing & printing paper, while conserving precious resources & protecting the environment.The mill was established in 1979-80, in a village - SailaKhurd, in District Hoshiarpur, in the state of Punjab, India, with an aim to utilize wild Agro vegetations like Sarkanda Grass and Kahi Grass, and Agro-residues such as Wheat straw and Bagasse, to make writing and printing grades of paper. These Agro vegetations were at the time being burnt in the fields, leading to environmental pollution. Thus by creating an application for their use, we helped reduce environmental degradation substantially. It has now reached a level of 120000 TPA in paper production. The company employs approximately 1400 people, and the annual sales turnover touches Rs. 7000 million .
Plant Equipment Details:-
Utility Details
Boiler Section Power Section
Boiler-02 26 TPH 35 Kg/cm2 TG-02 5 MW Condensate
Boiler-03 26 TPH 35 Kg/cm2 TG-03 1.12 MW Back Pressure
Boiler-04 60 TPH 67 Kg/cm2 TG-04 10 MW Back Pressure
Chemical Recovery Boiler
21 TPH 67 Kg/cm2 Grid S/S Supply at 66 KV
10.5 MVA
Pulp Mill Details
Agro Section Hardwood Section
Agro Street 160 TPD Hard Wood 60 TPD
Paper Machines Other Sections
Paper Machine-01 25 TPD Effulent Tratment Plant 20000m3/day
Paper Machine-02 30 TPDChemical Recovery Plant
200 TPD
Paper Machine-03 100 TPD Lime Kiln Plant 40 TPD
Paper Machine-04 250 TPD Fluidized Bed Reactor 85 TPD
Plant Equipment Details:-
Achievement:- In Terms of Savings
ENERGY CONSERVATION PROJECTS DURING 2014-2015
SR.
NOPROJECT AREA
POWER CONSUMPTION (KW) SAVING IN SAVING IN
REMARKSBEFORE
MODIFICATION
AFTER
MODIFICATION
KWH (PER
ANNUM)
Rs.
MILLIONS
1 PCC PUMP PM # 4 709 518 1512720 10.6 Pump Impeller Trimmed.
2BSW#0 VAT DILUTION
PUMP
PULP
MILL56.2 45 88704 0.6
100HP Motor Replaced With 75HP
Motor & New Energy Efficient Pump Installed.
3BSW#1 VAT DILUTION
PUMP
PULP
MILL54.4 44 82368 0.6
100HP Motor Replaced With 75HP
Motor & New Energy Efficient Pump Installed.
4BSW#2 VAT DILUTION
PUMP
PULP
MILL52.5 37 122760 0.9
100HP Motor Replaced With 75HP
Motor & New Energy Efficient Pump Installed.
5BSW#3 VAT DILUTION
PUMP
PULP
MILL52 37 118800 0.8
100HP Motor Replaced With 75HP
Motor & New Energy Efficient
Pump Installed.
6DECKER WASHER
CLEANING SHOWER
PULP
MILL21.9 10 94248 0.7
40HP Motor Replaced With 20 HP
Motor & New Energy Efficient Pump Installed.
Cont… In Terms of Savings
ENERGY CONSERVATION PROJECTS DURING 2014-2015
SR.
NO.PROJECT AREA
POWER CONSUMPTION (KW) SAVING IN SAVING IN
REMARKSBEFORE
MODIFICATION
AFTER
MODIFICATION
KWH (PER
ANNUM)
Rs.
MILLIONS
7ALKALI WASHER
CLEANING SHOWERPULP MILL 21 9 95040 0.7
40HP Motor Replaced With 15 HP Motor &
New Energy Efficient Pump Installed.
8HYPO SUPPLY PUMP
(AGRO)PULP MILL 6.5 3.5 23760 0.2
15HP Motor Replaced With 7.5 HP Motor &
New Energy Efficient Pump Installed.
9HYPO SUPPLY PUMP
(HARDWOOD)PULP MILL 7 3.5 27720 0.2
15HP Motor Replaced With 7.5 HP Motor &
New Energy Efficient Pump Installed.
10 FEED WATER PUMPPOWER
HOUSE285 221 506880 3.5 VFD Installed
11 VACUUM PUMP NO.1 PM # 3 138 104 269280 1.9220HP Motor Replaced With 150 HP Motor
& New Energy Efficient Pump Installed.
12 VACUUM PUMP NO.2 PM # 3 131 122 71280 0.5220HP Motor Replaced With 180 HP Motor
& New Energy Efficient Pump Installed.
Achievement:- In Terms of Savings
ENERGY CONSERVATION PROJECTS DURING 2015-16
Sr.
No.PROJECT Area
POWER CONSUMPTION (KW)SAVING
INSAVING
RS.millionsREMARKS
BEFORE
MODIFICATION
AFTER
MODIFICATION
KWH
(PER
ANNUM)
1 H2 TOWER AGT. PULPMILL 21.0 16.0 39600 0.2850HP/960RPM MOTOR REPLACED
WITH 40HP/960RPM MOTOR
2 H1 TOWER AGT. PULPMILL 19.0 12.0 55440 0.3950HP/960RPM MOTOR REPLACED
WITH 30HP/960RPM MOTOR
3 WASH WATER PUMP PULPMILL 84.0 68.0 126720 0.89 VFD INSTALLED
4 WHITE LIQUOR PUMP CD PULPMILL 38.0 20.0 142560 1.00 VFD INSTALLED
5 CBD BLACK LIQ. PUMP PULPMILL 74.0 54.0 158400 1.11 VFD INSTALLED
6 MC PUMP PULPMILL 41.0 37.0 31680 0.22 VFD INSTALLED
7 MC PUMP PULPMILL 38.0 25.0 102960 0.72 VFD INSTALLED
8 DILUTION PUMP PM#3 38.0 19.0 150480 1.0575HP/1440RPM MOTOR REPLACED
WITH 50HP/960RPM MOTOR
9 CHEST NO.40 PUMP PM#3 18.5 13.0 43560 0.3030HP/1440RPM MOTOR REPLACED
WITH 20HP/1440RPM MOTOR
10 CHEST NO.38 PUMP PM#3 12.0 8.0 31680 0.2225HP/1440RPM MOTOR REPLACED
WITH 15HP/1440RPM MOTOR
11 CHEST NO.39 PUMP PM#3 11.5 10.0 11880 0.0825HP/1440RPM MOTOR REPLACED
WITH 20HP/1440RPM MOTOR
12 BOOSTER PUMP PM#3 86.0 31.0 435600 3.05 VFD INSTALLED
Cont… In Terms of Savings ENERGY CONSERVATION PROJECTS DURING 2015-16
Sr.
No.PROJECT Area
POWER CONSUMPTION (KW)SAVING
INSAVING
RS.millionsREMARKS
BEFORE
MODIFICATION
AFTER
MODIFICATION
KWH
(PER
ANNUM)
13 BOOSTER PUMP PM#3 26.0 15.0 87120 0.61 VFD INSTALLED
14 30M3 PUMP PM#3 22.0 11.1 86328 0.60 VFD INSTALLED
15 15M3 PUMP PM#3 18.5 8.8 76824 0.54 VFD INSTALLED
16 SCC PUMP PM#3 50.0 32.0 142560 1.00 VFD INSTALLED
17 TCC Pump PM#4 82.8 77.6 40988 0.29 IMPELLER TRIMMED
18 F/CHEST PUMP (CLEAR) # 60 PM#4 49.5 44.0 43180 0.30 VFD INSTALLED
19H/W REFINED (BLEND) CHEST- PUMP
PM#4 29.7 13.0 132492 0.93 VFD INSTALLED
20S/Wood REFINED CHEST-PUMP
PM#4 20.1 8.0 96037 0.67 VFD INSTALLED
21HARDWOOD SPARE CHEST -PUMP
PM#4 18.4 12.0 50694 0.35 VFD INSTALLED
22 DEFLAKER CHEST PUMP PM#4 23.0 9.0 110888 0.78 VFD INSTALLED
23 CVACUUM SEAL PIT PUMP PM#4 16.0 11.0 39600 0.28 VFD INSTALLED
24PURCHASED H/W HOLDING CHEST AGITATORT (2KV)
PM#4 68.7 13.8 435149 3.05EXISTING AGITATOR REPLACED WITH NEW TECHNOLOGY AGITATOR OF NORD MAKE
Cont… In Terms of Savings
ENERGY CONSERVATION PROJECTS DURING 2015-16
Sr.
No.PROJECT Area
POWER CONSUMPTION (KW)SAVING
INSAVING
RS.millionsREMARKS
BEFORE
MODIFICATION
AFTER
MODIFICATION
KWH
(PER
ANNUM)
25 COAL CRUSHER (BOILER # 4) POWER HOUSE 32 26 47520 0.3375HP 1440RPM MOTOR REPLACED WITH 50HP 960RPM
26 CEP PUMP POWER HOUSE 7.4 4.8 20592 0.14 VFD INSTALLED
27 FD FAN BOILER NO.3 POWER HOUSE 87 55 253440 1.77 VFD INSTALLED
28 SCFT PUMP CRP 17 4 102960 0.72 VFD INSTALLED
29 PLFT PUMP CRP 11 8.7 18216 0.13 VFD INSTALLED
30 AMT TANK TRANSFER PUMP CRP 7 2.3 37224 0.26 VFD INSTALLED
31 PCFT PUMP CRP 5 1.2 30096 0.21 VFD INSTALLED
32 COOLING TOWER PUMP CRP 95 77 142560 1 VFD INSTALLED
33GREEN LIQUOR TRANSFER PP.
CRP 6 4 15840 0.11 VFD INSTALLED
34WHITE LIQUOR TRANSFER PP.
CRP 6 4 15840 0.11 VFD INSTALLED
PROJECTS WITH “NO INVESTMENT “
PAPER MACHINE-04 PRIMARY CENTICLEANER 11 KV
DRIVEN MOTOR PUMP IMPELLER TRIMMED FOR FY 2014-15 .
Power Consumption Before Pump Impeller Trim = 709 Kw
Power Consumption After Pump Impeller Trim = 518 Kw
Power Consumption Saving Per Hours = 191 Kw
Power Consumption Saving 15,12,720 Kwh/Annum.
PAPER MACHINE-04 TERITARY CENTICLEANER PUMP
IMPELLER TRIMMED FOR FY 2015-16.
Power Consumption Before Pump Impeller Trim = 83 Kw
Power Consumption After Pump Impeller Trim = 78 Kw
Power Consumption Saving Per Hours = 5 Kw
Power Consumption Saving 40988 Kwh/Annum.
PROJECTS WITH “NO INVESTMENT “
In Terms of Kwh/MT of Finished Production
Description 2013-14 2014-15 2015-16 2016-17
Specific Electrical Energy Consumption
Kwh/MT of Finished Production
1217 1223 1198 1154
1100
1120
1140
1160
1180
1200
1220
1240
Kwh/MT of Finished
Production
2013-14 2014-15 2015-16 2016-17
12171223
1198
1154
In Terms of Mtoe /Finished Production
Description 2013-14 2014-15 2015-16 2016-17
Specific Energy
ConsumptionSec(Mtoe) 0.505 0.450 0.377 0.270
0
0.1
0.2
0.3
0.4
0.5
0.6
2013-14 2014-15 2015-16 2016-17
0.5050.450
0.377
0.270
Specific Energy Consumption Sec(Mtoe)
INNOVATIVE PROJECTS:
USES OF BIOGAS AS A FUEL IN BOILER’S FROM UPFLOW
ANAROBIC SLUDGE BLANKET.
CONVERSION FROM RICE STRAW TO ETHANOL BY
FERMENTATION (PLANT UNDER ERECTION STAGE).
BIOCLEANER TECHNOLOGY:
BIOCLEANER TECHNOLOGY:
The company has also entered into a tripartite agreement with
Department of Biotechnology, Himachal Pradesh University, Shimla
and M/s Bio Cleaner, USA for implementing IMBR (Immobilized
Microbial Bioreactor) technology for waste handling in various sectors
including Pulp & Paper, Sludge Disposal, Sewage Treatment etc.
Implementation of IMBR technology in pulp & Paper industry for
liquefaction of waste activated sludge for addressing the problem of
secondary sludge disposal with minimal power consumption and
demonstration of IMBR technology for Sewage treatment at
Municipal Corporation Shimla, are the key achievements of the
Company in this area of Environmental Research.
Team Work in ENCON:
•Steering Committee
• MD & Senior Leadership
•Guiding Panel Champions
• Technical Head
• Process Head
•Area Improvement Team• Department Heads ,
Executives and service
department members
KAIZEN SCHEME:
Kuantum Papers has achieved benefits of rupees worth 42.7 million
INR through Kaizen scheme.
Kaizen Committee has been constituted who review and implement
the Kaizens submitted by the employees.
28 teams across 8 sections in the Paper mill has been constituted
No of Kaizen Submitted is 234 in 2016-17
UTILIZATION OF MILL WASTE:
Kuantum Papers Limited also uses the mill
waste as a fuel in boilers for environment
cleaning.
WOOD CHIPS DUST.
PITH.
STRAW DUST.
Utilization of ETP sludge for board making.
Boiler Fly ash for bricks making.
Renewable Energy:
CELLULOSIC ETHANOL PROJECT:
Company has also been granted a prestigious project from BIRAC,
Department of Bio-Technology, GOI titled, “Cellulosic ethanol pilot plant
for rice straw management” worth Rs. 18.32 Crores for demonstration of
patented technology acquired by the company, to address the issue of
paddy straw burning in open fields by the farmers leading to air
pollution. This project is currently in the advanced stage of
implementation and successful demonstration of this technology will
provide a viable solution for various stakeholders including Punjab
Pollution Control Board and Govt. of Punjab, besides contributing
significantly for implementation of Ethanol Blending Programme of
Govt. of India. According to an estimate, after successful demonstration
of the technology currently implemented by Kuantum Papers Ltd,
Punjab can alone meet the demand of 10% ethanol blending requirement
of entire country by using paddy straw which is burnt in the open fields
by the farmers in the absence of any viable technology.
Renewable Energy:
BIOMETHANATION OF WET WASHING EFFLUENT:
Wet washing effluent generated during wet cleaning of agro-residues is
treated in the biomethanation plant based on Upflow Anaerobic
Sludge Blanket ( UASB Technology) for reduction in pollution load
with biogas as a byproduct. The biogas generated in the UASB reactor
is used as fuel in the FBC Boiler.
Renewable Energy:
Boimethane Generation
Description Units April -17 May -17 June- 17 July -17
Biomethane generation M³ 73039 80099 58879 73566
LP Steam consumption in Biogas Plant
MT 51 31 25 20
Rice husk savingequivalent to methane gas
MT 78.14 85.69 62.99 78.70
Rice husk saving Rs.(Lacs) 23.60 27.70 20.19 26.06