presentation iclude some projects i worked in op(1)

30
Brief report of My Experience along with photo report of some executed activities

Upload: khalafmosad

Post on 08-Feb-2016

11 views

Category:

Documents


0 download

DESCRIPTION

Presentation

TRANSCRIPT

Page 1: Presentation Iclude Some Projects i Worked in Op(1)

Brief report of My Experiencealong with photo report of some

executed activities

Page 2: Presentation Iclude Some Projects i Worked in Op(1)

AREA OF EXPERIENCE1. Oil Gas ,Petrochemical

2. Power and industrial

3. Water and wastewater treatment .

Page 3: Presentation Iclude Some Projects i Worked in Op(1)

1.LIST OF CLIENTS AND CONSULTANTSTechnip (K.T.I),Bechtel ,Siemens ,Parson ,CMI,SKODA,Halcro, Dorch,Idrosse,MWH,ADWEA,DEWA,ADSSC,ADNOC,EEA,….ETC

2. LIST OF Employers :- Kharafi National L.L.C -UAE Metito Overseas Limited -UAE ARESCO(ASEC GROUP)-EGYPT ARAB CONTRACTOR(Osman Ahmed Osman &Co.)-EGYPT ASK MORE (Environmental consultant office)-EGYPT

Page 4: Presentation Iclude Some Projects i Worked in Op(1)

Key skills Creative , innovative and Active listener – Willing to

learn and listen Strong drive to success: Goal-oriented and Results

driven Organized – Outstanding organizational skills,

Planning and organizing. Leadership, Adaptability, tolerance and Conflict

resolution and Tolerant to stressed situations. Excellent project-management skills, Communication

and networking skills.

Page 5: Presentation Iclude Some Projects i Worked in Op(1)

An experienced team leader with the ability toinitiate/manage cross-functional teams and multi-disciplinary projects. Critical thinking, decision making and problem

solving skills. Excellence Personal Communication skills,

Influencing, leading, negotiating and delegatingabilities. Effective budgeting and cost management ,Excellent

commercial, Admin , procurement and contractmanagement of projects

Page 6: Presentation Iclude Some Projects i Worked in Op(1)

Education& Qualifications :- Bachelor’s degree in Mechanical Engineering Alexandria

University , (Alexandria /Egypt) from 1993-1998 Started my career in May 1995. PMI – Certified Project Manager. Possessed technical knowledge in [oil gas, petrochemical,

water &sewage treatment and power] industries. Vast knowledge on Internet, budgeting, finance, [product

technology] and BI applications. English, Arabic and familiar with German Experience with data management tools – BAN, ERP

systems and Microsoft platform applications (MS Word,Excel, Power-point, AutoCAD 2011, MS Project, Primavera,cost control, project engineer 13).

Page 7: Presentation Iclude Some Projects i Worked in Op(1)

Accomplishments BriefConstruction of the followings :- Diesel and DM tanks (12 tanks) Boilers and stacks Hydrogen plants and natural gas pipe lines EPC Water and wastewater projects Transformers,11 kv cable ,MCC,PLC,SCADA,..etc. Ear thing ,lightening ,lighting,syetems Civil work Tanks, Building, Finish work,..etc..) Generators ,piping work(GRE,GRP , S.S, Alloy Steel,..Etc.) All Types of steel structure and accessories Cement and steel factories capital repairs ETC

Page 8: Presentation Iclude Some Projects i Worked in Op(1)

1. Oil Gas , Petrochemical,

industrial and power projects.

Page 9: Presentation Iclude Some Projects i Worked in Op(1)

List Of Executed projects1. Hydrogen generation plant Construction //Suez Oil

processing (Main Contractor Technip Group (K.T.I),Suez/Egypt.

2. Construction of the main natural gas pipe line (feeder) tothe power plant (Elkurimat power station)Egypt

3. Diesel storage tanks in El Kurimat Power station ,phaseII ,EGYPT

4. DM tanks in DEWA power station,Jebel Ali /UAE5. Elkurimat power generation plant ,combined cycle ,750

MV Phase #II construction (in Egypt-PEGASCO (Bechtel)6. (Boilers, stacks, intake, DM &Diesel tanks, steel

structure….etc.)

Page 10: Presentation Iclude Some Projects i Worked in Op(1)
Page 11: Presentation Iclude Some Projects i Worked in Op(1)
Page 12: Presentation Iclude Some Projects i Worked in Op(1)
Page 13: Presentation Iclude Some Projects i Worked in Op(1)
Page 14: Presentation Iclude Some Projects i Worked in Op(1)

Hydrogen Generation Plant ,19,000 Nm3/hMain Contractor :-K.T.I (Technip Group)

Employment :- Arab contractorPosition :-Electromechanical site Engineer

Page 15: Presentation Iclude Some Projects i Worked in Op(1)

DM Water tanks ,DEWA power station,Construction Manager

Page 16: Presentation Iclude Some Projects i Worked in Op(1)

Borg Arab stadium steel shade constructionCapacity of stadium:-80,000 shade total weight :-4,000 ton

Employment :- Arab contractorPosition :-On site Project Manager

Page 17: Presentation Iclude Some Projects i Worked in Op(1)

Borg Arab stadium steel shade constructionCapacity of stadium:-80,000 shade total weight :-4,000 ton

Employment :- Arab contractorPosition :- On site Project Manager

Page 18: Presentation Iclude Some Projects i Worked in Op(1)

Suez Canal University Sports Hall &swimming pool space frame shadeconstruction

Employment :- Arab contractorPosition:- On site Project Manager

Page 19: Presentation Iclude Some Projects i Worked in Op(1)

Suez Canal University Sports Hall &swimming pool space frame shadeconstruction

Employment :- Arab contractorPosition:- On site Project Manager

Page 20: Presentation Iclude Some Projects i Worked in Op(1)

2.Water&sewageTreatment projects

Page 21: Presentation Iclude Some Projects i Worked in Op(1)

List Of Executed projects1. Saadiyat Sewage Treatment Plant ,STP#2,45,000 m3/day –

MBR technology , EPC project, budget :- $130 M , AbuDhabi-UAE (Sewage Treatment)-present

2. YAS ISLAND Sewage treatment plant ,57,000 m3/day ,MBR technology , EPC project, budget :- budget :- ($80M) –/ Abu Dhabi/UAE)/ Sewage Treatment

3. AUGMENTATION OF DM WATER PRODUCTION ,4000m3//day, Mixed bed technology, budget :- ($40 M) (Dubai/ Jebel Ali) Water treatment

4. Riffa views STP,3600 m3/day, Extended aeration process,/ budget :- ($35 M) Bahrain - Sewage Treatment

Page 22: Presentation Iclude Some Projects i Worked in Op(1)

5. Jabeish surface water treatment, (3600m3/h) – budget :-($30 M)- Iraq, Water treatment6. Al Tawessa STP ,400 m3/day , budget :- $7 M, Al Ain/UAE-,Sewage Treatment7. El Tabeen WTP phase II construction ,3000 m3/hbudget :- $15 M , Cairo-Egypt (surface water treatment )8. Construction of five sewage pumping stations and STP,25,000 m3/day , budget :- $15 M ,Cairo-Egypt (sewagetreatment )9. Compliance action plans, environmental and wastewatertreatment projects for up to 150 factories in Egypt ,withEnvironmental consultant office

Page 23: Presentation Iclude Some Projects i Worked in Op(1)

Photo Report of someexecuted scope ofprevious list of projects

Page 24: Presentation Iclude Some Projects i Worked in Op(1)

Yas IslandSTP

Project #1:- Yas Island SewageTreatment/38,000 m3/day /ABU DHABI

Plant Metito overseas limitedPosition:- Construction Manager

Page 25: Presentation Iclude Some Projects i Worked in Op(1)
Page 26: Presentation Iclude Some Projects i Worked in Op(1)

Project :-#2 :-Sadiyaat Island Sewage TreatmentPlant II

Capacity :-45,000 m3/day future professional :-28,000 m3/day

Location :- Sadiyaat Island /Abu Dhabi/UAE

Client :- TDIC

Consultant:-PARSON/DORCH/MWH/KEO/EMIT

Employment:-Kharafi National L.L.C

Position :-Construction Manager

Page 27: Presentation Iclude Some Projects i Worked in Op(1)

Project #2:- Sadiyaat Island SewageTreatment Plant II/Abu Dhabi

Kharafi National L.L.CPosition:- Construction Manager

Page 28: Presentation Iclude Some Projects i Worked in Op(1)

Project #3:-Jebiesh Water Treatment Plantconstruction/Iraq

3000 m3/hMetito overseas limited

Position:- Project Manager

Page 29: Presentation Iclude Some Projects i Worked in Op(1)

GLS CLARRIFIER TANK

Project #4:-Riffa Views STPplant/Bahrain3600 m3/day

Metito overseas limitedPosition:-Project Manager

Page 30: Presentation Iclude Some Projects i Worked in Op(1)

project #5:-Al Tweesa Sewage Water Treatment Plant construction,200m3/h

Metito overseas limitedPosition:-project manager